Loading...
HomeMy WebLinkAboutSupplemental Materials 2026-01-21 Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108 Landscape Architecture + Land Use Planning January 21, 2026 Nicholas Gioello Associate Planner City of Eugene Planning and Development 99 W 10th Avenue Eugene, OR 97401 RE: Braewood Hills 3rd Addition Completeness Review Response (PDF 25-1 and SDR 25-2) Nick: The items below are in response to the last Completeness Review list generated by city staff. The following are the responses to the Completeness Review items. The City items are in regular typeface and my responses are in italics. COA#5: Prior to final PUD and plat approval, the applicant shall submit Private Joint Use Access and Utility Easement and Maintenance Agreement (JAM). The JAM will include a description defining the area of the private street and will also identify permitted improvements, construction expectations, rights of usage and maintenance responsibilities for the facilities in the street. The JAM will be recorded concurrent with and cross- referenced on the final plat. At the time of this review no Joint Use Access and Utility Easement and Maintenance Agreement (JAM) has been submitted for review, therefore this condition is not satisfied. See attached JAM. COA#6: Provisions for a public emergency access easement within the private street may be included in the proposed JAM which creates the private street, or alternatively, may be dedicated as a Public Emergency Access Easement on a standard City form. At the time of this review no JAM has been submitted, therefore this condition is not satisfied. See attached JAM. COA#7: Prior to final plat approval, the applicant shall dedicate a 14-foot Public Utility Easement or Public Wastewater Easement that will encumber the proposed public wastewater system. The required easement shall also be shown on revised final PUD plans. The Final PUD plans do not show a 14-foot PUE or Public Wastewater Easement to encumber the proposed public wastewater system, therefore this condition is not satisfied. You are correct. The final plans do not show a 14 foot PUE. Instead, the plans show a PUE on the entire width of the private roads which satisfies this requirement. While not specifically mentioned in the Incomplete letter dated 10.3.25, this condition of approval is still relevant. COA #15 The proposed Joint Access Easements, which are subject to City review and approval prior to recording with the final plat, shall be cross-referenced on the plat and be accompanied by a maintenance agreement for each shared driveway, which addresses the rights and responsibilities of each parcel relative to each shared driveway. Braewood Hills 3rd Addition Page 2 of 2 Completeness Review Response: (PDF 25-1 and SDR 25-2) January 21, 2026 Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108 Landscape Architecture + Land Use Planning COA#16: The location of proposed Joint Access Easements shall also be clearly shown and labeled as such on final PUD plans. All proposed Joint Access Easements are clearly shown on the final PUD plans, with the exception of the easement over Lots 4-5 & 9-10, therefore this condition is not satisfied. This easement is now labeled. COA#26: Prior to final PUD approval, the applicant shall submit updated application materials that demonstrate compliance with EC 9.6796. The updated stormwater report notes that all proposed stormwater facilities will be publicly owned, however, no public stormwater easements are proposed, therefore this condition is not satisfied. See attached revised Stormwater report. I believe this responds to all incomplete items and issues. Sincerely, Schirmer Consulting, LLC Carol Schirmer 1 – PRIVATE JOINT USE ACCESS AND UTILITY EASEMENT AND MAINTENANCE AGREEMENT After recording return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 PRIVATE JOINT USE ACCESS AND UTILITY EASEMENT AND MAINTENANCE AGREEMENT DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 1 through 38, Lot A and Lot B (each, a “Lot,” and collectively, the “Lots”), BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this Private Joint Use Access and Utility Easement and Maintenance Agreement (this “JAM”) as Reception Number 2026- ___________, Lane County Oregon Deeds and Records (the “Plat”). B. In anticipation of future separate ownership of the Lots and in compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3, and specifically to fulfill Conditions 5 and 6 of PDT 24-1 and ST 24-3), Declarant desires to provide for the improvement and shared use and maintenance of (i) Lot A, shown on the Plat as TAMBOUR LANE - PRIVATE (the “Private Street”) and (ii) any shared (which will mean for the purposes of this JAM use by more than one Lot owner) private utilities or other private facilities located in, on or under the “VARIABLE WIDTH PRIVATE UTILITY CORRIDOR” shown on the Plat within the Private Street (the “Private Facilities”). AGREEMENT 1. Permitted Improvements and Construction Expectations. Declarant will construct the Private Street and install such Private Facilities as may be necessary or desirable in Declarant’s sole discretion. Construction of the Private Street will include construction of a roadway to applicable standards for private streets. Installation of the Private Facilities will include installation of, without limitation, storm sewer facilities. Public utility facilities may be installed in, on or under the “VARIABLE WIDTH PUE” shown on the Plat within the Private Street as needed to serve the Lots. Except as expressly provided in this JAM, no party may construct any structure in the Private Street or obstruct access to the Private Street for the purposes contemplated in this JAM, except as temporarily necessary in the case of an emergency. 2 – PRIVATE JOINT USE ACCESS AND UTILITY EASEMENT AND MAINTENANCE AGREEMENT 2. Rights of Usage. Each owner of a Lot, and its tenants, contractors, agents, invitees and employees, will have and is hereby granted a perpetual non-exclusive right and easement to use the Private Street for pedestrian and vehicular ingress and egress to and from such owner’s Lot and to use the Private Facilities serving such owner’s Lot, if any. 3. Public Emergency Access Easement. Declarant grants a public emergency access easement over the Private Street for emergency vehicle access to all Lots. Any improvements required in connection with this emergency access easement are included in the definition of Private Facilities for the purposes of this JAM. 4. Maintenance Responsibilities. Declarant will convey Lot A and Lot B to the Stonehedge Homeowners’ Association (the “Association”). The Association will be responsible for the maintenance, repair and replacement of the Private Street and Private Facilities and will assess the cost of such maintenance, repair and replacement equally to the owners of Lots 1 through 38. Until Declarant conveys Lot A and Lot B to the Association, Declarant will be responsible for the maintenance, repair and replacement of the Private Street and Private Facilities at Declarant’s cost. 5. Termination. The easements and obligations contained in this JAM will terminate only upon mutual written agreement of the owners of all Lots. 6. Notices. All notices required or permitted to be given shall be in writing and shall be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the owner of the relevant property at the then-current address for such owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above shall be effective when received by the party for whom it is intended. 7. Recording. Declarant will record this JAM in the Official Records of Lane County concurrent with the Plat so it may be cross-referenced on the Plat. 8. Attorney Fees. If litigation is instituted with respect to this JAM, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 9. Binding Effect. The covenants and restrictions contained herein run with the Lots, including any future subdivision or partition of any of them. This JAM shall be binding on and inure to the benefit of the parties and their respective heirs, successors and assigns of any interest in the Lots. Declarant intends this JAM to continue and not merge and to remain appurtenant to and to benefit the Lots. 10. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 3 – PRIVATE JOINT USE ACCESS AND UTILITY EASEMENT AND MAINTENANCE AGREEMENT 11. Governing Law; Interpretation. This JAM will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this JAM to be void or unenforceable as written, the parties intend that (1) that portion of this JAM be enforced to the extent permitted by law, and (2) the balance of this JAM remain in full force and effect. 12. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this JAM must be approved by the owners of all Lots, in writing. 13. Electronic Copies. An electronic copy of the original executed JAM will be binding. [Remainder of page intentionally left blank.] 4 – PRIVATE JOINT USE ACCESS AND UTILITY EASEMENT AND MAINTENANCE AGREEMENT This Private Joint Use Access and Utility Easement and Maintenance Agreement is executed as of the Effective Date. DECLARANT: Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 1, 2, 6, 7, 11 and 12) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 1, 2, 6, 7, 11 and 12) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 1, 2, 6, 7, 11 and 12, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this Variable Width Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lots 1, 2, 6, 7, 11 and 12 shown on the Plat as VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden Lots 1, 2, 6, 7, 11 and 12 and benefit Lots 1, 2, 6 and 7. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of each of Lots 1, 2, 6, 7, 11 and 12 (each, a “Burdened Owner,” and together, the “Burdened Owners”) hereby grant to the owner of each of Lots 1, 2, 6 and 7 (each, a “Benefitted Owner” and together, the “Benefitted Owners”) a perpetual non-exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Benefitted Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere 2 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 1, 2, 6, 7, 11 and 12) with the use of the other Benefitted Owners and the Burdened Owners. The use rights of the Benefited Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Benefitted Owner or Burdened Owner (each, an “Owner” and together, the “Owners”) may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 7 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Benefitted Owners equally (1/4th per lot). The other Benefitted Owners will reimburse the Owner of Lot 7 within thirty (30) days after receipt of an invoice from the Owner of Lot 7. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 7 fails to perform any maintenance required by this Easement, any other Benefitted Owner, upon reasonable advance written notice to the other Benefitted Owners, will have the right to perform or cause to have performed said maintenance and recover the other Benefitted Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Benefitted Owners will reimburse the performing Benefitted Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 7 will maintain any Utilities shared by all of the Benefitted Owners in good condition. The cost of any maintenance will be shared by the Benefitted Owners equally in the same way as provided for Driveway maintenance above. For Utilities serving the property of more than one Benefitted Owner but fewer than all of the Benefitted Owners, the Benefitted Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Benefitted Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Benefitted Owners and share all costs equally (1/4th per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. 3 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 1, 2, 6, 7, 11 and 12) If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Burdened Owners will each pay the property taxes on the portion of the Easement Area located on such Burdened Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 1, 2, 6, 7, 11 and 12, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 1, 2, 6, 7, 11 and 12. Declarant intends this Easement to continue and not merge and to burden Lots 1, 2, 6, 7, 11 and 12 remain appurtenant to and to benefit Lots 1, 2, 6 and 7. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 4 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 1, 2, 6, 7, 11 and 12) 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 5 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 1, 2, 6, 7, 11 and 12) This Variable Width Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – 10’ WIDE PRIVATE UTILITY EASEMENT (Lots 1, 2, 6 and 7) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF 10’ WIDE PRIVATE UTILITY EASEMENT (Lots 1, 2, 6 and 7) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 1, 2, 6 and 7, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this 10’ Wide Private Utility Easement (this “Easement”) as Reception Number 2026- ___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility easement over Lots 1, 2, 6 and 7 shown on the Plat as 10’ WIDE PRIVATE UTILITY EASEMENT (the “Easement Area”) to burden and benefit Lots 1, 2, 6 and 7. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Utility Easement. The owner of each of Lots 1, 2, 6 and 7 (each, an “Owner,” and together, the “Owners”) will have and hereby grant each other a perpetual non-exclusive right and easement to install, maintain, repair and replace underground utility pipes, conduits and facilities within the Easement Area and serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere with the use of the other Owners. The use rights of the Owners include their tenants, employees, contractors, agents and invitees. 2 – 10’ WIDE PRIVATE UTILITY EASEMENT (Lots 1, 2, 6 and 7) 3. Restriction. No Owner may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. The Owner of Lot 2 will maintain, repair and replace any Utilities shared by all of the Owners in good condition. The cost of any maintenance, repair and replacement will be shared by the Owners equally (1/4th per lot). The other Owners will reimburse the Owner of Lot 2 within thirty (30) days after receipt of an invoice from the Owner of Lot 2. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 2 fails to perform any maintenance, repair or replacement required by this Easement, any other Owner, upon reasonable advance written notice to the other Owners, will have the right to perform or cause to have performed said maintenance, repair or replacement and recover the other Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Owners will reimburse the performing Owner within thirty (30) days after receipt of an invoice. If maintenance, repair or replacement of any Utilities is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance, repair or replacement at their sole cost and expense or reimburse the performing Owner in full. For Utilities serving the property of more than one Owner but fewer than all of the Owners, the Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Owners will each pay the property taxes on the portion of the Easement Area located on such Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 3 – 10’ WIDE PRIVATE UTILITY EASEMENT (Lots 1, 2, 6 and 7) 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 1, 2, 6 and 7, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 1, 2, 6 and 7. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 1, 2, 6 and 7. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 4 – 10’ WIDE PRIVATE UTILITY EASEMENT (Lots 1, 2, 6 and 7) This 10’ Wide Private Utility Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 4, 5, 9 and 10) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 4, 5, 9 and 10) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 4, 5, 9 and 10, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this Variable Width Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lots 4, 5, 9 and 10 shown on the Plat as VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden and benefit Lots 4, 5, 9 and 10. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of each of Lots 4, 5, 9 and 10 (each, an “Owner,” and together, the “Owners”) will have and hereby grant each other a perpetual non- exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere with the use of 2 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 4, 5, 9 and 10) the other Owners. The use rights of the Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Owner may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 5 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Owners equally (1/4th per lot). The other Owners will reimburse the Owner of Lot 5 within thirty (30) days after receipt of an invoice from the Owner of Lot 5. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 5 fails to perform any maintenance required by this Easement, any other Owner, upon reasonable advance written notice to the other Owners, will have the right to perform or cause to have performed said maintenance and recover the other Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Owners will reimburse the performing Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 5 will maintain any Utilities shared by all of the Owners in good condition. The cost of any maintenance will be shared by the Owners equally in the same way as provided for Driveway maintenance above. For Utilities serving the property of more than one Owner but fewer than all of the Owners, the Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Owners and share all costs equally (1/4th per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable 3 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 4, 5, 9 and 10) to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Owners will each pay the property taxes on the portion of the Easement Area located on such Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 4, 5, 9 and 10, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 4, 5, 9 and 10. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 4, 5, 9 and 10. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 4 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 4, 5, 9 and 10) 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 5 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 4, 5, 9 and 10) This Variable Width Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 9, 10, 13 and 14) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 9, 10, 13 and 14) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 9, 10, 13 and 14, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this 14’ Wide Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lots 9, 10, 13 and 14 shown on the Plat as 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden and benefit Lots 9, 10, 13 and 14. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of each of Lots 9, 10, 13 and 14 (each, an “Owner,” and together, the “Owners”) will have and hereby grant each other a perpetual non- exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere with the use of 2 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 9, 10, 13 and 14) the other Owners. The use rights of the Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Owner may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 10 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Owners equally (1/4th per lot). The other Owners will reimburse the Owner of Lot 10 within thirty (30) days after receipt of an invoice from the Owner of Lot 10. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 10 fails to perform any maintenance required by this Easement, any other Owner, upon reasonable advance written notice to the other Owners, will have the right to perform or cause to have performed said maintenance and recover the other Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Owners will reimburse the performing Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 10 will maintain any Utilities shared by all of the Owners in good condition. The cost of any maintenance will be shared by the Owners equally in the same way as provided for Driveway maintenance above. For Utilities serving the property of more than one Owner but fewer than all of the Owners, the Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Owners and share all costs equally (1/4th per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable 3 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 9, 10, 13 and 14) to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Owners will each pay the property taxes on the portion of the Easement Area located on such Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 9, 10, 13 and 14, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 9, 10, 13 and 14. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 9, 10, 13 and 14. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 4 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 9, 10, 13 and 14) 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 5 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 9, 10, 13 and 14) This 14’ Wide Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 18, 20 and 21) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 18, 20 and 21) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 18, 20 and 21, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this 14’ Wide Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lots 18, 20 and 21 shown on the Plat as 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden and benefit Lots 18, 20 and 21. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of each of Lots 18, 20 and 21 (each, an “Owner,” and together, the “Owners”) will have and hereby grant each other a perpetual non- exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere with the use of 2 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 18, 20 and 21) the other Owners. The use rights of the Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Owner may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 21 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Owners equally (1/3rd per lot). The other Owners will reimburse the Owner of Lot 21 within thirty (30) days after receipt of an invoice from the Owner of Lot 21. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 21 fails to perform any maintenance required by this Easement, any other Owner, upon reasonable advance written notice to the other Owners, will have the right to perform or cause to have performed said maintenance and recover the other Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Owners will reimburse the performing Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 21 will maintain any Utilities shared by all of the Owners in good condition. The cost of any maintenance will be shared by the Owners equally in the same way as provided for Driveway maintenance above. For Utilities serving the property of more than one Owner but fewer than all of the Owners, the Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Owners and share all costs equally (1/3rd per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable 3 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 18, 20 and 21) to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Owners will each pay the property taxes on the portion of the Easement Area located on such Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 18, 20 and 21, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 18, 20 and 21. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 18, 20 and 21. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 4 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 18, 20 and 21) 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 5 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 18, 20 and 21) This 14’ Wide Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 26, 27, 28 and 32) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 26, 27, 28 and 32) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 25, 26, 27, 28, 29 and 32, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this Variable Width Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lots 25, 27, 28 and 29 shown on the Plat as VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden Lots 25, 27, 28 and 29 and benefit Lots 26, 27, 28 and 32. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of each of Lots 25, 27, 28 and 29 (each, a “Burdened Owner,” and together, the “Burdened Owners”) hereby grant to the owner of each of Lots 26, 27, 28 and 32 (each, a “Benefitted Owner” and together, the “Benefitted Owners”) a perpetual non-exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Benefitted Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere 2 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 26, 27, 28 and 32) with the use of the other Benefitted Owners and the Burdened Owners. The use rights of the Benefitted Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Benefitted Owner or Burdened Owner (each, an “Owner” and together, the “Owners”) may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 32 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Benefitted Owners equally (1/4th per lot). The other Benefitted Owners will reimburse the Owner of Lot 32 within thirty (30) days after receipt of an invoice from the Owner of Lot 32. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 32 fails to perform any maintenance required by this Easement, any other Benefitted Owner, upon reasonable advance written notice to the other Benefitted Owners, will have the right to perform or cause to have performed said maintenance and recover the other Benefitted Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Benefitted Owners will reimburse the performing Benefitted Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 32 will maintain any Utilities shared by all of the Benefitted Owners in good condition. The cost of any maintenance will be shared by the Benefitted Owners equally in the same way as provided for Driveway maintenance above. For Utilities serving the property of more than one Benefitted Owner but fewer than all of the Benefitted Owners, the Benefitted Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Benefitted Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Benefitted Owners and share all costs equally (1/4th per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. 3 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 26, 27, 28 and 32) If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Burdened Owners will each pay the property taxes on the portion of the Easement Area located on such Burdened Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 25, 26, 27, 28, 29 and 32, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 25, 26, 27, 28, 29 and 32. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 26, 27, 28 and 32. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 4 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 26, 27, 28 and 32) 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 5 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 26, 27, 28 and 32) This Variable Width Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 30 and 31) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 30 and 31) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 30 and 31, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this 14’ Wide Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lot 30 shown on the Plat as 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden Lot 30 and benefit Lots 30 and 31. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of Lot 30 hereby grants to the owner of Lot 31 a perpetual non-exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The owner of Lot 30 and the owner of Lot 31 (each, an “Owner” and together, the “Owners”) will cooperate during periods of joint use of the Easement Area and each will use 2 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 30 and 31) this Easement in such ways so as to not unreasonably interfere with the use of the other Owner. The use rights of the Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Owner may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 31 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Owners equally (one-half per lot). The Owner of Lot 30 will reimburse the Owner of Lot 31 within thirty (30) days after receipt of an invoice from the Owner of Lot 31. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 31 fails to perform any maintenance required by this Easement, the Owner of Lot 30, upon reasonable advance written notice to the Owner of Lot 31, will have the right to perform or cause to have performed said maintenance and recover the Owner of Lot 31’s share of the reasonable and actual costs and expenses of the same. The nonperforming Owner will reimburse the performing Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 31 will maintain any Utilities shared by both of the Owners in good condition. The cost of any maintenance will be shared by the Owners equally in the same way as provided for Driveway maintenance above. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Owners and share all costs equally (one-half per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to 3 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 30 and 31) satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Owner of Lot 30 will pay the property taxes on the Easement Area. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 30 and 31, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 30 and 31. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 30 and 31. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 4 – 14’ WIDE PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 30 and 31) This 14’ Wide Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: 1 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 33, 36 and 37) After recording, return to: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 DECLARATION OF VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 33, 36 and 37) DECLARANT: Piculell Properties LLC 3104 E. Camelback Rd. #116 Phoenix, AZ 85016 EFFECTIVE DATE: ________________, 2026 RECITALS A. Declarant is the owner of certain real property commonly known as Lots 33, 36 and 37, BRAEWOOD HILLS 3RD ADDITION SUBDIVISION, as platted and recorded concurrently with this Variable Width Private Utility and Joint Access Easement (this “Easement”) as Reception Number 2026-___________, Lane County Oregon Deeds and Records (the “Plat”). B. In compliance with the conditions of City of Eugene for Braewood Hills 3rd Addition (PDT 24-1 and ST 24-3), Declarant has created on the Plat, and acknowledges and grants in this Easement, that private utility and access easement over Lots 36 and 37 shown on the Plat as VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (the “Easement Area”) to burden Lots 36 and 37 and benefit Lots 33, 36 and 37. EASEMENTS NOW, THEREFORE, for valuable consideration, the receipt and sufficiency of which is hereby acknowledged, the parties hereby agree as follows. 1. Private Joint Access Easement. The owner of each of Lots 36 and 37 (each, a “ Burdened Owner,” and together, the “Burdened Owners”) hereby grant to the owner of each of Lots 33, 36 and 37 (each, a “Benefitted Owner” and together, the “Benefitted Owners”) a perpetual non- exclusive right and easement to (i) enjoy pedestrian and vehicular ingress and egress to and from their property over the shared driveway and any sidewalk within the Easement Area (the “Driveway”) and (ii) install, maintain, repair and replace underground utility pipes, conduits and facilities serving their property exclusively or in common with others (the “Utilities”). 2. Joint Use. The Benefitted Owners will cooperate during periods of joint use of the Easement Area and each will use this Easement in such ways so as to not unreasonably interfere 2 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 33, 36 and 37) with the use of the other Benefitted Owners and the Burdened Owners. The use rights of the Benefitted Owners include their tenants, employees, contractors, agents and invitees. 3. Restriction. No Benefitted Owner or Burdened Owner (each, an “Owner” and together, the “Owners”) may construct any structure in the Easement Area or obstruct access to the Easement Area for the purposes contemplated in this Agreement, except as temporarily necessary in the case of an emergency. 4. Maintenance. 4.1 Driveway. The Owner of Lot 33 will maintain the Driveway in good condition. The cost of any maintenance will be shared by the Benefitted Owners equally (1/3rd per lot). The other Benefitted Owners will reimburse the Owner of Lot 33 within thirty (30) days after receipt of an invoice from the Owner of Lot 33. Late payments will accrue interest at nine percent (9%) per annum from the date the invoice is received. If the Owner of Lot 33 fails to perform any maintenance required by this Easement, any other Benefitted Owner, upon reasonable advance written notice to the other Benefitted Owners, will have the right to perform or cause to have performed said maintenance and recover the other Benefitted Owners’ share of the reasonable and actual costs and expenses of the same. The nonperforming Benefitted Owners will reimburse the performing Benefitted Owner within thirty (30) days after receipt of an invoice. If maintenance of the Driveway is needed due to the negligence or fault of any Owner, such Owner will promptly complete the maintenance at their sole cost and expense or reimburse the performing Owner in full. 4.2 Utilities. The Owner of Lot 33 will maintain any Utilities shared by all of the Benefitted Owners in good condition. The cost of any maintenance will be shared by the Benefitted Owners equally in the same way as provided for Driveway maintenance above. For Utilities serving the property of more than one Benefitted Owner but fewer than all of the Benefitted Owners, the Benefitted Owners of the lots served will cooperate in determining the necessity of maintenance, repair and replacement of their shared Utilities and share all costs equally. Utilities serving only one lot will be the responsibility of the Owner of the lot served, at such Owner’s sole cost and expense. 4.3 Repair and Replacement. The Benefitted Owners will cooperate in determining the necessity of repair and replacement of the Driveway and any Utilities shared by all of the Benefitted Owners and share all costs equally (1/3rd per lot). 5. Improvements and Liens. All work undertaken in the Easement Area will be done in a good and workmanlike manner and in compliance with all applicable laws. The Owner performing the work will have a temporary non-exclusive easement over a reasonable portion of the other property to the extent necessary to perform any installation, maintenance, repair and replacement within the Easement Area. The Owner performing the work will promptly repair any and all damage arising from such work so that the area affected by such work is restored to as good or better condition than it was immediately before such work. The Owner performing the work agrees to pay, when due, all sums for labor, services, materials, supplies, utilities, furnishings, machinery, or equipment that have been provided or ordered with the Owner performing the work’s consent. 3 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 33, 36 and 37) If any lien is filed against any other Owner’s property which the Owner performing the work wishes to protest, then the Owner performing the work will immediately notify the other Owner of the basis for its protest and must deposit cash with the other Owner, or procure a bond acceptable to the other Owner, in an amount sufficient to cover the cost of removing the lien from the other Owner’s property. If the Owner performing the work fails to remove the lien or furnish the cash or a bond acceptable to the other Owner within ten (10) days, the other Owner will be entitled to satisfy the lien without further notice to the Owner performing the work, and the Owner performing the work will immediately reimburse the other Owner for any sums so paid to remove any such lien. The Burdened Owners will each pay the property taxes on the portion of the Easement Area located on such Burdened Owner’s lot. 6. Indemnity. The Owners indemnify, defend and hold each other harmless from and against all claims and losses arising out of or resulting from the indemnifying Owner’s use of the Easement Area. 7. Notices. All notices required or permitted to be given will be in writing and will be deemed given and received on personal service or deposit in the United States Mail, certified or registered mail, postage prepaid, return receipt requested, addressed to the Owner of the relevant property at the then-current address for such Owner shown on the Lane County Assessor’s records. Such addresses may be changed by written notice, given in the same manner. Notice given in any manner other than the manner set forth above will be effective when received by the party for whom it is intended. 8. Recording. Declarant will promptly record this Easement in the Official Records of Lane County. 9. Attorney Fees. If litigation is instituted with respect to this Easement, the prevailing party will be entitled to recover from the losing party, in addition to all other sums and allowable costs, its reasonable attorney fees, both in preparation for and at trial and any appeal or review, such amount to be set by the court before which the matter is heard. 10. Binding Effect. The covenants, easements and restrictions contained herein run with Lots 33, 36 and 37, including any future subdivision or partition thereof. This Easement will be binding on and inure to the benefit of the Owners and their respective heirs, successors and assigns of any interest in Lots 33, 36 and 37. Declarant intends this Easement to continue and not merge and to remain appurtenant to and to benefit Lots 33, 36 and 37. 11. No Waiver. Granting a waiver or failing to enforce a covenant, easement or restriction contained herein in one or more instances will not constitute a waiver of the right to enforce a covenant, easement or restriction in the future. 12. Governing Law; Interpretation. This Easement will be governed by the laws of Oregon. If a court of competent jurisdiction holds any portion of this Easement to be void or unenforceable as written, the Owners intend that (1) that portion of this Easement be enforced to the extent permitted by law, and (2) the balance of this Easement remain in full force and effect. 4 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 33, 36 and 37) 13. Amendment and Termination. Any termination or modifications, changes, additions, or deletions to this Easement must be approved by all of the Owners, in writing. 14. Electronic Copies. An electronic copy of the original executed Easement will be binding. [Remainder of page intentionally left blank.] 5 – VARIABLE WIDTH PRIVATE UTILITY AND JOINT ACCESS EASEMENT (Lots 33, 36 and 37) This Variable Width Private Utility and Joint Access Easement is executed as of the Effective Date. Piculell Properties LLC, an Arizona limited liability company By: _____________________________ Name: _____________________________ Its: _____________________________ STATE OF _________ ) )ss County of _____ ) On , 2026, personally appeared the above-named ___________, Manager of Piculell Properties LLC, an Arizona limited liability company, and acknowledged the foregoing to be his voluntary act and deed. Notary Public for the State of _________ My commission expires: Stormwater Analysis Braewood Hills Prepared for: Al Lundstrom Prepared by: Anna Backus, PE Project Engineer: Anna Backus, PE December 2023 (Updated October 2025) | KPFF Project #2100216 KPFF’S COMMITMENT TO SUSTAINABILITY As a member of the US Green Building Council, a sustaining member of Oregon Natural Step, and a member of the Sustainable Products Purchasers Coalition, KPFF is committed to the practice of sustainable design and the use of sustainable materials in our work. When hardcopy reports are provided by KPFF, they are prepared using recycled and recyclable materials, reflecting KPFF’s commitment to using sustainable practices and methods in all of our products. 1 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Table of Contents Drainage Report ............................................................................................................................................. 2 Site Constraints ............................................................................................................................................... 2 Project Narrative ................................................................................................................................................ 2 Existing Conditions ......................................................................................................................................... 2 Proposed Conditions ....................................................................................................................................... 3 Proposed Stormwater System ........................................................................................................................ 3 Analysis ............................................................................................................................................................... 5 Engineering Conclusions .................................................................................................................................... 6 Tables TABLE 1: 24-Hour Precipitation for Eugene, OR (NOAA Atlas 2, Volume X) ...................................................... 6 Appendices Appendix 1 Basin Maps Appendix 2 Existing Conditions Runoff Appendix 3 Water Quality Calculations Appendix 4 Detention and Runoff Results Appendix 5 Draft O&M Plans Appendix 6 Detention Calculation with Adjacent, Developed Lots Appendix 7 Site Plans 2 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Project Overview and Description Drainage Report This storm drainage report has been prepared to show that the proposed Braewood Hills Third Addition PUD meets or exceeds the stormwater regulations of the City of Eugene and SLOPES V (Standard Local Operating Procedures for Endangered Species, authorized or carried out by the US Army Corps of Engineers in Oregon). This report has been prepared for the JPA, Final PUD review, Site Development Permit review and PEPI Permit review. The report will discuss existing and proposed storm drainage and how the proposed facilities will meet the following requirements: vegetated treatment for water quality, flood control, flow control and source control. Site Constraints The project will be constructed on a site that has a 15 to 20 percent average slope and poorly infiltrating soils. For these reasons, infiltration is not an option. Instead, detention will be used to provide flood control for the site. This will be discussed further in the Proposed Stormwater System section. Project Narrative Existing Conditions The site is surrounded by low-density residential or undeveloped lots. Hawkins Drive provides the western border of the project, Randy Lane runs along a portion of the southern edge and existing single-family residences border the east edge of the site. The existing wetlands have several sources. Some of them are from Goal 5 season streams that cut through the site, but at least one of the wetland areas was likely caused by a storm system outfall that was installed as part of the housing development to the east. The outfall itself is just outside of the project boundary. See Exhibit 1 in Appendix 1 for existing conditions, including the existing wetland extents. The site is within the City of Eugene Amazon Basin, per the 2002 Stormwater Master Plan and the receiving water body for this basin is Amazon Creek. Currently, there is no stormwater infrastructure on site. Amazon Diversion Canal-Amazon Creek is classified as water quality with a TMDL developed for the parameters of Dissolved Oxygen and E. coli and is listed on the Section 303(d) list of impaired water bodies for the parameters of Arsenic, Inorganic, Dissolved Oxygen and Iron (total). There are no nearby active NPDES Permits. The site and receiving water are not in a groundwater management area or EPA-designated sole source aquifer. Before European Development, the site would have been a wooded hillside. According to the USDA Web Soil Survey (WSS), the site soils consist of a combination of Dixonville silty clay loam, Panther silty clay loam and Philomath cobbly silty clay. All of those soils have a hydrologic soil group rating of D . The resulting runoff curve number for the pre-development condition of this site is 76. This was used to calculate the pre- development runoff rates (see Appendix 2). 3 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS The downstream streams are considered floodwater streams, which trigger flow control requirements. However, the SLOPES V requirements of limiting the post-development runoff to pre-European development runoff at the 2-year and 10-year storms are more stringent. Proposed Conditions The proposed conditions will include single-family houses on individual lots, private streets and shared driveways. The private streets and shared driveways are assumed to be 100 percent impervious. They will be treated by vegetated facilities. For the detention calculations, the proposed lots are assumed to be 20% impervious with most of the large, steep lots left as wooded and vegetated. The detention system is sized to detain the proposed runoff at the 2-year and 10-year storm event, assuming that the private streets are 100% impervious and that the lots are 20% impervious. If lots are developed with more impervious area than this assumption, they must provide detention for all runoff beyond the assumed 20% impervious area. For the water quality calculations, the proposed lots are assumed to be 50% impervious. Water quality will be provided by swales located along the private streets and at the low side of the lot along the existing Randy Lane and the west property line. These vegetated swales will slow the water significantly and create a longer path of travel that more closely mimics how water travels through the wetlands. These assumptions are conservative. They are intended to be higher than the likely impervious percentages, given the amount of protected wetlands that will remain on site. Some of the 15.50-acre site is outside of the study area because of unimpacted Goal 5 areas and unimpacted areas downhill of the storm system. Additionally, Lot 39 at the northeast corner of the site is not currently planned for development. When it is developed, it will be required to provide water quality and detention within the lot boundaries. A total of 12.39 acres are assumed to be impacted and included in the study. For the limits of the study, see Exhibit 2 in Appendix 1. The runoff from the development to the east has not been considered in water quality or detention, but the site piping is sized to accommodate peak flows from the existing outfall. Proposed Stormwater System Stormwater Requirements The City of Eugene requires water quality treatment of an equivalent area for all new or replaced impervious surfaces. The 2014 City of Eugene Stormwater Management Manual (SWMM) implements a hierarchical system in which infiltration facilities must be considered first. If infiltration is not possible, filtration facilities must be considered. Finally, if the site has insufficient room for filtration facilities, a greatly increased SDC fee may be assessed. The on-site soils allow for limited infiltration and there is a concern about slope stability if infiltration is attempted. Therefore, filtration facilities have been selected to meet the requirements of vegetated treatment. 4 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS SLOPES V requirements are applied to this project as part of the Joint Permit Application (JPA) that will be obtained for improvements proposed within the wetlands delineated on the site. SLOPES V requires that the pre-development flow is equal to or greater than the post-development flow for this site. In this case, pre- development means pre-European development. The Existing Runoff Calculations for the site can be found in Appendix 2. Water Quality Facilities, Flood Control and Flow Control There are six vegetated treatment facilities on site. The first is a vegetated swale that will treat the public extension of Randy Lane as well as the lots fronting that roadway. This swale is called Swale 1 – Upper on the attached Basin Map. This swale will be constructed under the PEPI and maintained by the City of Eugene. Swale 1 – Lower is adjacent to the existing, public Randy Lane. Swale 1 – Upper will drain into Swale 1 – Lower, so it will serve to provide additional treatment for the upper basins. Swale 1 – Lower will also provide treatment for the lots fronting the public portion of Randy Lane. Swales 2, 4, 5 and 6 are adjacent to Stonehedge Way. They capture and treat the runoff from the lots that are east of Stonehedge as well as the road itself. This swale moves the runoff laterally across the hill, slowing the water and helping to reduce the peak of the runoff from the site. Swale 3 is located at the low end of the site. It treats Stonehedge Way and Stonehedge Court as well as the lots located in the northwest corner of the site. Swale 3 is located at the bottom of the lower detention ponds, so this stormwater facility provides treatment as well as detention. All swales act as a cut-off for the hill as well as providing treatment. Runoff from the vegetated facilities will be collected in open detention ponds. At the end of the piped system, five-tiered detention ponds will hold the water at the 2-year and 10-year storms. The runoff from Swale 1 (Upper and Lower), the runoff from Swale 2 and the runoff from Swale 4 enter the detention system at the upper tier. The runoff from Swales 5 and 6 enters the detention system at the lower tiers and at the beginning of Swale 3. Each tier has an undersized piped draining to the next tier that will act as an orifice. Each tier only has one orifice, which is sized to control the 2-year storm to the correct release rate. At the 2-year storm, the pre-development rate is 2.50 cfs, so the detained rate must be equal to or less than that rate. The detention basins have orifices with sizes that vary between 7 and 8 inches. The peak flow from the system is 2.43 cfs. See the Proposed Basin Map in Appendix 1 and the Runoff and Detention Output from Storm and Sanitary Analysis (SSA) in Appendix 4 for the orifice sizing. At the 10-year storm, the flow will be controlled by the orifices and by a weir installed above the orifice, which will allow the water to spill from one tier to the next. The pre-development rate is 5.19 cfs, so the detained rate must be equal to or less than that rate. The post-development rate is 4.96 cfs. See the Proposed Basin Map in Appendix 1 and the Runoff and Detention Output from Storm and Sanitary Analysis (SSA) in Appendix 4 for the orifice sizing. 5 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Runoff from the Adjacent Site All the facilities are sized to provide water quality and detention for the proposed development area, as described in detail above. However, four lots sitting on the west side of Suncrest Avenue drain into a private storm pipe that outfalls at the eastern property line of the development area. This project is not required to provide water quality and detention for the previous development, but infrastructure is proposed that captures the runoff from the adjacent lots and routes it through the proposed detention system. This runoff is already passing through the site, being captured by one of two existing inlets along Hawkins Lane and then being routed to the open creek on the west side of Hawkins. This project does not impact the quantity or destination of that water. The design team has viewed this water as “pass through,” meaning it currently flows through the site and will continue to flow through the site as the same rate. We do have a version of the stormwater model that addresses this flow. At the 2-year storm, the peak flow from the adjacent lots is 0.67 cfs. Because this passes through the detention system, this peak flow is slightly mitigated and only increases the peak flow in the system from 2.43 to 2.78. At the 10-year storm, the peak flow from the adjacent lots is 1.15 cfs. This is not mitigated by the detention system; it is simply passed through at 1.15 cfs to the downstream pipe. See Appendix 6 for modelled results at the 2-year and 10-year storms that include the adjacent lots. Operations & Maintenance All the facilities described in this report will be publicly maintained facilities. City of Eugene maintenance staff will maintain the pipes, detention ponds, swales and planters per City requirements. See Appendix 5 for the City’s Standard Operations and Maintenance Plan. Analysis The water quality facilities have been sized using the Eugene Stormwater Facility Calculator. The calculator determines runoff using the Santa Barbara Urban Hydrograph (SBUH) Method and NRCS 24-Hour Type 1A Hyetograph as outlined in Appendix M of the City of Eugene’s Stormwater Management Manual. The facility capacity is based on the requirements and facility details found in the Eugene Stormwater Management Manual (see Appendix 3 for the Stormwater Facility Calculator Results). Detention has been calculated using Storm and Sanitary Analysis (SSA). SSA modeled runoff from the developed lots, time of concentration, pipe capacity and detention volumes. For analysis purposes, each basin of the property required the following information as input data for the computer model: • Impervious Area (Ai), in acres • Curve Number (CNi), impervious • Travel Time (Tc) • Total Precipitation 6 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Precipitation data for the respective storms are City of Eugene design storms are shown in Table 1 below. TABLE 1: 24-Hour Precipitation for Eugene, OR (NOAA Atlas 2, Volume X) Storm Event Inches WQ 1.56* 2-Year 3.23* 5-Year 3.6 10-Year 4.46 25-Year 5.18 50-Year 6.0 100-Year 6.48 *Updated to match SLOPES V & DEQ Storm Values, increased from storm events defined in the SWMM See Appendix 3 for Water Quality Calculations and Appendix 4 for Detention Calculations. Engineering Conclusions Based on the requirements of the Stormwater Management Manual, no errors were found in the stormwater system design. The facilities and conveyance components have enough capacity to handle the required storm events and should be approved as designed. 2100216-kg Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 1 Basin Maps STOPEND END OHUT[T][T][T][T][T][T][T][T][T][T][T][T]UCUCPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5' 27.5' 27.5'CDCDCDTRANJBVENTVENTEVLTEVLTEVLT EVLTEVLTEVLTJBJBJBTRTRTRTRTRTRTELVLTETRTRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WICV(2)SSSDSDDDDDDDDDDSSSSSSDSDRDRDSDSTRWSSS#10#9#8#7#11#12#13#6#5#14#4#15#3#16#17#2#1#20#19#18BBD1234567810111213141516SSSSS9EHAWKINS LANERANDY LANEOVERALL EXISTING BASINAREA=539,556 SF(760)(765)(770)(775)(780)(785)(790)(795)(800)(805)(810)(815)(820)(825) (8 3 0 ) (835) (840) (845) (850)(855)(860) (865) (870) (875)(880)(885) (810) (815) (820) (825) (830) (835) (840) (845)(850)(855)(860)(865)(870)(875)(880)(885)(890)(895)(900)(905)(910)(915)(920)(925)(930)(935)DEVELOPED UPHILL BASINAREA=82,748 SF25% IMPERVIOUS (20,687 SF)2-YEAR PEAK: 0.65 CFS1O-YEAR PEAK: 1.18 CFSEXH-1STORMWATERBASINBOUNDARYSHEET LEGENDPROPERTY LINESTORM PIPEBRAEWOOD HILL PUDSCALE601 INCH = 60 FEET601200240120120120 FEET STOPEND END OHUT[T][T][T][T][T][T][T][T][T][T][T][T]UCUCPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5' 27.5' 27.5'CDCDCDTRANJBVENTVENTEVLTEVLTEVLT EVLTEVLTEVLTJBJBJBTRTRTRTRTRTRTELVLTETRTRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WICV(2)SSSDSDDDDDDDDDDSSSSSSDSDRDRDSDSTRWSSS#10#9#8#7#11#12#13#6#5#14#4#15#3#16#17#2#1#20#19#18BBD1234567810111213141516SSSSS9ELOT 1LOT 6LOT 5LOT 12LOT 28LOT 7LOT 2LOT 3LOT 31LOT 22LOT 29LOT 33LOT 18LOT 24LOT 17LOT 34LOT 21LOT 35LOT 25LOT 32LOT 37LOT 4LOT 20LOT 36LOT 27LOT 30LOT 10LOT 15LOT 11LOT 14LOT 16LOT 19LOT 23LOT 26LOT 13LOT 38LOT 9LOT 835'-0"35'35'-0"35'35'6'-1014"35'35'35'35'35'CREATING LOOPED SYSTEM THATCONNECTS TO HAWKINS LANE.CREATING LOOPED SYSTEM THATCONNECTS TO HAWKINS LANE.10FOOT WIDE PUE TOACCOMMODATE EWEB WATER LINE>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'HAWKINS LANERANDY LANESTONEHEDGE WAYRANDY LANESTONEHEDGE COURTBASIN S1(PEPI/PUBLIC)AREA=22,111 SF100% IMPERVIOUSBASIN S2AREA=8,306 SFBASIN L2AREA=73,332 SFSEE NOTE 1BASIN L8AREA=45,263 SFSEE NOTE 1BASIN L1AREA=89,730 SFSEE NOTE 1SWALE 1 - UPPERLENGTH: 414 LFWIDTH: 5'SIDE SLOPE: 3:1RUNNING SLOPE: VARIES 2%-6%BASIN L3AREA=57,594 SFSEE NOTE 1SWALE 1 - LOWERLENGTH: 386 LFWIDTH: 5'SIDE SLOPE: 3:1RUNNING SLOPE: 6%SWALE 2LENGTH: 206 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%SWALE 3LENGTH: 111 LFWIDTH: 5'SIDE SLOPE: 3:1RUNNING SLOPE: 0.85%BASIN L4AREA=54,116 SFSEE NOTE 1BASIN S3AREA=4,297 SFBASIN L6AREA=22,361 SFSEE NOTE 1BASIN S4AREA=4,912 SFSWALE 4LENGTH: 83 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%>>>>>>>>>>>>>>>>>>>>>>>>> > > > > > > >>>>>>>>>>>>>> > > >>>>>>>BASIN L7AREA=27,793 SFSEE NOTE 1BASIN S5AREA=3,195 SFSWALE 5LENGTH: 120 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%BASIN S6AREA=8,253 SFSWALE 6LENGTH: 84 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%DET 12.5:1 SIDE SLOPES3.6' DEPTH8" ORIFICE1' WIDE WEIRPEAK 2-YEAR FLOW: 1.99 CFSPEAK 10-YEAR FLOW: 2.59 CFSDET 22.5:1 SIDE SLOPES3.6' DEPTH7" ORIFICE8" WIDE WEIRPEAK 2-YEAR FLOW: 1.83 CFSPEAK 10-YEAR FLOW: 2.26 CFSDET 32.5:1 SIDE SLOPES3.6' DEPTH7" ORIFICE4" WIDE WEIRPEAK 2-YEAR FLOW: 1.75 CFSPEAK 10-YEAR FLOW: 2.16 CFSDET 43:1 SIDE SLOPES3' DEPTH7.75" ORIFICE2' WEIRPEAK 2-YEAR FLOW: 2.50 CFSPEAK 10-YEAR FLOW: 5 CFSDET 53:1 SIDE SLOPES3' DEPTH7.75" ORIFICE1.6' WEIRPEAK 2-YEAR FLOW: 2.43 CFSPEAK 10-YEAR FLOW: 4.96 CFSBASIN L5AREA=121,298 SFSEE NOTE 1EXH-2STORMWATER BASIN BOUNDARYSHEET LEGEND1.LOT AREAS ARE ASSUMED TO BE 50% IMPERVIOUS FOR WATER QUALITYSIZING AND 20% IMPERVIOUS FOR DETENTION SIZING. DEVELOPMENTBEYOND 20% IMPERVIOUS WILL REQUIRE INDIVIDUAL HOME BUILDERS TOPROVIDE ON-SITE DETENTION TO RESTRICT FLOW TO THE 20%IMPERVIOUS RATE.BRAEWOOD HILL PUDSCALE601 INCH = 60 FEET601200240120120120 FEETSHEET LEGEND Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 2 Existing Conditions Runoff SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 10/30/2025Designer: Anna BackusBasin: Full Existing Study AreaUser-Supplied DataPervious AreaImpervious AreaPervious Area, SF539,556Pervious Area, Acres12.390.00Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes17Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ25102550100Inches1.4 3.12 3.6 4.46 5.18 6 6.48 Calculated DataTotal Project Area, Acres12.39Total Project Area, Square Feet539,556Recurrence IntervalWQ25102550100Peak Flow Rate, Qpeak, cfs0.152.283.265.196.939.0110.27Total Runoff Volume, V, cubic feet6,76249,31064,67194,329120,706151,980170,760Time to Peak Runoff, hours24.008.008.008.008.008.008.00Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.002.004.006.008.0010.0012.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 3 Water Quality Calculations SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 8/28/2025Designer: ALBBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)User-Supplied DataPervious AreaImpervious AreaPervious Area, SF110,334139,581 Pervious Area, Acres2.533.20Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48 Calculated DataTotal Project Area, Acres5.74Total Project Area, Square Feet249,915Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs1.233.163.835.066.127.358.08Total Runoff Volume, V, cubic feet17,51843,67452,37968,42382,17898,099107,517Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.001.002.003.004.005.006.007.008.009.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)Instructions:Date: 8/28/20251. Choose Facility Type2. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%66sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ1.230917,453Filtration Only2-Yr3.161943,6075-Yr3.825352,31410-Yr5.056268,3546925-Yr6.117282,11350-Yr7.349198,032100-Yr8.0787107,448WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A Swale WorksheetProject Name: BraewoodBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line11940.065 2 3 311503.60.5146.292171 0.05 5 2 3 32 1803.80.4835.90350 0.05 5 2 3 321803.80.4831.724386 0.06 5 2 3 31 1503.60.51412.5256789101112131415161700018000190002000026.43Max 3.8 0.514Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) Project Name: BraewoodBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.20000.40000.60000.80001.00001.20001.40000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: Braewood######Designer: ALBBasin: Swale 2User-Supplied DataPervious AreaImpervious AreaPervious Area, SF27,05827,058 Pervious Area, Acres0.620.62Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48 Calculated DataTotal Project Area, Acres1.24Total Project Area, Square Feet54,116Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs0.240.640.781.051.281.541.70Total Runoff Volume, V, cubic feet3,4958,98410,83314,25517,19920,61422,637Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.000.200.400.600.801.001.201.401.601.800 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 2Instructions:458971. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%73sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.23803,421Filtration Only2-Yr0.64138,9115-Yr0.782610,75610-Yr1.046314,1787725-Yr1.274617,12450-Yr1.540520,537100-Yr1.698322,558WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A Swale WorksheetProject Name: BraewoodBasin: Swale 2Instructions:458971. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line12060.014 2 3 367302.40.17419.7520003456789101112131415161700018000190002000019.75Max 2.4 0.174Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) Project Name: BraewoodBasin: Swale 245897Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.05000.10000.15000.20000.25000.30000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080.00090 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com SBUH Calculation Worksheet for City of Eugene Storm Events Project Name: Braewood Date: 8/28/25 Designer: ALB Basin: Swale 3 (Basin S3, L5) User-Supplied Data Pervious Area Impervious Area Pervious Area, SF 60,649 60,649 Pervious Area, Acres 1.39 1.39 Pervious Area Curve Number, CNperv 76 98 Time of Concentration, Tc, minutes5 Note: minimum Tc is five minutes City of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution) Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr Inches 1.56 3.12 3.6 4.46 5.18 6 6.48 Calculated Data Total Project Area, Acres 2.78 Total Project Area, Square Feet 121,298 Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr Peak Flow Rate, Qpeak, cfs 0.54 1.44 1.76 2.35 2.86 3.45 3.81 Total Runoff Volume, V, cubic feet 7,835 20,138 24,282 31,952 38,550 46,204 50,739 Time to Peak Runoff, hours 7.83 7.83 7.83 7.83 7.83 7.83 7.83 Runoff Hydrograph Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNimp0.000.501.001.502.002.503.003.504.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 3 (Basin S3, L5)Instructions:Date: 8/28/251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity9cf0Infiltration Area @ 75%105sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.006cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.53417,728Filtration Only2-Yr1.438020,0295-Yr1.754724,17610-Yr2.345831,84610625-Yr2.857738,44150-Yr3.453746,099100-Yr3.807350,633N/A100%N/AN/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):WATER QUALITY EVENTPASSROCK CAPACITY N/A Swale WorksheetProject Name: BraewoodBasin: Swale 3 (Basin S3, L5)Instructions:Date: 8/28/251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line11110.00855 2 3 3910504.00.2039.132000345678910111213141516170001800019000200009.13Max 4.0 0.203Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Slope (ft/ft)Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in) Project Name: BraewoodBasin: Swale 3 (Basin S3, L5)Date: 8/28/25Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.10000.20000.30000.40000.50000.60000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00020.00040.00060.00080.00100.00120.00140 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 8/28/2025Designer: ALBBasin: Swale 4User-Supplied DataPervious AreaImpervious AreaPervious Area, SF11,18116,093 Pervious Area, Acres0.260.37Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48 Calculated DataTotal Project Area, Acres0.63Total Project Area, Square Feet27,273Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs0.140.360.430.560.680.820.90Total Runoff Volume, V, cubic feet1,9934,8945,8547,6199,13010,87611,908Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.000.100.200.300.400.500.600.700.800.901.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 4Instructions:Date: 8/28/20251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%73sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.14111,919Filtration Only2-Yr0.35594,8195-Yr0.42895,78010-Yr0.56407,5457525-Yr0.68029,05250-Yr0.814910,801100-Yr0.894511,832WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A Swale WorksheetProject Name: BraewoodBasin: Swale 4Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line1830.014 2 3 367301.80.1399.952000345678910111213141516170001800019000200009.95Max 1.8 0.139Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) Project Name: BraewoodBasin: Swale 4Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.02000.04000.06000.08000.10000.12000.14000.16000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080.00090 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com SBUH Calculation Worksheet for City of Eugene Storm Events Project Name: Braewood Date: 8/28/2025 Designer: ALB Basin: Swale 5 User-Supplied Data Pervious Area Impervious Area Pervious Area, SF 13,897 17,092 Pervious Area, Acres 0.32 0.39 Pervious Area Curve Number, CNperv 76 98 Time of Concentration, Tc, minutes5 Note: minimum Tc is five minutes City of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution) Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr Inches 1.56 3.12 3.6 4.46 5.18 6 6.48 Calculated Data Total Project Area, Acres 0.71 Total Project Area, Square Feet 30,988 Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr Peak Flow Rate, Qpeak, cfs 0.15 0.39 0.47 0.62 0.76 0.91 1.00 Total Runoff Volume, V, cubic feet 2,152 5,383 6,460 8,446 10,149 12,121 13,288 Time to Peak Runoff, hours 7.83 7.83 7.83 7.83 7.83 7.83 7.83 Runoff Hydrograph Impervious Area, SF Impervious Area, Acres Impervious Area Curve Number, CNimp0.000.200.400.600.801.001.200 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 5Instructions:Date: 8/28/20251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%73sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.15002,078Filtration Only2-Yr0.38845,3085-Yr0.47056,38510-Yr0.62298,3717525-Yr0.754410,07150-Yr0.907112,046100-Yr0.997513,211WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A Swale WorksheetProject Name: BraewoodBasin: Swale 5Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line11200.014 2 3 367301.80.14214.0920003456789101112131415161700018000190002000014.09Max 1.8 0.142Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) Project Name: BraewoodBasin: Swale 5Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.02000.04000.06000.08000.10000.12000.14000.16000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080.00090 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 8/28/2025Designer: ALBBasin: Swale 6User-Supplied DataPervious AreaImpervious AreaPervious Area, SF13,89717,092 Pervious Area, Acres0.320.39Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48 Calculated DataTotal Project Area, Acres0.71Total Project Area, Square Feet30,988Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs0.150.390.470.620.760.911.00Total Runoff Volume, V, cubic feet2,1525,3836,4608,44610,14912,12113,288Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.000.200.400.600.801.001.200 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 6Instructions:Date: 8/28/20251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity13cf0Infiltration Area @ 75%146sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.002cfsInfiltration Capacity (avg)0.008cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.14912,003Filtration Only2-Yr0.38765,2295-Yr0.46966,30510-Yr0.62218,29515125-Yr0.753510,00050-Yr0.906211,967100-Yr0.996713,130WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A Swale WorksheetProject Name: BraewoodBasin: Swale 6Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line1840.0054 2 3 31314602.30.11312.3820003456789101112131415161700018000190002000012.38Max 2.3 0.113Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) Project Name: BraewoodBasin: Swale 6Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.02000.04000.06000.08000.10000.12000.14000.16000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00020.00040.00060.00080.00100.00120.00140.00160.00180 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 4 Detention and Runoff Results Autodesk® Storm and Sanitary Analysis 2024 - Version 13.6.268 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. 20251029-CALC-WithUphillDetentionPondRebuild.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. Santa Barbara UH Time of Concentration...... SCS TR-55 Link Routing Method ....... Hydrodynamic Storage Node Exfiltration.. None Starting Date ............. AUG-28-2025 00:00:00 Ending Date ............... AUG-29-2025 00:00:00 Report Time Step .......... 00:00:10 ************* Element Count ************* Number of rain gages ...... 4 Number of subbasins ....... 15 Number of nodes ........... 23 Number of links ........... 26 **************** Subbasin Summary **************** Subbasin Total Imperv. Raingage Area Area ID ft² % ---------------------------------------------------- BASIN-L1 89729.62 20.00 StormGage BASIN-L2 73331.70 20.00 StormGage BASIN-L3 57593.75 20.00 StormGage BASIN-L4 54115.76 20.00 StormGage BASIN-L5 121297.51 20.00 StormGage BASIN-L6 22360.91 20.00 StormGage BASIN-L7 27792.87 20.00 StormGage BASIN-L8 45262.84 20.00 StormGage BASIN-S1 22110.92 100.00 StormGage BASIN-S2 3305.97 100.00 StormGage BASIN-S3 4297.00 100.00 StormGage BASIN-S4 4911.98 100.00 StormGage BASIN-S5 3194.98 100.00 StormGage BASIN-S6 8252.97 100.00 StormGage Uphill 82747.68 25.00 StormGage ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ J-1 JUNCTION 753.00 759.00 0.00 Jun-13 JUNCTION 810.15 818.30 0.00 Jun-15 JUNCTION 809.70 812.00 0.00 Jun-17 JUNCTION 808.00 819.50 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 2-Year Model Results for Detention MH-3 JUNCTION 779.50 787.00 0.00 OV-01 JUNCTION 808.93 812.29 0.00 SW1-L-Start JUNCTION 809.16 812.00 0.00 SW1-U-1 JUNCTION 840.97 842.00 0.00 SW1-U-OF1A JUNCTION 829.33 830.50 0.00 SW1-U-OF1B JUNCTION 820.77 826.64 0.00 SW1-U-OF2A JUNCTION 817.18 818.35 0.00 SW1-U-OF2B JUNCTION 813.79 815.66 0.00 SW-2-Start JUNCTION 816.36 820.36 0.00 SW-4-Start JUNCTION 815.13 816.13 0.00 SW-5-Start JUNCTION 816.70 817.70 0.00 SW-6-Start JUNCTION 816.34 820.34 0.00 Out-01 OUTFALL 0.00 753.00 0.00 Uphill-NotIncluded OUTFALL 0.00 0.00 0.00 DET-1 STORAGE 768.00 772.00 0.00 DET-2 STORAGE 766.75 766.75 0.00 DET-3 STORAGE 763.50 763.50 0.00 DET-4 STORAGE 757.40 757.40 0.00 DET-5 STORAGE 754.70 754.70 0.00 ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type ft % Roughness -------------------------------------------------------------------------------------------- CULVERT-1 SW1-U-OF1A SW1-U-OF1B CONDUIT 20.0 17.6000 0.0150 CULVERT-2 SW1-U-OF2A SW1-U-OF2B CONDUIT 20.0 11.7500 0.0150 EndPipe J-1 Out-01 CONDUIT 10.0 10.0000 0.0150 Link-19 Jun-17 DET-4 CONDUIT 480.0 10.5417 0.0150 PIPE Jun-13 Jun-15 CONDUIT 20.0 10.0000 0.0150 PIPE-SW1L-To-PondMH-3 DET-1 CONDUIT 67.0 15.6418 0.0150 PIPE-SW1UtoSW1L OV-01 SW1-L-Start CONDUIT 120.0 0.3083 0.0150 PIPE-UPPER-TO-LOWERJun-15 MH-3 CONDUIT 182.0 16.5934 0.0150 SW1-Lower SW1-L-Start MH-3 CHANNEL 386.0 6.0000 0.0500 SWALE-3 SW-2-Start Jun-13 CHANNEL 206.0 1.0000 0.0500 SWALE-4 SW-4-Start Jun-13 CHANNEL 83.0 1.0000 0.0500 SWALE-5 SW-5-Start Jun-17 CHANNEL 120.0 1.0000 0.0500 SWALE-6 SW-6-Start Jun-17 CHANNEL 84.0 1.0000 0.0500 SW-U-1A SW1-U-1 SW1-U-OF1A CHANNEL 194.0 6.0000 0.0500 SW-U-1B SW1-U-OF1B SW1-U-OF2A CHANNEL 177.0 1.9322 0.0500 SW-U-1C SW1-U-OF2B OV-01 CHANNEL 50.0 5.0000 0.0500 Orifice-01 DET-1 DET-2 ORIFICE Orifice-02 DET-2 DET-3 ORIFICE Orifice-03 DET-3 DET-4 ORIFICE Orifice-04 DET-4 DET-5 ORIFICE Orifice-05 DET-5 J-1 ORIFICE Weir-01 DET-1 DET-2 WEIR Weir-02 DET-2 DET-3 WEIR Weir-03 DET-3 DET-4 WEIR Weir-04 DET-4 DET-5 WEIR Weir-05 DET-5 J-1 WEIR ********************* Cross Section Summary ********************* Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Area Radius Capacity ft ft ft² ft cfs Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ------------------------------------------------------------------------------------------------- --------- CULVERT-1 CIRCULAR 0.83 0.83 1 0.55 0.21 7.97 CULVERT-2 CIRCULAR 0.83 0.83 1 0.55 0.21 6.51 EndPipe CIRCULAR 1.00 1.00 1 0.79 0.25 9.76 Link-19 CIRCULAR 0.83 0.83 1 0.55 0.21 6.17 PIPE CIRCULAR 0.67 0.67 1 0.35 0.17 3.31 PIPE-SW1L-To-Pond CIRCULAR 0.83 0.83 1 0.55 0.21 7.51 PIPE-SW1UtoSW1L CIRCULAR 1.00 1.00 1 0.79 0.25 1.71 PIPE-UPPER-TO-LOWER CIRCULAR 0.67 0.67 1 0.35 0.17 4.27 SW1-Lower TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SWALE-3 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SWALE-4 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-5 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-6 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SW-U-1A TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SW-U-1B TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 26.21 SW-U-1C TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 42.17 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 3.826 3.224 Surface Runoff ........... 1.960 1.652 Continuity Error (%) ..... 0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 1.936 0.631 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.023 0.008 Continuity Error (%) ..... 0.000 ****************************************** Composite Curve Number Computations Report ****************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 89729.62 80.40 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L2 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 73331.70 80.40 -------------------- Subbasin BASIN-L3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 57593.75 80.40 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 54115.76 80.40 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 121297.51 80.40 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22360.91 80.40 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 27792.87 80.40 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 45262.84 80.40 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22110.92 98.00 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3305.97 98.00 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4297.00 98.00 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4911.98 98.00 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3194.98 98.00 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 8252.97 98.00 ------------------ Subbasin Uphill ------------------ Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 82747.68 81.50 ************************************** Runoff Coefficient Computations Report ************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 89729.62 - 0.72 Composite Area & Weighted Runoff Coeff. 89729.62 0.72 -------------------- Subbasin BASIN-L2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 73331.70 - 0.72 Composite Area & Weighted Runoff Coeff. 73331.70 0.72 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 57593.75 - 0.72 Composite Area & Weighted Runoff Coeff. 57593.75 0.72 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 54115.76 - 0.72 Composite Area & Weighted Runoff Coeff. 54115.76 0.72 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 121297.51 - 0.72 Composite Area & Weighted Runoff Coeff. 121297.51 0.72 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22360.91 - 0.72 Composite Area & Weighted Runoff Coeff. 22360.91 0.72 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 27792.87 - 0.72 Composite Area & Weighted Runoff Coeff. 27792.87 0.72 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 45262.84 - 0.72 Composite Area & Weighted Runoff Coeff. 45262.84 0.72 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22110.92 - 0.72 Composite Area & Weighted Runoff Coeff. 22110.92 0.72 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ----------------------------------------------------------------------------------------- - 3305.97 - 0.72 Composite Area & Weighted Runoff Coeff. 3305.97 0.72 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4297.00 - 0.72 Composite Area & Weighted Runoff Coeff. 4297.00 0.72 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4911.98 - 0.72 Composite Area & Weighted Runoff Coeff. 4911.98 0.72 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 3194.98 - 0.72 Composite Area & Weighted Runoff Coeff. 3194.98 0.72 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 8252.97 - 0.72 Composite Area & Weighted Runoff Coeff. 8252.97 0.72 ------------------ Subbasin Uphill ------------------ Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 82747.68 - 0.72 Composite Area & Weighted Runoff Coeff. 82747.68 0.72 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness -------------------- Subbasin BASIN-L1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L5 -------------------- User-Defined TOC override (minutes): 5.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis -------------------- Subbasin BASIN-L6 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L7 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L8 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S5 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S6 -------------------- User-Defined TOC override (minutes): 5.00 ------------------ Subbasin Uphill ------------------ User-Defined TOC override (minutes): 7.00 *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- BASIN-L1 3.22 1.53 0.69 80.400 0 00:05:00 BASIN-L2 3.22 1.53 0.56 80.400 0 00:05:00 BASIN-L3 3.22 1.53 0.44 80.400 0 00:05:00 BASIN-L4 3.22 1.53 0.42 80.400 0 00:05:00 BASIN-L5 3.22 1.53 0.93 80.400 0 00:05:00 BASIN-L6 3.22 1.53 0.17 80.400 0 00:05:00 BASIN-L7 3.22 1.53 0.21 80.400 0 00:05:00 BASIN-L8 3.22 1.53 0.35 80.400 0 00:05:00 BASIN-S1 3.22 2.99 0.38 98.000 0 00:05:00 BASIN-S2 3.22 2.99 0.06 98.000 0 00:05:00 BASIN-S3 3.22 2.99 0.07 98.000 0 00:05:00 BASIN-S4 3.22 2.99 0.08 98.000 0 00:05:00 BASIN-S5 3.22 2.99 0.06 98.000 0 00:05:00 BASIN-S6 3.22 2.99 0.14 98.000 0 00:05:00 Uphill 3.22 1.62 0.67 81.500 0 00:07:00 -------------------------------------------------------------------------- ****************** Node Depth Summary ****************** ----------------------------------------------------------------------------------------- Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded ft ft ft days hh:mm acre-in minutes hh:mm:ss ----------------------------------------------------------------------------------------- J-1 0.28 0.49 753.49 0 09:00 0 0 0:00:00 Jun-13 1.70 1.84 811.99 0 08:00 0 0 0:00:00 Jun-15 0.09 0.19 809.89 0 08:01 0 0 0:00:00 Jun-17 0.09 0.20 808.20 0 08:00 0 0 0:00:00 MH-3 0.17 0.36 779.86 0 07:53 0 0 0:00:00 OV-01 0.95 1.39 810.32 0 08:00 0 0 0:00:00 SW1-L-Start 0.08 0.18 809.34 0 08:01 0 0 0:00:00 SW1-U-1 0.04 0.09 841.06 0 08:00 0 0 0:00:00 SW1-U-OF1A 0.08 0.18 829.51 0 08:01 0 0 0:00:00 SW1-U-OF1B 0.09 0.21 820.98 0 08:01 0 0 0:00:00 SW1-U-OF2A 0.11 0.26 817.44 0 08:01 0 0 0:00:00 SW1-U-OF2B 0.07 0.17 813.96 0 08:00 0 0 0:00:00 SW-2-Start 0.18 0.38 816.74 0 08:01 0 0 0:00:00 SW-4-Start 0.06 0.14 815.27 0 08:00 0 0 0:00:00 SW-5-Start 0.06 0.15 816.85 0 08:00 0 0 0:00:00 SW-6-Start 0.15 0.31 816.65 0 08:00 0 0 0:00:00 Out-01 0.00 0.00 0.00 0 00:00 0 0 0:00:00 Uphill-NotIncluded 0.00 0.00 0.00 0 00:00 0 0 0:00:00 DET-1 0.57 2.18 770.18 0 08:17 0 0 0:00:00 DET-2 0.65 2.22 768.97 0 08:27 0 1400 0:00:00 DET-3 0.64 2.06 765.56 0 08:47 0 1369 0:00:00 DET-4 0.89 2.56 759.96 0 08:28 0 1404 0:00:00 DET-5 0.88 2.46 757.16 0 09:00 0 1398 0:00:00 ***************** Node Flow Summary ***************** ------------------------------------------------------------------------------------ Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------ J-1 JUNCTION 0.00 2.43 0 09:00 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Jun-13 JUNCTION 0.00 0.73 0 08:00 0.00 Jun-15 JUNCTION 0.00 0.73 0 08:00 0.00 Jun-17 JUNCTION 0.14 0.75 0 08:00 0.00 MH-3 JUNCTION 0.00 2.82 0 08:01 0.00 OV-01 JUNCTION 0.00 1.61 0 08:00 0.00 SW1-L-Start JUNCTION 0.50 2.11 0 08:00 0.00 SW1-U-1 JUNCTION 0.69 0.69 0 08:00 0.00 SW1-U-OF1A JUNCTION 0.00 0.69 0 08:00 0.00 SW1-U-OF1B JUNCTION 0.38 1.06 0 08:00 0.00 SW1-U-OF2A JUNCTION 0.00 1.05 0 08:01 0.00 SW1-U-OF2B JUNCTION 0.56 1.61 0 08:00 0.00 SW-2-Start JUNCTION 0.49 0.49 0 08:00 0.00 SW-4-Start JUNCTION 0.26 0.26 0 08:00 0.00 SW-5-Start JUNCTION 0.27 0.27 0 08:00 0.00 SW-6-Start JUNCTION 0.35 0.35 0 08:00 0.00 Out-01 OUTFALL 0.00 2.43 0 09:00 0.00 Uphill-NotIncluded OUTFALL 0.67 0.67 0 08:00 0.00 DET-1 STORAGE 0.00 2.82 0 08:01 0.00 DET-2 STORAGE 0.00 1.99 0 08:09 0.00 DET-3 STORAGE 0.00 1.83 0 08:27 0.00 DET-4 STORAGE 0.93 2.96 0 08:01 0.00 DET-5 STORAGE 0.00 2.50 0 08:28 0.00 ******************** Storage Node Summary ******************** ------------------------------------------------------------------------------------------------- ------------------------------------ Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs cfm hh:mm:ss 1000 ft³ ------------------------------------------------------------------------------------------------- ------------------------------------ DET-1 1.747 37 0 08:17 0.306 6 1.99 0.00 0:00:00 0.000 DET-2 0.000 0 0 00:00 0.195 0 1.83 0.00 0:00:00 0.000 DET-3 0.000 0 0 00:00 0.197 0 1.75 0.00 0:00:00 0.000 DET-4 0.000 0 0 00:00 0.392 0 2.50 0.00 0:00:00 0.000 DET-5 0.000 0 0 00:00 0.385 0 2.43 0.00 0:00:00 0.000 *********************** Outfall Loading Summary *********************** ----------------------------------------------- Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cfs cfs ----------------------------------------------- Out-01 99.50 1.08 2.43 Uphill-NotIncluded 99.63 0.16 0.67 ----------------------------------------------- System 99.56 1.25 2.69 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ***************** Link Flow Summary ***************** ------------------------------------------------------------------------------------------------- ------------------------------- Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm ft/sec cfs cfs Flow Depth minutes ------------------------------------------------------------------------------------------------- ------------------------------- CULVERT-1 CONDUIT 0 08:01 8.31 1.00 0.68 7.97 0.09 0.21 0 Calculated CULVERT-2 CONDUIT 0 08:01 7.91 1.00 1.05 6.51 0.16 0.29 0 Calculated EndPipe CONDUIT 0 09:00 7.88 1.00 2.43 9.76 0.25 0.42 0 Calculated Link-19 CONDUIT 0 08:00 2.12 1.00 0.75 6.17 0.12 0.62 0 Calculated PIPE CONDUIT 0 08:00 6.95 1.00 0.73 3.31 0.22 0.34 0 Calculated PIPE-SW1L-To-Pond CONDUIT 0 08:01 11.85 1.00 2.82 7.51 0.38 0.71 0 Calculated PIPE-SW1UtoSW1L CONDUIT 0 08:00 4.27 1.00 1.61 1.71 0.94 0.48 0 Calculated PIPE-UPPER-TO-LOWER CONDUIT 0 08:01 5.51 1.00 0.73 4.27 0.17 0.41 0 Calculated SW1-Lower CHANNEL 0 08:01 2.18 1.00 2.09 46.19 0.05 0.17 0 Calculated SWALE-3 CHANNEL 0 08:01 0.98 1.00 0.48 243.47 0.00 0.07 0 Calculated SWALE-4 CHANNEL 0 08:00 0.62 1.00 0.25 16.06 0.02 0.10 0 Calculated SWALE-5 CHANNEL 0 08:00 0.62 1.00 0.26 16.06 0.02 0.10 0 Calculated SWALE-6 CHANNEL 0 08:00 0.92 1.00 0.35 243.47 0.00 0.06 0 Calculated SW-U-1A CHANNEL 0 08:00 0.93 1.00 0.69 46.19 0.01 0.14 0 Calculated SW-U-1B CHANNEL 0 08:01 1.20 1.00 1.05 26.21 0.04 0.16 0 Calculated SW-U-1C CHANNEL 0 08:00 1.91 1.00 1.61 42.17 0.04 0.15 0 Calculated Orifice-01 ORIFICE 0 08:09 1.99 1.00 Orifice-02 ORIFICE 0 08:27 1.83 1.00 Orifice-03 ORIFICE 0 08:47 1.75 1.00 Orifice-04 ORIFICE 0 08:28 2.41 1.00 Orifice-05 ORIFICE 0 09:00 2.36 1.00 Weir-01 WEIR 0 00:00 0.00 0.00 Weir-02 WEIR 0 00:00 0.00 0.00 Weir-03 WEIR 0 00:00 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 0.00 Weir-04 WEIR 0 08:28 0.09 0.06 Weir-05 WEIR 0 09:00 0.07 0.06 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. WARNING 108 : Surcharge elevation defined for Junction Jun-13 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-15 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction Jun-17 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-17 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction MH-3 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction MH-3 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction OV-01 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction OV-01 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction OV-01 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-L-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-L-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-1 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-1 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2A is below junction invert Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-2-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW-5-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-1 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 117 : Conduit outlet invert elevation defined for Conduit PIPE-SW1UtoSW1L is below downstream node invert elevation. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Assumed conduit outlet invert elevation equal to downstream node invert elevation. WARNING 116 : Conduit inlet invert elevation defined for Conduit PIPE-UPPER-TO-LOWER is below upstream node invert elevation. Assumed conduit inlet invert elevation equal to upstream node invert elevation. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-13. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-17. WARNING 102 : Storage Node DET-2 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-3 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-4 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-5 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. Analysis began on: Thu Oct 30 17:04:31 2025 Analysis ended on: Thu Oct 30 17:04:37 2025 Total elapsed time: 00:00:06 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 2-Year Detention Timeplots Autodesk® Storm and Sanitary Analysis 2024 - Version 13.6.268 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. 20251029-CALC-WithUphillDetentionPondRebuild.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. Santa Barbara UH Time of Concentration...... SCS TR-55 Link Routing Method ....... Hydrodynamic Storage Node Exfiltration.. None Starting Date ............. AUG-28-2025 00:00:00 Ending Date ............... AUG-29-2025 00:00:00 Report Time Step .......... 00:00:10 ************* Element Count ************* Number of rain gages ...... 4 Number of subbasins ....... 15 Number of nodes ........... 23 Number of links ........... 26 **************** Subbasin Summary **************** Subbasin Total Imperv. Raingage Area Area ID ft² % ---------------------------------------------------- BASIN-L1 89729.62 20.00 StormGage BASIN-L2 73331.70 20.00 StormGage BASIN-L3 57593.75 20.00 StormGage BASIN-L4 54115.76 20.00 StormGage BASIN-L5 121297.51 20.00 StormGage BASIN-L6 22360.91 20.00 StormGage BASIN-L7 27792.87 20.00 StormGage BASIN-L8 45262.84 20.00 StormGage BASIN-S1 22110.92 100.00 StormGage BASIN-S2 3305.97 100.00 StormGage BASIN-S3 4297.00 100.00 StormGage BASIN-S4 4911.98 100.00 StormGage BASIN-S5 3194.98 100.00 StormGage BASIN-S6 8252.97 100.00 StormGage Uphill 82747.68 25.00 StormGage ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ J-1 JUNCTION 753.00 759.00 0.00 Jun-13 JUNCTION 810.15 818.30 0.00 Jun-15 JUNCTION 809.70 812.00 0.00 Jun-17 JUNCTION 808.00 819.50 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 10-Year Model Results for Detention MH-3 JUNCTION 779.50 787.00 0.00 OV-01 JUNCTION 808.93 812.29 0.00 SW1-L-Start JUNCTION 809.16 812.00 0.00 SW1-U-1 JUNCTION 840.97 842.00 0.00 SW1-U-OF1A JUNCTION 829.33 830.50 0.00 SW1-U-OF1B JUNCTION 820.77 826.64 0.00 SW1-U-OF2A JUNCTION 817.18 818.35 0.00 SW1-U-OF2B JUNCTION 813.79 815.66 0.00 SW-2-Start JUNCTION 816.36 820.36 0.00 SW-4-Start JUNCTION 815.13 816.13 0.00 SW-5-Start JUNCTION 816.70 817.70 0.00 SW-6-Start JUNCTION 816.34 820.34 0.00 Out-01 OUTFALL 0.00 753.00 0.00 Uphill-NotIncluded OUTFALL 0.00 0.00 0.00 DET-1 STORAGE 768.00 772.00 0.00 DET-2 STORAGE 766.75 766.75 0.00 DET-3 STORAGE 763.50 763.50 0.00 DET-4 STORAGE 757.40 757.40 0.00 DET-5 STORAGE 754.70 754.70 0.00 ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type ft % Roughness -------------------------------------------------------------------------------------------- CULVERT-1 SW1-U-OF1A SW1-U-OF1B CONDUIT 20.0 17.6000 0.0150 CULVERT-2 SW1-U-OF2A SW1-U-OF2B CONDUIT 20.0 11.7500 0.0150 EndPipe J-1 Out-01 CONDUIT 10.0 10.0000 0.0150 Link-19 Jun-17 DET-4 CONDUIT 480.0 10.5417 0.0150 PIPE Jun-13 Jun-15 CONDUIT 20.0 10.0000 0.0150 PIPE-SW1L-To-PondMH-3 DET-1 CONDUIT 67.0 15.6418 0.0150 PIPE-SW1UtoSW1L OV-01 SW1-L-Start CONDUIT 120.0 0.3083 0.0150 PIPE-UPPER-TO-LOWERJun-15 MH-3 CONDUIT 182.0 16.5934 0.0150 SW1-Lower SW1-L-Start MH-3 CHANNEL 386.0 6.0000 0.0500 SWALE-3 SW-2-Start Jun-13 CHANNEL 206.0 1.0000 0.0500 SWALE-4 SW-4-Start Jun-13 CHANNEL 83.0 1.0000 0.0500 SWALE-5 SW-5-Start Jun-17 CHANNEL 120.0 1.0000 0.0500 SWALE-6 SW-6-Start Jun-17 CHANNEL 84.0 1.0000 0.0500 SW-U-1A SW1-U-1 SW1-U-OF1A CHANNEL 194.0 6.0000 0.0500 SW-U-1B SW1-U-OF1B SW1-U-OF2A CHANNEL 177.0 1.9322 0.0500 SW-U-1C SW1-U-OF2B OV-01 CHANNEL 50.0 5.0000 0.0500 Orifice-01 DET-1 DET-2 ORIFICE Orifice-02 DET-2 DET-3 ORIFICE Orifice-03 DET-3 DET-4 ORIFICE Orifice-04 DET-4 DET-5 ORIFICE Orifice-05 DET-5 J-1 ORIFICE Weir-01 DET-1 DET-2 WEIR Weir-02 DET-2 DET-3 WEIR Weir-03 DET-3 DET-4 WEIR Weir-04 DET-4 DET-5 WEIR Weir-05 DET-5 J-1 WEIR ********************* Cross Section Summary ********************* Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Area Radius Capacity ft ft ft² ft cfs Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ------------------------------------------------------------------------------------------------- --------- CULVERT-1 CIRCULAR 0.83 0.83 1 0.55 0.21 7.97 CULVERT-2 CIRCULAR 0.83 0.83 1 0.55 0.21 6.51 EndPipe CIRCULAR 1.00 1.00 1 0.79 0.25 9.76 Link-19 CIRCULAR 0.83 0.83 1 0.55 0.21 6.17 PIPE CIRCULAR 0.67 0.67 1 0.35 0.17 3.31 PIPE-SW1L-To-Pond CIRCULAR 0.83 0.83 1 0.55 0.21 7.51 PIPE-SW1UtoSW1L CIRCULAR 1.00 1.00 1 0.79 0.25 1.71 PIPE-UPPER-TO-LOWER CIRCULAR 0.67 0.67 1 0.35 0.17 4.27 SW1-Lower TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SWALE-3 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SWALE-4 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-5 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-6 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SW-U-1A TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SW-U-1B TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 26.21 SW-U-1C TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 42.17 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 5.283 4.452 Surface Runoff ........... 3.149 2.654 Continuity Error (%) ..... 0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 3.116 1.015 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.032 0.010 Continuity Error (%) ..... 0.000 ****************************************** Composite Curve Number Computations Report ****************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 89729.62 80.40 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L2 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 73331.70 80.40 -------------------- Subbasin BASIN-L3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 57593.75 80.40 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 54115.76 80.40 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 121297.51 80.40 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22360.91 80.40 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 27792.87 80.40 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 45262.84 80.40 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22110.92 98.00 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3305.97 98.00 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4297.00 98.00 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4911.98 98.00 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3194.98 98.00 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 8252.97 98.00 ------------------ Subbasin Uphill ------------------ Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 82747.68 81.50 ************************************** Runoff Coefficient Computations Report ************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 89729.62 - 0.72 Composite Area & Weighted Runoff Coeff. 89729.62 0.72 -------------------- Subbasin BASIN-L2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 73331.70 - 0.72 Composite Area & Weighted Runoff Coeff. 73331.70 0.72 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 57593.75 - 0.72 Composite Area & Weighted Runoff Coeff. 57593.75 0.72 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 54115.76 - 0.72 Composite Area & Weighted Runoff Coeff. 54115.76 0.72 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 121297.51 - 0.72 Composite Area & Weighted Runoff Coeff. 121297.51 0.72 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22360.91 - 0.72 Composite Area & Weighted Runoff Coeff. 22360.91 0.72 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 27792.87 - 0.72 Composite Area & Weighted Runoff Coeff. 27792.87 0.72 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 45262.84 - 0.72 Composite Area & Weighted Runoff Coeff. 45262.84 0.72 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22110.92 - 0.72 Composite Area & Weighted Runoff Coeff. 22110.92 0.72 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ----------------------------------------------------------------------------------------- - 3305.97 - 0.72 Composite Area & Weighted Runoff Coeff. 3305.97 0.72 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4297.00 - 0.72 Composite Area & Weighted Runoff Coeff. 4297.00 0.72 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4911.98 - 0.72 Composite Area & Weighted Runoff Coeff. 4911.98 0.72 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 3194.98 - 0.72 Composite Area & Weighted Runoff Coeff. 3194.98 0.72 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 8252.97 - 0.72 Composite Area & Weighted Runoff Coeff. 8252.97 0.72 ------------------ Subbasin Uphill ------------------ Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 82747.68 - 0.72 Composite Area & Weighted Runoff Coeff. 82747.68 0.72 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness -------------------- Subbasin BASIN-L1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L5 -------------------- User-Defined TOC override (minutes): 5.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis -------------------- Subbasin BASIN-L6 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L7 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L8 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S5 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S6 -------------------- User-Defined TOC override (minutes): 5.00 ------------------ Subbasin Uphill ------------------ User-Defined TOC override (minutes): 7.00 *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- BASIN-L1 4.45 2.51 1.21 80.400 0 00:05:00 BASIN-L2 4.45 2.51 0.99 80.400 0 00:05:00 BASIN-L3 4.45 2.51 0.78 80.400 0 00:05:00 BASIN-L4 4.45 2.51 0.73 80.400 0 00:05:00 BASIN-L5 4.45 2.51 1.64 80.400 0 00:05:00 BASIN-L6 4.45 2.51 0.30 80.400 0 00:05:00 BASIN-L7 4.45 2.51 0.38 80.400 0 00:05:00 BASIN-L8 4.45 2.51 0.61 80.400 0 00:05:00 BASIN-S1 4.45 4.21 0.53 98.000 0 00:05:00 BASIN-S2 4.45 4.21 0.08 98.000 0 00:05:00 BASIN-S3 4.45 4.21 0.10 98.000 0 00:05:00 BASIN-S4 4.45 4.21 0.12 98.000 0 00:05:00 BASIN-S5 4.45 4.21 0.08 98.000 0 00:05:00 BASIN-S6 4.45 4.21 0.20 98.000 0 00:05:00 Uphill 4.45 2.62 1.15 81.500 0 00:07:00 -------------------------------------------------------------------------- ****************** Node Depth Summary ****************** ----------------------------------------------------------------------------------------- Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded ft ft ft days hh:mm acre-in minutes hh:mm:ss ----------------------------------------------------------------------------------------- J-1 0.38 0.85 753.85 0 08:26 0 0 0:00:00 Jun-13 1.73 1.94 812.09 0 08:00 0 0 0:00:00 Jun-15 0.11 0.25 809.95 0 08:00 0 0 0:00:00 Jun-17 0.11 0.25 808.25 0 08:00 0 0 0:00:00 MH-3 0.21 0.51 780.01 0 08:01 0 0 0:00:00 OV-01 1.05 2.48 811.41 0 08:00 0 0 0:00:00 SW1-L-Start 0.10 0.24 809.40 0 08:01 0 0 0:00:00 SW1-U-1 0.05 0.13 841.10 0 08:00 0 0 0:00:00 SW1-U-OF1A 0.11 0.25 829.58 0 08:00 0 0 0:00:00 SW1-U-OF1B 0.12 0.25 821.02 0 07:47 0 0 0:00:00 SW1-U-OF2A 0.14 0.35 817.53 0 08:00 0 0 0:00:00 SW1-U-OF2B 0.09 0.22 814.01 0 08:00 0 0 0:00:00 SW-2-Start 0.23 0.48 816.84 0 08:00 0 0 0:00:00 SW-4-Start 0.08 0.19 815.32 0 08:00 0 0 0:00:00 SW-5-Start 0.08 0.20 816.90 0 08:00 0 0 0:00:00 SW-6-Start 0.19 0.41 816.75 0 08:00 0 0 0:00:00 Out-01 0.00 0.00 0.00 0 00:00 0 0 0:00:00 Uphill-NotIncluded 0.00 0.00 0.00 0 00:00 0 0 0:00:00 DET-1 0.87 3.16 771.16 0 08:10 0 0 0:00:00 DET-2 1.00 3.23 769.98 0 08:14 0 1412 0:00:00 DET-3 1.02 3.44 766.94 0 08:23 0 1395 0:00:00 DET-4 1.35 3.00 760.40 0 08:20 0.00 1416 0:00:00 DET-5 1.35 2.98 757.68 0 08:26 0 1410 0:00:00 ***************** Node Flow Summary ***************** ------------------------------------------------------------------------------------ Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------ J-1 JUNCTION 0.00 4.96 0 08:26 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Jun-13 JUNCTION 0.00 1.24 0 08:00 0.00 Jun-15 JUNCTION 0.00 1.24 0 08:00 0.00 Jun-17 JUNCTION 0.20 1.25 0 08:00 0.00 MH-3 JUNCTION 0.00 4.78 0 08:01 0.00 OV-01 JUNCTION 0.00 2.71 0 08:00 0.00 SW1-L-Start JUNCTION 0.86 3.56 0 08:00 0.00 SW1-U-1 JUNCTION 1.21 1.21 0 08:00 0.00 SW1-U-OF1A JUNCTION 0.00 1.21 0 08:00 0.00 SW1-U-OF1B JUNCTION 0.53 1.73 0 08:00 0.00 SW1-U-OF2A JUNCTION 0.00 1.73 0 08:00 0.00 SW1-U-OF2B JUNCTION 0.99 2.72 0 08:00 0.00 SW-2-Start JUNCTION 0.83 0.83 0 08:00 0.00 SW-4-Start JUNCTION 0.42 0.42 0 08:00 0.00 SW-5-Start JUNCTION 0.45 0.45 0 08:00 0.00 SW-6-Start JUNCTION 0.61 0.61 0 08:00 0.00 Out-01 OUTFALL 0.00 4.96 0 08:26 0.00 Uphill-NotIncluded OUTFALL 1.15 1.15 0 08:00 0.00 DET-1 STORAGE 0.00 4.78 0 08:01 0.00 DET-2 STORAGE 0.00 4.12 0 08:09 0.00 DET-3 STORAGE 0.00 3.94 0 08:14 0.00 DET-4 STORAGE 1.64 5.07 0 08:19 0.07 0 08:20 DET-5 STORAGE 0.00 5.00 0 08:20 0.00 ******************** Storage Node Summary ******************** ------------------------------------------------------------------------------------------------- ------------------------------------ Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs cfm hh:mm:ss 1000 ft³ ------------------------------------------------------------------------------------------------- ------------------------------------ DET-1 3.179 67 0 08:10 0.567 12 4.12 0.00 0:00:00 0.000 DET-2 0.000 0 0 00:00 0.355 0 3.94 0.00 0:00:00 0.000 DET-3 0.000 0 0 00:00 0.380 0 3.51 0.00 0:00:00 0.000 DET-4 0.000 0 0 00:00 0.700 0 5.00 0.00 0:00:00 0.000 DET-5 0.000 0 0 00:00 0.703 0 4.96 0.00 0:00:00 0.000 *********************** Outfall Loading Summary *********************** ----------------------------------------------- Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cfs cfs ----------------------------------------------- Out-01 99.67 1.69 4.96 Uphill-NotIncluded 99.77 0.26 1.15 ----------------------------------------------- System 99.72 1.95 5.56 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ***************** Link Flow Summary ***************** ------------------------------------------------------------------------------------------------- ------------------------------- Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm ft/sec cfs cfs Flow Depth minutes ------------------------------------------------------------------------------------------------- ------------------------------- CULVERT-1 CONDUIT 0 08:00 9.53 1.00 1.20 7.97 0.15 0.28 0 Calculated CULVERT-2 CONDUIT 0 08:00 8.82 1.00 1.73 6.51 0.27 0.39 0 Calculated EndPipe CONDUIT 0 08:26 8.73 1.00 4.96 9.76 0.51 0.68 0 Calculated Link-19 CONDUIT 0 08:00 3.32 1.00 1.25 6.17 0.20 0.65 0 Calculated PIPE CONDUIT 0 08:00 7.79 1.00 1.24 3.31 0.37 0.46 0 Calculated PIPE-SW1L-To-Pond CONDUIT 0 08:01 12.24 1.00 4.78 7.51 0.64 0.81 0 Calculated PIPE-SW1UtoSW1L CONDUIT 0 08:00 5.29 1.00 2.71 1.71 1.58 0.62 0 > CAPACITY PIPE-UPPER-TO-LOWER CONDUIT 0 08:00 6.27 1.00 1.24 4.27 0.29 0.57 0 Calculated SW1-Lower CHANNEL 0 08:01 2.59 1.00 3.54 46.19 0.08 0.24 0 Calculated SWALE-3 CHANNEL 0 08:00 1.14 1.00 0.82 243.47 0.00 0.09 0 Calculated SWALE-4 CHANNEL 0 08:00 0.75 1.00 0.42 16.06 0.03 0.13 0 Calculated SWALE-5 CHANNEL 0 08:00 0.76 1.00 0.45 16.06 0.03 0.13 0 Calculated SWALE-6 CHANNEL 0 08:00 1.09 1.00 0.61 243.47 0.00 0.07 0 Calculated SW-U-1A CHANNEL 0 08:00 1.15 1.00 1.21 46.19 0.03 0.19 0 Calculated SW-U-1B CHANNEL 0 08:00 1.41 1.00 1.73 26.21 0.07 0.22 0 Calculated SW-U-1C CHANNEL 0 08:00 2.27 1.00 2.71 42.17 0.06 0.21 0 Calculated Orifice-01 ORIFICE 0 07:55 2.27 1.00 Orifice-02 ORIFICE 0 08:14 2.26 1.00 Orifice-03 ORIFICE 0 08:23 2.34 1.00 Orifice-04 ORIFICE 0 08:20 2.64 1.00 Orifice-05 ORIFICE 0 08:26 2.63 1.00 Weir-01 WEIR 0 08:10 2.21 0.38 Weir-02 WEIR 0 08:14 1.68 0.42 Weir-03 WEIR 0 08:23 1.17 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 0.52 Weir-04 WEIR 0 08:20 2.35 0.50 Weir-05 WEIR 0 08:26 2.33 0.58 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. WARNING 108 : Surcharge elevation defined for Junction Jun-13 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-15 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction Jun-17 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-17 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction MH-3 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction MH-3 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction OV-01 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction OV-01 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction OV-01 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-L-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-L-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-1 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-1 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2A is below junction invert Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-2-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW-5-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-1 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 117 : Conduit outlet invert elevation defined for Conduit PIPE-SW1UtoSW1L is below downstream node invert elevation. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Assumed conduit outlet invert elevation equal to downstream node invert elevation. WARNING 116 : Conduit inlet invert elevation defined for Conduit PIPE-UPPER-TO-LOWER is below upstream node invert elevation. Assumed conduit inlet invert elevation equal to upstream node invert elevation. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-13. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-17. WARNING 102 : Storage Node DET-2 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-3 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-4 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-5 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. Analysis began on: Thu Oct 30 16:52:01 2025 Analysis ended on: Thu Oct 30 16:52:07 2025 Total elapsed time: 00:00:06 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 10-Year Detention Timeplots Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 5 Draft O&M Plans Stormwater Management Manual 4-19 Eugene 2014 4.5.7 Rain Garden O & M Plan Rain Gardens are vegetated surface reservoirs used to collect and treat stormwater runoff from impervious surfaces by allowing the pollutants to settle and filter out as the water percolates through vegetation and soil mediums before infiltrating into the ground below or being piped to its downstream destination. Rain Gardens can be used to help fulfill a site’s required landscaping area requirement and should be integrated into the overall site design. Numerous design variations of shape and planting scheme can be used to fit the character of a site. The reservoir basin shall infiltrate stormwater within 24 hours. All facility components and vegetation shall be inspected for proper operations and structural stability, at a minimum, quarterly for the first 2 years from the date of installation, 2 times per year thereafter, and within 48 hours after each major storm event. Training and/or Written Guidance information for operating and maintaining vegetated infiltration basins shall be provided to all property owners and tenants. A copy of the O & M Plan shall be provided to all property owners and tenants. Inspection Logs shall be kept by the facility owner demonstrating the following items have been inspected and are being maintained properly: • Access to Rain Gardens shall be safe and efficient. Obstacles preventing maintenance personnel and/or equipment access to the components of the facility shall be removed. • Debris and Litter shall be removed to prevent channelization, clogging, and interference with plant growth. Fallen leaves and debris from deciduous plant foliage shall be raked and removed. • Erosion Damage shall be identified and controlled when native soil is exposed or erosion channels are forming. • Grassed Rain Gardens shall be mowed to 4”-9” high and grass clippings shall be removed no less than 2 times per year. • Infiltrating Rain Gardens shall be excavated and cleaned, and gravel or soil shall be replaced to correct low infiltration rates. • Inlets shall be cleared when conveyance capacity is plugged to ensure unrestricted stormwater flow to the rain garden. • Mulch shall be replenished as needed to ensure healthy plant growth. • Nuisance and Prohibited Vegetation from the Eugene Plant List (such as blackberries and English Ivy) shall be removed when discovered. Invasive vegetation contributing up to 25% of vegetation of all species shall be removed and replaced. • Outlets shall be cleared when 50% of the conveyance capacity is plugged. • Overflows shall be cleared when 25% of the conveyance capacity is plugged. Stormwater Management Manual 4-20 Eugene 2014 • Rocks or Other Armoring shall be replaced when only one layer of rock exists above native soil. • Sedimentation build-up near or exceeding 2” in depth shall be hand-removed with minimum damage to vegetation using proper erosion control measures. Sediment shall be removed if it is more than 4 inches thick or so thick as to damage or kill vegetation. • Slopes shall be stabilized using appropriate measures when native soil is exposed. • Vegetation shall be healthy and dense enough to provide filtering while protecting underlying soils from erosion. Dead vegetation shall be removed to maintain less than 10% of area coverage or when vegetative filter function is impaired. Vegetation shall be replaced immediately to control erosion where soils are exposed and within 3 months to maintain cover density. Spill Prevention Measures shall be exercised on site when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified. Non-Chemical Pest Control measures shall be taken to prevent development of insects, mosquitoes, and rodents. Stormwater Management Manual 4-29 Eugene 2014 4.5.12 Structural Detention Facility O & M Plan Structural Detention Facilities are flow control devices. Structural detention facilities include tanks, vaults, and oversized pipes designed to fill with stormwater during large storm events and slowly release the runoff over a number of hours. There are numerous components to each system; inlet pipes conveying stormwater into the detention facility, detention chambers storing stormwater during storm events, and outlet drains restricting the flow out of the detention chamber. Underground Structural Detention Facilities shall be inspected quarterly and within 48 hours after each major storm event. Training and/or Written Guidance information for operating and maintaining Detention Facilities shall be provided to all property owners and tenants. A copy of the O & M Plan shall be provided to all property owners and tenants. Inspection Logs shall be kept by the facility owner demonstrating the following items have been inspected and are being maintained properly: • Access to the detention facility shall be safe and efficient. Obstacles preventing maintenance personnel and/or equipment access to the components of the facility shall be removed. • Debris/Sediment that is found to clog the inlet shall be removed, tested, and disposed of in accordance with applicable federal and state requirements. • Detention Chamber shall be cleaned out yearly or after an inch of sediment has accumulated and inspected for cracks or damage. Grit and sediment that has settled to the bottom of the chamber shall be removed during each cleaning. Cleaning shall be done without use of detergents or surfactants. A pressure washer may be used if necessary. • Inlets shall be cleared when conveyance capacity is plugged to ensure unrestricted stormwater flow. • Outlets shall be cleared when 50% of the conveyance capacity is plugged. • Vegetation such as large shrubs or trees that are likely to interfere with detention facility operation shall be identified at each inspection then removed. Spill Prevention Measures shall be exercised when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified. Non-Chemical Pest Control measures shall be taken to prevent development of insects, mosquitoes, and rodents. Stormwater Management Manual 4-25 Eugene 2014 4.5.10 Swale O & M Plan Swales are filtration stormwater conveyance facilities that provide flow control and stormwater quality benefits. Swales are long and narrow vegetated and grassed depressions used to collect and convey stormwater runoff which allows pollutants to settle and filter out as the water flows through the facility. All facility components, vegetation, and source controls shall be inspected for proper operations and structural stability, at a minimum, quarterly for the first 2 years from the date of installation, 2 times per year thereafter, and within 48 hours after each major storm event. Training and/or Written Guidance information for operating and maintaining Swales shall be provided to all property owners and tenants. A copy of the O & M Plan shall be provided to all property owners and tenants. Inspection Logs shall be kept by the facility owner demonstrating the following items have been inspected and are being maintained properly: • Access to Swales shall be safe and efficient. Obstacles preventing maintenance personnel and/or equipment access to the components of the facility shall be removed. • Channelization and causes for altered water flow shall be identified and corrected upon discovery. Stormwater should exit the vegetative filter as sheet flow, unless a collection drainpipe is used. • Debris and Litter shall be removed to prevent channelization, clogging, and interference with plant growth. Fallen leaves and debris from deciduous plant foliage shall be raked and removed. • Erosion Damage shall be identified and controlled when native soil is exposed or erosion channels are forming. • Grassed Swales shall be mowed to 4”-9” high and grass clippings shall be removed no less than 2 times per year. • Infiltrating Swales shall be excavated and cleaned, and gravel or soil shall be replaced to correct low infiltration rates. The Swale should drain within 48 hours of a storm event. • Inlets shall maintain a calm flow of water entering the Swale and shall be cleared when conveyance capacity is plugged to ensure unrestricted stormwater flow to the rain garden. • Mulch shall be replenished as needed to ensure healthy plant growth. • Nuisance and Prohibited Vegetation from the Eugene Plant List (such as blackberries and English Ivy) shall be removed when discovered. Invasive vegetation contributing up to 25% of vegetation of all species shall be removed and replaced. • Outlets shall be cleared when 50% of the conveyance capacity is plugged. Stormwater Management Manual 4-26 Eugene 2014 • Sedimentation build-up near or exceeding 2” in depth shall be hand-removed with minimum damage to vegetation using proper erosion control measures. Sediment shall be removed if it is more than 4 inches thick or so thick as to damage or kill vegetation. • Slopes shall be stabilized to prevent erosion and failure using appropriate measures when native soil is exposed. • Vegetation shall be healthy and dense enough to provide filtering while protecting underlying soils from erosion. Dead vegetation shall be removed to maintain less than 10% of area coverage or when vegetative filter function is impaired. Vegetation shall be replaced immediately to control erosion where soils are exposed and within 3 months to maintain cover density. Spill Prevention Measures shall be exercised on site when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified. Non-Chemical Pest Control measures shall be taken to prevent development of insects, mosquitoes, and rodents. Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 6 Detention Calculations with Adjacent, Developed Lots Autodesk® Storm and Sanitary Analysis 2024 - Version 13.6.268 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. 20251029-CALC-WithUphillDetentionPondRebuild.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. Santa Barbara UH Time of Concentration...... SCS TR-55 Link Routing Method ....... Hydrodynamic Storage Node Exfiltration.. None Starting Date ............. AUG-28-2025 00:00:00 Ending Date ............... AUG-29-2025 00:00:00 Report Time Step .......... 00:00:10 ************* Element Count ************* Number of rain gages ...... 4 Number of subbasins ....... 15 Number of nodes ........... 22 Number of links ........... 27 **************** Subbasin Summary **************** Subbasin Total Imperv. Raingage Area Area ID ft² % ---------------------------------------------------- BASIN-L1 89729.62 20.00 StormGage BASIN-L2 73331.70 20.00 StormGage BASIN-L3 57593.75 20.00 StormGage BASIN-L4 54115.76 20.00 StormGage BASIN-L5 121297.51 20.00 StormGage BASIN-L6 22360.91 20.00 StormGage BASIN-L7 27792.87 20.00 StormGage BASIN-L8 45262.84 20.00 StormGage BASIN-S1 22110.92 100.00 StormGage BASIN-S2 3305.97 100.00 StormGage BASIN-S3 4297.00 100.00 StormGage BASIN-S4 4911.98 100.00 StormGage BASIN-S5 3194.98 100.00 StormGage BASIN-S6 8252.97 100.00 StormGage Uphill 82747.68 25.00 StormGage ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ J-1 JUNCTION 753.00 759.00 0.00 Jun-13 JUNCTION 810.15 818.30 0.00 Jun-15 JUNCTION 809.70 812.00 0.00 Jun-17 JUNCTION 808.00 819.50 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 2-Year Model Results with Adjacent Lots MH-3 JUNCTION 779.50 787.00 0.00 OV-01 JUNCTION 808.93 812.29 0.00 SW1-L-Start JUNCTION 809.16 812.00 0.00 SW1-U-1 JUNCTION 840.97 842.00 0.00 SW1-U-OF1A JUNCTION 829.33 830.50 0.00 SW1-U-OF1B JUNCTION 820.77 826.64 0.00 SW1-U-OF2A JUNCTION 817.18 818.35 0.00 SW1-U-OF2B JUNCTION 813.79 815.66 0.00 SW-2-Start JUNCTION 816.36 820.36 0.00 SW-4-Start JUNCTION 815.13 816.13 0.00 SW-5-Start JUNCTION 816.70 817.70 0.00 SW-6-Start JUNCTION 816.34 820.34 0.00 Out-01 OUTFALL 0.00 753.00 0.00 DET-1 STORAGE 768.00 772.00 0.00 DET-2 STORAGE 766.75 766.75 0.00 DET-3 STORAGE 763.50 763.50 0.00 DET-4 STORAGE 757.40 757.40 0.00 DET-5 STORAGE 754.70 754.70 0.00 ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type ft % Roughness -------------------------------------------------------------------------------------------- CULVERT-1 SW1-U-OF1A SW1-U-OF1B CONDUIT 20.0 17.6000 0.0150 CULVERT-2 SW1-U-OF2A SW1-U-OF2B CONDUIT 20.0 11.7500 0.0150 EndPipe J-1 Out-01 CONDUIT 10.0 10.0000 0.0150 Link-19 Jun-17 DET-4 CONDUIT 480.0 10.5417 0.0150 PIPE Jun-13 Jun-15 CONDUIT 20.0 10.0000 0.0150 PIPE-SW1L-To-PondMH-3 DET-1 CONDUIT 67.0 15.6418 0.0150 PIPE-SW1UtoSW1L OV-01 SW1-L-Start CONDUIT 120.0 0.3083 0.0150 PIPE-UPPER-TO-LOWERJun-15 MH-3 CONDUIT 182.0 16.5934 0.0150 SW1-Lower SW1-L-Start MH-3 CHANNEL 386.0 6.0000 0.0500 SWALE-3 SW-2-Start Jun-13 CHANNEL 206.0 1.0000 0.0500 SWALE-4 SW-4-Start Jun-13 CHANNEL 83.0 1.0000 0.0500 SWALE-5 SW-5-Start Jun-17 CHANNEL 120.0 1.0000 0.0500 SWALE-6 SW-6-Start Jun-17 CHANNEL 84.0 1.0000 0.0500 SW-U-1A SW1-U-1 SW1-U-OF1A CHANNEL 194.0 6.0000 0.0500 SW-U-1B SW1-U-OF1B SW1-U-OF2A CHANNEL 177.0 1.9322 0.0500 SW-U-1C SW1-U-OF2B OV-01 CHANNEL 50.0 5.0000 0.0500 Orifice-01 DET-1 DET-2 ORIFICE Orifice-02 DET-2 DET-3 ORIFICE Orifice-03 DET-3 DET-4 ORIFICE Orifice-04 DET-4 DET-5 ORIFICE Orifice-05 DET-5 J-1 ORIFICE Weir-01 DET-1 DET-2 WEIR Weir-02 DET-2 DET-3 WEIR Weir-03 DET-3 DET-4 WEIR Weir-04 DET-4 DET-5 WEIR Weir-04-EmergencyDET-4 DET-5 WEIR Weir-05 DET-5 J-1 WEIR ********************* Cross Section Summary ********************* Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Area Radius Capacity ft ft ft² ft cfs Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ------------------------------------------------------------------------------------------------- --------- CULVERT-1 CIRCULAR 0.83 0.83 1 0.55 0.21 7.97 CULVERT-2 CIRCULAR 0.83 0.83 1 0.55 0.21 6.51 EndPipe CIRCULAR 1.00 1.00 1 0.79 0.25 9.76 Link-19 CIRCULAR 0.83 0.83 1 0.55 0.21 6.17 PIPE CIRCULAR 0.67 0.67 1 0.35 0.17 3.31 PIPE-SW1L-To-Pond CIRCULAR 0.83 0.83 1 0.55 0.21 7.51 PIPE-SW1UtoSW1L CIRCULAR 1.00 1.00 1 0.79 0.25 1.71 PIPE-UPPER-TO-LOWER CIRCULAR 0.67 0.67 1 0.35 0.17 4.27 SW1-Lower TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SWALE-3 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SWALE-4 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-5 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-6 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SW-U-1A TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SW-U-1B TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 26.21 SW-U-1C TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 42.17 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 3.826 3.224 Surface Runoff ........... 1.960 1.652 Continuity Error (%) ..... 0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 1.934 0.630 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.026 0.008 Continuity Error (%) ..... 0.000 ****************************************** Composite Curve Number Computations Report ****************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 89729.62 80.40 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L2 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 73331.70 80.40 -------------------- Subbasin BASIN-L3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 57593.75 80.40 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 54115.76 80.40 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 121297.51 80.40 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22360.91 80.40 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 27792.87 80.40 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 45262.84 80.40 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22110.92 98.00 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3305.97 98.00 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4297.00 98.00 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4911.98 98.00 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3194.98 98.00 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 8252.97 98.00 ------------------ Subbasin Uphill ------------------ Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 82747.68 81.50 ************************************** Runoff Coefficient Computations Report ************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 89729.62 - 0.72 Composite Area & Weighted Runoff Coeff. 89729.62 0.72 -------------------- Subbasin BASIN-L2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 73331.70 - 0.72 Composite Area & Weighted Runoff Coeff. 73331.70 0.72 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 57593.75 - 0.72 Composite Area & Weighted Runoff Coeff. 57593.75 0.72 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 54115.76 - 0.72 Composite Area & Weighted Runoff Coeff. 54115.76 0.72 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 121297.51 - 0.72 Composite Area & Weighted Runoff Coeff. 121297.51 0.72 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22360.91 - 0.72 Composite Area & Weighted Runoff Coeff. 22360.91 0.72 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 27792.87 - 0.72 Composite Area & Weighted Runoff Coeff. 27792.87 0.72 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 45262.84 - 0.72 Composite Area & Weighted Runoff Coeff. 45262.84 0.72 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22110.92 - 0.72 Composite Area & Weighted Runoff Coeff. 22110.92 0.72 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ----------------------------------------------------------------------------------------- - 3305.97 - 0.72 Composite Area & Weighted Runoff Coeff. 3305.97 0.72 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4297.00 - 0.72 Composite Area & Weighted Runoff Coeff. 4297.00 0.72 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4911.98 - 0.72 Composite Area & Weighted Runoff Coeff. 4911.98 0.72 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 3194.98 - 0.72 Composite Area & Weighted Runoff Coeff. 3194.98 0.72 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 8252.97 - 0.72 Composite Area & Weighted Runoff Coeff. 8252.97 0.72 ------------------ Subbasin Uphill ------------------ Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 82747.68 - 0.72 Composite Area & Weighted Runoff Coeff. 82747.68 0.72 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness -------------------- Subbasin BASIN-L1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L5 -------------------- User-Defined TOC override (minutes): 5.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis -------------------- Subbasin BASIN-L6 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L7 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L8 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S5 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S6 -------------------- User-Defined TOC override (minutes): 5.00 ------------------ Subbasin Uphill ------------------ User-Defined TOC override (minutes): 7.00 *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- BASIN-L1 3.22 1.53 0.69 80.400 0 00:05:00 BASIN-L2 3.22 1.53 0.56 80.400 0 00:05:00 BASIN-L3 3.22 1.53 0.44 80.400 0 00:05:00 BASIN-L4 3.22 1.53 0.42 80.400 0 00:05:00 BASIN-L5 3.22 1.53 0.93 80.400 0 00:05:00 BASIN-L6 3.22 1.53 0.17 80.400 0 00:05:00 BASIN-L7 3.22 1.53 0.21 80.400 0 00:05:00 BASIN-L8 3.22 1.53 0.35 80.400 0 00:05:00 BASIN-S1 3.22 2.99 0.38 98.000 0 00:05:00 BASIN-S2 3.22 2.99 0.06 98.000 0 00:05:00 BASIN-S3 3.22 2.99 0.07 98.000 0 00:05:00 BASIN-S4 3.22 2.99 0.08 98.000 0 00:05:00 BASIN-S5 3.22 2.99 0.06 98.000 0 00:05:00 BASIN-S6 3.22 2.99 0.14 98.000 0 00:05:00 Uphill 3.22 1.62 0.67 81.500 0 00:07:00 -------------------------------------------------------------------------- ****************** Node Depth Summary ****************** ----------------------------------------------------------------------------------------- Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded ft ft ft days hh:mm acre-in minutes hh:mm:ss ----------------------------------------------------------------------------------------- J-1 0.31 0.54 753.54 0 08:47 0 0 0:00:00 Jun-13 1.74 1.97 812.12 0 08:00 0 0 0:00:00 Jun-15 0.12 0.26 809.96 0 08:00 0 0 0:00:00 Jun-17 0.09 0.20 808.20 0 08:00 0 0 0:00:00 MH-3 0.19 0.40 779.90 0 08:00 0 0 0:00:00 OV-01 0.94 1.39 810.32 0 08:00 0 0 0:00:00 SW1-L-Start 0.08 0.18 809.34 0 08:01 0 0 0:00:00 SW1-U-1 0.04 0.09 841.06 0 08:00 0 0 0:00:00 SW1-U-OF1A 0.08 0.18 829.51 0 08:01 0 0 0:00:00 SW1-U-OF1B 0.09 0.21 820.98 0 08:01 0 0 0:00:00 SW1-U-OF2A 0.11 0.26 817.44 0 08:01 0 0 0:00:00 SW1-U-OF2B 0.07 0.17 813.96 0 08:00 0 0 0:00:00 SW-2-Start 0.18 0.38 816.74 0 08:01 0 0 0:00:00 SW-4-Start 0.06 0.14 815.27 0 08:00 0 0 0:00:00 SW-5-Start 0.06 0.15 816.85 0 08:00 0 0 0:00:00 SW-6-Start 0.15 0.31 816.65 0 08:00 0 0 0:00:00 Out-01 0.00 0.00 0.00 0 00:00 0 0 0:00:00 DET-1 0.71 2.69 770.69 0 08:15 0 0 0:00:00 DET-2 0.79 2.67 769.42 0 08:21 0 1400 0:00:00 DET-3 0.80 2.58 766.08 0 08:36 0 1369 0:00:00 DET-4 1.01 2.64 760.04 0 08:39 0 1404 0:00:00 DET-5 1.00 2.57 757.27 0 08:47 0 1398 0:00:00 ***************** Node Flow Summary ***************** ------------------------------------------------------------------------------------ Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------ J-1 JUNCTION 0.00 2.78 0 08:47 0.00 Jun-13 JUNCTION 0.67 1.40 0 08:00 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Jun-15 JUNCTION 0.00 1.40 0 08:00 0.00 Jun-17 JUNCTION 0.14 0.75 0 08:00 0.00 MH-3 JUNCTION 0.00 3.49 0 08:00 0.00 OV-01 JUNCTION 0.00 1.61 0 08:00 0.00 SW1-L-Start JUNCTION 0.50 2.11 0 08:00 0.00 SW1-U-1 JUNCTION 0.69 0.69 0 08:00 0.00 SW1-U-OF1A JUNCTION 0.00 0.69 0 08:00 0.00 SW1-U-OF1B JUNCTION 0.38 1.06 0 08:00 0.00 SW1-U-OF2A JUNCTION 0.00 1.05 0 08:01 0.00 SW1-U-OF2B JUNCTION 0.56 1.61 0 08:00 0.00 SW-2-Start JUNCTION 0.49 0.49 0 08:00 0.00 SW-4-Start JUNCTION 0.26 0.26 0 08:00 0.00 SW-5-Start JUNCTION 0.27 0.27 0 08:00 0.00 SW-6-Start JUNCTION 0.35 0.35 0 08:00 0.00 Out-01 OUTFALL 0.00 2.78 0 08:47 0.00 DET-1 STORAGE 0.00 3.49 0 08:00 0.00 DET-2 STORAGE 0.00 2.55 0 08:12 0.00 DET-3 STORAGE 0.00 2.35 0 08:21 0.00 DET-4 STORAGE 0.93 3.08 0 08:00 0.00 DET-5 STORAGE 0.00 2.81 0 08:39 0.00 ******************** Storage Node Summary ******************** ------------------------------------------------------------------------------------------------- ------------------------------------ Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs cfm hh:mm:ss 1000 ft³ ------------------------------------------------------------------------------------------------- ------------------------------------ DET-1 2.442 52 0 08:15 0.417 9 2.55 0.00 0:00:00 0.000 DET-2 0.000 0 0 00:00 0.258 0 2.35 0.00 0:00:00 0.000 DET-3 0.000 0 0 00:00 0.267 0 2.07 0.00 0:00:00 0.000 DET-4 0.000 0 0 00:00 0.470 0 2.81 0.00 0:00:00 0.000 DET-5 0.000 0 0 00:00 0.464 0 2.78 0.00 0:00:00 0.000 *********************** Outfall Loading Summary *********************** ----------------------------------------------- Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cfs cfs ----------------------------------------------- Out-01 99.52 1.23 2.78 ----------------------------------------------- System 99.52 1.23 2.78 ***************** Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Link Flow Summary ***************** ------------------------------------------------------------------------------------------------- ------------------------------- Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm ft/sec cfs cfs Flow Depth minutes ------------------------------------------------------------------------------------------------- ------------------------------- CULVERT-1 CONDUIT 0 08:01 8.31 1.00 0.68 7.97 0.09 0.21 0 Calculated CULVERT-2 CONDUIT 0 08:01 7.91 1.00 1.05 6.51 0.16 0.29 0 Calculated EndPipe CONDUIT 0 08:47 8.06 1.00 2.78 9.76 0.28 0.45 0 Calculated Link-19 CONDUIT 0 08:00 2.12 1.00 0.75 6.17 0.12 0.62 0 Calculated PIPE CONDUIT 0 08:00 7.98 1.00 1.40 3.31 0.42 0.50 0 Calculated PIPE-SW1L-To-Pond CONDUIT 0 08:00 12.12 1.00 3.49 7.51 0.46 0.74 0 Calculated PIPE-SW1UtoSW1L CONDUIT 0 08:00 4.27 1.00 1.61 1.71 0.94 0.48 0 Calculated PIPE-UPPER-TO-LOWER CONDUIT 0 08:00 8.10 1.00 1.40 4.27 0.33 0.50 0 Calculated SW1-Lower CHANNEL 0 08:01 2.18 1.00 2.09 46.19 0.05 0.17 0 Calculated SWALE-3 CHANNEL 0 08:01 0.98 1.00 0.48 243.47 0.00 0.07 0 Calculated SWALE-4 CHANNEL 0 08:00 0.62 1.00 0.25 16.06 0.02 0.10 0 Calculated SWALE-5 CHANNEL 0 08:00 0.62 1.00 0.26 16.06 0.02 0.10 0 Calculated SWALE-6 CHANNEL 0 08:00 0.92 1.00 0.35 243.47 0.00 0.06 0 Calculated SW-U-1A CHANNEL 0 08:00 0.93 1.00 0.69 46.19 0.01 0.14 0 Calculated SW-U-1B CHANNEL 0 08:01 1.20 1.00 1.05 26.21 0.04 0.16 0 Calculated SW-U-1C CHANNEL 0 08:00 1.91 1.00 1.61 42.17 0.04 0.15 0 Calculated Orifice-01 ORIFICE 0 08:05 2.17 1.00 Orifice-02 ORIFICE 0 08:21 2.03 1.00 Orifice-03 ORIFICE 0 08:36 1.99 1.00 Orifice-04 ORIFICE 0 08:39 2.46 1.00 Orifice-05 ORIFICE 0 08:47 2.42 1.00 Weir-01 WEIR 0 08:15 0.53 0.15 Weir-02 WEIR 0 08:21 0.32 0.14 Weir-03 WEIR 0 08:36 0.08 0.09 Weir-04 WEIR 0 08:39 0.35 0.14 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Weir-04-Emergency WEIR 0 00:00 0.00 0.00 Weir-05 WEIR 0 08:47 0.36 0.17 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. WARNING 108 : Surcharge elevation defined for Junction Jun-13 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-15 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction Jun-17 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-17 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction MH-3 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction MH-3 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction OV-01 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction OV-01 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction OV-01 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-L-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-L-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-1 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-1 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2A is below junction invert Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-2-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW-5-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-1 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 117 : Conduit outlet invert elevation defined for Conduit PIPE-SW1UtoSW1L is below downstream node invert elevation. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Assumed conduit outlet invert elevation equal to downstream node invert elevation. WARNING 116 : Conduit inlet invert elevation defined for Conduit PIPE-UPPER-TO-LOWER is below upstream node invert elevation. Assumed conduit inlet invert elevation equal to upstream node invert elevation. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-13. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-17. WARNING 102 : Storage Node DET-2 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-3 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-4 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-5 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. Analysis began on: Thu Oct 30 17:46:11 2025 Analysis ended on: Thu Oct 30 17:46:17 2025 Total elapsed time: 00:00:06 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Autodesk® Storm and Sanitary Analysis 2024 - Version 13.6.268 (Build 0) ----------------------------------------------------------------------------------------- ******************* Project Description ******************* File Name ................. 20251029-CALC-WithUphillDetentionPondRebuild.SPF **************** Analysis Options **************** Flow Units ................ cfs Subbasin Hydrograph Method. Santa Barbara UH Time of Concentration...... SCS TR-55 Link Routing Method ....... Hydrodynamic Storage Node Exfiltration.. None Starting Date ............. AUG-28-2025 00:00:00 Ending Date ............... AUG-29-2025 00:00:00 Report Time Step .......... 00:00:10 ************* Element Count ************* Number of rain gages ...... 4 Number of subbasins ....... 15 Number of nodes ........... 22 Number of links ........... 27 **************** Subbasin Summary **************** Subbasin Total Imperv. Raingage Area Area ID ft² % ---------------------------------------------------- BASIN-L1 89729.62 20.00 StormGage BASIN-L2 73331.70 20.00 StormGage BASIN-L3 57593.75 20.00 StormGage BASIN-L4 54115.76 20.00 StormGage BASIN-L5 121297.51 20.00 StormGage BASIN-L6 22360.91 20.00 StormGage BASIN-L7 27792.87 20.00 StormGage BASIN-L8 45262.84 20.00 StormGage BASIN-S1 22110.92 100.00 StormGage BASIN-S2 3305.97 100.00 StormGage BASIN-S3 4297.00 100.00 StormGage BASIN-S4 4911.98 100.00 StormGage BASIN-S5 3194.98 100.00 StormGage BASIN-S6 8252.97 100.00 StormGage Uphill 82747.68 25.00 StormGage ************ Node Summary ************ Node Element Invert Maximum Ponded External ID Type Elevation Elev. Area Inflow ft ft ft² ------------------------------------------------------------------------------ J-1 JUNCTION 753.00 759.00 0.00 Jun-13 JUNCTION 810.15 818.30 0.00 Jun-15 JUNCTION 809.70 812.00 0.00 Jun-17 JUNCTION 808.00 819.50 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis 10-Year Model Results with Adjacent Lots MH-3 JUNCTION 779.50 787.00 0.00 OV-01 JUNCTION 808.93 812.29 0.00 SW1-L-Start JUNCTION 809.16 812.00 0.00 SW1-U-1 JUNCTION 840.97 842.00 0.00 SW1-U-OF1A JUNCTION 829.33 830.50 0.00 SW1-U-OF1B JUNCTION 820.77 826.64 0.00 SW1-U-OF2A JUNCTION 817.18 818.35 0.00 SW1-U-OF2B JUNCTION 813.79 815.66 0.00 SW-2-Start JUNCTION 816.36 820.36 0.00 SW-4-Start JUNCTION 815.13 816.13 0.00 SW-5-Start JUNCTION 816.70 817.70 0.00 SW-6-Start JUNCTION 816.34 820.34 0.00 Out-01 OUTFALL 0.00 753.00 0.00 DET-1 STORAGE 768.00 772.00 0.00 DET-2 STORAGE 766.75 766.75 0.00 DET-3 STORAGE 763.50 763.50 0.00 DET-4 STORAGE 757.40 757.40 0.00 DET-5 STORAGE 754.70 754.70 0.00 ************ Link Summary ************ Link From Node To Node Element Length Slope Manning's ID Type ft % Roughness -------------------------------------------------------------------------------------------- CULVERT-1 SW1-U-OF1A SW1-U-OF1B CONDUIT 20.0 17.6000 0.0150 CULVERT-2 SW1-U-OF2A SW1-U-OF2B CONDUIT 20.0 11.7500 0.0150 EndPipe J-1 Out-01 CONDUIT 10.0 10.0000 0.0150 Link-19 Jun-17 DET-4 CONDUIT 480.0 10.5417 0.0150 PIPE Jun-13 Jun-15 CONDUIT 20.0 10.0000 0.0150 PIPE-SW1L-To-PondMH-3 DET-1 CONDUIT 67.0 15.6418 0.0150 PIPE-SW1UtoSW1L OV-01 SW1-L-Start CONDUIT 120.0 0.3083 0.0150 PIPE-UPPER-TO-LOWERJun-15 MH-3 CONDUIT 182.0 16.5934 0.0150 SW1-Lower SW1-L-Start MH-3 CHANNEL 386.0 6.0000 0.0500 SWALE-3 SW-2-Start Jun-13 CHANNEL 206.0 1.0000 0.0500 SWALE-4 SW-4-Start Jun-13 CHANNEL 83.0 1.0000 0.0500 SWALE-5 SW-5-Start Jun-17 CHANNEL 120.0 1.0000 0.0500 SWALE-6 SW-6-Start Jun-17 CHANNEL 84.0 1.0000 0.0500 SW-U-1A SW1-U-1 SW1-U-OF1A CHANNEL 194.0 6.0000 0.0500 SW-U-1B SW1-U-OF1B SW1-U-OF2A CHANNEL 177.0 1.9322 0.0500 SW-U-1C SW1-U-OF2B OV-01 CHANNEL 50.0 5.0000 0.0500 Orifice-01 DET-1 DET-2 ORIFICE Orifice-02 DET-2 DET-3 ORIFICE Orifice-03 DET-3 DET-4 ORIFICE Orifice-04 DET-4 DET-5 ORIFICE Orifice-05 DET-5 J-1 ORIFICE Weir-01 DET-1 DET-2 WEIR Weir-02 DET-2 DET-3 WEIR Weir-03 DET-3 DET-4 WEIR Weir-04 DET-4 DET-5 WEIR Weir-04-EmergencyDET-4 DET-5 WEIR Weir-05 DET-5 J-1 WEIR ********************* Cross Section Summary ********************* Link Shape Depth/ Width No. of Cross Full Flow Design ID Diameter Barrels Sectional Hydraulic Flow Area Radius Capacity ft ft ft² ft cfs Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ------------------------------------------------------------------------------------------------- --------- CULVERT-1 CIRCULAR 0.83 0.83 1 0.55 0.21 7.97 CULVERT-2 CIRCULAR 0.83 0.83 1 0.55 0.21 6.51 EndPipe CIRCULAR 1.00 1.00 1 0.79 0.25 9.76 Link-19 CIRCULAR 0.83 0.83 1 0.55 0.21 6.17 PIPE CIRCULAR 0.67 0.67 1 0.35 0.17 3.31 PIPE-SW1L-To-Pond CIRCULAR 0.83 0.83 1 0.55 0.21 7.51 PIPE-SW1UtoSW1L CIRCULAR 1.00 1.00 1 0.79 0.25 1.71 PIPE-UPPER-TO-LOWER CIRCULAR 0.67 0.67 1 0.35 0.17 4.27 SW1-Lower TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SWALE-3 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SWALE-4 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-5 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68 16.06 SWALE-6 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98 243.47 SW-U-1A TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 46.19 SW-U-1B TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 26.21 SW-U-1C TRAPEZOIDAL 1.00 11.00 1 8.00 0.71 42.17 ************************** Volume Depth Runoff Quantity Continuity acre-ft inches ************************** --------- ------- Total Precipitation ...... 5.283 4.452 Surface Runoff ........... 3.149 2.654 Continuity Error (%) ..... 0.000 ************************** Volume Volume Flow Routing Continuity acre-ft Mgallons ************************** --------- --------- External Inflow .......... 0.000 0.000 External Outflow ......... 3.111 1.014 Initial Stored Volume .... 0.000 0.000 Final Stored Volume ...... 0.036 0.012 Continuity Error (%) ..... 0.000 ****************************************** Composite Curve Number Computations Report ****************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 89729.62 80.40 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L2 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 73331.70 80.40 -------------------- Subbasin BASIN-L3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 57593.75 80.40 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 54115.76 80.40 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 121297.51 80.40 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22360.91 80.40 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 27792.87 80.40 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 45262.84 80.40 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 22110.92 98.00 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3305.97 98.00 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4297.00 98.00 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 4911.98 98.00 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 3194.98 98.00 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 8252.97 98.00 ------------------ Subbasin Uphill ------------------ Area Soil Soil/Surface Description (ft²) Group CN ---------------------------------------------------------------------------------------- Composite Area & Weighted CN 82747.68 81.50 ************************************** Runoff Coefficient Computations Report ************************************** -------------------- Subbasin BASIN-L1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 89729.62 - 0.72 Composite Area & Weighted Runoff Coeff. 89729.62 0.72 -------------------- Subbasin BASIN-L2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 73331.70 - 0.72 Composite Area & Weighted Runoff Coeff. 73331.70 0.72 -------------------- Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Subbasin BASIN-L3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 57593.75 - 0.72 Composite Area & Weighted Runoff Coeff. 57593.75 0.72 -------------------- Subbasin BASIN-L4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 54115.76 - 0.72 Composite Area & Weighted Runoff Coeff. 54115.76 0.72 -------------------- Subbasin BASIN-L5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 121297.51 - 0.72 Composite Area & Weighted Runoff Coeff. 121297.51 0.72 -------------------- Subbasin BASIN-L6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22360.91 - 0.72 Composite Area & Weighted Runoff Coeff. 22360.91 0.72 -------------------- Subbasin BASIN-L7 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 27792.87 - 0.72 Composite Area & Weighted Runoff Coeff. 27792.87 0.72 -------------------- Subbasin BASIN-L8 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 45262.84 - 0.72 Composite Area & Weighted Runoff Coeff. 45262.84 0.72 -------------------- Subbasin BASIN-S1 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 22110.92 - 0.72 Composite Area & Weighted Runoff Coeff. 22110.92 0.72 -------------------- Subbasin BASIN-S2 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ----------------------------------------------------------------------------------------- - 3305.97 - 0.72 Composite Area & Weighted Runoff Coeff. 3305.97 0.72 -------------------- Subbasin BASIN-S3 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4297.00 - 0.72 Composite Area & Weighted Runoff Coeff. 4297.00 0.72 -------------------- Subbasin BASIN-S4 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 4911.98 - 0.72 Composite Area & Weighted Runoff Coeff. 4911.98 0.72 -------------------- Subbasin BASIN-S5 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 3194.98 - 0.72 Composite Area & Weighted Runoff Coeff. 3194.98 0.72 -------------------- Subbasin BASIN-S6 -------------------- Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 8252.97 - 0.72 Composite Area & Weighted Runoff Coeff. 8252.97 0.72 ------------------ Subbasin Uphill ------------------ Area Soil Runoff Soil/Surface Description (ft²) Group Coeff. ----------------------------------------------------------------------------------------- - 82747.68 - 0.72 Composite Area & Weighted Runoff Coeff. 82747.68 0.72 *************************************************** SCS TR-55 Time of Concentration Computations Report *************************************************** Sheet Flow Equation ------------------- Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4)) Where: Tc = Time of Concentration (hrs) n = Manning's Roughness Lf = Flow Length (ft) P = 2 yr, 24 hr Rainfall (inches) Sf = Slope (ft/ft) Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Shallow Concentrated Flow Equation ---------------------------------- V = 16.1345 * (Sf^0.5) (unpaved surface) V = 20.3282 * (Sf^0.5) (paved surface) V = 15.0 * (Sf^0.5) (grassed waterway surface) V = 10.0 * (Sf^0.5) (nearly bare & untilled surface) V = 9.0 * (Sf^0.5) (cultivated straight rows surface) V = 7.0 * (Sf^0.5) (short grass pasture surface) V = 5.0 * (Sf^0.5) (woodland surface) V = 2.5 * (Sf^0.5) (forest w/heavy litter surface) Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) Channel Flow Equation --------------------- V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n R = Aq / Wp Tc = (Lf / V) / (3600 sec/hr) Where: Tc = Time of Concentration (hrs) Lf = Flow Length (ft) R = Hydraulic Radius (ft) Aq = Flow Area (ft²) Wp = Wetted Perimeter (ft) V = Velocity (ft/sec) Sf = Slope (ft/ft) n = Manning's Roughness -------------------- Subbasin BASIN-L1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L5 -------------------- User-Defined TOC override (minutes): 5.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis -------------------- Subbasin BASIN-L6 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L7 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-L8 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S1 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S2 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S3 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S4 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S5 -------------------- User-Defined TOC override (minutes): 5.00 -------------------- Subbasin BASIN-S6 -------------------- User-Defined TOC override (minutes): 5.00 ------------------ Subbasin Uphill ------------------ User-Defined TOC override (minutes): 7.00 *********************** Subbasin Runoff Summary *********************** -------------------------------------------------------------------------- Subbasin Total Total Peak Weighted Time of Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis ID Precip Runoff Runoff Curve Concentration in in cfs Number days hh:mm:ss -------------------------------------------------------------------------- BASIN-L1 4.45 2.51 1.21 80.400 0 00:05:00 BASIN-L2 4.45 2.51 0.99 80.400 0 00:05:00 BASIN-L3 4.45 2.51 0.78 80.400 0 00:05:00 BASIN-L4 4.45 2.51 0.73 80.400 0 00:05:00 BASIN-L5 4.45 2.51 1.64 80.400 0 00:05:00 BASIN-L6 4.45 2.51 0.30 80.400 0 00:05:00 BASIN-L7 4.45 2.51 0.38 80.400 0 00:05:00 BASIN-L8 4.45 2.51 0.61 80.400 0 00:05:00 BASIN-S1 4.45 4.21 0.53 98.000 0 00:05:00 BASIN-S2 4.45 4.21 0.08 98.000 0 00:05:00 BASIN-S3 4.45 4.21 0.10 98.000 0 00:05:00 BASIN-S4 4.45 4.21 0.12 98.000 0 00:05:00 BASIN-S5 4.45 4.21 0.08 98.000 0 00:05:00 BASIN-S6 4.45 4.21 0.20 98.000 0 00:05:00 Uphill 4.45 2.62 1.15 81.500 0 00:07:00 -------------------------------------------------------------------------- ****************** Node Depth Summary ****************** ----------------------------------------------------------------------------------------- Node Average Maximum Maximum Time of Max Total Total Retention ID Depth Depth HGL Occurrence Flooded Time Time Attained Attained Attained Volume Flooded ft ft ft days hh:mm acre-in minutes hh:mm:ss ----------------------------------------------------------------------------------------- J-1 0.42 1.43 754.43 0 08:20 0 0 0:00:00 Jun-13 1.79 2.17 812.32 0 08:00 0 0 0:00:00 Jun-15 0.15 0.36 810.06 0 08:00 0 0 0:00:00 Jun-17 0.11 0.25 808.25 0 08:00 0 0 0:00:00 MH-3 0.23 0.65 780.15 0 08:00 0 0 0:00:00 OV-01 1.05 2.48 811.41 0 08:00 0 0 0:00:00 SW1-L-Start 0.10 0.24 809.40 0 08:01 0 0 0:00:00 SW1-U-1 0.05 0.13 841.10 0 08:00 0 0 0:00:00 SW1-U-OF1A 0.11 0.25 829.58 0 08:00 0 0 0:00:00 SW1-U-OF1B 0.12 0.25 821.02 0 07:55 0 0 0:00:00 SW1-U-OF2A 0.14 0.35 817.53 0 08:00 0 0 0:00:00 SW1-U-OF2B 0.09 0.22 814.01 0 08:00 0 0 0:00:00 SW-2-Start 0.22 0.48 816.84 0 08:00 0 0 0:00:00 SW-4-Start 0.08 0.19 815.32 0 08:00 0 0 0:00:00 SW-5-Start 0.08 0.20 816.90 0 08:00 0 0 0:00:00 SW-6-Start 0.19 0.41 816.75 0 08:00 0 0 0:00:00 Out-01 0.00 0.00 0.00 0 00:00 0 0 0:00:00 DET-1 1.06 3.44 771.44 0 08:07 0 0 0:00:00 DET-2 1.24 3.58 770.33 0 08:12 0 1412 0:00:00 DET-3 1.28 3.98 767.48 0 08:19 0 1395 0:00:00 DET-4 1.54 3.09 760.49 0 08:17 0 1416 0:00:00 DET-5 1.54 3.18 757.88 0 08:20 0 1410 0:00:00 ***************** Node Flow Summary ***************** ------------------------------------------------------------------------------------ Node Element Maximum Peak Time of Maximum Time of Peak ID Type Lateral Inflow Peak Inflow Flooding Flooding Inflow Occurrence Overflow Occurrence cfs cfs days hh:mm cfs days hh:mm ------------------------------------------------------------------------------------ J-1 JUNCTION 0.00 6.37 0 08:20 0.00 Jun-13 JUNCTION 1.15 2.39 0 08:00 0.00 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Jun-15 JUNCTION 0.00 2.39 0 08:00 0.00 Jun-17 JUNCTION 0.20 1.25 0 08:00 0.00 MH-3 JUNCTION 0.00 5.92 0 08:00 0.00 OV-01 JUNCTION 0.00 2.71 0 08:00 0.00 SW1-L-Start JUNCTION 0.86 3.56 0 08:00 0.00 SW1-U-1 JUNCTION 1.21 1.21 0 08:00 0.00 SW1-U-OF1A JUNCTION 0.00 1.21 0 08:00 0.00 SW1-U-OF1B JUNCTION 0.53 1.73 0 08:00 0.00 SW1-U-OF2A JUNCTION 0.00 1.73 0 08:00 0.00 SW1-U-OF2B JUNCTION 0.99 2.72 0 08:00 0.00 SW-2-Start JUNCTION 0.83 0.83 0 08:00 0.00 SW-4-Start JUNCTION 0.42 0.42 0 08:00 0.00 SW-5-Start JUNCTION 0.45 0.45 0 08:00 0.00 SW-6-Start JUNCTION 0.61 0.61 0 08:00 0.00 Out-01 OUTFALL 0.00 6.37 0 08:20 0.00 DET-1 STORAGE 0.00 5.92 0 08:00 0.00 DET-2 STORAGE 0.00 5.38 0 08:07 0.00 DET-3 STORAGE 0.00 5.16 0 08:10 0.00 DET-4 STORAGE 1.64 6.45 0 08:15 0.00 DET-5 STORAGE 0.00 6.44 0 08:17 0.00 ******************** Storage Node Summary ******************** ------------------------------------------------------------------------------------------------- ------------------------------------ Storage Node ID Maximum Maximum Time of Max Average Average Maximum Maximum Time of Max. Total Ponded Ponded Ponded Ponded Ponded Storage Node Exfiltration Exfiltration Exfiltrated Volume Volume Volume Volume Volume Outflow Rate Rate Volume 1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs cfm hh:mm:ss 1000 ft³ ------------------------------------------------------------------------------------------------- ------------------------------------ DET-1 3.663 77 0 08:07 0.737 16 5.38 0.00 0:00:00 0.000 DET-2 0.000 0 0 00:00 0.471 0 5.16 0.00 0:00:00 0.000 DET-3 0.000 0 0 00:00 0.513 0 4.72 0.00 0:00:00 0.000 DET-4 0.000 0 0 00:00 0.849 0 6.44 0.00 0:00:00 0.000 DET-5 0.000 0 0 00:00 0.846 0 6.37 0.00 0:00:00 0.000 *********************** Outfall Loading Summary *********************** ----------------------------------------------- Outfall Node ID Flow Average Peak Frequency Flow Inflow (%) cfs cfs ----------------------------------------------- Out-01 99.68 1.93 6.37 ----------------------------------------------- System 99.68 1.93 6.37 ***************** Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Link Flow Summary ***************** ------------------------------------------------------------------------------------------------- ------------------------------- Link ID Element Time of Maximum Length Peak Flow Design Ratio of Ratio of Total Reported Type Peak Flow Velocity Factor during Flow Maximum Maximum Time Condition Occurrence Attained Analysis Capacity /Design Flow Surcharged days hh:mm ft/sec cfs cfs Flow Depth minutes ------------------------------------------------------------------------------------------------- ------------------------------- CULVERT-1 CONDUIT 0 08:00 9.53 1.00 1.20 7.97 0.15 0.28 0 Calculated CULVERT-2 CONDUIT 0 08:00 8.82 1.00 1.73 6.51 0.27 0.39 0 Calculated EndPipe CONDUIT 0 08:20 9.52 1.00 6.37 9.76 0.65 0.79 0 Calculated Link-19 CONDUIT 0 08:00 3.32 1.00 1.25 6.17 0.20 0.65 0 Calculated PIPE CONDUIT 0 08:00 8.60 1.00 2.39 3.31 0.72 0.74 0 Calculated PIPE-SW1L-To-Pond CONDUIT 0 08:00 11.72 1.00 5.92 7.51 0.79 0.89 0 Calculated PIPE-SW1UtoSW1L CONDUIT 0 08:00 5.29 1.00 2.71 1.71 1.58 0.62 0 > CAPACITY PIPE-UPPER-TO-LOWER CONDUIT 0 08:00 9.00 1.00 2.39 4.27 0.56 0.75 0 Calculated SW1-Lower CHANNEL 0 08:01 2.59 1.00 3.54 46.19 0.08 0.24 0 Calculated SWALE-3 CHANNEL 0 08:00 1.14 1.00 0.82 243.47 0.00 0.09 0 Calculated SWALE-4 CHANNEL 0 08:00 0.75 1.00 0.42 16.06 0.03 0.13 0 Calculated SWALE-5 CHANNEL 0 08:00 0.76 1.00 0.45 16.06 0.03 0.13 0 Calculated SWALE-6 CHANNEL 0 08:00 1.09 1.00 0.61 243.47 0.00 0.07 0 Calculated SW-U-1A CHANNEL 0 08:00 1.15 1.00 1.21 46.19 0.03 0.19 0 Calculated SW-U-1B CHANNEL 0 08:00 1.41 1.00 1.73 26.21 0.07 0.22 0 Calculated SW-U-1C CHANNEL 0 08:00 2.27 1.00 2.71 42.17 0.06 0.21 0 Calculated Orifice-01 ORIFICE 0 07:50 2.28 1.00 Orifice-02 ORIFICE 0 08:08 2.38 1.00 Orifice-03 ORIFICE 0 08:19 2.53 1.00 Orifice-04 ORIFICE 0 08:08 2.67 1.00 Orifice-05 ORIFICE 0 08:20 2.73 1.00 Weir-01 WEIR 0 08:07 3.54 0.52 Weir-02 WEIR 0 08:12 2.86 0.59 Weir-03 WEIR 0 08:19 2.19 0.79 Weir-04 WEIR 0 08:17 3.05 0.59 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Weir-04-Emergency WEIR 0 08:17 0.77 0.09 Weir-05 WEIR 0 08:20 3.64 0.78 ******************************** Highest Flow Instability Indexes ******************************** All links are stable. WARNING 108 : Surcharge elevation defined for Junction Jun-13 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-15 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction Jun-17 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction Jun-17 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction MH-3 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction MH-3 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction OV-01 is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction OV-01 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction OV-01 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-L-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-L-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-1 is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-1 is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF1B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF1B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2A is below junction invert Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2A is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2A is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW1-U-OF2B is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW1-U-OF2B is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-2-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-4-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 106 : Max/rim elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-5-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 108 : Surcharge elevation defined for Junction SW-5-Start is below junction maximum elevation. Assumed surcharge elevation equal to maximum elevation. WARNING 106 : Max/rim elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed max/rim elevation equal to invert elevation. WARNING 107 : Initial water surface elevation defined for Junction SW-6-Start is below junction invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-1 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-2 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-3 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-4 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 109 : Maximum elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed maximum elevation equal to invert elevation. WARNING 110 : Initial water surface elevation defined for Storage Node DET-5 is below storage node invert elevation. Assumed initial water surface elevation equal to invert elevation. WARNING 117 : Conduit outlet invert elevation defined for Conduit PIPE-SW1UtoSW1L is below downstream node invert elevation. Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Assumed conduit outlet invert elevation equal to downstream node invert elevation. WARNING 116 : Conduit inlet invert elevation defined for Conduit PIPE-UPPER-TO-LOWER is below upstream node invert elevation. Assumed conduit inlet invert elevation equal to upstream node invert elevation. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-13. WARNING 002 : Max/rim elevation (depth) increased to account for connecting conduit height dimensions for Node Jun-17. WARNING 102 : Storage Node DET-2 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-3 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-4 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. WARNING 102 : Storage Node DET-5 did not have a maximum elevation defined to account for the storage of water. The maximum depth defined for the corresponding storage curve was used. Analysis began on: Thu Oct 30 17:39:02 2025 Analysis ended on: Thu Oct 30 17:39:09 2025 Total elapsed time: 00:00:07 Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 7 Site Plans 10' SLOPE EASEMENTDOC. NO. 2003-114114,RECORDED 11/25/200314' UTILITY EASEMENTDOC. NO. 2001-044541,RECORDED 07/18/200114' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASMENTN 22 ° 3 1 ' 5 0 " E 32.9 6 'N 57 °25 '28 " E34.95 'N 72°33'51" E45.29'44.82'50.00'180.00'10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT7' UTILITY EASEMENTDOC. NO. 2003-114113,RECORDED 11/25/20031' WIDE ACCESS RESTRICTION STRIP5' WIDE PUBLIC UTILITYEASEMENTFUTURE 40' WIDERIGHT-OF-WAYDEDICATION7'7' 7' 7'5'5'7'7'14'7'7'49.90'30.44 '34.71'7'7'7'7'5'5'5'5'5'5'>>>>>>>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>2''G 2''G 2''G 2''G 2''G 2''G 2''G2''G8''W8''W8''W8''W8''W8''W8''W8''W2''G2' 'G8''WE E E EEEEEEEEEEEEE E ESTOPEND END 2''G2''G2''G2''G2''G2''G2''G2''GEEEEEE T[T][T][T][T][T][T][T][T][T][T][T][T]8''W 8''W 8''W 8''W 8''W8''WUCUC12''SD 12' 'SD12' 'SD8''SS8' 'SS8' 'SS8''SS8''SS8''SS8''SS12''SD 30''SD 18''SD8''SS 8''SS8''SS8''SS8''SS8''SS8''SS12''SD 12''SD12''SD12''SD18''SD12''SD12''SD12''SD12''SD8''SS 8''SS 8''SS8''SS8''SS8''SS30''SD 30''SD 8 ' ' SD 8''SS8''SS8''SS8''SS8''SS8''SS8''SS 8''SS 8''SS 8''SS8''SS12''W12''W8''SSPER AS-BUILT8''SS8''SS8''SSPER AS-BUILTPER AS-BUILT8''SS8''SSPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5' 27.5' 27.5'[E][E][E][E][E][E][E][E]CDCDCDGATEGATEGATEGUARDRAIL TRANJBJBEVLTEVLTEVLTJBJBJB TRTRTRTRTRTRTRTELVLTETRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WWWICV(2)SSSDSDDDDDDDDDDSSSSSSDGARDENGATEWOOD PILESDSDSTRWSSSBBD12345678101112131415123456789101112131415161718192021222324252628D/WHCRHCRHCRHCRSSSSS927EGRAVEL PATHGRAVEL PATH GRAVEL PATH 12" CPP CULVERTIE = 823.24'24" CPP CULVERTIE = 754.53'24" CPP CULVERTIE = 756.20'8" RCP OUTFALLIE = 879.33'15" RCP INLETIE = 773.10'LOT 1LOT 6LOT 5LOT 12LOT 28LOT 7LOT 2LOT 3LOT 31LOT 22LOT 29LOT 33LOT 18LOT 24LOT 17LOT 34LOT 21LOT 35LOT 25LOT 32LOT 37LOT 4LOT 20LOT 36LOT 27LOT 30LOT 10LOT 15LOT 11LOT 14LOT 16LOT 19LOT 23LOT 26LOT 13LOT 38LOT 9LOT 835'-0"35'35'-0"35'35'6'-1014"35'35'35'35'35'WWWW WWWWW WW4"S CO-LOT-1S4"S CO-LOT-6S4"S CO-LOT-2S4"S CO-LOT-7S4"S CO-LOT-15S4"S CO-LOT-16S4"S CO-LOT-19S4"S CO-LOT-22S4"S CO-LOT-24S4"S CO-LOT-3S4"S CO-LOT-5S4"S CO-LOT-9S4"S CO-LOT-8S4"S CO-LOT-12S4"S CO-LOT-17SS STUB-LOT-14S4"S CO-LOT-13S4"S CO-LOT-18S4"S STUB-LOT-21S4"S CO-LOT-20S4"S CO-LOT-23S4"S CO-LOT-25S4"S CO-LOT-26S4"S CO-LOT-27S4"S CO-LOT-32S4"S CO-LOT-28S4"S CO-LOT-29S4"S STUB-LOT-31S6"S CO-LOT-30S6"S CO-LOT-34S6"S CO-LOT-35S6"S CO-LOT-36S4"S STUB-LOT-37SS MH-07IE 6" IN=861.68 (N)IE 4" IN=861.68 (E)IE 8" OUT=861.28 (W)S MH-08IE 8" IN=838.10 (E)IE 8" OUT=837.60 (NW)S FT-MH-09IE 8" IN=823.06 (SE)IE 6" IN=823.38 (NE)IE 8" OUT=822.56 (NW)S MH-10IE 8" IN=813.25 (SE)IE 8" OUT=812.75 (NW)IE 8"=795.23IE 8"=803.08S OUT-DROP-MH-32IE 8"=794.85IE 8"=802.00S OUT-DROP-MH-22S OUT-DROP-MH-1IE 8" IN=808.44 (N)IE 6" IN=810.44 (E)IE 8" OUT=807.44 (SW)S MH-02IE 8" IN=808.85 (NW)IE 4" IN=809.25 (E)IE 8" OUT=808.75 (S)S MH-03IE 8" IN=809.67 (N)IE 8" OUT=809.57 (SE)S OUT-DROP-MH-05IE 8" IN=810.07 (N)IE 8" OUT=809.97 (S)S MH-05IE 8" IN=810.84 (N)IE 8" OUT=810.74 (S)S MH-06IE 4" IN=812.76 (W)IE 4" IN=812.76 (N)IE 6" IN=812.76 (E)IE 8" OUT=812.76 (S)S MH-EX-01IE 8" IN=794.29 (NE)IE 8" IN=794.23 (SE)IE 8" OUT=794.21 (NW)S MH-EX-05IE 8" IN=752.97 (S)IE 8" IN=753.02 (E)IE 8" OUT=752.92 (N)S EX-DROP-MH-01IE 8" IN=746.92 (S)IE 8" OUT=741.48 (N)IE 8"=753.75S PLUG-EX-3SW FH-028"WW FH-01W FH-03S OUT-DROP-MH-4IE 8" IN=809.80 (SE)IE 6" IN=811.49 (NE)IE 8" OUT=805.00 (NW)4"S4"S6"S8"S 8"S 8"S4"S8"S 8"S 6"S8"S8"S4"S8"S8"S8"S8"S6"S 4"S4"S4"S4"S4"S 8"W8"W8"W8"W8"W8"W8"W8"W8"W 8"W4"S22222IE 8"=768.38IE 8"=768.17IE 4"=768.50S MH-EX-0326"SWQHAWKINS LANERANDY LANERANDY LANETAMBOUR LANETAMBOUR COURTWQWQWQ11WQWQDETDETWQWQWQWQWQWQWQDET6"S STUB-LOT-33SSTRUCTURE TYPESTRUCTURE LABELXX XX-XXX+XX.X RT X.X'RIM=IE IN = XX.XIE OUT = XX.XSTRUCTURE TYPE CALLOUTUTILITY TYPE (S=SANITARY SEWER, W=WATER, FP=FIREPROTECTION)ID NUMBER (WHERE APPLICABLE)STRUCTURE INFO (WHERE APPLICABLE)LOCATION (WHERE APPLICABLE)1.WATER MAIN TO BE INSTALLED UNDER EWEB PERMIT.PIPE LABELXXLF - XX" XXUTILITY SIZEUTILITY LENGTHUTILITY TYPES=X.XX%SLOPE (WHERE APPLICABLE)XKEY NOTESCALLOUTDESCRIPTIONDETAIL REF.COCLEANOUT TO GRADEFHFIRE HYDRANTMHMANHOLEPLUGPLUGSTUBSTUBNOTEDESCRIPTIONDETAILREF.1CONNECT TO 8" PUBLIC EWEB WATER MAIN.COORDINATE WORK WITH EWEB.2CONNECT TO EXISTING 8' PUBLIC SANITARY MAIN.SPROVIDE SANITARY SEWER STUB TO LOT FOR FUTUREDEVELOPMENT.WQVEGETATED WATER QUALITY SWALEDETDETENTION BASINSHEET NOTESUTILITY LABEL LEGENDFO R I N FO RM A T IO NON L Y BRAEWOOD HILLS THIRD ADDITION PUD PHASES 5 & 6 SEPTEMBER 6, 2023 2100216ABAB/FUAB/FUC1.010/31/25 2:06pmABackusC1.0File: O:\c\p\2021\2100216-Braewood-Hills-PUD\CAD\PLOT\PUD\2100216-01UT.dwg TAB:C1.0Plotted: 10/31/25 at 2:06pm By: ABackus 800 Willamette Street, Suite 400Eugene, OR 97401O: 541.684.4902F: 541.684.4909www.kpff.comSTAMP2100216-01UT.dwgSCALE501 INCH = 50 FEET50100012/31/202512/31/2025WATER AND SEWER PLAN 10' SLOPE EASEMENTDOC. NO. 2003-114114,RECORDED 11/25/200314' UTILITY EASEMENTDOC. NO. 2001-044541,RECORDED 07/18/200114' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASMENTN 22 ° 3 1 ' 5 0 " E 32.9 6 'N 57 °25 '28 " E34.95 'N 72°33'51" E45.29'44.82'50.00'180.00'10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT7' UTILITY EASEMENTDOC. NO. 2003-114113,RECORDED 11/25/20031' WIDE ACCESS RESTRICTION STRIP5' WIDE PUBLIC UTILITYEASEMENTFUTURE 40' WIDERIGHT-OF-WAYDEDICATION7'7' 7' 7'5'5'7'7'14'7'7'49.90'30.44 '34.71'7'7'7'7'5'5'5'5'5'5'LOT 1LOT 6LOT 5LOT 12LOT 28LOT 7LOT 2LOT 3LOT 31LOT 22LOT 29LOT 33LOT 18LOT 24LOT 17LOT 34LOT 21LOT 35LOT 25LOT 32LOT 37LOT 4LOT 20LOT 36LOT 27LOT 30LOT 10LOT 15LOT 11LOT 14LOT 16LOT 19LOT 23LOT 26LOT 13LOT 38LOT 9LOT 8>>>>>>>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>2''G 2''G 2''G 2''G 2''G 2''G 2''G2''G8''W8''W8''W8''W8''W8''W8''W8''W2''G2' 'G8''WE E E EEEEEEEEEEEEE E ESTOPEND END 2''G2''G2''G2''G2''G2''G2''G2''GEEEEEE T[T][T][T][T][T][T][T][T][T][T][T][T]8''W 8''W 8''W 8''W 8''W8''WUCUC12''SD 12' 'SD12' 'SD8''SS8' 'SS8' 'SS8''SS8''SS8''SS8''SS12''SD 30''SD 18''SD8''SS 8''SS8''SS8''SS8''SS8''SS8''SS12''SD 12''SD12''SD12''SD18''SD12''SD12''SD12''SD12''SD8''SS 8''SS 8''SS8''SS8''SS8''SS30''SD 30''SD 8 ' ' SD 8''SS8''SS8''SS8''SS8''SS8''SS8''SS 8''SS 8''SS 8''SS8''SS12''W12''W8''SSPER AS-BUILT8''SS8''SS8''SSPER AS-BUILTPER AS-BUILT8''SS8''SSPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5' 27.5' 27.5'[E][E][E][E][E][E][E][E]CDCDCDTRANJBJBEVLTEVLTEVLTJBJBJB TRTRTRTRTRTRTRTELVLTETRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WWWICV(2)SSSDSDDDDDDDDDDSSSSSSDSDSDSTRSSSBBD12345678101112131415123456789101112131415161718192021222324252628SSSSS927E12" CPP CULVERTIE = 823.24'24" CPP CULVERTIE = 754.53'24" CPP CULVERTIE = 756.20'8" RCP OUTFALLIE = 879.33'15" RCP INLETIE = 773.10'WWWW WWWWW WWW FH-01W BO-02SD DI-2SD CO-4SD CO-5SD CO-6SD CO-7SD MH-02SD MH-03SD OF-3SD MH-05SD CO-8SD CO-1IE 10"=755.25IE 24"=755.15SD MH-061HAWKINS LANERANDY LANETAMBOUR LANE(PRIVATE)RANDY LANE(PUBLIC)WQ10"SD 8"SD8"SD 8"SD10"SD10"SD10"SD10"SD10"SD8"SD WQWQWQWQWQWQWQWQDETDETDETTAMBOUR COURT(PRIVATE)STRUCTURE TYPESTRUCTURE LABELXX XX-XXX+XX.X RT X.X'RIM=IE IN = XX.XIE OUT = XX.XSTRUCTURE TYPE CALLOUTUTILITY TYPE (S=SANITARY SEWER, W=WATER, FP=FIREPROTECTION)ID NUMBER (WHERE APPLICABLE)STRUCTURE INFO (WHERE APPLICABLE)LOCATION (WHERE APPLICABLE)1.WATER MAIN TO BE INSTALLED UNDER EWEB PERMIT.PIPE LABELXXLF - XX" XXUTILITY SIZEUTILITY LENGTHUTILITY TYPES=X.XX%SLOPE (WHERE APPLICABLE)XKEY NOTESCALLOUTDESCRIPTIONDETAIL REF.CBCATCH BASINCOCLEANOUT TO GRADEDIDITCH INLETMHMANHOLEOFOUTFALLOVOVERFLOW INLETWQWATER QUALITYNOTEDESCRIPTIONDETAILREF.1CONNECT TO EXISTING 24" CPP CULVERTWQSTORMWATER QUALITY FACILITY.DETDETENTION BASINSHEET NOTESUTILITY LABEL LEGENDFO R I N FO RM A T IO NON L Y BRAEWOOD HILLS THIRD ADDITION PUD PHASES 5 & 6 SEPTEMBER 6, 2023 2100216ABAB/FUAB/FUC2.010/31/25 2:07pmABackusC2.0File: O:\c\p\2021\2100216-Braewood-Hills-PUD\CAD\PLOT\PUD\2100216-02SD.dwg TAB:C2.0Plotted: 10/31/25 at 2:07pm By: ABackus 800 Willamette Street, Suite 400Eugene, OR 97401O: 541.684.4902F: 541.684.4909www.kpff.comSTAMP2100216-02SD.dwgSCALE501 INCH = 50 FEET50100012/31/202512/31/2025STORMWATER DRAINAGE PLAN 10' SLOPE EASEMENTDOC. NO. 2003-114114,RECORDED 11/25/200314' UTILITY EASEMENTDOC. NO. 2001-044541,RECORDED 07/18/200114' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT14' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASMENTN 22 ° 3 1 ' 5 0 " E 32.9 6 'N 57 °25 '28 " E34.95 'N 72°33'51" E45.29 '44.82'50.00'180.00'10' WIDE PRIVATE JOINT USEACCESS AND UTILITY EASEMENT7' UTILITY EASEMENTDOC. NO. 2003-114113,RECORDED 11/25/20031' WIDE ACCESS RESTRICTION STRIP5' WIDE PUBLIC UTILITYEASEMENTFUTURE 40' WIDERIGHT-OF-WAYDEDICATION7'7' 7' 7'5'5'7'7'14'7'7'49.90'30.44 '34.71'7'7'7'7'5'5'5'5'5'5'2''G 2''G 2''G 2''G 2''G 2''G 2''G2''G8''W8''W8''W8''W8''W8''W8''W8''W2''G2' 'G8''WE E E EEEEEEEEEEEEE E ESTOPEND END 2''G2''G2''G2''G2''G2''G2''G2''GEEEEEE T[T][T][T][T][T][T][T][T][T][T][T][T]8''W 8''W 8''W 8''W 8''W8''WUCUC12''SD 12' 'SD12' 'SD8''SS8' 'SS8' 'SS8''SS8''SS8''SS8''SS12''SD 30''SD 18''SD8''SS 8''SS8''SS8''SS8''SS8''SS8''SS12''SD 12''SD12''SD12''SD18''SD12''SD12''SD12''SD12''SD8''SS 8''SS 8''SS8''SS8''SS8''SS30''SD 30''SD 8 ' ' SD 8''SS8''SS8''SS8''SS8''SS8''SS8''SS 8''SS 8''SS 8''SS8''SS12''W12''W8''SSPER AS-BUILT8''SS8''SS8''SSPER AS-BUILTPER AS-BUILT8''SS8''SSPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5' 27.5' 27.5'[E][E][E][E][E][E][E][E]CDCDCDGATEGATEGATEGUARDRAIL TRANJBJBEVLTEVLTEVLTJBJBJB TRTRTRTRTRTRTRTELVLTETRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WWWICV(2)SSSDSDDDDDDDDDDSSSSSSDGARDENGATEWOOD PILESDSDSTRSSSBBD12345678101112131415123456789101112131415161718192021222324252628D/WHCRHCRHCRHCRSSSSS927EGRAVEL PATHGRAVEL PATH GRAVEL PATH 12" CPP CULVERTIE = 823.24'24" CPP CULVERTIE = 754.53'24" CPP CULVERTIE = 756.20'8" RCP OUTFALLIE = 879.33'15" RCP INLETIE = 773.10'LOT 1LOT 6LOT 5LOT 12LOT 28LOT 7LOT 2LOT 3LOT 31LOT 22LOT 29LOT 33LOT 18LOT 24LOT 17LOT 34LOT 21LOT 35LOT 25LOT 32LOT 37LOT 4LOT 20LOT 36LOT 27LOT 30LOT 10LOT 15LOT 11LOT 14LOT 16LOT 19LOT 23LOT 26LOT 13LOT 38LOT 9LOT 8>>>>>>>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>HAWKINS LANERANDY LANERANDY LANE82083 0 840 850 812814816818 8228248 2 6 8 2 8 83 2 83 4 836 838 842 844 846 848 860 870880862 864 866868872874876878882884810808812814816818818820 830840816818818818822824826828832834 836 838 790800810788792794796798802804806808812814816820830 840 850820 830 840 850 860770772768766 764 (755)(760)(765)(770)(775)(780)(785)(790)(795)(800)(805)(810)(815)(820)(825) (830) (835) (840) (845) (850) (855) (860) (865) (870) (875) (880) (885) (790)(795)(800)(805)(810)(815)(820)(825)(830)(835) (840) (845) (850) (855) (860) (865) (870) (875)(880)(820)(825)(830)(835)(840)(845)(850)(855)(860)(865)(870)(875)(880)(885) (890)(865)(870)(875)(880)(885)(890)(895)(900)(905)(910)(915)(920)3C3.02C3.0TAMBOUR LANEWQ1+882+003+004+004+301/C3.0WQWQWQWQWQWQWQWQWQDETWQWQDETDETWQWQTAMBOUR COURTCONTOUR MAJOR (FG)CONTOUR MINOR (FG)EX. CONTOUR MAJOREX. CONTOUR MINORSHEET LEGEND4950(49)(50)STORMWATER WATER QUALITY FACILITYWQAREAS WHERE SLOPES EXCEED 15%DETENTION FACILITYDETCURB & GUTTERCURB &SIDEWALKWATER QUALITYSWALESLOPE AT 3:1 TOMATCH EXISTINGSLOPE AT 3:1 TOMATCH EXISTING21'SHED SECTION4' WALK2.0%EXISTING GRADECURB & GUTTERCURB &SIDEWALKWATER QUALITYSWALESLOPE AT 3:1 TOMATCH EXISTINGSLOPE AT 2.5:1TO MATCHEXISTING21'SHED SECTION5' WALK2.0%EXISTING GRADEOFF-PICULELL PROFILE7757807857907958008058108158208257757807857907958008058108158208251+502+002+503+003+504+004+50EXISTINGGRADEPROPOSEDGRADE-2.00%-5.00%-5.00%-10.00%-15.00%-24.22%-20.00%2+62.95 PVIS815.38' PVIE96.11' VCK = 5.002+14.89 BVCS817.78' BVCE 3+11.00 EVCS803.74' EVCE 2+10.50 GB818.004+00.00 GB787.72 3+80.00 GB789.72 3+40.00 GB796.72 3+60.00 GB792.72 FO R I N FO RM A T IO NON L Y BRAEWOOD HILLS THIRD ADDITION PUD PHASES 5 & 6 SEPTEMBER 6, 2023 2100216ABAB/FUAB/FUC3.010/31/25 2:07pmABackusC3.0File: O:\c\p\2021\2100216-Braewood-Hills-PUD\CAD\PLOT\PUD\2100216-03GD.dwg TAB:C3.0Plotted: 10/31/25 at 2:07pm By: ABackus 800 Willamette Street, Suite 400Eugene, OR 97401O: 541.684.4902F: 541.684.4909www.kpff.comSTAMP2100216-03GD.dwgSCALE501 INCH = 50 FEET50100012/31/202512/31/2025SCALE:2PRIVATE DRIVE SECTIONNTSGRADING PLAN SCALE:1" = 20'1TAMBOUR COURT PROFILESCALE:3PUBLIC ROAD (RANDY LANE) SECTIONNTS 800 Willamette Street, Suite 400, Eugene, OR 97401 541-684-4902 | www.kpff.com