SUBDIVISION, FINAL PLAT
www.eugene-or.gov/planning
Planning & Development Planning Division Updated: January 2025
99 W. 10TH Avenue Suite 290, Eugene, OR 97401
Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us Page 1 of 3
Please complete the following application checklist. Note that additional information may be required upon further review
in order to adequately address the applicable criteria for approval. If you have any questions about filling out this
application, please contact Planning staff at the Permit and Information Center, phone
(541) 682-5377, 99 West 10th Avenue, Eugene.
Tentative Subdivision
File Number:
Approval Date:
Expiration Date:
List the Assessor’s Map and Tax Lot number(s) of the property included in the request. Please indicate if only a portion of
a lot is included in the request and attach any additional map and lot numbers for the property.
Assessor’s Map Tax Lot
Area of Request: _______________________________ Number of Parcels Created: ___________________
Name of Subdivision Plat: _________________________________________________________________________
Stage 1 Application Requirements
A filing fee must accompany all applications. The fee varies depending upon the type of application and is adjusted
periodically by the City Manager. Check with Planning staff at the Permit and Information Center to determine the
required fee or check website at www.eugeneplanning.org
Stage 2 Application Requirements
Final plat mylars
Concurrences
Performance Bond, if required for public improvements.
Documentation of water service availability to each lot in the plat.
All documents specified as Draft in Stage 1 shall be final.
Additional documentation or evidence to demonstrate compliance with tentative approval conditions and final plat
approval criteria, as required.
Post-monumentation certificate, identification of corners to be post-monumented, deposit estimate, and check, as
required.
ST 24-3
February 18, 2025
36 months from effective date of approval
18 04 11 12 200
673,873 sf / 15.47 acres 38
Braewood Hills 3rd Addition Subdivsion
x
www.eugene-or.gov/planning
Planning & Development Planning Division Updated: January 2025
99 W. 10TH Avenue Suite 290, Eugene, OR 97401
Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us Page 2 of 3
Submittal Requirements:
Provide 2 paper copies and one digital copy (CD, USB Drive, or Other) of all application materials (i.e. written statement,
site plans, etc.). Digital files must be in PDF file format. Please note that it is the applicant’s responsibility to make sure
that the digital and paper copies are identical. Following completeness review, an updated digital and paper copies may
be required. All paper site plans must be folded to a size equal or less than 11” x 17”.
Written statement that indicates how the final application addresses the final plat approval criteria and the conditions of
approval (informational items identified during the tentative approval may be applicable during the final plat stage).
Plat signed by an Oregon licensed land surveyor. A list of plat requirements subject to City Survey staff review is
available at the City of Eugene Public Works offices, at 858 Pearl Street, Eugene, OR 97401.
As required, include the following:
Delineation of the flood plain or floodway boundaries.
The community number, map/panel number and effective date of the relevant FIRM map.
A note including the Base Flood Elevation for each lot.
A stamped, dated narrative from the surveyor or engineer explaining the methodology used to determine the
Base Flood Elevation.
The applicant is responsible for submitting a copy of the plat signed by an Oregon licensed land surveyor to the Lane
County Surveyor’s office along with necessary review fee.
A current title report issued by a title insurance company licensed by the State of Oregon, verifying ownership by the
applicant of the real property.
Closures for lots, right-of-way, centerline, and irregularly shaped easements.
Draft Irrevocable Petition for Public Improvements, as required
Draft Bargain and Sale Deeds for reserve strips, as required.
Draft Conditions, Covenants, and Restrictions or Joint Access Easement and Maintenance Agreement, as required
Drywell certification signed by a civil engineer, based on field-observed soil types and percolation rates, as required.
Draft copies of off-site easements and right-of-way, as required.
Draft storm drainage maintenance agreement, as required.
Copy of the receipt for the Street Tree Agreement submitted to the City’s Urban Forester, as required.
Copy of wetland documents, as required.
Deed restrictions, as required.
Submit a legal description of property included in the subdivision application. This legal description must be typed on an
8½" x 11" white sheet of paper (no letterhead) so that it is suitable for recording.
Alternate Methods and Materials (AMM) application, fire separation easement and receipt demonstrating the AMM has
been submitted to Building and Permit Services staff for review, as required.
NOTICE STATEMENT: If the Eugene/Springfield Fire Marshall (or the Fire Marshal’s designee) determine that there is
inadequate water supply, apparatus access, or both, to the site for the development of one and two family dwellings
that will be subject to the Oregon Residential Specialty Code, the Eugene Building Official (or the Building Official’s
designee) may require compliance with one or more of the fire suppression or fire containment Uniform Alternate
Construction Standards set out at OAR 918-480-0125(4) and (5).
x
x
N/A
x
x
x
x
N/A
x
N/A
x
x
N/A
N/A
Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108
Landscape Architecture + Land Use Planning
FINAL PUD and FINAL SUBDIVISION
APPLICATION
Braewood Hills 3rd Addition PUD
Eugene, OR
Assessor’s Map Tax Lots
18 04 11 12 00200
September 5, 2025
Braewood Hills 3rd Addition PUD (PDT 24-1 and ST 24-3) Page 2 of 6
Conditions of Approval
September 5, 2025
Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108
Landscape Architecture + Land Use Planning
September 5, 2025
FINAL PUD and FINAL SUBDIVISION APPLICATION
Braewood Hills 3rd Addition PUD
PROJECT DIRECTORY
PROPERTY OWNER / APPLICANT
Piculell Properties, LLC
3104 E. Camelback Road, #116
Phoenix, AZ 85016
Contact: Al Lundstrom
Phone : 602.418.3229
APPLICANT’S REPRESENTATIVE
LAND USE PLANNER, LANDSCAPE ARCHITECT
Schirmer Consulting, LLC
PO Box 10424
Eugene, OR 97440
Contact: Carol Schirmer
Email: schirmer@schirmerconsulting.com
Phone: 541.234.5108
CIVIL ENGINEER
KPFF Consulting Engineers
800 Willamette Street
Eugene, OR 97401
Contact: Anna Backus, P.E.
Email: anna.backus@kpff.com
Phone: 541.735.9249
SURVEYOR
KPFF Consulting Engineers
800 Willamette Street
Eugene, OR 97401
Contact: Troy Tetsuka, PLS
Email: troy.tetsuka@kpff.com
Phone: 503.542.2860
MAP and TAX LOT
Assessor’s Map Tax Lot Current Zoning
18 04 11 12 00200 R-1/WR/PD
AREA OF REQUEST
673,873 sf or 15.47 acres (approximately)
EXISTING USE OF THE PROPERTY
Vacant
PROPOSED USE OF THE PROPERTY
The proposed use is residential.
Braewood Hills 3rd Addition PUD (PDT 24-1 and ST 24-3) Page 3 of 6
Conditions of Approval
September 5, 2025
Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108
Landscape Architecture + Land Use Planning
Conditions of Approval
The following are the conditions of approval from the Final Order of the Eugene Planning Commission on February
18, 2025 for the subject property. The conditions are in plain text and the responses are in italics.
The following are the responses to the Final PUD and Final Subdivision Application Requirements, Conditions of
Approval and Information Items. The City items are in regular typeface and our responses are in italics.
1. On the final PUD site plans and final plat, the applicant shall create an access restriction strip along the
westerly boundary line of Lot 15 abutting Hawkins Lane.
An access restriction strip has been added to the westerly boundary line of Lot 15. See revised Site Plan.
2. Prior to final plat approval, the applicant shall demonstrate approval from the regional road naming group for
alternate street names to replace “Stonehedge Way” and “Stonehedge Court”.
The client coordinated with the regional road naming group and they approved Tambour Lane and Tambour
Court as street names. See partial email thread below.
From: DOYLE Victoria M <VDoyle@eugene-or.gov>
Sent: Monday, April 7, 2025 11:52 AM
To: Al Lundstrom <al@katchmor.com>; Carol Schirmer <schirmer@schirmerconsulting.com>
Subject: Tambour
It appears that Tambour is approvable.
You can use this as a placeholder for now or design accordingly.
From: LIMBIRD Andrew <alimbird@springfield-or.gov>
Sent: Monday, April 7, 2025 10:58 AM
To: DOYLE Victoria M <VDoyle@eugene-or.gov>; HANKE-HILLS Ben J <ben.hanke-hills@lanecountyor.gov>
Cc: *LCOG Roadnames <roadnames@lcog.org>
Subject: RE: Request input please
[EXTERNAL ⚠]
Hi Victoria, these appear to be unique street names that aren’t duplicated elsewhere in the County so Springfield has no objections or
concerns with this proposal.
Best Regards,
Andy Limbird
Senior Planner
Development & Public Works Dept.
City of Springfield, Oregon
225 Fifth Street, Springfield OR 97477
Office: (541) 726-3784 (Oregon Relay 711)
3. The private streets shall be labeled on the final plat and final PUD sites plans as “[Approved Street Name} –
Private”.
See revised site Plan.
4. The structural design and construction inspection for the private streets will remain the developer’s
responsibility. Certification by a licensed engineer that a structural design meeting the applicable standards will
be required at the time of the site development permit for the private street.
Acknowledged and agreed. The Site Development Permit Plans have been submitted to the city by KPFF, Civil
Engineers.
5. Prior to final PUD approval and plat approval, the applicant shall submit Private Joint Use Access and Utility
Easement and Maintenance Agreement (JAM). The JAM will include a description defining the area of the
private street and will also identify permitted improvements, construction expectations, rights of usage and
Braewood Hills 3rd Addition PUD (PDT 24-1 and ST 24-3) Page 4 of 6
Conditions of Approval
September 5, 2025
Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108
Landscape Architecture + Land Use Planning
maintenance responsibilities for the facilities in the street. The JAM will be recorded concurrent with and cross-
referenced on the final plat.
This item is still in process with the attorney who is drafting tis document.
6. Provisions for a public emergency access easement within the private street may be included in the proposed
JAM which creates the private street, or alternatively, may be dedicated as a Public Emergency Access
Easement on a standard city form.
Provisions for public emergency access within the private street have been included in the JAM.
7. Prior to final plat approval, the applicant shall dedicate a 14-foot Public Utility Easement or Public Wastewater
Easement that will encumber the proposed wastewater system. The required easement shall also be shown on
the revised final PUD Plans.
The entire right of way for proposed Randy Lane, Proposed Tambour Court and Proposed Tambour Lane will
be dedicated as a PUE that will encompass the proposed wastewater system.
8. The final PUD site plans shall include the following note: “No building, structure, tree or other obstruction shall
be placed or located on or in a Public Utility Easement, consistent with EC 9.6500(3)”.
See revised Site Plan for note.
9. The final PUD site plans shall include the following note: “Compliance with public improvement requirements
shall be demonstrated in accordance with EC 9.6505 as part of the permitting process for development within
the PUD including Privately Engineered Public Improvement (PEPI) Permits, Site Development Permits and
Building Permits.”
See revised Site Plan for note.
10. The final PUD site plans shall include the following note: “A Privately Engineered Public Improvement (PEPI)
permit shall be issued for the construction of public improvements prior to development.”
See revised Site Plan for note.
11. Prior to final plat approval, the applicant shall provide documentation that EWEB has received a financial
guarantee, ensuring water will be provided to each lot in the plat.
Acknowledged and agreed.
12. Prior to final PUD approval, the applicant shall submit an updated site plan that depicts wastewater service to
Lot 38. Alternatively, the applicant may combine Lots 37 and 38 to demonstrate compliance with the
requirement for wastewater service.
Lots 37 and 38 have been combined into Lot 37. Lot 37 is served by private wastewater as depicted on the
Site Plan.
13. The applicant shall submit an Irrevocable Petition for public improvements in Hawkins Lane to include
sidewalks
See attached Irrevocable Petition for public improvements in Hawkins Lane.
14. The applicant shall submit an Irrevocable Petition for public improvements and Randy Lane (existing portion
between Hawkins Lane and Black Tail Drive) to include setback sidewalks and street trees.
See attached Irrevocable Petition for public improvements in Randy Lane.
15. The proposed Joint Access Easements, which are subject to City review and approval prior to recording with
the final plat, shall be cross-referenced on the plat and be accompanied by a maintenance agreement for each
share driveway, which addresses the rights and responsibilities of each parcel relative to each shared
driveway.
See attached maintenance agreement for each Joint Access Easement.
· Variable Width Private Utility and Access Easement - Lots 1,2,6,7,11 and 12.
· Variable Width Private Utility and Access Easement - Lots 4,5,9 and 10.
· 14’ Wide Private Utility and Access Easement - Lots 9,10,13 and 14.
· 10’ Wide Private Utility Easement – Lots 16,17 and 19.
Braewood Hills 3rd Addition PUD (PDT 24-1 and ST 24-3) Page 5 of 6
Conditions of Approval
September 5, 2025
Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108
Landscape Architecture + Land Use Planning
· 14’ Wide Private Utility and Access Easement - Lots 18,20 and 21.
· Variable Width Private utility and Access Easement – Lots 25,26,27,28,29,32.
· 14’ Wide Private Utility and Access Easement - Lots 28,30 and 31.
· 14’ Wide Private Utility and Access Easement - Lots 33,36 and 37.
16. The location of the proposed Joint Access Easements shall also be clearly shown and labeled as such on Final
PUD plans.
See location of the proposed Joint Access Easements on the Final PUD plans.
17. Prior to Final PUD approval, the applicant shall update their stormwater memo to show how the proposed
shared driveways will satisfy EC 9.6792(3)(c).
See attached revised Stormwater Analysis addressing the shared driveways.
18. Prior to final PUD approval, the applicant shall obtain Type II Standards Review approval for the proposed
public street extension of Roandy Lane and any other utility crossings or other allowed improvements within
the protected /WR conservation area, subject to the applicable standards at EC 9.4900 – 9.4980.
A Standards Review application has been submitted.
19. All future building permits for Lots 30 through 35 shall depict the Goal 5 resource and its 40-foot setback from
top of bank and shall include site plans showing the location of protective fencing subject to the applicable
standards at EC 9.4920 – 9.4930.
See revised Site Plan for note.
20. The final PUD shall include the following note: “Compliance with all applicable development standards, special
use limitations, and other general development standards for single-unit or middle housing residential dwelling
types shall be demonstrated at the time of future building permit on each individual lot.”
See revised Site Plan for note.
21. The final PUD plans shall be revised to remove any reference to middle housing lots to be created on land
above 901-foot elevation. The final PUD plans shall also include a note stating that: “No development of middle
housing, single-unit dwellings, or any other development, including but not limited to land divisions, may occur
on any land above 901-feet in elevation.
All references to middle housing lots to be created above 901-foot elevation have been removed. See revised
Site Plan for note.
22. The final PUD shall include the following note: “No site alteration is allowed prior to final PUD approval. This
prohibition includes site grading and the removal of trees and other vegetation, as well as any impacts to
wetlands and the protected stream on the subject property including changes to the existing drainage pattern.
Any such alterations shall only be allowed subject to permit review and approval, and erosion control
measures as required for the proposed work.”
Site Plan for note.
23. Prior to final PUD approval, the applicant shall submit an updated site plan depicting that portion of Randy
Lane now shown as a proposed private street on Sheet L2.0 of the applicant’s site plans, as a public street
instead. The revised site plan shall show that portion of Randy Lane will be designed and constructed to City
standards as a public street meeting the standards for an Access Lane in accordance with EC 9.6505(3)(a)
and the Local Street Standards of the Design Standards and Guidelines for Eugene Streets, Sidewalks,
Bikeway and Accessways, as well as the City’s Public Improvement Design Standards (PIDS) Manual.
See revised Site Plan. Randy Lane is now shown as a public street that meets Local Street Design Standards
as well as the City’s Public Improvements Design Standards (PIDS) Manual.
24. On the final plat, the applicant shall dedicate a 40-foot-wide right-of-way extending the public right-of-way for
Randy Lane from its existing intersection with Blacktail Drive westerly (toward the western terminus of Randy
Land) to the proposed terminus of Randy Lane as currently depicted on Sheet L2.0 of the applicant’s site
plans. The right-of-way shall also encompass the required turnaround area at the end of the street and include
a reserve strip in accordance with EC 9.6840(1).
Braewood Hills 3rd Addition PUD (PDT 24-1 and ST 24-3) Page 6 of 6
Conditions of Approval
September 5, 2025
Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108
Landscape Architecture + Land Use Planning
See Site Plan for dedicated 40-foot right-of-way. A reserve strip has been shown on the south side of the
proposed section of Randy Lane.
25. Prior to final PUD approval, the applicant shall submit an updated sit plan that depicts that Lot 38 will have
frontage on a public street or having access to a public street over a private street or proposed private access
easement. Alternatively, the applicant may combine Lots 37 and 38 to demonstrate compliance with the
requirement for public street access.
See revise Site Plan. Lot 37 and 38 have been combined.
26. Prior to final PUD approval, the applicant shall submit updated application materials that demonstrate
compliance with EC 9.6796.
See revised Stormwater Analysis and Civil Engineering Plans.
27. Prior to final PUD approval, the applicant shall submit and updated site plan that includes the following notes:
· The approved stormwater system shall be designed and sized by a civil engineer for the full build-out of
the project including 20% of each lot assumed to be impervious surface area. If a lot is proposed to be
developed with more than 20% impervious surface area, then additional on-site detention is required.
Stormwater runoff from private facilities may also be combined with runoff from the public street (Randy
Lane), as long as the public detention system is sized and designed in accordance with applicable Public
Improvement Standards.”
See note on Site Plan.
· In addition to on-site detention requirements noted above, all subsequent site development permits,
building permits, and privately engineered public improvement (PEPI) permits for development of the PUD
shall demonstrate compliance with applicable stormwater standards at EC 0.6791 through 9.6797 and
requirements of the Stormwater Management Manual.”
See revised Stormwater Analysis and Civil Engineering Plans.
Please call if you have any questions, comments or need any additional information.
Sincerely,
Schirmer Consulting, LLC
Carol Schirmer
Principal
MAIN OFFICE
675 OAK STREET, SUITE 100
EUGENE, OREGON 97401
PH: (541) 687-2233 * FAX: (541)485-0307
FLORENCE OFFICE
715 HWY 101 * FLORENCE, OREGON 97439
MAILING: PO BOX 508 * FLORENCE, OREGON 97439
PH: (541) 997-8417 * FAX: (541)997-8246
VILLAGE PLAZA OFFICE
4750 VILLAGE PLAZA LOOP SUITE 100
EUGENE, OREGON 97401
PH: (541) 653-8622 * FAX: (541) 844-1626
STATUS OF RECORD TITLE REPORT
3RD SUPPLEMENTAL
SCHIRMER CONSULTING, LLC Date: SEPTEMBER 16, 2025
ATTN: CAROL SCHIRMER Our No: CT-0328567
PO BOX 10424 Charge: $300.00
EUGENE, OR 97440
As requested, Cascade Title Co. has searched our tract indices as to the following
described real property:
( A T T A C H E D )
and as of: SEPTEMBER 09, 2025 at 8:00 A.M., we find the following:
Vestee:
PICULELL PROPERTIES, LLC,
an Arizona limited liability company
Said property is subject to the following on record matters:
1. Property taxes in an undetermined amount, which are a lien but not yet payable,
including any assessments collected with taxes to be levied for the fiscal year
2025-2026.
2. Power line and water easement, including the terms and provisions thereof, granted
to the City of Eugene, by instrument recorded December 22, 1975, Reception No.
1975-055845, Lane County Official Records.
3. Power line easement, including the terms and provisions thereof, granted to the
City of Eugene, by instrument recorded August 11, 1976, Reception No. 1976-041113,
and recorded August 24, 1976, Reception No. 1976-043810, Lane County Official
Records.
4. Access easement over existing roadways from Hawkins Substation Northerly to Hawkins
Lane, including the terms and provisions thereof, granted to the City of Eugene, by
instrument recorded September 7, 1977, Reception No. 1977-056549, Lane County
Official Records.
5. Power line easement, including the terms and provisions thereof, granted to the
City of Eugene, by instrument recorded September 7, 1977, Reception No. 1977-
056548, Lane County Official Records.
6. Power line easement in the Northwest corner of Section 11 and in the Northwest
corner of Section 12, including the terms and provisions thereof, granted to the
City of Eugene, by instrument recorded February 28, 1980, Reception No. 1980-
010383, Lane County Official Records.
*0328567*
Order No. 0328567
Page 2
7. Boundary line agreement with John Laurin Reynolds, recorded December 14, 1976,
Reception No. 1976-066066, Lane County Official Records, establishing the West line
of this property and the centerline of Section 11.
8. Conveyance of Utility Easement, including the terms and provisions thereof, granted
City of Eugene, an Oregon municipal corporation, by instrument recorded July 18,
2001, Reception No. 2001-044541, Lane County Deeds and Records.
9. Notice of Planned Unit Development Agreement (PDF 03-1), including the terms and
provisions thereof, recorded July 3, 2003, Reception No. 2003-061306, and
modification recorded October 6, 2006, Reception No. 2006-073077, and modification
recorded January 28, 2010, Reception No. 2010-004634, Lane County Deeds and Records.
10. Restrictions, including the terms and provisions thereof, imposed by the City of
Eugene in “Notice of Approval for a Property Line Adjustment” recorded August 22,
2003, Reception No. 2003-080688, Lane County Deeds and Records.
11. Easement, including the terms and provisions thereof, granted the City of Eugene, an
Oregon municipal corporation, by instrument recorded November 25, 2003, Reception
No. 2003-114113, Lane County Deeds and Records.
12. Easement, including the terms and provisions thereof, granted the City of Eugene, an
Oregon municipal corporation, by instrument recorded November 25, 2003, Reception
No. 2003-114114, Lane County Deeds and Records.
NOTE: Taxes, Account No. 1711827, Assessor's Map No. 18 04 11 1 2, #200, Code 4-00,
2024-2025, in the amount of $21,320.61, PAID IN FULL.
NOTE: This report is being supplemented to update the report – NO CHANGE.
This report is to be utilized for information only. This report is not to be used as a
basis for transferring, encumbering or foreclosing the real property described.
The liability of Cascade Title Co. is limited to the addressee and shall not exceed the
premium paid hereunder.
CASCADE TITLE CO., by:
rh: Title Officer: KURT BEATY
Order No. 0328567
Page 3
PROPERTY DESCRIPTION
A parcel of land being a portion of the Northeast quarter of Section 11, Township 18
South, Range 4 West of the Willamette Meridian, being more particularly described as
follows: Commencing at a found 1 inch iron rod marking the North quarter corner of said
Section 11; thence following along the North-South midsection line of said Section 11,
South 00° 08’ 13” West, 389.75 feet; thence leaving said North-South midsection line,
South 63° 25’ 30” East, 16.65 feet; thence South 89° 52’ 31” East 12.30 feet to a point
of curvature; thence following along the arc of a 127.50 foot radius curve to the right,
through a central angle of 48° 20’ 30”, an arc distance of 107.57 feet, (the long chord
of which bears South 65° 42’ 16” East, 104.41 feet) to a point of tangency; thence South
41° 32’ 01” East 410.17 feet; thence South 48° 27’ 59” West 55.00 feet; thence South 41°
32’ 01” East, 81.72 feet to a point of curvature; thence following along the arc of a
curve to the right, through a central angle of 20° 10’ 42”, an arc distance of 25.53
feet (the long chord of which bears South 31° 26’ 39” East, 25.40 feet) to a point of
tangency; thence South 21° 21’ 18” East, 25.19 feet to a point of curvature; thence
following along the arc of a curve to the left, through a central angle of 67° 38’ 49”,
an arc distance of 321.73 feet (the long chord of which bears South 55° 10’ 43” East,
303.37 feet) to a point of tangency; thence South 89° 00’ 07” East, 203.98 feet to a
point of curvature; thence following along the arc of a curve to the right, through a
central angle of 21° 58’ 47”, an arc distance of 27.81 (the long chord of which bears
South 78° 00’ 43” East, 27.64 feet) to a point of tangency; thence South 67° 01’ 20”
East, 167.47 feet, to a point of curvature; thence following along a curve to the left,
through a central angle of 36° 25’ 18”, an arc distance of 81.05 feet (the long chord of
which bears South 85° 13’ 59” East, 79.69 feet) to a point of tangency; thence North 76°
33’ 22” East, 38.06 feet, to a point of curvature; thence following along the arc of a
curve to the right, through a central angle of 14° 16’ 02”, an arc distance of 18.05
feet (the long chord of which bears North 83° 41’ 22” East, 18.01 feet) to a point of
tangency; thence South 89° 12’ 39” East, 145.09 feet to a point on the West line of the
REPLAT OF LOT 64, BRAEWOOD HILLS 2ND ADDITION P.U.D., as platted and recorded in File
75, Slides 1125 and 1126, Lane County Oregon Plat Records, Eugene, Lane County, Oregon;
thence following along the exterior boundary of said Plat, North 03° 01’ 16” West,
146.50 feet; thence North 55° 06’ 19” West, 84.78 feet to the most Southerly corner of
Lot 9, BRAEWOOD NORTH P.U.D. as platted and recorded in File 75, Slides 384 through 386,
Lane County Oregon Plat Records, Eugene, Lane County, Oregon; thence following along the
exterior boundary of said Plat, North 63° 13’ 20” West, 272.85 feet; thence North 68°
10’ 07” West, 233.91 feet; North 35° 41’ 55” West, 168.86 feet; thence North 18° 54’ 40”
West, 168.76 feet; thence North 05° 14’ 11” West, 104.98 feet; thence North, 324.76 feet
to a point on the North line of Section 11; thence following along said North line,
North 89° 33’ 50” West, 641.67 feet to the point of beginning, all in said Section 11,
Township 18 South, Range 4 West of the Willamette Meridian, Eugene, Lane County, Oregon.
MAP NO.
18-04-11-12
THIS MAP/PLAT IS BEING FURNISHED AS AN AID IN LOCATING THE HEREIN DESCRIBED LAND IN
RELATION TO ADJOINING STREETS, NATURAL BOUNDARIES AND OTHER LAND, AND IS NOT A SURVEY
OF THE LAND DEPICTED. EXCEPT TO THE EXTENT A POLICY OF TITLE INSURANCE IS EXPRESSLY
MODIFIED BY ENDORSEMENT, IF ANY, THE COMPANY DOES NOT INSURE DIMENSIONS, DISTANCES,
LOCATION OF EASEMENTS, ACREAGE OR OTHER MATTERS SHOWN THEREON.
Order No. 0328567
Page 3
PROPERTY DESCRIPTION
A parcel of land being a portion of the Northeast quarter of Section 11, Township 18
South, Range 4 West of the Willamette Meridian, being more particularly described as
follows: Commencing at a found 1 inch iron rod marking the North quarter corner of said
Section 11; thence following along the North-South midsection line of said Section 11,
South 00° 08’ 13” West, 389.75 feet; thence leaving said North-South midsection line,
South 63° 25’ 30” East, 16.65 feet; thence South 89° 52’ 31” East 12.30 feet to a point
of curvature; thence following along the arc of a 127.50 foot radius curve to the right,
through a central angle of 48° 20’ 30”, an arc distance of 107.57 feet, (the long chord
of which bears South 65° 42’ 16” East, 104.41 feet) to a point of tangency; thence South
41° 32’ 01” East 410.17 feet; thence South 48° 27’ 59” West 55.00 feet; thence South 41°
32’ 01” East, 81.72 feet to a point of curvature; thence following along the arc of a
curve to the right, through a central angle of 20° 10’ 42”, an arc distance of 25.53
feet (the long chord of which bears South 31° 26’ 39” East, 25.40 feet) to a point of
tangency; thence South 21° 21’ 18” East, 25.19 feet to a point of curvature; thence
following along the arc of a curve to the left, through a central angle of 67° 38’ 49”,
an arc distance of 321.73 feet (the long chord of which bears South 55° 10’ 43” East,
303.37 feet) to a point of tangency; thence South 89° 00’ 07” East, 203.98 feet to a
point of curvature; thence following along the arc of a curve to the right, through a
central angle of 21° 58’ 47”, an arc distance of 27.81 (the long chord of which bears
South 78° 00’ 43” East, 27.64 feet) to a point of tangency; thence South 67° 01’ 20”
East, 167.47 feet, to a point of curvature; thence following along a curve to the left,
through a central angle of 36° 25’ 18”, an arc distance of 81.05 feet (the long chord of
which bears South 85° 13’ 59” East, 79.69 feet) to a point of tangency; thence North 76°
33’ 22” East, 38.06 feet, to a point of curvature; thence following along the arc of a
curve to the right, through a central angle of 14° 16’ 02”, an arc distance of 18.05
feet (the long chord of which bears North 83° 41’ 22” East, 18.01 feet) to a point of
tangency; thence South 89° 12’ 39” East, 145.09 feet to a point on the West line of the
REPLAT OF LOT 64, BRAEWOOD HILLS 2ND ADDITION P.U.D., as platted and recorded in File
75, Slides 1125 and 1126, Lane County Oregon Plat Records, Eugene, Lane County, Oregon;
thence following along the exterior boundary of said Plat, North 03° 01’ 16” West,
146.50 feet; thence North 55° 06’ 19” West, 84.78 feet to the most Southerly corner of
Lot 9, BRAEWOOD NORTH P.U.D. as platted and recorded in File 75, Slides 384 through 386,
Lane County Oregon Plat Records, Eugene, Lane County, Oregon; thence following along the
exterior boundary of said Plat, North 63° 13’ 20” West, 272.85 feet; thence North 68°
10’ 07” West, 233.91 feet; North 35° 41’ 55” West, 168.86 feet; thence North 18° 54’ 40”
West, 168.76 feet; thence North 05° 14’ 11” West, 104.98 feet; thence North, 324.76 feet
to a point on the North line of Section 11; thence following along said North line,
North 89° 33’ 50” West, 641.67 feet to the point of beginning, all in said Section 11,
Township 18 South, Range 4 West of the Willamette Meridian, Eugene, Lane County, Oregon.
Stormwater Analysis Braewood Hills Prepared for: Al Lundstrom Prepared by: Anna Backus, PE Project Engineer: Anna Backus, PE December 2023 (Updated August 2025) | KPFF Project #2100216
KPFF’S COMMITMENT TO SUSTAINABILITY As a member of the US Green Building Council, a sustaining member of Oregon Natural Step, and a member of the Sustainable Products Purchasers Coalition, KPFF is committed to the practice of sustainable design and the use of sustainable materials in our work. When hardcopy reports are provided by KPFF, they are prepared using recycled and recyclable materials, reflecting KPFF’s commitment to using sustainable practices and methods in all of our products.
1 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Table of Contents Drainage Report ............................................................................................................................................. 2 Site Constraints ............................................................................................................................................... 2 Project Narrative ................................................................................................................................................ 2 Existing Conditions ......................................................................................................................................... 2 Proposed Conditions ....................................................................................................................................... 3 Proposed Stormwater System ........................................................................................................................ 3 Analysis ............................................................................................................................................................... 5 Engineering Conclusions .................................................................................................................................... 5 Tables and Figures FIGURE 1: 24-Hour Precipitation for Eugene, OR (NOAA Atlas 2, Volume X) .................................................... 5 Appendices Appendix 1 Basin Maps Appendix 2 Existing Conditions Runoff Appendix 3 Water Quality Calculations Appendix 4 Detention and Runoff Results Appendix 5 Draft O&M Plans
2 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Project Overview and Description Drainage Report This storm drainage report has been prepared to show that the proposed Braewood Hills Third Addition PUD meets or exceeds the stormwater regulations of the City of Eugene and SLOPES V (Standard Local Operating Procedures for Endangered Species, authorized or carried out by the US Army Corps of Engineers in Oregon). This report has been prepared for the Final PUD review, Site Development Permit review, and PEPI permit review. The report will discuss existing and proposed storm drainage and how the proposed facilities will meet the following requirements: vegetated treatment for water quality, flood control, flow control and source control. Site Constraints The project will be constructed on a site that has a 15 to 20 percent average slope and poorly infiltrating soils. For these reasons, infiltration is not an option. Instead, detention will be used to provide flood control for the site. This will be discussed further in the Proposed Stormwater System section. Project Narrative Existing Conditions The site is surrounded by low-density residential or undeveloped lots. Hawkins Drive provides the western border of the project, Randy Lane runs along a portion of the southern edge and existing single-family residences border the east edge of the site. The existing wetlands have several sources. Some of them are from Goal 5 season streams that cut through the site, but at least one of the wetland areas was likely caused by a storm system outfall that was installed as part of the housing development to the east. The outfall itself is just outside of the project boundary. See Exhibit 1 in Appendix 1 for existing conditions, including the existing wetland extents. The site is within the City of Eugene Amazon Basin, per the 2002 Stormwater Master Plan and the receiving water body for this basin is Amazon Creek. Currently, there is no stormwater infrastructure on site. Amazon Creek is not TMDL and/or 303(d) listed. There are no nearby active NPDES Permits. The site and receiving water are not in a groundwater management area or EPA-designated sole source aquifer. Before European Development, the site would have been a wooded hillside. According to the USDA Web Soil Survey (WSS), the site soils consist of a combination of Dixonville silty clay loam, Panther silty clay loam and Philomath cobbly silty clay. All of those soils have a hydrologic soil group rating of D. The resulting runoff curve number for the pre-development condition of this site is 76. This was used to calculate the pre-development runoff rates (see Appendix 2). The downstream streams are considered floodwater streams, which trigger flow control requirements. However, the SLOPES V requirements of limiting the post-development runoff to pre-European development runoff at the 2-year and 10-year storms are more stringent.
3 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Proposed Conditions The proposed conditions will include single-family houses on individual lots, private streets and shared driveways. The private streets and shared driveways are assumed to be 100 percent impervious. They will be treated by vegetated facilities. For the detention calculations, the proposed lots are assumed to be 20% impervious with most of the large, steep lots left as wooded and vegetated. The detention system is sized to detain the proposed runoff at the 2-year and 10-year storm event, assuming that the private streets are 100% impervious and that the lots are 20% impervious. If lots are developed with more impervious area than this assumption, they must provide detention for all runoff beyond the assumed 20% impervious area. For the detention calculations, the proposed lots are assumed to be 50% impervious. Water quality will be provided by swales located along the private streets and at the low side of the lot along the existing Randy Lane and the west property line. These vegetated swales will slow the water significantly and create a longer path of travel that more closely mimics how water travels through the wetlands. These assumptions are conservative and intended to be higher than the likely impervious percentages given the amount of protected wetlands that will remain on site. Some of the 15.50-acre site is outside of the study area because of unimpacted Goal 5 areas and unimpacted areas downhill of the storm system. Additionally, Lot 39 at the northeast corner of the site is not currently planned for development. When it is developed, it will be required to provide water quality and detention within the lot boundaries. A total of 12.39 acres are assumed to be impacted and included in the study. For the limits of the study, see Exhibit 2 in Appendix 1. The runoff from the development to the east has not been considered in water quality or detention, but the site piping is sized to accommodate peak flows from the existing outfall. Proposed Stormwater System Stormwater Requirements The City of Eugene requires water quality treatment of an equivalent area for all new or replaced impervious surfaces. The 2014 City of Eugene Stormwater Management Manual (SWMM) implements a hierarchical system in which infiltration facilities must be considered first. If infiltration is not possible, filtration facilities must be considered. Finally, if the site has insufficient room for filtration facilities, a greatly increased SDC fee may be assessed. The on-site soils allow for limited infiltration and there is a concern about slope stability if infiltration is attempted. Therefore, filtration facilities have been selected to meet the requirements of vegetated treatment. SLOPES V requirements are applied to this project as part of the Joint Permit Application (JPA) that will be obtained for improvements proposed within the wetlands delineated on the site. SLOPES V requires that the pre-development flow is equal to or greater than the post-development flow for this site. In this case, pre-
4 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS development means pre-European development. The existing runoff calculations for the site can be found in Appendix 2. Water Quality Facilities, Flood Control and Flow Control There are six vegetated treatment facilities on site. The first is a vegetated swale that will treat the public extension of Randy Lane as well as the lots fronting that roadway. This swale is called Swale 1 – Upper on the attached Basin Map. This swale will be constructed under the PEPI and maintained by the City of Eugene. Swale 1 – Lower is adjacent to the existing, public Randy Lane. Swale 1 – Upper will drain into Swale 1 – Lower, so it will serve to provide additional treatment for the upper basins. Swale 1 – Lower will also provide treatment for the lots fronting the public portion of Randy Lane. Swales 2, 4, 5, and 6 are adjacent to Stonehedge Way. They captures and treats the runoff from the lots that are east of Stonehedge as well as the road itself. This swale moves the runoff laterally across the hill, slowing the water and helping to reduce the peak of the runoff from the site. Swale 3 is located at the low end of the site. It treats Stonehedge Way and Stonehedge Court as well as the lots located in the northwest corner of the site. Swale 3 is located at the bottom of the lower detention ponds, so this stormwater facility is providing treatment as well as detention. All swales act as a cut-off for the hill as well as providing treatment. Runoff from the vegetated facilities will be collected open detention ponds. At the end of the piped system, five tiered detention ponds will hold the water at the 2-year and 10-year storms. The runoff from Swale 1 (Upper and Lower), the runoff from Swale 2, and the runoff from Swale 4 enter the detention system at the upper tier. The runoff from Swales 5 and 6 enters the detention system at the lower tiers and at the beginning of Swale 3. Each tier has an undersized piped draining to the next tier that will act as an orifice. Each pipe only has one orifice, which is sized to control the 2-year storm to the correct release rate. This means that the 5-year and 10-year release rate is well under the pre-development conditions. At the 2-year storm, the pre-development rate is 2.28 cfs, so the detained rate must be equal to or less than that rate. The detention basins have orifices with sizes that vary between 8” and 9.5”. The peak flow from the system is 1.19 cfs. See the Proposed Basin Map in Appendix 1 and the Runoff and Detention Output from Storm and Sanitary Analysis (SSA) in Appendix 4 for the orifice sizing. At the 10-year storm, the pre-development rate is 5.19 cfs, so the detained rate must be equal to or less than that rate. The same orifices will be used for the 10-year storm, but the individual basins will detain much more water. They are sized to detain 2’ of water and still have 1’ of freeboard. The post-development rate is 3.05 cfs. See the Proposed Basin Map in Appendix 1 and the Runoff and Detention Output from Storm and Sanitary Analysis (SSA) in Appendix 4 for the orifice sizing. Operations & Maintenance All the facilities described in this report will be publicly maintained facilities. City of Eugene maintenance staff will maintain the pipes, detention ponds, swales and planters per City requirements. See Appendix 4 for the City’s standard Operations and Maintenance Plan.
5 Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Analysis The water quality facilities have been sized using the Eugene Stormwater Facility Calculator. The calculator determines runoff using the Santa Barbara Urban Hydrograph (SBUH) Method and NRCS 24-Hour Type 1A Hyetograph as outlined in Appendix M of the City of Eugene’s Stormwater Management Manual. The facility capacity is based on the requirements and facility details found in the Eugene Stormwater Management Manual (see Appendix 3 for the Stormwater Facility Calculator results). Detention has been calculated using Storm and Sanitary Analysis (SSA). SSA modeled runoff from the developed lots, time of concentration, pipe capacity and detention volumes. For analysis purposes, each basin of the property required the following information as input data for the computer model: • Impervious Area (Ai), in acres • Curve Number (CNi), impervious • Travel Time (Tc) • Total Precipitation Precipitation data for the respective storms are City of Eugene design storms are shown in Table 1 below. TABLE 1: 24-Hour Precipitation for Eugene, OR (NOAA Atlas 2, Volume X) Storm Event Inches WQ 1.56 2-Year 3.12 5-Year 3.6 10-Year 4.46 25-Year 5.18 50-Year 6.0 100-Year 6.48 See Appendix 3 for Water Quality Calculations and Appendix 4 for Detention Calculations. Engineering Conclusions Based on the requirements of the Stormwater Management Manual, no errors were found in the stormwater system design. The facilities and conveyance components have enough capacity to handle the required storm events and should be approved as designed. 2100216-kg
Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 1 Basin Maps
STOPEND
END OHUT[T][T][T][T][T][T][T][T][T][T][T][T]UCUCPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE
RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5'
27.5'
27.5'CDCDCDTRANJBVENTVENTEVLTEVLTEVLT EVLTEVLTEVLTJBJBJBTRTRTRTRTRTRTELVLTETRTRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WICV(2)SSSDSDDDDDDDDDDSSSSSSDSDRDRDSDSTRWSSS#10#9#8#7#11#12#13#6#5#14#4#15#3#16#17#2#1#20#19#18BBD1234567810111213141516SSSSS9EHAWKINS LANERANDY LANEOVERALL EXISTING BASINAREA=539,556 SF(760)(765)(770)(775)(780)(785)(790)(795)(800)(805)(810)(815)(820)(825)
(8
3
0
)
(835)
(840)
(845)
(850)(855)(860)
(865)
(870)
(875)(880)(885)
(810)
(815)
(820)
(825)
(830)
(835)
(840)
(845)(850)(855)(860)(865)(870)(875)(880)(885)(890)(895)(900)(905)(910)(915)(920)(925)(930)(935)EXH-1STORMWATERBASINBOUNDARYSHEET LEGENDPROPERTY LINESTORM PIPEBRAEWOOD HILL PUDSCALE601 INCH = 60 FEET601200240120120120 FEET
STOPEND
END OHUT[T][T][T][T][T][T][T][T][T][T][T][T]UCUCPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTPER AS-BUILTHAWKINS LANEHAWKINS LANERANDY LANEBLACKTAIL DRIVE
RANDY LANE25'VARIES25'VARIES25'25'27.5'27.5'27.5'27.5'27.5'27.5'
27.5'
27.5'CDCDCDTRANJBVENTVENTEVLTEVLTEVLT EVLTEVLTEVLTJBJBJBTRTRTRTRTRTRTELVLTETRTRTRTRWICVICVICVICV(2)ICV(3)WICV(2)WICV(2)SSSDSDDDDDDDDDDSSSSSSDSDRDRDSDSTRWSSS#10#9#8#7#11#12#13#6#5#14#4#15#3#16#17#2#1#20#19#18BBD1234567810111213141516SSSSS9ELOT 1LOT 6LOT 5LOT 12LOT 28LOT 7LOT 2LOT 3LOT 31LOT 22LOT 29LOT 33LOT 18LOT 24LOT 17LOT 34LOT 21LOT 35LOT 25LOT 32LOT 37LOT 4LOT 20LOT 36LOT 27LOT 30LOT 10LOT 15LOT 11LOT 14LOT 16LOT 19LOT 23LOT 26LOT 13LOT 38LOT 9LOT 835'-0"35'35'-0"35'35'6'-1014"35'35'35'35'35'CREATING LOOPED SYSTEM THATCONNECTS TO HAWKINS LANE.CREATING LOOPED SYSTEM THATCONNECTS TO HAWKINS LANE.10FOOT WIDE PUE TOACCOMMODATE EWEB WATER LINE>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'>>>>>>>>>>>>>>>>>>>>10.50'10.50'4.00'1.50'HAWKINS LANERANDY LANESTONEHEDGE WAYRANDY LANESTONEHEDGE COURTBASIN S1(PEPI/PUBLIC)AREA=22,111 SF100% IMPERVIOUSBASIN S2AREA=8,306 SFBASIN L2AREA=73,332 SFSEE NOTE 1BASIN L8AREA=45,263 SFSEE NOTE 1BASIN L5AREA=121,298 SFSEE NOTE 1BASIN L1AREA=89,730 SFSEE NOTE 1SWALE 1 - UPPERLENGTH: 414 LFWIDTH: 5'SIDE SLOPE: 3:1RUNNING SLOPE: VARIES 2%-6%BASIN L3AREA=57,594 SFSEE NOTE 1SWALE 1 - LOWERLENGTH: 386 LFWIDTH: 5'SIDE SLOPE: 3:1RUNNING SLOPE: 6%SWALE 2LENGTH: 206 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%SWALE 3LENGTH: 111 LFWIDTH: 5'SIDE SLOPE: 3:1RUNNING SLOPE: 0.85%BASIN L4AREA=54,116 SFSEE NOTE 1BASIN S3AREA=4,297 SFBASIN L6AREA=22,361 SFSEE NOTE 1BASIN S4AREA=4,912 SFSWALE 4LENGTH: 83 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%>>>>>>>>>>>>>>>>>>>>>>>>>
>
>
>
>
>
>
>>>>>>>>>>>>>>
>
>
>>>>>>>BASIN L7AREA=27,793 SFSEE NOTE 1BASIN S5AREA=3,195 SFSWALE 5LENGTH: 120 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%BASIN S6AREA=8,253 SFSWALE 6LENGTH: 84 LFWIDTH: 4'SIDE SLOPE: 3:1RUNNING SLOPE: 1%DET 12' DEPTH + 1' FREEBOARD9" ORIFICEPEAK 2-YEAR FLOW: 0.76 CFSPEAK 10-YEAR FLOW: 2.59 CFSDET 22' DEPTH + 1' FREEBOARD8" ORIFICEPEAK 2-YEAR FLOW: 0.75 CFSPEAK 10-YEAR FLOW: 2.26 CFSDET 32' DEPTH + 1' FREEBOARD8" ORIFICEPEAK 2-YEAR FLOW: 0.74 CFSPEAK 10-YEAR FLOW: 2.16 CFSDET 42' DEPTH + 1' FREEBOARD9.5" ORIFICEPEAK 2-YEAR FLOW: 1.21 CFSPEAK 10-YEAR FLOW: 3.08 CFSDET 52' DEPTH + 1' FREEBOARD9.5" ORIFICEPEAK 2-YEAR FLOW: 1.19 CFSPEAK 10-YEAR FLOW: 3.05 CFSEXH-2STORMWATER BASIN BOUNDARYSHEET LEGEND1.LOT AREAS ARE ASSUMED TO BE 50% IMPERVIOUS FOR WATER QUALITYSIZING AND 20% IMPERVIOUS FOR DETENTION SIZING. DEVELOPMENTBEYOND 20% IMPERVIOUS WILL REQUIRE INDIVIDUAL HOME BUILDERS TOPROVIDE ON-SITE DETENTION TO RESTRICT FLOW TO THE 20%IMPERVIOUS RATE.BRAEWOOD HILL PUDSCALE601 INCH = 60 FEET601200240120120120 FEETSHEET LEGEND
Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 2 Existing Conditions Runoff
SBUH Calculation Worksheet for City of Eugene Storm Events
Project Name: Braewood Date: 12/18/2023
Designer: Anna Backus Basin: Full Existing Study Area
User-Supplied Data
Pervious Area Impervious Area
Pervious Area, SF 539,556
Pervious Area, Acres 12.39 0.00
Pervious Area Curve Number, CNperv 76 98
Time of Concentration, Tc, minutes 17 Note: minimum Tc is five minutes
City of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)
Recurrence Interval WQ 2 5 10 25 50 100
Inches 1.4 3.12 3.6 4.46 5.18 6 6.48
Calculated Data
Total Project Area, Acres 12.39 Total Project Area, Square Feet 539,556
Recurrence Interval WQ 2 5 10 25 50 100
Peak Flow Rate, Qpeak, cfs 0.15 2.28 3.26 5.19 6.93 9.01 10.27
Total Runoff Volume, V, cubic feet 6,762 49,310 64,671 94,329 120,706 151,980 170,760
Time to Peak Runoff, hours 24.00 8.00 8.00 8.00 8.00 8.00 8.00
Runoff Hydrograph
Impervious Area, SF
Impervious Area, Acres
Impervious Area Curve Number, CNimp
0.00
2.00
4.00
6.00
8.00
10.00
12.00
0 500 1000 1500 2000 2500Runoff, cfsTime, minutes
WQ
2-Year
5-Year
10-Year
25-Year
50-Year
100-Year
800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 3 Water Quality Calculations
SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 8/28/2025Designer: ALBBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)User-Supplied DataPervious AreaImpervious AreaPervious Area, SF110,334139,581 Pervious Area, Acres2.533.20Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48
Calculated DataTotal Project Area, Acres5.74Total Project Area, Square Feet249,915Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs1.233.163.835.066.127.358.08Total Runoff Volume, V, cubic feet17,51843,67452,37968,42382,17898,099107,517Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.001.002.003.004.005.006.007.008.009.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)Instructions:Date: 8/28/20251. Choose Facility Type2. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%66sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ1.230917,453Filtration Only2-Yr3.161943,6075-Yr3.825352,31410-Yr5.056268,3546925-Yr6.117282,11350-Yr7.349198,032100-Yr8.0787107,448WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Swale WorksheetProject Name: BraewoodBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line11940.065 2 3 311503.60.5146.292171 0.05 5 2 3 32
1803.80.4835.90350 0.05 5 2 3 321803.80.4831.724386 0.06 5 2 3 31
1503.60.51412.5256789101112131415161700018000190002000026.43Max 3.8 0.514Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Project Name: BraewoodBasin: Swale 1 (Basins L1, L2, L3, S1, and S2)Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.20000.40000.60000.80001.00001.20001.40000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: Braewood######Designer: ALBBasin: Swale 2User-Supplied DataPervious AreaImpervious AreaPervious Area, SF27,05827,058 Pervious Area, Acres0.620.62Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48
Calculated DataTotal Project Area, Acres1.24Total Project Area, Square Feet54,116Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs0.240.640.781.051.281.541.70Total Runoff Volume, V, cubic feet3,4958,98410,83314,25517,19920,61422,637Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.000.200.400.600.801.001.201.401.601.800 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 2Instructions:458971. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%73sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.23803,421Filtration Only2-Yr0.64138,9115-Yr0.782610,75610-Yr1.046314,1787725-Yr1.274617,12450-Yr1.540520,537100-Yr1.698322,558WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Swale WorksheetProject Name: BraewoodBasin: Swale 2Instructions:458971. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line12060.014 2 3 367302.40.17419.7520003456789101112131415161700018000190002000019.75Max 2.4 0.174Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Project Name: BraewoodBasin: Swale 245897Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.05000.10000.15000.20000.25000.30000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080.00090 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
SBUH Calculation Worksheet for City of Eugene Storm Events
Project Name: Braewood Date: 8/28/25
Designer: ALB Basin: Swale 3 (Basin S3, L5)
User-Supplied Data
Pervious Area Impervious Area
Pervious Area, SF 60,649 60,649 Pervious Area, Acres 1.39 1.39
Pervious Area Curve Number, CNperv 76 98
Time of Concentration, Tc, minutes5 Note: minimum Tc is five minutes
City of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)
Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr
Inches 1.56 3.12 3.6 4.46 5.18 6 6.48
Calculated Data
Total Project Area, Acres 2.78 Total Project Area, Square Feet 121,298
Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr
Peak Flow Rate, Qpeak, cfs 0.54 1.44 1.76 2.35 2.86 3.45 3.81
Total Runoff Volume, V, cubic feet 7,835 20,138 24,282 31,952 38,550 46,204 50,739
Time to Peak Runoff, hours 7.83 7.83 7.83 7.83 7.83 7.83 7.83
Runoff Hydrograph
Impervious Area, SF
Impervious Area, Acres
Impervious Area Curve Number, CNimp0.000.501.001.502.002.503.003.504.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 3 (Basin S3, L5)Instructions:Date: 8/28/251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity9cf0Infiltration Area @ 75%105sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.006cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.53417,728Filtration Only2-Yr1.438020,0295-Yr1.754724,17610-Yr2.345831,84610625-Yr2.857738,44150-Yr3.453746,099100-Yr3.807350,633N/A100%N/AN/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):WATER QUALITY EVENTPASSROCK CAPACITY N/A 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Swale WorksheetProject Name: BraewoodBasin: Swale 3 (Basin S3, L5)Instructions:Date: 8/28/251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line11110.00855 2 3 3910504.00.2039.132000345678910111213141516170001800019000200009.13Max 4.0 0.203Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Slope (ft/ft)Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in) 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Project Name: BraewoodBasin: Swale 3 (Basin S3, L5)Date: 8/28/25Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.10000.20000.30000.40000.50000.60000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00020.00040.00060.00080.00100.00120.00140 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 8/28/2025Designer: ALBBasin: Swale 4User-Supplied DataPervious AreaImpervious AreaPervious Area, SF11,18116,093 Pervious Area, Acres0.260.37Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48
Calculated DataTotal Project Area, Acres0.63Total Project Area, Square Feet27,273Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs0.140.360.430.560.680.820.90Total Runoff Volume, V, cubic feet1,9934,8945,8547,6199,13010,87611,908Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.000.100.200.300.400.500.600.700.800.901.000 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 4Instructions:Date: 8/28/20251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%73sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.14111,919Filtration Only2-Yr0.35594,8195-Yr0.42895,78010-Yr0.56407,5457525-Yr0.68029,05250-Yr0.814910,801100-Yr0.894511,832WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Swale WorksheetProject Name: BraewoodBasin: Swale 4Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line1830.014 2 3 367301.80.1399.952000345678910111213141516170001800019000200009.95Max 1.8 0.139Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Project Name: BraewoodBasin: Swale 4Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.02000.04000.06000.08000.10000.12000.14000.16000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080.00090 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
SBUH Calculation Worksheet for City of Eugene Storm Events
Project Name: Braewood Date: 8/28/2025
Designer: ALB Basin: Swale 5
User-Supplied Data
Pervious Area Impervious Area
Pervious Area, SF 13,897 17,092 Pervious Area, Acres 0.32 0.39
Pervious Area Curve Number, CNperv 76 98
Time of Concentration, Tc, minutes5 Note: minimum Tc is five minutes
City of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)
Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr
Inches 1.56 3.12 3.6 4.46 5.18 6 6.48
Calculated Data
Total Project Area, Acres 0.71 Total Project Area, Square Feet 30,988
Recurrence Interval WQ 2-Yr 5-Yr 10-Yr 25-Yr 50-Yr 100-Yr
Peak Flow Rate, Qpeak, cfs 0.15 0.39 0.47 0.62 0.76 0.91 1.00
Total Runoff Volume, V, cubic feet 2,152 5,383 6,460 8,446 10,149 12,121 13,288
Time to Peak Runoff, hours 7.83 7.83 7.83 7.83 7.83 7.83 7.83
Runoff Hydrograph
Impervious Area, SF
Impervious Area, Acres
Impervious Area Curve Number, CNimp0.000.200.400.600.801.001.200 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 5Instructions:Date: 8/28/20251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity6cf0Infiltration Area @ 75%73sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.001cfsInfiltration Capacity (avg)0.004cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.15002,078Filtration Only2-Yr0.38845,3085-Yr0.47056,38510-Yr0.62298,3717525-Yr0.754410,07150-Yr0.907112,046100-Yr0.997513,211WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Swale WorksheetProject Name: BraewoodBasin: Swale 5Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line11200.014 2 3 367301.80.14214.0920003456789101112131415161700018000190002000014.09Max 1.8 0.142Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Project Name: BraewoodBasin: Swale 5Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.02000.04000.06000.08000.10000.12000.14000.16000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00010.00020.00030.00040.00050.00060.00070.00080.00090 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
SBUH Calculation Worksheet for City of Eugene Storm EventsProject Name: BraewoodDate: 8/28/2025Designer: ALBBasin: Swale 6User-Supplied DataPervious AreaImpervious AreaPervious Area, SF13,89717,092 Pervious Area, Acres0.320.39Pervious Area Curve Number, CNperv7698Time of Concentration, Tc, minutes5Note: minimum Tc is five minutesCity of Eugene 24-Hour Rainfall Depths (NRCS Type 1A distribution)Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrInches1.56 3.12 3.6 4.46 5.18 6 6.48
Calculated DataTotal Project Area, Acres0.71Total Project Area, Square Feet30,988Recurrence IntervalWQ2-Yr5-Yr10-Yr25-Yr50-Yr100-YrPeak Flow Rate, Qpeak, cfs0.150.390.470.620.760.911.00Total Runoff Volume, V, cubic feet2,1525,3836,4608,44610,14912,12113,288Time to Peak Runoff, hours7.837.837.837.837.837.837.83Runoff HydrographImpervious Area, SFImpervious Area, AcresImpervious Area Curve Number, CNimp0.000.200.400.600.801.001.200 500 1000 1500 2000 2500Runoff, cfsTime, minutesWQ2-Year5-Year10-Year25-Year50-Year100-Year 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Eugene Stormwater Facility CalculatorProject Name: BraewoodBasin: Swale 6Instructions:Date: 8/28/20251. Choose Facility TypeDate: 12.01.232. Choose shape3. Complete information in highlighted cellsFacilitySwaleSwale TypeVegetatedShapeRectangularBelow-GradeSee Swale Worksheet1,168sfSee Swale Worksheet1,1685ft124to 10.406in18inTested infiltration rate1.00in/hrInfiltration Safety Factor2.00Surface Storage Capacity13cf0Infiltration Area @ 75%146sfDesign Infiltration Rate0.50in/hrGM Infiltration Rate2.5in/hrInfiltration Capacity0.002cfsInfiltration Capacity (avg)0.008cfsResultsSURFACE CAPACITYRecurrance IntervalPeak Flow (cfs)Volume (cf)Meets Infiltration?WQ0.14912,003Filtration Only2-Yr0.38765,2295-Yr0.46966,30510-Yr0.62218,29515125-Yr0.753510,00050-Yr0.906211,967100-Yr0.996713,130WATER QUALITY EVENTPASSROCK CAPACITY N/ARock CapacityN/AN/AN/AN/AOpen, No Rock10-Yr Infiltration Volume (cf):N/A100%N/AN/A 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Swale WorksheetProject Name: BraewoodBasin: Swale 6Instructions:Date: 8/28/20251. Complete information in highlighted cells (downstream depth = top of check dam or overflow)2. Click ''calculate'' at the end of the facility segment line1840.0054 2 3 31314602.30.11312.3820003456789101112131415161700018000190002000012.38Max 2.3 0.113Resi-dence Time (m)Storage Capa-city (cf)Infiltra-tion Area (sf)Rock Depth (in)Rock Width (ft)Bottom Width (ft)WQ Flow Depth (in)Rock Capa-city (cf)WQ Velo-city (ft/s)Down-stream Depth (in)Slope (ft/ft)Facil-ity Seg-ment (ft)Length (ft)Right Side Slope (X:1)Total Residence Time:3. If any cell turns red, it does not meet the city's requirements. If facility segment identifier turns red, consider shortening length between check dams or increasing the depth because the segment's capacity is not being fully utilizedLeft Side Slope (X:1) 1201 Oak Street, Suite 100 Eugene, OR 97401 541.684.4902 kpff.com
Project Name: BraewoodBasin: Swale 6Date: 8/28/2025Water Quality Event Surface Facility ModelingWater Quality Event Below Grade Modeling0%10%20%30%40%50%60%70%80%90%100%0.00000.02000.04000.06000.08000.10000.12000.14000.16000 500 1000 1500 2000 2500Runoff, cfsTime, minutesSurface InflowInfiltration CapacityPercolation to SubsurfaceOverflowSurface Capacity0%10%20%30%40%50%60%70%80%90%100%0.00000.00020.00040.00060.00080.00100.00120.00140.00160.00180 500 1000 1500 2000 2500Runoff, cfsTime, minutesRock InflowInfiltration CapacityOverflowRock Capacity 800 Willamette Street, Suite 400 Eugene, OR 97401 541.684.4902 kpff.com
Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 4 Detention and Runoff Results
Autodesk® Storm and Sanitary Analysis 2024 - Version 13.6.268 (Build 0)
-----------------------------------------------------------------------------------------
*******************
Project Description
*******************
File Name ................. 20250828-CALC-DetentionPondRebuild.SPF
****************
Analysis Options
****************
Flow Units ................ cfs
Subbasin Hydrograph Method. Santa Barbara UH
Time of Concentration...... SCS TR-55
Link Routing Method ....... Hydrodynamic
Storage Node Exfiltration.. None
Starting Date ............. AUG-28-2025 00:00:00
Ending Date ............... AUG-29-2025 00:00:00
Report Time Step .......... 00:00:10
*************
Element Count
*************
Number of rain gages ...... 3
Number of subbasins ....... 14
Number of nodes ........... 21
Number of links ........... 20
****************
Subbasin Summary
****************
Subbasin Total Imperv. Raingage
Area Area
ID ft² %
----------------------------------------------------
BASIN-L1 89729.64 20.00 StormGage
BASIN-L2 73331.70 20.00 StormGage
BASIN-L3 57593.77 20.00 StormGage
BASIN-L4 54115.78 20.00 StormGage
BASIN-L5 121297.51 20.00 StormGage
BASIN-L6 22360.91 20.00 StormGage
BASIN-L7 27792.89 20.00 StormGage
BASIN-L8 45262.82 20.00 StormGage
BASIN-S1 22110.91 100.00 StormGage
BASIN-S2 3305.99 100.00 StormGage
BASIN-S3 4296.98 100.00 StormGage
BASIN-S4 4911.98 100.00 StormGage
BASIN-S5 3194.99 100.00 StormGage
BASIN-S6 8252.97 100.00 StormGage
************
Node Summary
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft²
------------------------------------------------------------------------------
Jun-13 JUNCTION 810.15 818.30 0.00
Jun-15 JUNCTION 0.00 810.42 0.00
Jun-17 JUNCTION 800.00 819.50 0.00
MH-3 JUNCTION 769.00 787.00 0.00
OV-01 JUNCTION 808.93 812.29 0.00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
SW1-L-Start JUNCTION 0.00 810.16 0.00
SW1-U-1 JUNCTION 840.97 841.97 0.00
SW1-U-OF1A JUNCTION 829.33 830.33 0.00
SW1-U-OF1B JUNCTION 820.77 826.64 0.00
SW1-U-OF2A JUNCTION 817.18 818.35 0.00
SW1-U-OF2B JUNCTION 813.79 815.66 0.00
SW-2-Start JUNCTION 0.00 820.36 0.00
SW-4-Start JUNCTION 0.00 816.13 0.00
SW-5-Start JUNCTION 815.50 817.70 0.00
SW-6-Start JUNCTION 0.00 820.34 0.00
Out-01 OUTFALL 753.00 753.79 0.00
DET-1 STORAGE 768.00 768.00 0.00
DET-2 STORAGE 766.75 766.75 0.00
DET-3 STORAGE 763.50 763.50 0.00
DET-4 STORAGE 757.40 757.40 0.00
DET-5 STORAGE 754.70 754.70 0.00
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
--------------------------------------------------------------------------------------------
CULVERT-1 SW1-U-OF1A SW1-U-OF1B CONDUIT 20.0 17.6000 0.0150
CULVERT-2 SW1-U-OF2A SW1-U-OF2B CONDUIT 20.0 11.7500 0.0150
Link-19 Jun-17 DET-4 CONDUIT 480.0 10.5417 0.0150
PIPE Jun-13 Jun-15 CONDUIT 20.0 10.0000 0.0150
PIPE-SW1L-To-PondMH-3 DET-1 CONDUIT 67.0 15.6418 0.0150
PIPE-SW1UtoSW1L OV-01 SW1-L-Start CONDUIT 120.0 1.0000 0.0150
PIPE-UPPER-TO-LOWERJun-15 MH-3 CONDUIT 182.0 16.4835 0.0150
SW1-Lower SW1-L-Start MH-3 CHANNEL 386.0 6.0000 0.0350
SWALE-3 SW-2-Start Jun-13 CHANNEL 206.0 1.0000 0.0320
SWALE-4 SW-4-Start Jun-13 CHANNEL 83.0 1.0000 0.0350
SWALE-5 SW-5-Start Jun-17 CHANNEL 120.0 1.0000 0.0350
SWALE-6 SW-6-Start Jun-17 CHANNEL 84.0 1.0000 0.0320
SW-U-1A SW1-U-1 SW1-U-OF1A CHANNEL 194.0 6.0000 0.0350
SW-U-1B SW1-U-OF1B SW1-U-OF2A CHANNEL 177.0 1.9322 0.0350
SW-U-1C SW1-U-OF2B OV-01 CHANNEL 50.0 5.0000 0.0350
Orifice-01 DET-1 DET-2 ORIFICE
Orifice-02 DET-2 DET-3 ORIFICE
Orifice-03 DET-3 DET-4 ORIFICE
Orifice-04 DET-4 DET-5 ORIFICE
Orifice-06 DET-5 Out-01 ORIFICE
*********************
Cross Section Summary
*********************
Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
Capacity
ft ft ft² ft
cfs
-------------------------------------------------------------------------------------------------
---------
CULVERT-1 CIRCULAR 0.83 0.83 1 0.55 0.21
7.97
CULVERT-2 CIRCULAR 0.83 0.83 1 0.55 0.21
6.51
Link-19 CIRCULAR 0.83 0.83 1 0.55 0.21
6.17
PIPE CIRCULAR 0.67 0.67 1 0.35 0.17
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
3.31
PIPE-SW1L-To-Pond CIRCULAR 0.83 0.83 1 0.55 0.21
7.51
PIPE-SW1UtoSW1L CIRCULAR 1.00 1.00 1 0.79 0.25
3.09
PIPE-UPPER-TO-LOWER CIRCULAR 0.67 0.67 1 0.35
0.17 4.25
SW1-Lower TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
65.99
SWALE-3 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98
380.41
SWALE-4 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68
22.94
SWALE-5 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68
22.94
SWALE-6 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98
380.41
SW-U-1A TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
65.99
SW-U-1B TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
37.45
SW-U-1C TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
60.24
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
************************** --------- -------
Total Precipitation ...... 3.203 3.114
Surface Runoff ........... 1.616 1.572
Continuity Error (%) ..... 0.000
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
************************** --------- ---------
External Inflow .......... 0.000 0.000
External Outflow ......... 0.973 0.317
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.018 0.006
Continuity Error (%) ..... 0.352
******************************************
Composite Curve Number Computations Report
******************************************
--------------------
Subbasin BASIN-L1
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 89729.64 80.40
--------------------
Subbasin BASIN-L2
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 73331.70 80.40
--------------------
Subbasin BASIN-L3
--------------------
Area Soil
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 57593.77 80.40
--------------------
Subbasin BASIN-L4
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 54115.78 80.40
--------------------
Subbasin BASIN-L5
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 121297.51 80.40
--------------------
Subbasin BASIN-L6
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 22360.91 80.40
--------------------
Subbasin BASIN-L7
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 27792.89 80.40
--------------------
Subbasin BASIN-L8
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 45262.82 80.40
--------------------
Subbasin BASIN-S1
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 22110.91 98.00
--------------------
Subbasin BASIN-S2
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 3305.99 98.00
--------------------
Subbasin BASIN-S3
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 4296.98 98.00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
--------------------
Subbasin BASIN-S4
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 4911.98 98.00
--------------------
Subbasin BASIN-S5
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 3194.99 98.00
--------------------
Subbasin BASIN-S6
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 8252.97 98.00
**************************************
Runoff Coefficient Computations Report
**************************************
--------------------
Subbasin BASIN-L1
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 89729.62 - 0.72
Composite Area & Weighted Runoff Coeff. 89729.62 0.72
--------------------
Subbasin BASIN-L2
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 73331.70 - 0.72
Composite Area & Weighted Runoff Coeff. 73331.70 0.72
--------------------
Subbasin BASIN-L3
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 57593.75 - 0.72
Composite Area & Weighted Runoff Coeff. 57593.75 0.72
--------------------
Subbasin BASIN-L4
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 54115.76 - 0.72
Composite Area & Weighted Runoff Coeff. 54115.76 0.72
--------------------
Subbasin BASIN-L5
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 121297.51 - 0.72
Composite Area & Weighted Runoff Coeff. 121297.51 0.72
--------------------
Subbasin BASIN-L6
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 22360.91 - 0.72
Composite Area & Weighted Runoff Coeff. 22360.91 0.72
--------------------
Subbasin BASIN-L7
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 27792.87 - 0.72
Composite Area & Weighted Runoff Coeff. 27792.87 0.72
--------------------
Subbasin BASIN-L8
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 45262.84 - 0.72
Composite Area & Weighted Runoff Coeff. 45262.84 0.72
--------------------
Subbasin BASIN-S1
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 22110.92 - 0.72
Composite Area & Weighted Runoff Coeff. 22110.92 0.72
--------------------
Subbasin BASIN-S2
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 3305.97 - 0.72
Composite Area & Weighted Runoff Coeff. 3305.97 0.72
--------------------
Subbasin BASIN-S3
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 4297.00 - 0.72
Composite Area & Weighted Runoff Coeff. 4297.00 0.72
--------------------
Subbasin BASIN-S4
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
- 4911.98 - 0.72
Composite Area & Weighted Runoff Coeff. 4911.98 0.72
--------------------
Subbasin BASIN-S5
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 3194.98 - 0.72
Composite Area & Weighted Runoff Coeff. 3194.98 0.72
--------------------
Subbasin BASIN-S6
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 8252.97 - 0.72
Composite Area & Weighted Runoff Coeff. 8252.97 0.72
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
-------------------
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
----------------------------------
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
---------------------
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where:
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's Roughness
--------------------
Subbasin BASIN-L1
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L2
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L3
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L4
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L5
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L6
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L7
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L8
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S1
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S2
--------------------
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S3
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S4
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S5
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S6
--------------------
User-Defined TOC override (minutes): 5.00
***********************
Subbasin Runoff Summary
***********************
--------------------------------------------------------------------------
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
in in cfs Number days hh:mm:ss
--------------------------------------------------------------------------
BASIN-L1 3.11 1.45 0.65 80.400 0 00:05:00
BASIN-L2 3.11 1.45 0.53 80.400 0 00:05:00
BASIN-L3 3.11 1.45 0.42 80.400 0 00:05:00
BASIN-L4 3.11 1.45 0.39 80.400 0 00:05:00
BASIN-L5 3.11 1.45 0.88 80.400 0 00:05:00
BASIN-L6 3.11 1.45 0.16 80.400 0 00:05:00
BASIN-L7 3.11 1.45 0.20 80.400 0 00:05:00
BASIN-L8 3.11 1.45 0.33 80.400 0 00:05:00
BASIN-S1 3.11 2.88 0.37 98.000 0 00:05:00
BASIN-S2 3.11 2.88 0.06 98.000 0 00:05:00
BASIN-S3 3.11 2.88 0.07 98.000 0 00:05:00
BASIN-S4 3.11 2.88 0.08 98.000 0 00:05:00
BASIN-S5 3.11 2.88 0.05 98.000 0 00:05:00
BASIN-S6 3.11 2.88 0.14 98.000 0 00:05:00
--------------------------------------------------------------------------
******************
Node Depth Summary
******************
-----------------------------------------------------------------------------------------
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
-----------------------------------------------------------------------------------------
Jun-13 0.00 0.00 810.15 0 00:00 0 0 0:00:00
Jun-15 0.00 0.00 0.00 0 00:00 0 0 0:00:00
Jun-17 7.61 8.14 808.14 0 08:00 0 0 0:00:00
MH-3 6.60 10.69 779.69 0 08:52 0 0 0:00:00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
OV-01 0.83 1.13 810.06 0 08:00 0 0 0:00:00
SW1-L-Start 636.35 809.24 809.24 0 08:52 0 0 0:00:00
SW1-U-1 0.03 0.07 841.04 0 08:00 0 0 0:00:00
SW1-U-OF1A 0.09 0.18 829.51 0 08:01 0 0 0:00:00
SW1-U-OF1B 0.06 0.14 820.91 0 08:00 0 0 0:00:00
SW1-U-OF2A 0.12 0.25 817.43 0 08:00 0 0 0:00:00
SW1-U-OF2B 0.06 0.13 813.92 0 08:00 0 0 0:00:00
SW-2-Start 265.67 601.54 601.54 1 00:00 0 0 0:00:00
SW-4-Start 141.62 308.56 308.56 1 00:00 0 0 0:00:00
SW-5-Start 1.21 1.31 816.81 0 08:00 0 0 0:00:00
SW-6-Start 185.89 434.76 434.76 1 00:00 0 0 0:00:00
Out-01 0.00 0.00 753.00 0 00:00 0 0 0:00:00
DET-1 0.22 0.52 768.52 0 09:04 0 913 0:00:00
DET-2 0.23 0.55 767.30 0 09:08 0 913 0:00:00
DET-3 0.23 0.55 764.05 0 09:12 0 913 0:00:00
DET-4 0.41 0.68 758.08 0 08:02 0 1404 0:00:00
DET-5 0.41 0.67 755.37 0 08:05 0 1395 0:00:00
*****************
Node Flow Summary
*****************
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
------------------------------------------------------------------------------------
Jun-13 JUNCTION 0.00 0.00 0 00:00 0.00
Jun-15 JUNCTION 0.00 0.00 0 00:00 0.00
Jun-17 JUNCTION 0.14 0.39 0 08:00 0.00
MH-3 JUNCTION 0.00 0.82 0 08:52 0.00
OV-01 JUNCTION 0.00 1.53 0 08:00 0.00
SW1-L-Start JUNCTION 0.47 1.99 0 08:00 0.00
SW1-U-1 JUNCTION 0.65 0.65 0 08:00 0.00
SW1-U-OF1A JUNCTION 0.00 0.65 0 08:00 0.00
SW1-U-OF1B JUNCTION 0.37 1.00 0 08:00 0.00
SW1-U-OF2A JUNCTION 0.00 1.00 0 08:00 0.00
SW1-U-OF2B JUNCTION 0.53 1.53 0 08:00 0.00
SW-2-Start JUNCTION 0.46 0.46 0 08:00 0.00
SW-4-Start JUNCTION 0.24 0.24 0 08:00 0.00
SW-5-Start JUNCTION 0.25 0.25 0 08:00 0.00
SW-6-Start JUNCTION 0.33 0.33 0 08:00 0.00
Out-01 OUTFALL 0.00 1.19 0 08:05 0.00
DET-1 STORAGE 0.00 0.82 0 08:52 0.00
DET-2 STORAGE 0.00 0.76 0 09:04 0.00
DET-3 STORAGE 0.00 0.75 0 09:08 0.00
DET-4 STORAGE 0.88 1.26 0 08:00 0.00
DET-5 STORAGE 0.00 1.21 0 08:02 0.00
********************
Storage Node Summary
********************
-------------------------------------------------------------------------------------------------
------------------------------------
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs
cfm hh:mm:ss 1000 ft³
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
-------------------------------------------------------------------------------------------------
------------------------------------
DET-1 0.000 0 0 00:00 0.100 0 0.76
0.00 0:00:00 0.000
DET-2 0.000 0 0 00:00 0.059 0 0.75
0.00 0:00:00 0.000
DET-3 0.000 0 0 00:00 0.059 0 0.74
0.00 0:00:00 0.000
DET-4 0.000 0 0 00:00 0.200 0 1.21
0.00 0:00:00 0.000
DET-5 0.000 0 0 00:00 0.109 0 1.19
0.00 0:00:00 0.000
***********************
Outfall Loading Summary
***********************
-----------------------------------------------
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
-----------------------------------------------
Out-01 96.96 0.63 1.19
-----------------------------------------------
System 96.96 0.63 1.19
*****************
Link Flow Summary
*****************
-------------------------------------------------------------------------------------------------
-------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
-------------------------------------------------------------------------------------------------
-------------------------------
CULVERT-1 CONDUIT 0 08:01 8.18 1.00 0.64 7.97 0.08
0.20 0 Calculated
CULVERT-2 CONDUIT 0 08:00 7.82 1.00 1.00 6.51 0.15
0.28 0 Calculated
Link-19 CONDUIT 0 08:00 1.65 1.00 0.39 6.17 0.06
0.49 0 Calculated
PIPE CONDUIT 0 00:00 0.00 1.00 0.00 3.31 0.00
0.00 0 Calculated
PIPE-SW1L-To-Pond CONDUIT 0 08:52 8.81 1.00 0.82 7.51 0.11
0.23 0 Calculated
PIPE-SW1UtoSW1L CONDUIT 0 08:00 3.77 1.00 1.52 3.09 0.49
0.61 0 Calculated
PIPE-UPPER-TO-LOWER CONDUIT 0 00:00 0.00 1.00 0.00 4.25 0.00
0.14 0 Calculated
SW1-Lower CHANNEL 0 08:52 1.90 1.00 0.82 65.99 0.01
0.08 0 Calculated
SWALE-3 CHANNEL 0 00:00 0.00 1.00 0.00 380.41 0.00
0.00 0 Calculated
SWALE-4 CHANNEL 0 00:00 0.00 1.00 0.00 22.94 0.00
0.00 0 Calculated
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
SWALE-5 CHANNEL 0 08:00 0.76 1.00 0.25 22.94 0.01
0.08 0 Calculated
SWALE-6 CHANNEL 0 00:00 0.00 1.00 0.00 380.41 0.00
0.00 0 Calculated
SW-U-1A CHANNEL 0 08:00 0.97 1.00 0.65 65.99 0.01
0.12 0 Calculated
SW-U-1B CHANNEL 0 08:00 1.52 1.00 1.00 37.45 0.03
0.12 0 Calculated
SW-U-1C CHANNEL 0 08:00 2.25 1.00 1.53 60.24 0.03
0.13 0 Calculated
Orifice-01 ORIFICE 0 09:04 0.76
0.69
Orifice-02 ORIFICE 0 09:08 0.75
0.83
Orifice-03 ORIFICE 0 09:12 0.74
0.82
Orifice-04 ORIFICE 0 08:02 1.21
0.85
Orifice-06 ORIFICE 0 08:05 1.19
0.85
********************************
Highest Flow Instability Indexes
********************************
Link SW-U-1C (4)
Link PIPE-SW1UtoSW1L (2)
WARNING 106 : Max/rim elevation defined for Junction Jun-13 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction Jun-13 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Jun-13 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction Jun-17 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction Jun-17 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Jun-17 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction MH-3 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction MH-3 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 106 : Max/rim elevation defined for Junction OV-01 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction OV-01 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction OV-01 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction SW1-U-1 is below junction invert
elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction SW1-U-1 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction SW1-U-1 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
Autodesk® Storm and Sanitary Analysis 2024 - Version 13.6.268 (Build 0)
-----------------------------------------------------------------------------------------
*******************
Project Description
*******************
File Name ................. 20250828-CALC-DetentionPondRebuild.SPF
****************
Analysis Options
****************
Flow Units ................ cfs
Subbasin Hydrograph Method. Santa Barbara UH
Time of Concentration...... SCS TR-55
Link Routing Method ....... Hydrodynamic
Storage Node Exfiltration.. None
Starting Date ............. AUG-28-2025 00:00:00
Ending Date ............... AUG-29-2025 00:00:00
Report Time Step .......... 00:00:10
*************
Element Count
*************
Number of rain gages ...... 3
Number of subbasins ....... 14
Number of nodes ........... 21
Number of links ........... 20
****************
Subbasin Summary
****************
Subbasin Total Imperv. Raingage
Area Area
ID ft² %
----------------------------------------------------
BASIN-L1 89729.64 20.00 StormGage
BASIN-L2 73331.70 20.00 StormGage
BASIN-L3 57593.77 20.00 StormGage
BASIN-L4 54115.78 20.00 StormGage
BASIN-L5 121297.51 20.00 StormGage
BASIN-L6 22360.91 20.00 StormGage
BASIN-L7 27792.89 20.00 StormGage
BASIN-L8 45262.82 20.00 StormGage
BASIN-S1 22110.91 100.00 StormGage
BASIN-S2 3305.99 100.00 StormGage
BASIN-S3 4296.98 100.00 StormGage
BASIN-S4 4911.98 100.00 StormGage
BASIN-S5 3194.99 100.00 StormGage
BASIN-S6 8252.97 100.00 StormGage
************
Node Summary
************
Node Element Invert Maximum Ponded External
ID Type Elevation Elev. Area Inflow
ft ft ft²
------------------------------------------------------------------------------
Jun-13 JUNCTION 810.15 818.30 0.00
Jun-15 JUNCTION 0.00 810.42 0.00
Jun-17 JUNCTION 800.00 819.50 0.00
MH-3 JUNCTION 769.00 787.00 0.00
OV-01 JUNCTION 808.93 812.29 0.00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
SW1-L-Start JUNCTION 0.00 810.16 0.00
SW1-U-1 JUNCTION 840.97 841.97 0.00
SW1-U-OF1A JUNCTION 829.33 830.33 0.00
SW1-U-OF1B JUNCTION 820.77 826.64 0.00
SW1-U-OF2A JUNCTION 817.18 818.35 0.00
SW1-U-OF2B JUNCTION 813.79 815.66 0.00
SW-2-Start JUNCTION 0.00 820.36 0.00
SW-4-Start JUNCTION 0.00 816.13 0.00
SW-5-Start JUNCTION 815.50 817.70 0.00
SW-6-Start JUNCTION 0.00 820.34 0.00
Out-01 OUTFALL 753.00 753.79 0.00
DET-1 STORAGE 768.00 768.00 0.00
DET-2 STORAGE 766.75 766.75 0.00
DET-3 STORAGE 763.50 763.50 0.00
DET-4 STORAGE 757.40 757.40 0.00
DET-5 STORAGE 754.70 754.70 0.00
************
Link Summary
************
Link From Node To Node Element Length Slope Manning's
ID Type ft % Roughness
--------------------------------------------------------------------------------------------
CULVERT-1 SW1-U-OF1A SW1-U-OF1B CONDUIT 20.0 17.6000 0.0150
CULVERT-2 SW1-U-OF2A SW1-U-OF2B CONDUIT 20.0 11.7500 0.0150
Link-19 Jun-17 DET-4 CONDUIT 480.0 10.5417 0.0150
PIPE Jun-13 Jun-15 CONDUIT 20.0 10.0000 0.0150
PIPE-SW1L-To-PondMH-3 DET-1 CONDUIT 67.0 15.6418 0.0150
PIPE-SW1UtoSW1L OV-01 SW1-L-Start CONDUIT 120.0 1.0000 0.0150
PIPE-UPPER-TO-LOWERJun-15 MH-3 CONDUIT 182.0 16.4835 0.0150
SW1-Lower SW1-L-Start MH-3 CHANNEL 386.0 6.0000 0.0350
SWALE-3 SW-2-Start Jun-13 CHANNEL 206.0 1.0000 0.0320
SWALE-4 SW-4-Start Jun-13 CHANNEL 83.0 1.0000 0.0350
SWALE-5 SW-5-Start Jun-17 CHANNEL 120.0 1.0000 0.0350
SWALE-6 SW-6-Start Jun-17 CHANNEL 84.0 1.0000 0.0320
SW-U-1A SW1-U-1 SW1-U-OF1A CHANNEL 194.0 6.0000 0.0350
SW-U-1B SW1-U-OF1B SW1-U-OF2A CHANNEL 177.0 1.9322 0.0350
SW-U-1C SW1-U-OF2B OV-01 CHANNEL 50.0 5.0000 0.0350
Orifice-01 DET-1 DET-2 ORIFICE
Orifice-02 DET-2 DET-3 ORIFICE
Orifice-03 DET-3 DET-4 ORIFICE
Orifice-04 DET-4 DET-5 ORIFICE
Orifice-05 DET-5 Out-01 ORIFICE
*********************
Cross Section Summary
*********************
Link Shape Depth/ Width No. of Cross Full Flow
Design
ID Diameter Barrels Sectional Hydraulic
Flow
Area Radius
Capacity
ft ft ft² ft
cfs
-------------------------------------------------------------------------------------------------
---------
CULVERT-1 CIRCULAR 0.83 0.83 1 0.55 0.21
7.97
CULVERT-2 CIRCULAR 0.83 0.83 1 0.55 0.21
6.51
Link-19 CIRCULAR 0.83 0.83 1 0.55 0.21
6.17
PIPE CIRCULAR 0.67 0.67 1 0.35 0.17
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
3.31
PIPE-SW1L-To-Pond CIRCULAR 0.83 0.83 1 0.55 0.21
7.51
PIPE-SW1UtoSW1L CIRCULAR 1.00 1.00 1 0.79 0.25
3.09
PIPE-UPPER-TO-LOWER CIRCULAR 0.67 0.67 1 0.35
0.17 4.25
SW1-Lower TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
65.99
SWALE-3 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98
380.41
SWALE-4 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68
22.94
SWALE-5 TRAPEZOIDAL 1.00 10.00 1 7.00 0.68
22.94
SWALE-6 TRAPEZOIDAL 4.00 25.00 1 52.00 1.98
380.41
SW-U-1A TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
65.99
SW-U-1B TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
37.45
SW-U-1C TRAPEZOIDAL 1.00 11.00 1 8.00 0.71
60.24
************************** Volume Depth
Runoff Quantity Continuity acre-ft inches
************************** --------- -------
Total Precipitation ...... 4.578 4.452
Surface Runoff ........... 2.735 2.659
Continuity Error (%) ..... 0.000
************************** Volume Volume
Flow Routing Continuity acre-ft Mgallons
************************** --------- ---------
External Inflow .......... 0.000 0.000
External Outflow ......... 1.813 0.591
Initial Stored Volume .... 0.000 0.000
Final Stored Volume ...... 0.025 0.008
Continuity Error (%) ..... 0.298
******************************************
Composite Curve Number Computations Report
******************************************
--------------------
Subbasin BASIN-L1
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 89729.64 80.40
--------------------
Subbasin BASIN-L2
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 73331.70 80.40
--------------------
Subbasin BASIN-L3
--------------------
Area Soil
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 57593.77 80.40
--------------------
Subbasin BASIN-L4
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 54115.78 80.40
--------------------
Subbasin BASIN-L5
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 121297.51 80.40
--------------------
Subbasin BASIN-L6
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 22360.91 80.40
--------------------
Subbasin BASIN-L7
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 27792.89 80.40
--------------------
Subbasin BASIN-L8
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 45262.82 80.40
--------------------
Subbasin BASIN-S1
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 22110.91 98.00
--------------------
Subbasin BASIN-S2
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 3305.99 98.00
--------------------
Subbasin BASIN-S3
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 4296.98 98.00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
--------------------
Subbasin BASIN-S4
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 4911.98 98.00
--------------------
Subbasin BASIN-S5
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 3194.99 98.00
--------------------
Subbasin BASIN-S6
--------------------
Area Soil
Soil/Surface Description (ft²) Group CN
----------------------------------------------------------------------------------------
Composite Area & Weighted CN 8252.97 98.00
**************************************
Runoff Coefficient Computations Report
**************************************
--------------------
Subbasin BASIN-L1
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 89729.62 - 0.72
Composite Area & Weighted Runoff Coeff. 89729.62 0.72
--------------------
Subbasin BASIN-L2
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 73331.70 - 0.72
Composite Area & Weighted Runoff Coeff. 73331.70 0.72
--------------------
Subbasin BASIN-L3
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 57593.75 - 0.72
Composite Area & Weighted Runoff Coeff. 57593.75 0.72
--------------------
Subbasin BASIN-L4
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 54115.76 - 0.72
Composite Area & Weighted Runoff Coeff. 54115.76 0.72
--------------------
Subbasin BASIN-L5
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 121297.51 - 0.72
Composite Area & Weighted Runoff Coeff. 121297.51 0.72
--------------------
Subbasin BASIN-L6
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 22360.91 - 0.72
Composite Area & Weighted Runoff Coeff. 22360.91 0.72
--------------------
Subbasin BASIN-L7
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 27792.87 - 0.72
Composite Area & Weighted Runoff Coeff. 27792.87 0.72
--------------------
Subbasin BASIN-L8
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 45262.84 - 0.72
Composite Area & Weighted Runoff Coeff. 45262.84 0.72
--------------------
Subbasin BASIN-S1
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 22110.92 - 0.72
Composite Area & Weighted Runoff Coeff. 22110.92 0.72
--------------------
Subbasin BASIN-S2
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 3305.97 - 0.72
Composite Area & Weighted Runoff Coeff. 3305.97 0.72
--------------------
Subbasin BASIN-S3
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 4297.00 - 0.72
Composite Area & Weighted Runoff Coeff. 4297.00 0.72
--------------------
Subbasin BASIN-S4
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
- 4911.98 - 0.72
Composite Area & Weighted Runoff Coeff. 4911.98 0.72
--------------------
Subbasin BASIN-S5
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 3194.98 - 0.72
Composite Area & Weighted Runoff Coeff. 3194.98 0.72
--------------------
Subbasin BASIN-S6
--------------------
Area Soil Runoff
Soil/Surface Description (ft²) Group Coeff.
-----------------------------------------------------------------------------------------
- 8252.97 - 0.72
Composite Area & Weighted Runoff Coeff. 8252.97 0.72
***************************************************
SCS TR-55 Time of Concentration Computations Report
***************************************************
Sheet Flow Equation
-------------------
Tc = (0.007 * ((n * Lf)^0.8)) / ((P^0.5) * (Sf^0.4))
Where:
Tc = Time of Concentration (hrs)
n = Manning's Roughness
Lf = Flow Length (ft)
P = 2 yr, 24 hr Rainfall (inches)
Sf = Slope (ft/ft)
Shallow Concentrated Flow Equation
----------------------------------
V = 16.1345 * (Sf^0.5) (unpaved surface)
V = 20.3282 * (Sf^0.5) (paved surface)
V = 15.0 * (Sf^0.5) (grassed waterway surface)
V = 10.0 * (Sf^0.5) (nearly bare & untilled surface)
V = 9.0 * (Sf^0.5) (cultivated straight rows surface)
V = 7.0 * (Sf^0.5) (short grass pasture surface)
V = 5.0 * (Sf^0.5) (woodland surface)
V = 2.5 * (Sf^0.5) (forest w/heavy litter surface)
Tc = (Lf / V) / (3600 sec/hr)
Where:
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
Channel Flow Equation
---------------------
V = (1.49 * (R^(2/3)) * (Sf^0.5)) / n
R = Aq / Wp
Tc = (Lf / V) / (3600 sec/hr)
Where:
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
Tc = Time of Concentration (hrs)
Lf = Flow Length (ft)
R = Hydraulic Radius (ft)
Aq = Flow Area (ft²)
Wp = Wetted Perimeter (ft)
V = Velocity (ft/sec)
Sf = Slope (ft/ft)
n = Manning's Roughness
--------------------
Subbasin BASIN-L1
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L2
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L3
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L4
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L5
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L6
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L7
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-L8
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S1
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S2
--------------------
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S3
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S4
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S5
--------------------
User-Defined TOC override (minutes): 5.00
--------------------
Subbasin BASIN-S6
--------------------
User-Defined TOC override (minutes): 5.00
***********************
Subbasin Runoff Summary
***********************
--------------------------------------------------------------------------
Subbasin Total Total Peak Weighted Time of
ID Precip Runoff Runoff Curve Concentration
in in cfs Number days hh:mm:ss
--------------------------------------------------------------------------
BASIN-L1 4.45 2.51 1.21 80.400 0 00:05:00
BASIN-L2 4.45 2.51 0.99 80.400 0 00:05:00
BASIN-L3 4.45 2.51 0.78 80.400 0 00:05:00
BASIN-L4 4.45 2.51 0.73 80.400 0 00:05:00
BASIN-L5 4.45 2.51 1.64 80.400 0 00:05:00
BASIN-L6 4.45 2.51 0.30 80.400 0 00:05:00
BASIN-L7 4.45 2.51 0.38 80.400 0 00:05:00
BASIN-L8 4.45 2.51 0.61 80.400 0 00:05:00
BASIN-S1 4.45 4.21 0.53 98.000 0 00:05:00
BASIN-S2 4.45 4.21 0.08 98.000 0 00:05:00
BASIN-S3 4.45 4.21 0.10 98.000 0 00:05:00
BASIN-S4 4.45 4.21 0.12 98.000 0 00:05:00
BASIN-S5 4.45 4.21 0.08 98.000 0 00:05:00
BASIN-S6 4.45 4.21 0.20 98.000 0 00:05:00
--------------------------------------------------------------------------
******************
Node Depth Summary
******************
-----------------------------------------------------------------------------------------
Node Average Maximum Maximum Time of Max Total Total Retention
ID Depth Depth HGL Occurrence Flooded Time Time
Attained Attained Attained Volume Flooded
ft ft ft days hh:mm acre-in minutes hh:mm:ss
-----------------------------------------------------------------------------------------
Jun-13 0.28 1.70 811.85 0 18:18 0 0 0:00:00
Jun-15 17.24 200.71 200.71 1 00:00 0 0 0:00:00
Jun-17 7.88 8.18 808.18 0 08:00 0 0 0:00:00
MH-3 8.41 10.94 779.94 0 07:59 0 0 0:00:00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
OV-01 0.91 1.41 810.34 0 08:00 0 0 0:00:00
SW1-L-Start 714.82 809.36 809.36 0 08:00 0 0 0:00:00
SW1-U-1 0.04 0.10 841.07 0 08:00 0 0 0:00:00
SW1-U-OF1A 0.11 0.25 829.58 0 08:00 0 0 0:00:00
SW1-U-OF1B 0.08 0.18 820.95 0 08:00 0 0 0:00:00
SW1-U-OF2A 0.15 0.35 817.53 0 08:01 0 0 0:00:00
SW1-U-OF2B 0.08 0.18 813.97 0 08:00 0 0 0:00:00
SW-2-Start 470.51 816.50 816.50 0 18:18 0 0 0:00:00
SW-4-Start 251.37 509.80 509.80 1 00:00 0 0 0:00:00
SW-5-Start 1.25 1.35 816.85 0 08:00 0 0 0:00:00
SW-6-Start 352.16 754.25 754.25 1 00:00 0 0 0:00:00
Out-01 0.00 0.00 753.00 0 00:00 0 0 0:00:00
DET-1 0.52 1.97 769.97 0 08:15 0 971 0:00:00
DET-2 0.58 2.06 768.81 0 08:24 0 971 0:00:00
DET-3 0.56 1.91 765.41 0 08:41 0 970 0:00:00
DET-4 0.78 2.01 759.41 0 08:46 0 1416 0:00:00
DET-5 0.77 1.98 756.68 0 08:59 0 1409 0:00:00
*****************
Node Flow Summary
*****************
------------------------------------------------------------------------------------
Node Element Maximum Peak Time of Maximum Time of Peak
ID Type Lateral Inflow Peak Inflow Flooding Flooding
Inflow Occurrence Overflow Occurrence
cfs cfs days hh:mm cfs days hh:mm
------------------------------------------------------------------------------------
Jun-13 JUNCTION 0.00 0.14 0 18:18 0.00
Jun-15 JUNCTION 0.00 0.14 0 18:18 0.00
Jun-17 JUNCTION 0.20 0.65 0 08:00 0.00
MH-3 JUNCTION 0.00 3.55 0 08:00 0.00
OV-01 JUNCTION 0.00 2.71 0 08:00 0.00
SW1-L-Start JUNCTION 0.86 3.56 0 08:00 0.00
SW1-U-1 JUNCTION 1.21 1.21 0 08:00 0.00
SW1-U-OF1A JUNCTION 0.00 1.21 0 08:00 0.00
SW1-U-OF1B JUNCTION 0.53 1.73 0 08:00 0.00
SW1-U-OF2A JUNCTION 0.00 1.73 0 08:00 0.00
SW1-U-OF2B JUNCTION 0.99 2.71 0 08:00 0.00
SW-2-Start JUNCTION 0.83 0.83 0 08:00 0.00
SW-4-Start JUNCTION 0.42 0.42 0 08:00 0.00
SW-5-Start JUNCTION 0.45 0.45 0 08:00 0.00
SW-6-Start JUNCTION 0.61 0.61 0 08:00 0.00
Out-01 OUTFALL 0.00 3.05 0 08:59 0.00
DET-1 STORAGE 0.00 3.57 0 08:00 0.00
DET-2 STORAGE 0.00 2.59 0 08:05 0.00
DET-3 STORAGE 0.00 2.26 0 08:24 0.00
DET-4 STORAGE 1.64 3.55 0 08:05 0.00
DET-5 STORAGE 0.00 3.08 0 08:46 0.00
********************
Storage Node Summary
********************
-------------------------------------------------------------------------------------------------
------------------------------------
Storage Node ID Maximum Maximum Time of Max Average Average Maximum
Maximum Time of Max. Total
Ponded Ponded Ponded Ponded Ponded Storage Node
Exfiltration Exfiltration Exfiltrated
Volume Volume Volume Volume Volume Outflow
Rate Rate Volume
1000 ft³ (%) days hh:mm 1000 ft³ (%) cfs
cfm hh:mm:ss 1000 ft³
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
-------------------------------------------------------------------------------------------------
------------------------------------
DET-1 0.000 0 0 00:00 0.306 0 2.59
0.00 0:00:00 0.000
DET-2 0.000 0 0 00:00 0.190 0 2.26
0.00 0:00:00 0.000
DET-3 0.000 0 0 00:00 0.187 0 2.16
0.00 0:00:00 0.000
DET-4 0.000 0 0 00:00 0.496 0 3.08
0.00 0:00:00 0.000
DET-5 0.000 0 0 00:00 0.282 0 3.05
0.00 0:00:00 0.000
***********************
Outfall Loading Summary
***********************
-----------------------------------------------
Outfall Node ID Flow Average Peak
Frequency Flow Inflow
(%) cfs cfs
-----------------------------------------------
Out-01 98.65 1.30 3.05
-----------------------------------------------
System 98.65 1.30 3.05
*****************
Link Flow Summary
*****************
-------------------------------------------------------------------------------------------------
-------------------------------
Link ID Element Time of Maximum Length Peak Flow Design Ratio of
Ratio of Total Reported
Type Peak Flow Velocity Factor during Flow Maximum
Maximum Time Condition
Occurrence Attained Analysis Capacity /Design
Flow Surcharged
days hh:mm ft/sec cfs cfs Flow
Depth minutes
-------------------------------------------------------------------------------------------------
-------------------------------
CULVERT-1 CONDUIT 0 08:00 9.53 1.00 1.21 7.97 0.15
0.28 0 Calculated
CULVERT-2 CONDUIT 0 08:01 8.82 1.00 1.72 6.51 0.26
0.39 0 Calculated
Link-19 CONDUIT 0 08:00 1.85 1.00 0.64 6.17 0.10
0.61 0 Calculated
PIPE CONDUIT 0 18:18 4.51 1.00 0.14 3.31 0.04
0.14 0 Calculated
PIPE-SW1L-To-Pond CONDUIT 0 08:00 12.76 1.00 3.57 7.51 0.48
0.73 0 Calculated
PIPE-SW1UtoSW1L CONDUIT 0 08:00 4.09 1.00 2.71 3.09 0.88
0.90 0 Calculated
PIPE-UPPER-TO-LOWER CONDUIT 0 00:00 0.00 1.00 0.00 4.25 0.00
0.33 0 Calculated
SW1-Lower CHANNEL 0 08:00 3.25 1.00 3.55 65.99 0.05
0.20 0 Calculated
SWALE-3 CHANNEL 0 18:18 0.95 1.00 0.14 380.41 0.00
0.03 0 Calculated
SWALE-4 CHANNEL 0 00:00 0.00 1.00 0.00 22.94 0.00
0.00 0 Calculated
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
SWALE-5 CHANNEL 0 08:00 0.95 1.00 0.45 22.94 0.02
0.11 0 Calculated
SWALE-6 CHANNEL 0 00:00 0.00 1.00 0.00 380.41 0.00
0.00 0 Calculated
SW-U-1A CHANNEL 0 08:00 1.23 1.00 1.21 65.99 0.02
0.18 0 Calculated
SW-U-1B CHANNEL 0 08:00 1.73 1.00 1.73 37.45 0.05
0.18 0 Calculated
SW-U-1C CHANNEL 0 08:00 2.76 1.00 2.71 60.24 0.04
0.18 0 Calculated
Orifice-01 ORIFICE 0 08:05 2.59
1.00
Orifice-02 ORIFICE 0 08:24 2.26
1.00
Orifice-03 ORIFICE 0 08:41 2.16
1.00
Orifice-04 ORIFICE 0 08:46 3.08
1.00
Orifice-05 ORIFICE 0 08:59 3.05
1.00
********************************
Highest Flow Instability Indexes
********************************
Link SW-U-1C (2)
WARNING 106 : Max/rim elevation defined for Junction Jun-13 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction Jun-13 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Jun-13 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction Jun-17 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction Jun-17 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction Jun-17 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction MH-3 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction MH-3 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 106 : Max/rim elevation defined for Junction OV-01 is below junction invert elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction OV-01 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction OV-01 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction SW1-U-1 is below junction invert
elevation.
Assumed max/rim elevation equal to invert elevation.
WARNING 107 : Initial water surface elevation defined for Junction SW1-U-1 is below junction
invert elevation.
Assumed initial water surface elevation equal to invert elevation.
WARNING 108 : Surcharge elevation defined for Junction SW1-U-1 is below junction maximum
elevation. Assumed surcharge elevation equal to maximum elevation.
WARNING 106 : Max/rim elevation defined for Junction SW1-U-OF1A is below junction invert
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary Analysis
Braewood Hills | KPFF Consulting Engineers STORMWATER ANALYSIS Appendix 5 Draft O&M Plans
Stormwater Management Manual 4-29 Eugene 2014
4.5.12 Structural Detention Facility O & M Plan
Structural Detention Facilities are flow control devices. Structural detention facilities include tanks, vaults, and oversized pipes designed to fill with stormwater during large storm events and slowly release the runoff over a number of hours. There are numerous components to each system; inlet pipes conveying stormwater into the detention facility, detention chambers storing stormwater during storm events, and outlet drains restricting the flow out of the detention chamber. Underground Structural Detention Facilities shall be inspected quarterly and within 48 hours after each major storm event.
Training and/or Written Guidance information for operating and maintaining Detention Facilities shall be provided to all property owners and tenants. A copy of the O & M Plan shall be provided to all property owners and tenants.
Inspection Logs shall be kept by the facility owner demonstrating the following items have been inspected and are being maintained properly:
• Access to the detention facility shall be safe and efficient. Obstacles preventing maintenance personnel and/or equipment access to the components of the facility shall be removed.
• Debris/Sediment that is found to clog the inlet shall be removed, tested, and disposed of in accordance with applicable federal and state requirements.
• Detention Chamber shall be cleaned out yearly or after an inch of sediment has accumulated and inspected for cracks or damage. Grit and sediment that has settled to the bottom of the chamber shall be removed during each cleaning. Cleaning shall be done without use of detergents or surfactants. A pressure washer may be used if necessary.
• Inlets shall be cleared when conveyance capacity is plugged to ensure unrestricted stormwater flow.
• Outlets shall be cleared when 50% of the conveyance capacity is plugged.
• Vegetation such as large shrubs or trees that are likely to interfere with detention facility operation shall be identified at each inspection then removed.
Spill Prevention Measures shall be exercised when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified.
Non-Chemical Pest Control measures shall be taken to prevent development of insects, mosquitoes, and rodents.
Stormwater Management Manual 4-25 Eugene 2014
4.5.10 Swale O & M Plan Swales are filtration stormwater conveyance facilities that provide flow control and stormwater quality benefits. Swales are long and narrow vegetated and grassed depressions used to collect and convey stormwater runoff which allows pollutants to settle and filter out as the water flows through the facility. All facility components, vegetation, and source controls shall be inspected for proper operations and structural stability, at a minimum, quarterly for the first 2 years from the date of installation, 2 times per year thereafter, and within 48 hours after each major storm event.
Training and/or Written Guidance information for operating and maintaining Swales shall be provided to all property owners and tenants. A copy of the O & M Plan shall be provided to all property owners and tenants.
Inspection Logs shall be kept by the facility owner demonstrating the following items have been inspected and are being maintained properly:
• Access to Swales shall be safe and efficient. Obstacles preventing maintenance personnel and/or equipment access to the components of the facility shall be removed.
• Channelization and causes for altered water flow shall be identified and corrected upon discovery. Stormwater should exit the vegetative filter as sheet flow, unless a collection drainpipe is used.
• Debris and Litter shall be removed to prevent channelization, clogging, and interference with plant growth. Fallen leaves and debris from deciduous plant foliage shall be raked and removed.
• Erosion Damage shall be identified and controlled when native soil is exposed or erosion channels are forming.
• Grassed Swales shall be mowed to 4”-9” high and grass clippings shall be removed no less than 2 times per year.
• Infiltrating Swales shall be excavated and cleaned, and gravel or soil shall be replaced to correct low infiltration rates. The Swale should drain within 48 hours of a storm event.
• Inlets shall maintain a calm flow of water entering the Swale and shall be cleared when conveyance capacity is plugged to ensure unrestricted stormwater flow to the rain garden.
• Mulch shall be replenished as needed to ensure healthy plant growth.
• Nuisance and Prohibited Vegetation from the Eugene Plant List (such as blackberries and English Ivy) shall be removed when discovered. Invasive vegetation contributing up to 25% of vegetation of all species shall be removed and replaced.
• Outlets shall be cleared when 50% of the conveyance capacity is plugged.
Stormwater Management Manual 4-26 Eugene 2014
• Sedimentation build-up near or exceeding 2” in depth shall be hand-removed with minimum damage to vegetation using proper erosion control measures. Sediment shall be removed if it is more than 4 inches thick or so thick as to damage or kill vegetation.
• Slopes shall be stabilized to prevent erosion and failure using appropriate measures when native soil is exposed.
• Vegetation shall be healthy and dense enough to provide filtering while protecting underlying soils from erosion. Dead vegetation shall be removed to maintain less than 10% of area coverage or when vegetative filter function is impaired. Vegetation shall be replaced immediately to control erosion where soils are exposed and within 3 months to maintain cover density.
Spill Prevention Measures shall be exercised on site when handling substances that contaminate stormwater. Releases of pollutants shall be corrected as soon as identified.
Non-Chemical Pest Control measures shall be taken to prevent development of insects, mosquitoes, and rodents.
CITY FILE NO.
APPROVED AND ACCEPTED BY CITY OF EUGENE, OR
City Deputy Recorder Date
AFTER RECORDING RETURN TO: City of Eugene, City Recorder, Eugene, Oregon 97401
UNTIL A CHANGE IS REQUESTED, MAIL ALL TAX STATEMENTS TO:
City of Eugene, Finance Department, Eugene, Oregon 97401
9/29/05
IRREVOCABLE PETITION FOR PUBLIC IMPROVEMENTS
PETITIONER(S): Albert C. Lundstrom, Manager, Piculell Properties, LLC.
Date: ____________________, 2025
Petitioner is the owner of the following described real property: Lots 15, 16, 19, 22 and 24 of the Braewood Hills 3rd
Addition PUD as recorded (Month & Day)____________________, 2025, Reception No. 2025-________________,
Lane County Deeds and Records, in Lane County, Oregon
Petitioner hereby irrevocably petitions the City of Eugene to initiate the following local improvements in accordance with
the standard specifications of the City:
Future public improvements in Randy Lane (existing portion between Hawkins Lane and Blacktail Drive) to include
setback sidewalks and street trees.
This petition is presented to the City so that Petitioner’s property may be developed and receive municipal services
from the City which will directly benefit Petitioner’s property and shall remain in full force and effect until the
above described public improvements have been constructed, and accepted for maintenance as public improvements
by the City Engineer.
It is understood by Petitioner that:
1. The cost of the improvements shall be borne by the benefited property in accordance with state law, the
Charter of the City of Eugene and its ordinances and policies.
2. The City in its sole discretion may initiate the construction of all or part of the local improvements requested or
may join all or part of Petitioners property with other property when creating a local improvement assessment
district.
3. Petitioner and Petitioners heirs, assigns and successors in interest in the property shall be bound by this
irrevocable petition which will run with the property and will be recorded by the City in the deed records of Lane
County.
4. Petitioner declares that the public improvements herein sought will directly benefit the described property and
will directly benefit the City through improvements to the public way and public utilities serving the property and
other properties in the vicinity.
5. Petitioner shall not challenge the formation of a local improvement assessment district by City and in
proceedings therein will acknowledge this petition if requested to do so by City.
6. If the City is required to file an action in any court of competent jurisdiction to enforce the language in this
petition or to prohibit the violation of any of the covenants contained herein, the prevailing party shall be entitled to
recover reasonable attorney fees and costs and disbursements of litigation at trial or on appeal.
7. In construing this petition singular words include the plural.
PETITIONER: ___________________________ PETITIONER: ___________________________
Albert C. Lundstrom, Manager
STATE OF OREGON
County of Lane
Personally appeared the above named Albert C. Lundstrom, Manager, Piculell Properties, LLC. and
acknowledged the foregoing instrument to be his voluntary act and deed. Before me this day of
_____________________, 2025.
_____________________________________
Notary Public for Oregon
My Commission Expires: ________________
CITY FILE NO.
APPROVED AND ACCEPTED BY CITY OF EUGENE, OR
City Deputy Recorder Date
AFTER RECORDING RETURN TO: City of Eugene, City Recorder, Eugene, Oregon 97401
UNTIL A CHANGE IS REQUESTED, MAIL ALL TAX STATEMENTS TO:
City of Eugene, Finance Department, Eugene, Oregon 97401
9/29/05
IRREVOCABLE PETITION FOR PUBLIC IMPROVEMENTS
PETITIONER(S): Albert C. Lundstrom, Manager, Piculell Properties, LLC.
Date: ____________________, 2025
Petitioner is the owner of the following described real property: Lots 1, 6, 11 and 15 of the Braewood Hills 3rd Addition
PUD as recorded (Month & Day)____________________, 2025, Reception No. 2025-________________, Lane County
Deeds and Records, in Lane County, Oregon
Petitioner hereby irrevocably petitions the City of Eugene to initiate the following local improvements in accordance with
the standard specifications of the City:
Future public improvements in Hawkins Lane to include sidewalks.
This petition is presented to the City so that Petitioner’s property may be developed and receive municipal services
from the City which will directly benefit Petitioner’s property and shall remain in full force and effect until the
above described public improvements have been constructed, and accepted for maintenance as public improvements
by the City Engineer.
It is understood by Petitioner that:
1. The cost of the improvements shall be borne by the benefited property in accordance with state law, the
Charter of the City of Eugene and its ordinances and policies.
2. The City in its sole discretion may initiate the construction of all or part of the local improvements requested or
may join all or part of Petitioners property with other property when creating a local improvement assessment
district.
3. Petitioner and Petitioners heirs, assigns and successors in interest in the property shall be bound by this
irrevocable petition which will run with the property and will be recorded by the City in the deed records of Lane
County.
4. Petitioner declares that the public improvements herein sought will directly benefit the described property and
will directly benefit the City through improvements to the public way and public utilities serving the property and
other properties in the vicinity.
5. Petitioner shall not challenge the formation of a local improvement assessment district by City and in
proceedings therein will acknowledge this petition if requested to do so by City.
6. If the City is required to file an action in any court of competent jurisdiction to enforce the language in this
petition or to prohibit the violation of any of the covenants contained herein, the prevailing party shall be entitled to
recover reasonable attorney fees and costs and disbursements of litigation at trial or on appeal.
7. In construing this petition singular words include the plural.
PETITIONER: ___________________________ PETITIONER: ___________________________
Albert C. Lundstrom, Manager
STATE OF OREGON
County of Lane
Personally appeared the above named Albert C. Lundstrom, Manager, Piculell Properties, LLC. and
acknowledged the foregoing instrument to be his voluntary act and deed. Before me this day of
_____________________, 2025.
_____________________________________
Notary Public for Oregon
My Commission Expires: ________________
Name: Standard : 1
North: 100478.66' East: 171598.67'
Segment #1 : Line
Course: N00°05'38"E Length: 99.62'
North: 100578.28' East: 171598.84'
Segment #2 : Line
Course: S89°35'50"E Length: 129.62'
North: 100577.37' East: 171728.45'
Segment #3 : Line
Course: S00°24'10"W Length: 99.62'
North: 100477.75' East: 171727.75'
Segment #4 : Line
Course: N89°35'50"W Length: 129.09'
North: 100478.66' East: 171598.67'
Perimeter: 457.94' Area: 12885.692 Sq. Ft.
Error Closure: 0.01 Course: S78°49'02"W
Error North: -0.001 East: -0.007
Precision 1: 45795.00
Name: Standard : 2
North: 100476.85' East: 171855.77'
Segment #1 : Line
Course: N89°35'50"W Length: 128.02'
North: 100477.75' East: 171727.75'
Segment #2 : Line
Course: N00°24'10"E Length: 99.62'
North: 100577.37' East: 171728.45'
Segment #3 : Line
Course: S89°35'50"E Length: 128.02'
North: 100576.47' East: 171856.47'
Segment #4 : Line
Course: S00°24'10"W Length: 99.62'
North: 100476.85' East: 171855.77'
Perimeter: 455.27' Area: 12752.530 Sq. Ft.
Error Closure: 0.00 Course: N00°00'00"E
Error North: 0.000 East: 0.000
Precision 1: 455280000.00
Name: Standard : 3
North: 100476.18' East: 171951.99'
Segment #1 : Line
Course: N89°35'50"W Length: 96.22'
North: 100476.85' East: 171855.77'
Segment #2 : Line
Course: N00°24'10"E Length: 99.62'
North: 100576.47' East: 171856.47'
Segment #3 : Line
Course: S89°35'50"E Length: 128.00'
North: 100575.57' East: 171984.47'
Segment #4 : Line
Course: S00°24'10"W Length: 103.67'
North: 100471.91' East: 171983.74'
Segment #5 : Curve
Length: 22.03' Radius: 149.05'
Delta: 008°28'01.58" Tangent: 11.03'
Chord: 22.01' Course: N83°39'41"W
Course In: N02°06'18"E Course Out: S10°34'20"W
RP North: 100620.85' East: 171989.21'
End North: 100474.34' East: 171961.86'
Segment #6 : Line
Course: N79°25'40"W Length: 10.05'
North: 100476.18' East: 171951.98'
Perimeter: 459.58' Area: 12829.296 Sq. Ft.
Error Closure: 0.00 Course: N81°31'22"W
Error North: 0.001 East: -0.004
Precision 1: 459570000.00
Name: Standard : 4
End North: 100473.83' East: 172013.73'
Segment #1 : Curve
Length: 30.10' Radius: 149.05'
Delta: 011°34'16.55" Tangent: 15.10'
Chord: 30.05' Course: S86°19'10"W
Course In: N09°27'59"W Course Out: S02°06'18"W
RP North: 100620.85' East: 171989.21'
End North: 100471.90' East: 171983.74'
Segment #2 : Line
Course: N00°24'10"E Length: 103.67'
North: 100575.57' East: 171984.47'
Segment #3 : Line
Course: S89°35'50"E Length: 130.00'
North: 100574.66' East: 172114.47'
Segment #4 : Line
Course: S00°24'10"W Length: 99.79'
North: 100474.87' East: 172113.76'
Segment #5 : Line
Course: N89°35'50"W Length: 90.08'
North: 100475.50' East: 172023.69'
Segment #6 : Line
Course: S80°32'01"W Length: 10.10'
North: 100473.84' East: 172013.72'
Perimeter: 463.74' Area: 13081.129 Sq. Ft.
Error Closure: 0.01 Course: N24°41'08"W
Error North: 0.009 East: -0.004
Precision 1: 46369.00
Name: Standard : 5
North: 100473.97' East: 172240.59'
Segment #1 : Line
Course: N89°35'50"W Length: 126.83'
North: 100474.86' East: 172113.76'
Segment #2 : Line
Course: N00°24'10"E Length: 99.79'
North: 100574.65' East: 172114.46'
Segment #3 : Line
Course: S89°35'50"E Length: 126.07'
North: 100573.76' East: 172240.53'
Segment #4 : Line
Course: S00°02'00"E Length: 99.80'
North: 100473.96' East: 172240.59'
Perimeter: 452.49' Area: 12619.048 Sq. Ft.
Error Closure: 0.01 Course: S03°23'59"W
Error North: -0.007 East: -0.000
Precision 1: 45249.00
Name: Standard : 6
North: 100378.08' East: 171598.51'
Segment #1 : Line
Course: N00°05'38"E Length: 100.58'
North: 100478.66' East: 171598.67'
Segment #2 : Line
Course: S89°35'50"E Length: 129.09'
North: 100477.75' East: 171727.76'
Segment #3 : Line
Course: S00°24'10"W Length: 100.58'
North: 100377.18' East: 171727.05'
Segment #4 : Line
Course: N89°35'50"W Length: 128.54'
North: 100378.08' East: 171598.52'
Perimeter: 458.79' Area: 12956.138 Sq. Ft.
Error Closure: 0.01 Course: S78°56'03"E
Error North: -0.002 East: 0.008
Precision 1: 45879.00
Name: Standard : 7
North: 100376.28' East: 171855.06'
Segment #1 : Line
Course: N89°35'50"W Length: 128.02'
North: 100377.18' East: 171727.05'
Segment #2 : Line
Course: N00°24'10"E Length: 100.58'
North: 100477.75' East: 171727.75'
Segment #3 : Line
Course: S89°35'50"E Length: 128.02'
North: 100476.85' East: 171855.77'
Segment #4 : Line
Course: S00°24'10"W Length: 100.58'
North: 100376.28' East: 171855.06'
Perimeter: 457.19' Area: 12875.981 Sq. Ft.
Error Closure: 0.00 Course: N00°00'00"E
Error North: 0.000 East: 0.000
Precision 1: 457200000.00
Name: Standard : 8
North: 100375.51' East: 171963.70'
Segment #1 : Line
Course: N89°35'50"W Length: 108.63'
North: 100376.28' East: 171855.07'
Segment #2 : Line
Course: N00°24'10"E Length: 100.58'
North: 100476.85' East: 171855.77'
Segment #3 : Line
Course: S89°35'50"E Length: 96.22'
North: 100476.18' East: 171951.99'
Segment #4 : Line
Course: S06°34'07"W Length: 22.00'
North: 100454.32' East: 171949.48'
Segment #5 : Line
Course: S79°21'35"E Length: 4.24'
North: 100453.54' East: 171953.64'
Segment #6 : Curve
Length: 48.62' Radius: 29.00'
Delta: 096°03'42.28" Tangent: 32.24'
Chord: 43.12' Course: S31°19'44"E
Course In: S10°38'25"W Course Out: S73°17'53"E
RP North: 100425.04' East: 171948.29'
End North: 100416.71' East: 171976.06'
Segment #7 : Line
Course: S16°42'07"W Length: 43.01'
North: 100375.51' East: 171963.70'
Perimeter: 423.30' Area: 11182.291 Sq. Ft.
Error Closure: 0.01 Course: S73°08'57"E
Error North: -0.002 East: 0.007
Precision 1: 41780.00
Name: Standard : 9
North: 100450.07' East: 172026.12'
Segment #1 : Line
Course: N05°27'26"W Length: 25.54'
North: 100475.49' East: 172023.69'
Segment #2 : Line
Course: S89°35'50"E Length: 90.08'
North: 100474.86' East: 172113.77'
Segment #3 : Line
Course: S00°24'10"W Length: 100.40'
North: 100374.46' East: 172113.06'
Segment #4 : Line
Course: N89°35'50"W Length: 121.76'
North: 100375.32' East: 171991.30'
Segment #5 : Line
Course: N16°42'07"E Length: 35.26'
North: 100409.09' East: 172001.44'
Segment #6 : Curve
Length: 15.99' Radius: 55.50'
Delta: 016°30'14.71" Tangent: 8.05'
Chord: 15.93' Course: N08°27'00"E
Course In: N73°17'53"W Course Out: S89°48'08"E
RP North: 100425.04' East: 171948.28'
End North: 100424.85' East: 172003.78'
Segment #7 : Curve
Length: 36.44' Radius: 25.50'
Delta: 081°51'56.34" Tangent: 22.11'
Chord: 33.41' Course: N41°07'50"E
Course In: S89°48'08"E Course Out: N07°56'11"W
RP North: 100424.76' East: 172029.28'
End North: 100450.01' East: 172025.76'
Segment #8 : Line
Course: N82°03'49"E Length: 0.36'
North: 100450.06' East: 172026.11'
Perimeter: 425.82' Area: 10596.894 Sq. Ft.
Error Closure: 0.01 Course: S45°57'52"W
Error North: -0.006 East: -0.007
Precision 1: 42274.00
Name: Standard : 10
North: 100373.57' East: 172240.65'
Segment #1 : Line
Course: N89°35'50"W Length: 127.59'
North: 100374.46' East: 172113.06'
Segment #2 : Line
Course: N00°24'10"E Length: 100.40'
North: 100474.86' East: 172113.77'
Segment #3 : Line
Course: S89°35'50"E Length: 126.83'
North: 100473.97' East: 172240.59'
Segment #4 : Line
Course: S00°02'00"E Length: 100.40'
North: 100373.57' East: 172240.65'
Perimeter: 455.23' Area: 12772.151 Sq. Ft.
Error Closure: 0.01 Course: N55°40'03"E
Error North: 0.003 East: 0.004
Precision 1: 45522.00
Name: Standard : 11
North: 100280.43' East: 171598.35'
Segment #1 : Line
Course: N00°05'38"E Length: 97.65'
North: 100378.08' East: 171598.51'
Segment #2 : Line
Course: S89°35'50"E Length: 128.54'
North: 100377.18' East: 171727.05'
Segment #3 : Line
Course: S00°24'10"W Length: 21.65'
North: 100355.53' East: 171726.89'
Segment #4 : Line
Course: N89°36'12"W Length: 1.00'
North: 100355.53' East: 171725.89'
Segment #5 : Line
Course: S00°24'10"W Length: 76.00'
North: 100279.53' East: 171725.36'
Segment #6 : Line
Course: N89°35'50"W Length: 127.02'
North: 100280.43' East: 171598.34'
Perimeter: 451.86' Area: 12450.609 Sq. Ft.
Error Closure: 0.01 Course: S77°04'36"W
Error North: -0.001 East: -0.006
Precision 1: 45186.00
Name: Standard : 12
North: 100355.35' East: 171752.39'
Segment #1 : Line
Course: N89°36'12"W Length: 25.49'
North: 100355.53' East: 171726.90'
Segment #2 : Line
Course: N00°24'10"E Length: 21.65'
North: 100377.18' East: 171727.05'
Segment #3 : Line
Course: S89°35'50"E Length: 128.02'
North: 100376.28' East: 171855.07'
Segment #4 : Line
Course: S89°35'50"E Length: 108.63'
North: 100375.51' East: 171963.70'
Segment #5 : Line
Course: S16°42'07"W Length: 69.22'
North: 100309.21' East: 171943.81'
Segment #6 : Curve
Length: 3.40' Radius: 175.00'
Delta: 001°06'41.72" Tangent: 1.70'
Chord: 3.40' Course: S16°08'46"W
Course In: S73°17'53"E Course Out: N74°24'35"W
RP North: 100258.92' East: 172111.42'
End North: 100305.95' East: 171942.86'
Segment #7 : Line
Course: N74°24'35"W Length: 3.50'
North: 100306.89' East: 171939.49'
Segment #8 : Curve
Length: 37.28' Radius: 25.50'
Delta: 083°45'52.72" Tangent: 22.87'
Chord: 34.05' Course: S57°28'22"W
Course In: N74°24'35"W Course Out: S09°21'18"W
RP North: 100313.74' East: 171914.93'
End North: 100288.58' East: 171910.78'
Segment #9 : Line
Course: N80°38'42"W Length: 50.35'
North: 100296.76' East: 171861.10'
Segment #10 : Curve
Length: 60.36' Radius: 195.00'
Delta: 017°44'05.00" Tangent: 30.42'
Chord: 60.12' Course: N71°46'40"W
Course In: N09°21'18"E Course Out: S27°05'23"W
RP North: 100489.17' East: 171892.80'
End North: 100315.56' East: 171803.99'
Segment #11 : Line
Course: N62°54'37"W Length: 7.16'
North: 100318.82' East: 171797.62'
Segment #12 : Curve
Length: 34.37' Radius: 114.54'
Delta: 017°11'37.90" Tangent: 17.32'
Chord: 34.24' Course: N71°30'26"W
Course In: S27°05'23"W Course Out: N09°53'45"E
RP North: 100216.85' East: 171745.46'
End North: 100329.68' East: 171765.15'
Segment #13 : Curve
Length: 21.78' Radius: 15.50'
Delta: 080°30'40.76" Tangent: 13.12'
Chord: 20.03' Course: N39°50'55"W
Course In: N09°53'45"E Course Out: N89°35'34"W
RP North: 100344.95' East: 171767.81'
End North: 100345.06' East: 171752.31'
Segment #14 : Line
Course: N00°24'26"E Length: 10.28'
North: 100355.34' East: 171752.39'
Perimeter: 581.49' Area: 14761.347 Sq. Ft.
Error Closure: 0.01 Course: S30°43'02"W
Error North: -0.009 East: -0.005
Precision 1: 57614.00
Name: Standard : 13
North: 100289.47' East: 172112.46'
Segment #1 : Line
Course: N89°35'50"W Length: 146.15'
North: 100290.49' East: 171966.31'
Segment #2 : Curve
Length: 11.47' Radius: 148.50'
Delta: 004°25'35.45" Tangent: 5.74'
Chord: 11.47' Course: N14°29'19"E
Course In: S77°43'28"E Course Out: N73°17'53"W
RP North: 100258.92' East: 172111.42'
End North: 100301.60' East: 171969.18'
Segment #3 : Line
Course: N16°42'07"E Length: 76.97'
North: 100375.32' East: 171991.30'
Segment #4 : Line
Course: S89°35'50"E Length: 121.76'
North: 100374.47' East: 172113.06'
Segment #5 : Line
Course: S00°24'10"W Length: 85.00'
North: 100289.47' East: 172112.46'
Perimeter: 441.35' Area: 11403.866 Sq. Ft.
Error Closure: 0.00 Course: N64°13'04"E
Error North: 0.002 East: 0.003
Precision 1: 441350000.00
Name: Standard : 14
North: 100288.56' East: 172240.70'
Segment #1 : Line
Course: N89°35'50"W Length: 128.24'
North: 100289.47' East: 172112.46'
Segment #2 : Line
Course: N00°24'10"E Length: 85.00'
North: 100374.46' East: 172113.06'
Segment #3 : Line
Course: S89°35'50"E Length: 127.59'
North: 100373.57' East: 172240.65'
Segment #4 : Line
Course: S00°02'00"E Length: 85.00'
North: 100288.57' East: 172240.69'
Perimeter: 425.84' Area: 10872.973 Sq. Ft.
Error Closure: 0.00 Course: N50°25'42"W
Error North: 0.002 East: -0.003
Precision 1: 425830000.00
Name: Standard : 15
End North: 100157.59' East: 171699.06'
Segment #1 : Curve
Length: 78.60' Radius: 127.50'
Delta: 035°19'16.19" Tangent: 40.59'
Chord: 77.36' Course: N72°13'31"W
Course In: S35°26'07"W Course Out: N00°06'51"E
RP North: 100053.71' East: 171625.14'
End North: 100181.21' East: 171625.39'
Segment #2 : Line
Course: N89°53'09"W Length: 12.30'
North: 100181.23' East: 171613.09'
Segment #3 : Line
Course: N63°26'08"W Length: 16.65'
North: 100188.68' East: 171598.20'
Segment #4 : Line
Course: N00°05'38"E Length: 91.75'
North: 100280.43' East: 171598.35'
Segment #5 : Line
Course: S89°35'50"E Length: 127.02'
North: 100279.53' East: 171725.37'
Segment #6 : Line
Course: S89°36'24"E Length: 23.00'
North: 100279.38' East: 171748.37'
Segment #7 : Line
Course: S22°02'19"W Length: 131.39'
North: 100157.59' East: 171699.06'
Perimeter: 480.70' Area: 13478.029 Sq. Ft.
Error Closure: 0.01 Course: S55°18'39"E
Error North: -0.004 East: 0.006
Precision 1: 47947.00
Name: Standard : 16
North: 100279.38' East: 171748.36'
Segment #1 : Line
Course: N00°26'24"E Length: 3.09'
North: 100282.47' East: 171748.38'
Segment #2 : Curve
Length: 35.84' Radius: 19.00'
Delta: 108°03'57.79" Tangent: 26.18'
Chord: 30.76' Course: N54°28'23"E
Course In: S89°33'36"E Course Out: N18°30'22"E
RP North: 100282.32' East: 171767.38'
End North: 100300.34' East: 171773.42'
Segment #3 : Curve
Length: 13.19' Radius: 88.04'
Delta: 008°35'01.44" Tangent: 6.61'
Chord: 13.18' Course: S67°12'08"E
Course In: S18°30'22"W Course Out: N27°05'23"E
RP North: 100216.85' East: 171745.47'
End North: 100295.24' East: 171785.57'
Segment #4 : Line
Course: S62°54'37"E Length: 7.16'
North: 100291.97' East: 171791.94'
Segment #5 : Curve
Length: 26.35' Radius: 221.50'
Delta: 006°48'57.47" Tangent: 13.19'
Chord: 26.33' Course: S66°19'06"E
Course In: N27°05'23"E Course Out: S20°16'26"W
RP North: 100489.17' East: 171892.81'
End North: 100281.40' East: 171816.06'
Segment #6 : Line
Course: S01°25'52"W Length: 116.58'
North: 100164.86' East: 171813.14'
Segment #7 : Line
Course: S48°12'32"W Length: 86.92'
North: 100106.93' East: 171748.34'
Segment #8 : Line
Course: N41°32'39"W Length: 41.87'
North: 100138.27' East: 171720.57'
Segment #9 : Curve
Length: 28.97' Radius: 127.50'
Delta: 013°01'13.81" Tangent: 14.55'
Chord: 28.91' Course: N48°03'16"W
Course In: S48°27'21"W Course Out: N35°26'07"E
RP North: 100053.71' East: 171625.14'
End North: 100157.59' East: 171699.07'
Segment #10 : Line
Course: N22°02'19"E Length: 131.39'
North: 100279.38' East: 171748.37'
Perimeter: 491.36' Area: 14580.881 Sq. Ft.
Error Closure: 0.01 Course: N68°32'36"E
Error North: 0.003 East: 0.009
Precision 1: 48619.00
Name: Standard : 17
End North: 100171.00' East: 171924.62'
Segment #1 : Curve
Length: 8.96' Radius: 201.00'
Delta: 002°33'13.84" Tangent: 4.48'
Chord: 8.96' Course: S05°33'38"W
Course In: S83°09'45"E Course Out: N85°42'59"W
RP North: 100147.07' East: 172124.19'
End North: 100162.09' East: 171923.76'
Segment #2 : Line
Course: N88°34'08"W Length: 110.65'
North: 100164.85' East: 171813.14'
Segment #3 : Line
Course: N01°25'52"E Length: 116.58'
North: 100281.39' East: 171816.05'
Segment #4 : Curve
Length: 42.21' Radius: 221.50'
Delta: 010°55'07.53" Tangent: 21.17'
Chord: 42.15' Course: S75°11'08"E
Course In: N20°16'26"E Course Out: S09°21'18"W
RP North: 100489.17' East: 171892.80'
End North: 100270.62' East: 171856.80'
Segment #5 : Line
Course: S80°38'42"E Length: 51.53'
North: 100262.24' East: 171907.65'
Segment #6 : Curve
Length: 44.28' Radius: 29.00'
Delta: 087°28'57.00" Tangent: 27.75'
Chord: 40.10' Course: S36°54'13"E
Course In: S09°21'18"W Course Out: S83°09'45"E
RP North: 100233.63' East: 171902.93'
End North: 100230.17' East: 171931.72'
Segment #7 : Line
Course: S06°50'15"W Length: 59.60'
North: 100171.00' East: 171924.63'
Perimeter: 433.81' Area: 11914.267 Sq. Ft.
Error Closure: 0.01 Course: S37°03'15"E
Error North: -0.006 East: 0.005
Precision 1: 42957.00
Name: Standard : 18
End North: 100276.60' East: 171963.98'
Segment #1 : Curve
Length: 14.09' Radius: 148.50'
Delta: 005°26'16.55" Tangent: 7.05'
Chord: 14.09' Course: N09°33'23"E
Course In: S83°09'45"E Course Out: N77°43'28"W
RP North: 100258.92' East: 172111.42'
End North: 100290.49' East: 171966.31'
Segment #2 : Line
Course: S89°35'50"E Length: 146.15'
North: 100289.47' East: 172112.46'
Segment #3 : Line
Course: S89°35'50"E Length: 128.24'
North: 100288.57' East: 172240.70'
Segment #4 : Line
Course: S00°02'00"E Length: 39.92'
North: 100248.65' East: 172240.72'
Segment #5 : Line
Course: S05°16'11"E Length: 75.95'
North: 100173.02' East: 172247.70'
Segment #6 : Line
Course: N89°35'50"W Length: 165.31'
North: 100174.18' East: 172082.39'
Segment #7 : Line
Course: N89°35'50"W Length: 130.59'
North: 100175.10' East: 171951.80'
Segment #8 : Line
Course: N06°50'15"E Length: 102.23'
North: 100276.60' East: 171963.97'
Perimeter: 802.48' Area: 32830.268 Sq. Ft.
Error Closure: 0.00 Course: S57°08'57"W
Error North: -0.000 East: -0.001
Precision 1: 802480000.00
Name: Standard : 19
End North: 100162.09' East: 171923.76'
Segment #1 : Curve
Length: 31.41' Radius: 201.00'
Delta: 008°57'12.72" Tangent: 15.74'
Chord: 31.38' Course: S00°11'35"E
Course In: S85°42'59"E Course Out: S85°19'48"W
RP North: 100147.07' East: 172124.19'
End North: 100130.71' East: 171923.86'
Segment #2 : Line
Course: S48°34'49"W Length: 147.15'
North: 100033.36' East: 171813.52'
Segment #3 : Line
Course: N41°32'39"W Length: 98.29'
North: 100106.92' East: 171748.33'
Segment #4 : Line
Course: N48°12'32"E Length: 86.92'
North: 100164.85' East: 171813.14'
Segment #5 : Line
Course: S88°34'08"E Length: 110.65'
North: 100162.08' East: 171923.75'
Perimeter: 474.42' Area: 13267.088 Sq. Ft.
Error Closure: 0.01 Course: S46°53'34"W
Error North: -0.004 East: -0.004
Precision 1: 47439.00
Name: Standard : 20
End North: 100088.27' East: 171959.90'
Segment #1 : Curve
Length: 80.80' Radius: 174.50'
Delta: 026°31'51.75" Tangent: 41.14'
Chord: 80.08' Course: N06°25'41"W
Course In: N70°18'23"E Course Out: N83°09'45"W
RP North: 100147.07' East: 172124.19'
End North: 100167.85' East: 171950.94'
Segment #2 : Line
Course: N06°50'15"E Length: 7.30'
North: 100175.09' East: 171951.80'
Segment #3 : Line
Course: S89°35'50"E Length: 130.59'
North: 100174.18' East: 172082.39'
Segment #4 : Line
Course: S21°18'57"E Length: 90.91'
North: 100089.49' East: 172115.44'
Segment #5 : Line
Course: S89°32'59"W Length: 155.54'
North: 100088.26' East: 171959.90'
Perimeter: 465.14' Area: 12588.000 Sq. Ft.
Error Closure: 0.01 Course: S15°30'36"E
Error North: -0.007 East: 0.002
Precision 1: 46442.00
Name: Standard : 21
North: 100050.68' East: 172130.58'
Segment #1 : Line
Course: N21°18'57"W Length: 41.66'
North: 100089.49' East: 172115.44'
Segment #2 : Line
Course: N21°18'57"W Length: 90.91'
North: 100174.18' East: 172082.39'
Segment #3 : Line
Course: S89°35'50"E Length: 165.31'
North: 100173.02' East: 172247.70'
Segment #4 : Line
Course: S05°16'11"E Length: 29.03'
North: 100144.11' East: 172250.36'
Segment #5 : Line
Course: S18°56'40"E Length: 40.64'
North: 100105.67' East: 172263.56'
Segment #6 : Line
Course: S67°31'50"W Length: 143.90'
North: 100050.67' East: 172130.58'
Perimeter: 511.44' Area: 14953.667 Sq. Ft.
Error Closure: 0.00 Course: S00°18'25"E
Error North: -0.004 East: 0.000
Precision 1: 511450000.00
Name: Standard : 22
End North: 100130.71' East: 171923.86'
Segment #1 : Curve
Length: 101.26' Radius: 201.00'
Delta: 028°51'50.44" Tangent: 51.73'
Chord: 100.19' Course: S19°06'07"E
Course In: N85°19'48"E Course Out: S56°27'58"W
RP North: 100147.07' East: 172124.19'
End North: 100036.04' East: 171956.65'
Segment #2 : Line
Course: S48°41'00"W Length: 108.90'
North: 99964.14' East: 171874.86'
Segment #3 : Line
Course: N41°32'39"W Length: 92.49'
North: 100033.36' East: 171813.52'
Segment #4 : Line
Course: N48°34'49"E Length: 147.15'
North: 100130.71' East: 171923.86'
Perimeter: 449.79' Area: 11430.188 Sq. Ft.
Error Closure: 0.00 Course: N34°44'07"E
Error North: 0.002 East: 0.002
Precision 1: 448730000.00
Name: Standard : 23
North: 100021.37' East: 172142.02'
Segment #1 : Line
Course: S82°24'00"W Length: 133.40'
North: 100003.73' East: 172009.79'
Segment #2 : Curve
Length: 3.29' Radius: 100.50'
Delta: 001°52'29.50" Tangent: 1.64'
Chord: 3.29' Course: N32°35'47"W
Course In: S58°20'27"W Course Out: N56°27'58"E
RP North: 99950.98' East: 171924.25'
End North: 100006.50' East: 172008.02'
Segment #3 : Line
Course: N33°32'02"W Length: 53.00'
North: 100050.68' East: 171978.74'
Segment #4 : Curve
Length: 42.15' Radius: 174.50'
Delta: 013°50'25.25" Tangent: 21.18'
Chord: 42.05' Course: N26°36'49"W
Course In: N56°27'58"E Course Out: S70°18'23"W
RP North: 100147.08' East: 172124.19'
End North: 100088.27' East: 171959.90'
Segment #5 : Line
Course: N89°32'59"E Length: 155.54'
North: 100089.49' East: 172115.44'
Segment #6 : Line
Course: S21°18'57"E Length: 41.66'
North: 100050.68' East: 172130.58'
Segment #7 : Line
Course: S21°18'57"E Length: 31.46'
North: 100021.38' East: 172142.02'
Perimeter: 460.51' Area: 11519.304 Sq. Ft.
Error Closure: 0.01 Course: N13°32'28"W
Error North: 0.007 East: -0.002
Precision 1: 46040.00
Name: Standard : 24
North: 99899.15' East: 171932.44'
Segment #1 : Line
Course: N41°32'39"W Length: 86.83'
North: 99964.14' East: 171874.86'
Segment #2 : Line
Course: N48°41'00"E Length: 108.90'
North: 100036.04' East: 171956.65'
Segment #3 : Line
Course: S33°32'02"E Length: 53.00'
North: 99991.86' East: 171985.93'
Segment #4 : Curve
Length: 104.37' Radius: 74.00'
Delta: 080°48'37.86" Tangent: 62.99'
Chord: 95.93' Course: S06°52'17"W
Course In: S56°27'58"W Course Out: S42°43'24"E
RP North: 99950.98' East: 171924.25'
End North: 99896.62' East: 171974.45'
Segment #5 : Line
Course: N86°32'39"W Length: 42.08'
North: 99899.15' East: 171932.45'
Perimeter: 395.18' Area: 10440.258 Sq. Ft.
Error Closure: 0.01 Course: N62°02'14"E
Error North: 0.002 East: 0.004
Precision 1: 38674.00
Name: Standard : 25
North: 100003.73' East: 172009.79'
Segment #1 : Line
Course: N82°24'00"E Length: 133.40'
North: 100021.37' East: 172142.02'
Segment #2 : Line
Course: S21°18'57"E Length: 63.62'
North: 99962.10' East: 172165.14'
Segment #3 : Line
Course: S21°18'57"E Length: 12.25'
North: 99950.69' East: 172169.60'
Segment #4 : Line
Course: S77°40'41"W Length: 106.80'
North: 99927.90' East: 172065.26'
Segment #5 : Line
Course: S77°40'41"W Length: 47.23'
North: 99917.82' East: 172019.11'
Segment #6 : Curve
Length: 89.32' Radius: 100.50'
Delta: 050°55'21.33" Tangent: 47.85'
Chord: 86.41' Course: N06°11'52"W
Course In: N70°44'11"W Course Out: N58°20'27"E
RP North: 99950.97' East: 171924.24'
End North: 100003.72' East: 172009.79'
Perimeter: 452.62' Area: 10964.932 Sq. Ft.
Error Closure: 0.00 Course: S50°24'15"W
Error North: -0.003 East: -0.003
Precision 1: 449710000.00
Name: Standard : 26
North: 100015.59' East: 172294.48'
Segment #1 : Line
Course: S67°31'50"W Length: 139.96'
North: 99962.10' East: 172165.14'
Segment #2 : Line
Course: N21°18'57"W Length: 63.62'
North: 100021.37' East: 172142.01'
Segment #3 : Line
Course: N21°18'57"W Length: 31.46'
North: 100050.68' East: 172130.58'
Segment #4 : Line
Course: N67°31'50"E Length: 143.90'
North: 100105.67' East: 172263.55'
Segment #5 : Line
Course: S18°56'40"E Length: 95.24'
North: 100015.59' East: 172294.47'
Perimeter: 474.18' Area: 13491.706 Sq. Ft.
Error Closure: 0.00 Course: N81°03'16"W
Error North: 0.000 East: -0.002
Precision 1: 474180000.00
Name: Standard : 27
North: 99880.98' East: 172196.80'
Segment #1 : Line
Course: N21°18'57"W Length: 74.83'
North: 99950.69' East: 172169.60'
Segment #2 : Line
Course: N21°18'57"W Length: 12.25'
North: 99962.10' East: 172165.14'
Segment #3 : Line
Course: N67°31'50"E Length: 139.96'
North: 100015.59' East: 172294.48'
Segment #4 : Line
Course: S18°56'40"E Length: 32.88'
North: 99984.50' East: 172305.15'
Segment #5 : Line
Course: S35°43'55"E Length: 58.90'
North: 99936.68' East: 172339.55'
Segment #6 : Line
Course: S68°41'03"W Length: 153.23'
North: 99880.98' East: 172196.80'
Perimeter: 472.05' Area: 12700.441 Sq. Ft.
Error Closure: 0.01 Course: N62°35'00"E
Error North: 0.002 East: 0.004
Precision 1: 47205.00
Name: Standard : 28
North: 99817.86' East: 172118.83'
Segment #1 : Line
Course: N25°57'30"W Length: 122.39'
North: 99927.90' East: 172065.25'
Segment #2 : Line
Course: N77°40'41"E Length: 106.80'
North: 99950.69' East: 172169.59'
Segment #3 : Line
Course: S21°18'57"E Length: 74.83'
North: 99880.98' East: 172196.80'
Segment #4 : Line
Course: S21°18'57"E Length: 22.90'
North: 99859.65' East: 172205.12'
Segment #5 : Line
Course: S64°09'50"W Length: 75.88'
North: 99826.58' East: 172136.82'
Segment #6 : Line
Course: S64°09'50"W Length: 20.00'
North: 99817.86' East: 172118.82'
Perimeter: 422.81' Area: 11022.280 Sq. Ft.
Error Closure: 0.01 Course: N29°52'22"W
Error North: 0.005 East: -0.003
Precision 1: 42280.00
Name: Standard : 29
North: 99927.90' East: 172065.26'
Segment #1 : Line
Course: S25°57'30"E Length: 122.39'
North: 99817.86' East: 172118.83'
Segment #2 : Line
Course: S64°09'50"W Length: 95.52'
North: 99776.23' East: 172032.86'
Segment #3 : Curve
Length: 38.96' Radius: 224.50'
Delta: 009°56'36.41" Tangent: 19.53'
Chord: 38.91' Course: N36°34'21"W
Course In: S58°23'57"W Course Out: N48°27'21"E
RP North: 99658.59' East: 171841.64'
End North: 99807.48' East: 172009.67'
Segment #4 : Line
Course: N41°32'39"W Length: 29.14'
North: 99829.29' East: 171990.35'
Segment #5 : Line
Course: N48°27'21"E Length: 3.00'
North: 99831.28' East: 171992.59'
Segment #6 : Line
Course: N41°32'39"W Length: 7.19'
North: 99836.66' East: 171987.82'
Segment #7 : Line
Course: N03°27'21"E Length: 38.49'
North: 99875.08' East: 171990.14'
Segment #8 : Curve
Length: 52.22' Radius: 100.66'
Delta: 029°43'35.46" Tangent: 26.71'
Chord: 51.64' Course: N34°07'57"E
Course In: N41°00'16"W Course Out: S70°43'51"E
RP North: 99951.04' East: 171924.10'
End North: 99917.82' East: 172019.12'
Segment #9 : Line
Course: N77°40'41"E Length: 47.23'
North: 99927.90' East: 172065.26'
Perimeter: 434.14' Area: 12352.690 Sq. Ft.
Error Closure: 0.01 Course: N57°42'35"E
Error North: 0.003 East: 0.005
Precision 1: 43351.00
Name: Standard : 30
End North: 99660.84' East: 172087.04'
Segment #1 : Curve
Length: 47.59' Radius: 232.50'
Delta: 011°43'38.33" Tangent: 23.88'
Chord: 47.51' Course: N27°13'45"W
Course In: N56°54'26"E Course Out: S68°38'04"W
RP North: 99787.79' East: 172281.82'
End North: 99703.09' East: 172065.30'
Segment #2 : Line
Course: N21°21'56"W Length: 40.05'
North: 99740.38' East: 172050.71'
Segment #3 : Curve
Length: 40.10' Radius: 224.50'
Delta: 010°14'06.89" Tangent: 20.11'
Chord: 40.05' Course: N26°28'59"W
Course In: S68°38'04"W Course Out: N58°23'57"E
RP North: 99658.60' East: 171841.64'
End North: 99776.23' East: 172032.85'
Segment #4 : Line
Course: N64°09'50"E Length: 95.52'
North: 99817.86' East: 172118.82'
Segment #5 : Line
Course: N64°09'50"E Length: 20.00'
North: 99826.58' East: 172136.82'
Segment #6 : Line
Course: S25°57'30"E Length: 139.81'
North: 99700.87' East: 172198.02'
Segment #7 : Line
Course: S70°10'14"W Length: 117.98'
North: 99660.85' East: 172087.04'
Perimeter: 501.07' Area: 15616.292 Sq. Ft.
Error Closure: 0.01 Course: N21°58'09"W
Error North: 0.007 East: -0.003
Precision 1: 50092.00
Name: Standard : 31
North: 99700.86' East: 172198.03'
Segment #1 : Line
Course: N25°57'30"W Length: 139.81'
North: 99826.57' East: 172136.83'
Segment #2 : Line
Course: N64°09'50"E Length: 75.88'
North: 99859.64' East: 172205.12'
Segment #3 : Line
Course: S21°18'57"E Length: 52.49'
North: 99810.74' East: 172224.21'
Segment #4 : Line
Course: S65°35'46"E Length: 74.84'
North: 99779.82' East: 172292.36'
Segment #5 : Line
Course: S15°23'50"E Length: 52.86'
North: 99728.85' East: 172306.39'
Segment #6 : Line
Course: S75°30'49"W Length: 45.49'
North: 99717.48' East: 172262.35'
Segment #7 : Line
Course: S75°30'49"W Length: 66.44'
North: 99700.86' East: 172198.02'
Perimeter: 507.81' Area: 14099.729 Sq. Ft.
Error Closure: 0.01 Course: S25°39'51"W
Error North: -0.009 East: -0.004
Precision 1: 50781.00
Name: Standard : 32
North: 99745.24' East: 172369.79'
Segment #1 : Line
Course: S75°30'49"W Length: 65.48'
North: 99728.86' East: 172306.40'
Segment #2 : Line
Course: N15°23'50"W Length: 52.86'
North: 99779.83' East: 172292.36'
Segment #3 : Line
Course: N65°35'46"W Length: 74.84'
North: 99810.75' East: 172224.21'
Segment #4 : Line
Course: N21°18'57"W Length: 52.49'
North: 99859.65' East: 172205.13'
Segment #5 : Line
Course: N21°18'57"W Length: 22.90'
North: 99880.98' East: 172196.80'
Segment #6 : Line
Course: N68°41'03"E Length: 153.23'
North: 99936.68' East: 172339.55'
Segment #7 : Line
Course: S35°43'55"E Length: 109.96'
North: 99847.42' East: 172403.77'
Segment #8 : Line
Course: S68°12'07"E Length: 72.59'
North: 99820.46' East: 172471.17'
Segment #9 : Line
Course: S53°25'26"W Length: 18.90'
North: 99809.20' East: 172455.99'
Segment #10 : Line
Course: S53°25'26"W Length: 107.33'
North: 99745.24' East: 172369.79'
Perimeter: 730.59' Area: 29168.624 Sq. Ft.
Error Closure: 0.00 Course: N24°44'53"E
Error North: 0.002 East: 0.001
Precision 1: 730580000.00
Name: Standard : 33
North: 99679.87' East: 172368.67'
Segment #1 : Line
Course: N00°59'15"E Length: 65.38'
North: 99745.24' East: 172369.79'
Segment #2 : Line
Course: N53°25'26"E Length: 107.33'
North: 99809.20' East: 172455.99'
Segment #3 : Line
Course: S45°28'34"E Length: 77.52'
North: 99754.84' East: 172511.26'
Segment #4 : Line
Course: S32°22'40"E Length: 92.69'
North: 99676.56' East: 172560.89'
Segment #5 : Line
Course: N89°00'45"W Length: 82.26'
North: 99677.98' East: 172478.64'
Segment #6 : Line
Course: N89°00'45"W Length: 110.00'
North: 99679.88' East: 172368.66'
Perimeter: 535.19' Area: 16170.529 Sq. Ft.
Error Closure: 0.01 Course: N68°01'12"W
Error North: 0.003 East: -0.008
Precision 1: 53518.00
Name: Standard : 34
End North: 99556.35' East: 172259.57'
Segment #1 : Curve
Length: 208.64' Radius: 232.50'
Delta: 051°24'57.25" Tangent: 111.93'
Chord: 201.71' Course: N58°48'03"W
Course In: N05°29'28"E Course Out: S56°54'26"W
RP North: 99787.79' East: 172281.82'
End North: 99660.84' East: 172087.04'
Segment #2 : Line
Course: N70°10'14"E Length: 117.98'
North: 99700.86' East: 172198.02'
Segment #3 : Line
Course: S55°33'42"E Length: 55.50'
North: 99669.48' East: 172243.80'
Segment #4 : Line
Course: N86°44'34"E Length: 17.77'
North: 99670.49' East: 172261.54'
Segment #5 : Line
Course: S00°59'15"W Length: 114.15'
North: 99556.35' East: 172259.57'
Perimeter: 514.05' Area: 15730.893 Sq. Ft.
Error Closure: 0.01 Course: N86°09'59"W
Error North: 0.000 East: -0.006
Precision 1: 50711.00
Name: Standard : 35
End North: 99555.32' East: 172277.82'
Segment #1 : Curve
Length: 18.28' Radius: 232.50'
Delta: 004°30'13.42" Tangent: 9.14'
Chord: 18.27' Course: N86°45'38"W
Course In: N00°59'15"E Course Out: S05°29'28"W
RP North: 99787.79' East: 172281.82'
End North: 99556.35' East: 172259.58'
Segment #2 : Line
Course: N00°59'15"E Length: 114.15'
North: 99670.49' East: 172261.54'
Segment #3 : Line
Course: N00°59'15"E Length: 47.01'
North: 99717.49' East: 172262.35'
Segment #4 : Line
Course: N75°30'49"E Length: 45.49'
North: 99728.87' East: 172306.40'
Segment #5 : Line
Course: N75°30'49"E Length: 65.48'
North: 99745.25' East: 172369.80'
Segment #6 : Line
Course: S00°59'15"W Length: 65.38'
North: 99679.88' East: 172368.67'
Segment #7 : Line
Course: S00°59'15"W Length: 86.35'
North: 99593.54' East: 172367.18'
Segment #8 : Line
Course: N89°00'45"W Length: 11.00'
North: 99593.73' East: 172356.18'
Segment #9 : Line
Course: S00°59'15"W Length: 21.75'
North: 99571.98' East: 172355.81'
Segment #10 : Curve
Length: 19.70' Radius: 27.00'
Delta: 041°48'37.13" Tangent: 10.31'
Chord: 19.27' Course: S21°53'34"W
Course In: N89°00'45"W Course Out: S47°12'08"E
RP North: 99572.45' East: 172328.81'
End North: 99554.10' East: 172348.62'
Segment #11 : Line
Course: N89°00'45"W Length: 70.81'
North: 99555.32' East: 172277.82'
Perimeter: 565.40' Area: 18414.421 Sq. Ft.
Error Closure: 0.01 Course: N62°15'29"E
Error North: 0.003 East: 0.006
Precision 1: 56496.00
Name: Standard : 36
End North: 99553.48' East: 172384.37'
Segment #1 : Curve
Length: 19.70' Radius: 27.00'
Delta: 041°48'37.13" Tangent: 10.31'
Chord: 19.27' Course: N19°55'04"W
Course In: N49°10'38"E Course Out: N89°00'45"W
RP North: 99571.13' East: 172404.80'
End North: 99571.60' East: 172377.80'
Segment #2 : Line
Course: N00°59'15"E Length: 21.75'
North: 99593.35' East: 172378.18'
Segment #3 : Line
Course: N89°00'45"W Length: 11.00'
North: 99593.54' East: 172367.18'
Segment #4 : Line
Course: N00°59'15"E Length: 86.35'
North: 99679.88' East: 172368.67'
Segment #5 : Line
Course: S89°00'45"E Length: 110.00'
North: 99677.98' East: 172478.65'
Segment #6 : Line
Course: S00°59'15"W Length: 135.10'
North: 99542.90' East: 172476.32'
Segment #7 : Line
Course: N89°00'45"W Length: 39.50'
North: 99543.58' East: 172436.83'
Segment #8 : Line
Course: N00°59'15"E Length: 9.00'
North: 99552.58' East: 172436.98'
Segment #9 : Line
Course: N89°00'45"W Length: 52.62'
North: 99553.49' East: 172384.37'
Perimeter: 485.03' Area: 13750.260 Sq. Ft.
Error Closure: 0.00 Course: N70°35'54"E
Error North: 0.001 East: 0.004
Precision 1: 484590000.00
Name: Standard : 37
End North: 99506.08' East: 172508.12'
Segment #1 : Curve
Length: 27.81' Radius: 72.49'
Delta: 021°58'47.00" Tangent: 14.08'
Chord: 27.64' Course: N78°01'22"W
Course In: S22°58'02"W Course Out: N00°59'15"E
RP North: 99439.33' East: 172479.83'
End North: 99511.81' East: 172481.08'
Segment #2 : Line
Course: N89°00'45"W Length: 44.79'
North: 99512.58' East: 172436.30'
Segment #3 : Line
Course: N00°59'15"E Length: 31.00'
North: 99543.58' East: 172436.83'
Segment #4 : Line
Course: S89°00'45"E Length: 39.50'
North: 99542.90' East: 172476.32'
Segment #5 : Line
Course: N00°59'15"E Length: 135.10'
North: 99677.98' East: 172478.65'
Segment #6 : Line
Course: S89°00'45"E Length: 82.26'
North: 99676.56' East: 172560.90'
Segment #7 : Line
Course: S32°22'40"E Length: 29.15'
North: 99651.94' East: 172576.51'
Segment #8 : Line
Course: S58°03'49"E Length: 63.42'
North: 99618.39' East: 172630.33'
Segment #9 : Line
Course: S27°29'22"E Length: 27.49'
North: 99594.01' East: 172643.02'
Segment #10 : Line
Course: S45°06'36"E Length: 141.55'
North: 99494.11' East: 172743.30'
Segment #11 : Line
Course: S34°44'12"E Length: 62.22'
North: 99442.98' East: 172778.76'
Segment #12 : Line
Course: S76°32'44"W Length: 38.07'
North: 99434.12' East: 172741.73'
Segment #13 : Curve
Length: 81.05' Radius: 127.50'
Delta: 036°25'18.00" Tangent: 41.95'
Chord: 79.69' Course: N85°14'37"W
Course In: N13°27'16"W Course Out: S22°58'02"W
RP North: 99558.12' East: 172712.06'
End North: 99440.73' East: 172662.31'
Segment #14 : Line
Course: N67°01'58"W Length: 167.47'
North: 99506.08' East: 172508.12'
Perimeter: 970.88' Area: 41922.887 Sq. Ft.
Error Closure: 0.00 Course: N84°28'22"E
Error North: 0.000 East: 0.003
Precision 1: 969350000.00
Name: Standard : 38
End North: 99444.96' East: 172796.60'
Segment #1 : Curve
Length: 18.01' Radius: 72.49'
Delta: 014°13'59.00" Tangent: 9.05'
Chord: 17.96' Course: S83°39'43"W
Course In: S00°46'43"W Course Out: N13°27'16"W
RP North: 99372.48' East: 172795.62'
End North: 99442.98' East: 172778.75'
Segment #2 : Line
Course: N34°44'12"W Length: 62.22'
North: 99494.11' East: 172743.30'
Segment #3 : Line
Course: N45°06'36"W Length: 141.55'
North: 99594.01' East: 172643.02'
Segment #4 : Line
Course: N27°29'22"W Length: 27.49'
North: 99618.39' East: 172630.33'
Segment #5 : Line
Course: N58°03'49"W Length: 63.42'
North: 99651.94' East: 172576.51'
Segment #6 : Line
Course: N32°22'40"W Length: 29.15'
North: 99676.56' East: 172560.90'
Segment #7 : Line
Course: N32°22'40"W Length: 92.69'
North: 99754.84' East: 172511.26'
Segment #8 : Line
Course: N45°28'34"W Length: 77.52'
North: 99809.20' East: 172455.99'
Segment #9 : Line
Course: N53°25'26"E Length: 18.90'
North: 99820.46' East: 172471.17'
Segment #10 : Line
Course: S68°12'07"E Length: 161.32'
North: 99760.56' East: 172620.96'
Segment #11 : Line
Course: S63°15'20"E Length: 272.85'
North: 99637.77' East: 172864.62'
Segment #12 : Line
Course: S55°01'10"E Length: 84.58'
North: 99589.28' East: 172933.92'
Segment #13 : Line
Course: S03°03'54"E Length: 146.50'
North: 99442.99' East: 172941.75'
Segment #14 : Line
Course: N89°13'17"W Length: 145.16'
North: 99444.96' East: 172796.60'
Perimeter: 1341.36' Area: 73157.562 Sq. Ft.
Error Closure: 0.00 Course: N41°31'05"E
Error North: 0.002 East: 0.002
Precision 1: 1341310000.00
Name: Standard : Outbounds
North: 97111.39' East: 169779.11'
Segment #1 : Line
Course: N00°05'38"E Length: 389.60'
North: 97500.99' East: 169779.75'
Segment #2 : Line
Course: S89°35'50"E Length: 641.71'
North: 97496.47' East: 170421.45'
Segment #3 : Line
Course: S00°02'00"E Length: 325.12'
North: 97171.35' East: 170421.64'
Segment #4 : Line
Course: S05°16'11"E Length: 104.98'
North: 97066.82' East: 170431.28'
Segment #5 : Line
Course: S18°56'40"E Length: 168.76'
North: 96907.20' East: 170486.07'
Segment #6 : Line
Course: S35°43'55"E Length: 168.86'
North: 96770.13' East: 170584.68'
Segment #7 : Line
Course: S68°12'07"E Length: 233.91'
North: 96683.27' East: 170801.86'
Segment #8 : Line
Course: S63°15'20"E Length: 272.85'
North: 96560.48' East: 171045.53'
Segment #9 : Line
Course: S55°01'10"E Length: 84.58'
North: 96511.99' East: 171114.83'
Segment #10 : Line
Course: S03°03'54"E Length: 146.50'
North: 96365.70' East: 171122.66'
Segment #11 : Line
Course: N89°13'17"W Length: 145.16'
North: 96367.67' East: 170977.51'
Segment #12 : Curve
Length: 18.01' Radius: 72.49'
Delta: 014°13'59.00" Tangent: 9.05'
Chord: 17.96' Course: S83°39'43"W
Course In: S00°46'43"W Course Out: N13°27'16"W
RP North: 96295.19' East: 170976.53'
End North: 96365.69' East: 170959.66'
Segment #13 : Line
Course: S76°32'44"W Length: 38.07'
North: 96356.83' East: 170922.64'
Segment #14 : Curve
Length: 81.05' Radius: 127.50'
Delta: 036°25'18.00" Tangent: 41.95'
Chord: 79.69' Course: N85°14'37"W
Course In: N13°27'16"W Course Out: S22°58'02"W
RP North: 96480.83' East: 170892.97'
End North: 96363.44' East: 170843.22'
Segment #15 : Line
Course: N67°01'58"W Length: 167.47'
North: 96428.79' East: 170689.03'
Segment #16 : Curve
Length: 27.81' Radius: 72.49'
Delta: 021°58'47.00" Tangent: 14.08'
Chord: 27.64' Course: N78°01'22"W
Course In: S22°58'02"W Course Out: N00°59'15"E
RP North: 96362.04' East: 170660.74'
End North: 96434.52' East: 170661.99'
Segment #17 : Line
Course: N89°00'45"W Length: 203.98'
North: 96438.04' East: 170458.04'
Segment #18 : Curve
Length: 321.73' Radius: 272.50'
Delta: 067°38'49.00" Tangent: 182.58'
Chord: 303.37' Course: N55°11'21"W
Course In: N00°59'15"E Course Out: S68°38'04"W
RP North: 96710.50' East: 170462.74'
End North: 96611.22' East: 170208.96'
Segment #19 : Line
Course: N21°21'56"W Length: 25.19'
North: 96634.68' East: 170199.78'
Segment #20 : Curve
Length: 25.53' Radius: 72.50'
Delta: 020°10'43.31" Tangent: 12.90'
Chord: 25.40' Course: N31°27'18"W
Course In: S68°38'04"W Course Out: N48°27'21"E
RP North: 96608.27' East: 170132.27'
End North: 96656.35' East: 170186.53'
Segment #21 : Line
Course: N41°32'39"W Length: 81.72'
North: 96717.51' East: 170132.33'
Segment #22 : Line
Course: N48°27'21"E Length: 55.00'
North: 96753.99' East: 170173.50'
Segment #23 : Line
Course: N41°32'39"W Length: 410.17'
North: 97060.98' East: 169901.47'
Segment #24 : Curve
Length: 107.57' Radius: 127.50'
Delta: 048°20'30.00" Tangent: 57.22'
Chord: 104.41' Course: N65°42'54"W
Course In: S48°27'21"W Course Out: N00°06'51"E
RP North: 96976.42' East: 169806.05'
End North: 97103.92' East: 169806.30'
Segment #25 : Line
Course: N89°53'09"W Length: 12.30'
North: 97103.94' East: 169794.00'
Segment #26 : Line
Course: N63°26'08"W Length: 16.65'
North: 97111.39' East: 169779.11'
Perimeter: 4274.29' Area: 674034.856 Sq. Ft.
Error Closure: 0.01 Course: N47°32'53"W
Error North: 0.004 East: -0.005
Precision 1: 425105.00
Name: Standard : A
End North: 98759.90' East: 169896.05'
Segment #1 : Curve
Length: 37.28' Radius: 25.50'
Delta: 083°45'52.72" Tangent: 22.87'
Chord: 34.05' Course: N57°28'22"E
Course In: N09°21'18"E Course Out: S74°24'35"E
RP North: 98785.06' East: 169900.19'
End North: 98778.21' East: 169924.75'
Segment #2 : Line
Course: S74°24'35"E Length: 3.50'
North: 98777.26' East: 169928.13'
Segment #3 : Curve
Length: 3.40' Radius: 175.00'
Delta: 001°06'41.72" Tangent: 1.70'
Chord: 3.40' Course: N16°08'46"E
Course In: S74°24'35"E Course Out: N73°17'53"W
RP North: 98730.23' East: 170096.69'
End North: 98780.53' East: 169929.07'
Segment #4 : Line
Course: N16°42'07"E Length: 112.23'
North: 98888.03' East: 169961.33'
Segment #5 : Curve
Length: 48.62' Radius: 29.00'
Delta: 096°03'42.28" Tangent: 32.24'
Chord: 43.12' Course: N31°19'44"W
Course In: N73°17'53"W Course Out: N10°38'25"E
RP North: 98896.36' East: 169933.55'
End North: 98924.86' East: 169938.91'
Segment #6 : Line
Course: N79°21'35"W Length: 4.24'
North: 98925.64' East: 169934.74'
Segment #7 : Line
Course: N06°34'07"E Length: 22.00'
North: 98947.50' East: 169937.25'
Segment #8 : Line
Course: S79°25'40"E Length: 10.05'
North: 98945.65' East: 169947.13'
Segment #9 : Curve
Length: 52.13' Radius: 149.05'
Delta: 020°02'18.13" Tangent: 26.33'
Chord: 51.86' Course: S89°26'50"E
Course In: N10°34'20"E Course Out: S09°27'59"E
RP North: 99092.17' East: 169974.48'
End North: 98945.15' East: 169998.99'
Segment #10 : Line
Course: N80°32'01"E Length: 10.10'
North: 98946.81' East: 170008.95'
Segment #11 : Line
Course: S05°27'26"E Length: 25.54'
North: 98921.39' East: 170011.38'
Segment #12 : Line
Course: S82°03'49"W Length: 0.36'
North: 98921.34' East: 170011.03'
Segment #13 : Curve
Length: 36.44' Radius: 25.50'
Delta: 081°51'56.34" Tangent: 22.11'
Chord: 33.41' Course: S41°07'50"W
Course In: S07°56'11"E Course Out: N89°48'08"W
RP North: 98896.08' East: 170014.55'
End North: 98896.18' East: 169989.05'
Segment #14 : Curve
Length: 15.99' Radius: 55.50'
Delta: 016°30'14.71" Tangent: 8.05'
Chord: 15.93' Course: S08°27'00"W
Course In: N89°48'08"W Course Out: S73°17'53"E
RP North: 98896.37' East: 169933.55'
End North: 98880.42' East: 169986.71'
Segment #15 : Line
Course: S16°42'07"W Length: 112.23'
North: 98772.92' East: 169954.46'
Segment #16 : Curve
Length: 25.57' Radius: 148.50'
Delta: 009°51'52.00" Tangent: 12.82'
Chord: 25.54' Course: S11°46'11"W
Course In: S73°17'53"E Course Out: N83°09'45"W
RP North: 98730.25' East: 170096.69'
End North: 98747.92' East: 169949.25'
Segment #17 : Line
Course: S06°50'15"W Length: 109.53'
North: 98639.17' East: 169936.21'
Segment #18 : Curve
Length: 122.96' Radius: 174.50'
Delta: 040°22'17.00" Tangent: 64.15'
Chord: 120.43' Course: S13°20'53"E
Course In: S83°09'45"E Course Out: S56°27'58"W
RP North: 98618.39' East: 170109.46'
End North: 98521.99' East: 169964.01'
Segment #19 : Line
Course: S33°32'02"E Length: 53.00'
North: 98477.81' East: 169993.29'
Segment #20 : Curve
Length: 143.02' Radius: 100.50'
Delta: 081°32'04.00" Tangent: 86.65'
Chord: 131.25' Course: S07°14'00"W
Course In: S56°27'58"W Course Out: S41°59'58"E
RP North: 98422.29' East: 169909.52'
End North: 98347.61' East: 169976.76'
Segment #21 : Line
Course: S48°00'02"W Length: 1.82'
North: 98346.39' East: 169975.41'
Segment #22 : Line
Course: S03°27'21"W Length: 38.49'
North: 98307.97' East: 169973.09'
Segment #23 : Line
Course: N41°32'39"W Length: 83.50'
North: 98370.47' East: 169917.71'
Segment #24 : Line
Course: S86°32'39"E Length: 42.08'
North: 98367.93' East: 169959.72'
Segment #25 : Curve
Length: 104.37' Radius: 74.00'
Delta: 080°48'37.86" Tangent: 62.99'
Chord: 95.93' Course: N06°52'17"E
Course In: N42°43'24"W Course Out: N56°27'58"E
RP North: 98422.29' East: 169909.51'
End North: 98463.17' East: 169971.19'
Segment #26 : Line
Course: N33°32'02"W Length: 53.00'
North: 98507.35' East: 169941.91'
Segment #27 : Curve
Length: 141.63' Radius: 201.00'
Delta: 040°22'17.00" Tangent: 73.90'
Chord: 138.72' Course: N13°20'54"W
Course In: N56°27'58"E Course Out: N83°09'45"W
RP North: 98618.39' East: 170109.46'
End North: 98642.32' East: 169909.89'
Segment #28 : Line
Course: N06°50'15"E Length: 59.60'
North: 98701.50' East: 169916.98'
Segment #29 : Curve
Length: 44.28' Radius: 29.00'
Delta: 087°28'57.00" Tangent: 27.75'
Chord: 40.10' Course: N36°54'14"W
Course In: N83°09'45"W Course Out: N09°21'18"E
RP North: 98704.95' East: 169888.19'
End North: 98733.56' East: 169892.90'
Segment #30 : Line
Course: N80°38'42"W Length: 51.53'
North: 98741.94' East: 169842.06'
Segment #31 : Curve
Length: 68.56' Radius: 221.50'
Delta: 017°44'05.00" Tangent: 34.56'
Chord: 68.29' Course: N71°46'40"W
Course In: N09°21'18"E Course Out: S27°05'23"W
RP North: 98960.49' East: 169878.06'
End North: 98763.29' East: 169777.19'
Segment #32 : Line
Course: N62°54'37"W Length: 7.16'
North: 98766.55' East: 169770.82'
Segment #33 : Curve
Length: 13.19' Radius: 88.04'
Delta: 008°35'01.43" Tangent: 6.61'
Chord: 13.18' Course: N67°12'08"W
Course In: S27°05'23"W Course Out: N18°30'22"E
RP North: 98688.17' East: 169730.73'
End North: 98771.66' East: 169758.67'
Segment #34 : Curve
Length: 35.84' Radius: 19.00'
Delta: 108°03'57.79" Tangent: 26.18'
Chord: 30.76' Course: S54°28'23"W
Course In: S18°30'22"W Course Out: N89°33'36"W
RP North: 98753.64' East: 169752.64'
End North: 98753.79' East: 169733.64'
Segment #35 : Line
Course: S00°26'24"W Length: 3.09'
North: 98750.70' East: 169733.61'
Segment #36 : Line
Course: N89°36'24"W Length: 23.00'
North: 98750.86' East: 169710.61'
Segment #37 : Line
Course: N00°24'10"E Length: 76.00'
North: 98826.85' East: 169711.15'
Segment #38 : Line
Course: S89°36'12"E Length: 26.49'
North: 98826.67' East: 169737.64'
Segment #39 : Line
Course: S00°24'26"W Length: 10.28'
North: 98816.39' East: 169737.56'
Segment #40 : Curve
Length: 21.78' Radius: 15.50'
Delta: 080°30'40.76" Tangent: 13.12'
Chord: 20.03' Course: S39°50'55"E
Course In: S89°35'34"E Course Out: S09°53'45"W
RP North: 98816.28' East: 169753.06'
End North: 98801.01' East: 169750.40'
Segment #41 : Curve
Length: 34.37' Radius: 114.54'
Delta: 017°11'37.90" Tangent: 17.32'
Chord: 34.24' Course: S71°30'26"E
Course In: S09°53'45"W Course Out: N27°05'23"E
RP North: 98688.18' East: 169730.71'
End North: 98790.15' East: 169782.87'
Segment #42 : Line
Course: S62°54'37"E Length: 7.16'
North: 98786.89' East: 169789.24'
Segment #43 : Curve
Length: 60.36' Radius: 195.00'
Delta: 017°44'05.00" Tangent: 30.42'
Chord: 60.12' Course: S71°46'40"E
Course In: N27°05'23"E Course Out: S09°21'18"W
RP North: 98960.50' East: 169878.04'
End North: 98768.09' East: 169846.35'
Segment #44 : Line
Course: S80°38'42"E Length: 50.35'
North: 98759.91' East: 169896.03'
Perimeter: 2006.08' Area: 26843.695 Sq. Ft.
Error Closure: 0.02 Course: N57°50'06"W
Error North: 0.010 East: -0.016
Precision 1: 97834.50
Name: Standard : B
North: 99794.80' East: 171951.42'
Segment #1 : Line
Course: N48°27'21"E Length: 52.00'
North: 99829.29' East: 171990.34'
Segment #2 : Line
Course: S41°32'39"E Length: 29.14'
North: 99807.48' East: 172009.67'
Segment #3 : Curve
Length: 38.96' Radius: 224.50'
Delta: 009°56'36.41" Tangent: 19.53'
Chord: 38.91' Course: S36°34'21"E
Course In: S48°27'21"W Course Out: N58°23'57"E
RP North: 99658.59' East: 171841.64'
End North: 99776.23' East: 172032.85'
Segment #4 : Curve
Length: 40.10' Radius: 224.50'
Delta: 010°14'06.89" Tangent: 20.11'
Chord: 40.05' Course: S26°28'59"E
Course In: S58°23'57"W Course Out: N68°38'04"E
RP North: 99658.59' East: 171841.64'
End North: 99740.38' East: 172050.71'
Segment #5 : Line
Course: S21°21'56"E Length: 40.05'
North: 99703.08' East: 172065.30'
Segment #6 : Curve
Length: 47.59' Radius: 232.50'
Delta: 011°43'38.33" Tangent: 23.88'
Chord: 47.51' Course: S27°13'45"E
Course In: N68°38'04"E Course Out: S56°54'26"W
RP North: 99787.79' East: 172281.82'
End North: 99660.84' East: 172087.04'
Segment #7 : Curve
Length: 208.64' Radius: 232.50'
Delta: 051°24'57.25" Tangent: 111.93'
Chord: 201.71' Course: S58°48'03"E
Course In: N56°54'26"E Course Out: S05°29'28"W
RP North: 99787.78' East: 172281.83'
End North: 99556.35' East: 172259.58'
Segment #8 : Curve
Length: 18.28' Radius: 232.50'
Delta: 004°30'13.42" Tangent: 9.14'
Chord: 18.27' Course: S86°45'38"E
Course In: N05°29'28"E Course Out: S00°59'15"W
RP North: 99787.78' East: 172281.83'
End North: 99555.32' East: 172277.82'
Segment #9 : Line
Course: S89°00'45"E Length: 70.81'
North: 99554.10' East: 172348.62'
Segment #10 : Curve
Length: 19.70' Radius: 27.00'
Delta: 041°48'37.13" Tangent: 10.31'
Chord: 19.27' Course: N21°53'34"E
Course In: N47°12'08"W Course Out: S89°00'45"E
RP North: 99572.44' East: 172328.81'
End North: 99571.98' East: 172355.80'
Segment #11 : Line
Course: N00°59'15"E Length: 21.75'
North: 99593.72' East: 172356.18'
Segment #12 : Line
Course: S89°00'45"E Length: 11.00'
North: 99593.53' East: 172367.18'
Segment #13 : Line
Course: S89°00'45"E Length: 11.00'
North: 99593.34' East: 172378.17'
Segment #14 : Line
Course: S00°59'15"W Length: 21.75'
North: 99571.60' East: 172377.80'
Segment #15 : Curve
Length: 19.70' Radius: 27.00'
Delta: 041°48'37.13" Tangent: 10.31'
Chord: 19.27' Course: S19°55'04"E
Course In: S89°00'45"E Course Out: S49°10'38"W
RP North: 99571.13' East: 172404.80'
End North: 99553.48' East: 172384.36'
Segment #16 : Line
Course: S89°00'45"E Length: 52.62'
North: 99552.57' East: 172436.98'
Segment #17 : Line
Course: S00°59'15"W Length: 9.00'
North: 99543.58' East: 172436.82'
Segment #18 : Line
Course: S00°59'15"W Length: 31.00'
North: 99512.58' East: 172436.29'
Segment #19 : Line
Course: N89°00'45"W Length: 159.19'
North: 99515.32' East: 172277.12'
Segment #20 : Curve
Length: 321.73' Radius: 272.50'
Delta: 067°38'49.00" Tangent: 182.58'
Chord: 303.37' Course: N55°11'21"W
Course In: N00°59'15"E Course Out: S68°38'04"W
RP North: 99787.78' East: 172281.82'
End North: 99688.51' East: 172028.04'
Segment #21 : Line
Course: N21°21'56"W Length: 25.19'
North: 99711.97' East: 172018.86'
Segment #22 : Curve
Length: 25.53' Radius: 72.50'
Delta: 020°10'43.31" Tangent: 12.90'
Chord: 25.40' Course: N31°27'18"W
Course In: S68°38'04"W Course Out: N48°27'21"E
RP North: 99685.55' East: 171951.35'
End North: 99733.63' East: 172005.61'
Segment #23 : Line
Course: N41°32'39"W Length: 81.72'
North: 99794.80' East: 171951.41'
Perimeter: 1356.46' Area: 25779.403 Sq. Ft.
Error Closure: 0.01 Course: S68°37'45"W
Error North: -0.004 East: -0.009
Precision 1: 132998.00
Name: Standard : C
North: 99717.48' East: 172262.35'
Segment #1 : Line
Course: S00°59'15"W Length: 47.01'
North: 99670.48' East: 172261.54'
Segment #2 : Line
Course: S86°44'34"W Length: 17.77'
North: 99669.47' East: 172243.80'
Segment #3 : Line
Course: N55°33'42"W Length: 55.50'
North: 99700.86' East: 172198.03'
Segment #4 : Line
Course: N75°30'49"E Length: 66.44'
North: 99717.48' East: 172262.36'
Perimeter: 186.72' Area: 1806.381 Sq. Ft.
Error Closure: 0.01 Course: S27°51'25"E
Error North: -0.006 East: 0.003
Precision 1: 18672.00