August 22, 2018
Nicholas Gioello
Planning and Development Department
City of Eugene
th
99 W 10 Avenue
Eugene, OR 97401
RE: North Campus Conditional Use Permit (CU 18-1 WG 18-12)
Project Area Calculations
Dear Nick,
Please accept this letter as supplemental information clarifying the project area and tax lot area
acreage calculations referenced in the North Campus Conditional Use and Willamette
Greenway Permit (CU 18-1 WG 18-2)narrative. The final narrative dated June 22, 2018, pages
6, 7 and Table 6-1 contained notional errors that have since been corrected. These corrections
are as follows:
The AssessorÈs Map reference for tax lot 00300 on pages 6, 7 and Table 6-1 was
inconsistent. This tax lot is associated with AssessorÈs Map 17-03-32-21. Pages 6, 7
and Table 6-1 have been corrected.
The AssessorÈs Map reference for tax lot 05300 on pages 6, 7 and Table 6-1 was
inconsistent. This tax lot is associated with AssessorÈs Map 17-03-32-24. Pages 6, 7
and Table 6-1 have been corrected.
Table 6-1 omitted two tax lots within the project area due to an incorrect base data file.
These tax lots are 17-03-32-24-05400 (7.91 acres) and 17-03-32-24-05500 (2.50 acres).
Theacreage associated with these tax lots was included in the total project area
calculation. The total project area acreage calculation is based on the project area
boundary, which is not affected by the corrections, thus total project area acreage is
unchanged (77.4 acres). The addition of tax lots 05400 and 05500 is simply notional to
the narrative, and not mathematical.
It is also important to note that the project area boundary, which is synonymous with the S-RP
zone boundary, and the parcel file (i.e. tax lot boundaries) are based on original GIS shapefiles
converted to AutoCAD drawing format. The files used for the analysis are not completely
coterminous with each other, resulting in minor discrepancies between the gross acreage
provided by the Lane County Regional Land Information Database (RLID) and the net acreage
calculated using AutoCAD for each tax lot within the project area, as illustrated on Sheet L06
Tax Lots.
Cameron McCarthy 1
North Campus Conditional Use Permit (CU 18-1 WG 18-12)
Project Area Calculations August22, 2018
In addition, the following tax lots are only partially within the project area, which results in a
discrepancy between the RLID tax lot acreage and the project area tax lot acreage:
17-03-32-14-00100
17-03-32-14-01800
17-03-32-14-02000
17-03-32-21-00300
17-03-32-24-05400
Table 6-1. UO North Campus Tax Lots à Expanded provides the RLID tax lot acreage; the
project area tax lot acreage in the Final Narrative dated June 22, 2018; the project area tax lot
acreage in the Revised Narrative dated August 13, 2018; as well as the change in acreage
(delta). As noted previously, the overall project area acreage remains unaffected.
The proposal requests Conditional Use and Willamette Greenway permit approval for
properties owned by the Applicant within the S-RP zone boundary and project area. This
supplemental information is consistent with that request.
Please feel free to contact me should you have any questions or need additional information.
Sincerely,
Colin G. McArthur, AICP
Cameron McCarthy 2
North Campus Conditional Use Permit (CU 18-1 WG 18-12)
Project Area Calculations August 21, 2018
Table 6-1. UO North Campus Tax Lots à Expanded
PROJECT PROJECT
TAX PLAN RLID
MAP ZONING DESIGNATION ACRES ACRES
LOT DESIGNATIONACRES
(Final) (Revised)
17-03-32-14100 University Research Riverfront Park Special Area (S-RP) 0.43 0.43 0.41 -0.02
17-03-32-14103 University Research Riverfront Park Special Area (S-RP) 2.46 2.46 2.31 -0.15
17-03-32-14105 University Research Riverfront Park Special Area (S-RP) 1.55 1.55 1.54 -0.01
17-03-32-141400 University Research Riverfront Park Special Area (S-RP) 2.30 2.30 2.23 -0.07
17-03-32-141600 University Research Riverfront Park Special Area (S-RP) 1.32 1.32 1.30 -0.02
17-03-32-141800 University Research Riverfront Park Special Area (S-RP) 16.95 16.95 14.78 -2.17
17-03-32-142000 University Research Riverfront Park Special Area (S-RP) 2.28 2.28 1.71 -0.57
17-03-32-142200 University Research Riverfront Park Special Area (S-RP) 2.37 2.37 2.37 0.00
17-03-32-142300 University Research Riverfront Park Special Area (S-RP) 2.50 2.50 2.50 0.00
17-03-32-142400 University Research Riverfront Park Special Area (S-RP) 0.89 0.89 0.89 0.00
17-03-32-142500 University Research Riverfront Park Special Area (S-RP) 1.24 1.20 1.21 0.01
17-03-32-142600 University Research Riverfront Park Special Area (S-RP) 1.22 1.22 1.22 0.00
17-03-32-142700 University Research Riverfront Park Special Area (S-RP) 0.64 0.64 0.64 0.00
17-03-32-21300 University Research Riverfront Park Special Area (S-RP) 27.54 32.90 25.18 -7.72
17-03-32-245300 University Research Riverfront Park Special Area (S-RP) 8.36 8.36 8.67 0.31
17-03-32-245400University ResearchRiverfront Park Special Area (S-RP)9.757.917.91
17-03-32-245500University ResearchRiverfront Park Special Area (S-RP)2.542.502.50
TOTAL84.377.477.4
Cameron McCarthy3
ŒÒŴ{
ǧúɶǧËǧƔŴȘ ǘ!ǧń
ǿǘkú!Œ !ǧ! ˖ǿ˷ǧǘ˗ ʦƔŴ
Ș!ʊ ŒƔȘ aƔȲŴ{!ǧʐ
˽˾̃̂ ȲŵûɷǨȀûșʑ ƕÌ ƔǨÓƕŵˍ ȳÓŵˍ Ɣǧ ̅̃̀˼˿
˽̃˷˼˿˷˿˾˷˾̀
Ș"ʋ Œƕș ˼́˿˼˼
˽̃˷˼˿˷˿˾˷˾˽
Ș"ʋ Œƕș ˼˼˿˼˼
ȲŴúɶǧǿúȘʐ ƔË ƔǧÒƔŴ
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˼˽˼˼
˽̃˷˼˿˷˿˾˷˾̀
Ș"ʋ Œƕș ˼́̀˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾̃˼˼
˽̃˷˼˿˷˿˾˷˾̀
Ș"ʋ Œƕș ˼́́˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˼˽˼́
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾̂˼˼
˽̃˷˼˿˷˿˾˷˽̀
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˽̂˼˼
Ș"ʋ Œƕș ˼˾́˼˼
˽̃˷˼˿˷˿˾˷˽̀
˽̃˷˼˿˷˿˾˷˽̀
˽̃˷˼˿˷˿˾˷˽̀˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˽̀˼˼
Ș"ʋ Œƕș ˼˾˿˼˼
Ș"ʋ Œƕș ˼˼˽˼˿Ș"ʋ Œƕș ˼˾˾˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾̀˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˽̄˼˼
ǿȘ!Ūǘ
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾˼˼˼
kŪ
kélŅ|ˏ
ɶǿ
{Ǩ"ɽŵ aʑˏ
kélŅ|ˏ
˽̃˿˿
ǘǨƕĽlș ˻ˏ
!ȳÓː ˽́ˍ ˾˼˽̄
{"șˏ
ǧɷː ˻ˏ{"șˏ
˻
||˝ūū˝ʑʑ
Œ!Ŵ{ Ȳǿ
ǿȲaŪúȘȘ!Œ
ǿèȘ ȘúȘŒǿèȘ ȘúȘŒ
Ș!ʊ ŒƔȘǿ
˼˟˽˼˼˟˾˼˼˟̀˼˼˟
ǿèȘ ˻
Ș!ʊ ŒƔȘǿ
Œ˼̂
˽
˽ˠ ̽ ˾˼˼˟˷˼ˠ