HomeMy WebLinkAboutSupplemental Materials
Transmittal
Nick Gioello
June 22, 2018
To: Date:
Associate Planner
UO North Campus CUP
Project:
City of Eugene Planning Division
1733E
Project No:
99 W. 10th Ave.
Eugene, OR 97401
Transmitted: Disposition:
Herewith Signed
By Carrier For Information
Hand Delivered For Reply
Other (USPS) For Approval
Copies: Item: Dated:
3 Completeness Review Response Letter 6.15.18
3 Updated Narrative 6.22.18
3 Updated Exhibit A Sheet L06 Tax Lots 6.15.18
3 Updated Exhibit A Sheet S01 Existing Conditions 6.15.18
3 Updated Exhibit A Sheet C02 Sanitary Sewer Plan 6.15.18
3 Updated Exhibit C Stormwater, Sanitary, Sewer, and Wastewater Report 6.15.18
3 Updated Exhibit D Transportation Assessment 6.15.18
3 Updated Exhibit H Outreach Meeting Summary 6.15.18
Comments:
None.
Copies To:
Owner Electrical
Architect Civil By:_______________________________________
File ContractorColin McArthur, AICP
June 15, 2018
Nicholas Gioello
Planning and Development Department
City of Eugene
th
99 W 10 Avenue
Eugene, OR 97401
RE: North Campus Conditional Use Permit (CU 18-1)
Completeness Review Response Letter
Dear Nicholas,
We appreciate the CityÈs timely review of the materials submitted for North Campus
Conditional Use Permit application (CU 18-1). Please accept this letter in response to the
incomplete items identified in the CityÈs completeness review letter dated March 28, 2018.
The additional items identified for application completeness are noted in italics, with responses
in plain text.
1.The written statement needs to address the Riparian Corridors, Wetlands, and Wildlife
Habitat (Goal 5) of the Metro Plan, specifically policies C.12, C.13, C.16 and C.17. Staff
notes that in reviewing the referenced map in policy C.16 (Goal 5 Significant Wildlife
Habitat for the area inside the UGB), it appears that a wildlife habitat corridor and
possibly riparian corridor runs adjacent to and through the site.
The written statement has been updated to address the Riparian Corridors, Wetlands, and
Wildlife Habitat (Goal 5) of the Metro Plan, specifically policies C.12, C.13, C.16 and C.17, in
addition to the referenced map in Policy C.16. This content can be found on pages 53 through
55 of the written application.
2.Please provide a map that shows all parcel boundaries and includes Map and Tax Lot.
A new sheet, Sheet L06, was prepared to reflect the parcel boundaries, Map, and Tax Lot
numbers. The sheet is included with this response.
3.Please show the location and width of all public and private easements. It appears that a
significant EWEB easement is located on the property but is not shown.
Sheet S01has been revised to show the location and width of all public and private easements
north of the railroad tracks, including the significant EWEB easement. Easements located
south of the railroad tracks will be identified and confirmed as part of any proposed
development.
Cameron McCarthy 1
North Campus Conditional Use Permit (CU 18-1)
Completeness Review Response Letter June 15, 2018
3.Public Works has indicated that it appears that the wastewater system shown located in
th
the 8 Avenue cul-de-sac does not exist and will need to be shown in the proper
location.
th
Sheet C02has been revised to show the wastewater system, originally shown in the 8Avenue
cul-de-sac, in its proper location. The information in the Stormwater, Sanitary Sewer, and
th
Water Analysis Report related to the description of the East 8 Avenue System (Destination C)
has also been updated.
4.Completeness comments from Scott Gillespie, PE Public Works, regarding the trip
generation report.
The applicant commissioned a Transportation Assessment Report, prepared by Kittelson
Associates,to address Public Works comments related to trip generation methodologyand
technical engineering analyses of the existing and proposed transportation system. After
multiple conversations with Public Works, it was confirmed that ITE Code 550 is an appropriate
method for estimating trip generation for a transportation assessment of this scope and
purpose. The written statement has been updated to reflect this supplemental information, as
well as how the modified proposal remains consistent with the Riverfront Park Study policies.
The report has also been stamped by a professional engineer, per request.
Please feel free to contact me should you have any questions or need additional information.
Sincerely,
Colin G. McArthur, AICP
Cameron McCarthy 2
CITY OF EUGENE
CONDITIONAL USE AND
WILLAMETTE GREENWAY
PERMIT APPLICATION
NORTH CAMPUS
UNIVERSITY OF OREGON
June 22, 2018
Cameron McCarthy
Landscape Architecture & Planning
160 East Broadway, Eugene, OR 97401
Phone 541.485.7385 | Fax 541.485.7389
www.cameronmccarthy.com
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
This page is intentionally blank.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 INDEX
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
INDEX
LAND USE APPLICATION FORMS
Conditional Use Permit
Willamette Greenway Permit
WRITTEN STATEMENT
1.0Project Information ................................................................................................ 5
2.0Introduction and Purpose ................................................................................... 11
3.0Planning Process .................................................................................................. 17
4.0Public Outreach ................................................................................................... 23
5.0Master Site Plan Description / Proposal Summary ............................................ 27
6.0Existing Conditions and Site History ................................................................... 33
7.0Submittal Requirements ...................................................................................... 41
8.0Approval Criteria and Applicable Standards ....................................................... 53
8.1 S-RP Approval Criteria (EC 9.3725) ¼¼¼¼¼..¼¼¼¼¼¼¼¼. ........... 53
8.2 Willamette Greenway Criteria (EC 9.8815) ¼¼¼¼¼..¼¼¼¼¼¼¼¼. 82
8.3 S-RP Development Standards (EC 9.3715) ¼¼¼..¼¼¼¼¼¼¼¼¼¼87
8.4 S-RP Public Facilities (EC 9.3720) ¼¼¼¼¼..¼¼¼¼¼¼¼¼.............. 94
8.5 Outdoor Lighting Standards (EC 9.6725) ¼¼¼¼¼..¼¼¼¼¼¼¼¼. .. 96
8.6 Duration of Approval ¼¼¼¼¼..¼¼¼¼¼¼¼¼. .................................. 97
8.7 Conclusion ¼¼¼¼¼..¼¼¼¼¼¼¼¼. ................................................. 98
EXHIBITS
A Plan Set ................................................................................................................... A
B Riparian Assessment and Management Report .................................................. B
C Conceptual Infrastructure Analysis Report .......................................................... C
D Trip Generation Study Report ................................................................................ D
E Neighborhood/Applicant Meeting Materials ......................................................... E
F Legal Description .................................................................................................... F
G Parking Code Compliance Report ........................................................................ G
H Outreach Summary ................................................................................................. H
I Campus Planning Committee Meeting Records .................................................. I
J Community Open House Materials¼¼¼¼¼¼.¼¼¼¼¼¼¼¼¼¼¼¼¼¼. J
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 INDEX
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
This page is intentionally blank.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 INDEX
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE AND WILLAMETTE GREENWAY
PERMITAPPLICATION
Written Statement
1.0PROJECT INFORMATION
The Applicant, the University of Oregon, requestsconcurrent
ApplicantÈs Request:
Conditional Use and Willamette Greenway permit approval for
University of Oregon owned property within the Riverfront
Park Special Area Zone (S-RP), also known as North Campus
(and formerly known as the Riverfront Research Park).
$11,635.75
Application Review Fee:
City of Eugene Planning and Development
Department:
Jamie Moffitt
Property Owner/Applicant:
Vice President for Finance and Administration
(Applicant) on behalf of:
State of Oregon
Acting by and through the Board of Trustees
103 Johnson Hall
1283 University of Oregon
Eugene OR 97403
541.346.5606
Colin McArthur, AICP
ApplicantÈs Representative:
Principal Planner
Cameron McCarthy
160 East Broadway
Eugene, OR 97401
541.485.7385
colin@cameronmccarthy.com
University of Oregon North Campus
Project Name:
Subject Property:AssessorÈs Map 17-03-32-21
Tax Lot 00300
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 5
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
AssessorÈs Map 17-03-32-14
Tax Lots 00300, 01800, 05300, 02300, 00103, 02200, 01400,
02000, 00105, 01600, 02500, 02600, 02400, 02700, 00100
Location:AssessorÈs Map 17-03-32-21
Tax Lot 00300
No site address is associated with this tax lot.
Geographic Coordinates:
X 4244944 Y 879273 (State Plane X, Y)
Latitude: 44.0507¡ Longitude: -123.0727¡
AssessorÈs Map 17-03-32-14
Tax Lot 01400
1387 Franklin Blvd Eugene, OR 97403
Geographic Coordinates:
X 4245389 Y 878668 (State Plane X, Y)
Latitude: 44.0491¡ Longitude: -123.0709¡
Tax Lot 01600
1383 Franklin Blvd Eugene, OR 97403
Geographic Coordinates:
X 4245352 Y 878569 (State Plane X, Y)
Latitude: 44.0488¡ Longitude: -123.0711¡
Tax Lot 01800
1149 Franklin Blvd Eugene, OR 97403
Geographic Coordinates:
X 4244371 Y 878593 (State Plane X, Y)
Latitude: 44.0488¡ Longitude: -123.0748¡
Tax Lot 02000
1307 Franklin Blvd Eugene, OR 97403
Geographic Coordinates:
X 4245164 Y 878567 (State Plane X, Y)
Latitude: 44.0488¡ Longitude: -123.0718¡
Tax Lot 02200
No site address is associated with this tax lot.
Geographic Coordinates:
X 4246091 Y 878310 (State Plane X, Y)
Latitude: 44.0481¡ Longitude: -123.0682¡
Tax Lot 02300
No site address is associated with this tax lot.
Geographic Coordinates:
X 4246398 Y 878292 (State Plane X, Y)
Latitude: 44.0481¡ Longitude: -123.0671¡
Tax Lot 02400
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 6
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
1900 Millrace Dr Eugene, OR 97403
Geographic Coordinates:
X 4246697 Y 878297 (State Plane X, Y)
Latitude: 44.0482¡ Longitude: -123.0659¡
Tax Lot 02500
No site address is associated with this tax lot.
Geographic Coordinates:
X 4246651 Y 878477 (State Plane X, Y)
Latitude: 44.0481¡ Longitude: -123.0655¡
Tax Lot 02600
1650 Millrace Dr Eugene, OR 97403
Geographic Coordinates:
X 4246253 Y 878595 (State Plane X, Y)
Latitude: 44.0489¡ Longitude: -123.0676¡
Tax Lot 02700
No site address is associated with this tax lot.
Geographic Coordinates:
X 4245940 Y 878715 (State Plane X, Y)
Latitude: 44.0492¡ Longitude: -123.0688¡
Tax Lot 05300
855 Riverfront Pkwy Eugene, OR 97401
Geographic Coordinates:
X 4243140 Y 879399 (State Plane X, Y)
Latitude: 44.0509¡ Longitude: -123.0796¡
Tax Lot 00105
No site address is associated with this tax lot.
Geographic Coordinates:
X 4245971 Y 878611 (State Plane X, Y)
Latitude: 44.0490¡ Longitude: -123.0687¡
Tax Lot 00103
1600 Millrace Dr Eugene, OR 97403
Geographic Coordinates:
X 4245866 Y 878299 (State Plane X, Y)
Latitude: 44.0481¡ Longitude: -123.0691¡
Tax Lot 00100
No site address is associated with this tax lot.
Geographic Coordinates:
X 4245595 Y 878683 (State Plane X, Y)
Latitude: 44.0491¡ Longitude: -123.0702¡
77.4 acres (3,371,544 square feet)
Property Size:
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 7
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
University Research
Plan Designation:
Water Resource Overlay (/WR)
Plan Overlay Designation:
Riverfront Park Special Area Zone (S-RP)
Zoning Designation:
N/A
Overlay Zoning Designation:
1
17-00120
Pre-Application Conference:
N/A
Associated Applications:
1.1 Summary of Request
The University of Oregon (Applicant) requests Conditional Use permit and concurrent Willamette
Greenway permit approval to enable future development of university-owned property within the
boundaries of the Riverfront Research Park Special Area Zone (S-RP) and Willamette Greenway.
These permits are necessary because they are required by the City of Eugene S-RP Zone and
Willamette Greenway designation, in which the property is located. The Applicant proposes to
use this land for university uses (programs and activities carried out by the University of Oregon)
and research that complements the university. The Applicant obtained prior Conditional Use
2
Permit approval for development on the subject property in 1988 primarily for the purposes of a
research park (research that complements the university), also known as the Riverfront Research
Park. Following Conditional Use Permit approval, the Applicant and City executed a Conditional
Use Permit Agreement that, among other things, established a time schedule for completion of
construction extending to October 10, 2012. The Conditional Use Permit expired on that date;
therefore, a new Conditional Use Permit is necessary for any new development to be possible.
The subject property is designated University Research by the Metro Plan and zoned S-RP by the
Eugene Zoning Ordinance. Future development envisioned entails uses consistent with applicable
adopted plans, policies, and standards, as described in this application.
1.2 Land Use and Development Requirements
Within the City of EugeneÈs policy framework, this proposal is subject to zone specific approval
criteria and standards at EC 9.3725 Riverfront Park Special Area Zone Approval Criteria and EC
9.8815 Willamette Greenway Permit Approval Criteria and Standards. This is a Type III request for
review and approval of a concurrent Conditional Use Permit and Willamette Greenway Permit
application to be held against the applicable criteria of approval in the Eugene Code. Findings
demonstrating consistency with applicable approval criteria, policies, and standards are provided
in Section 6 Approval Criteria and Standards. The attached materials and enclosed findings
1
The pre-application conference was scheduled and conducted as a project consultation meeting per
instructions from City staff and occurred on Friday, January 5, 2018.
2
Conditional Use Permit CU 88-16 approved October 10, 1989; Execution of Conditional Use Agreement
approved April 27, 1192; Approval of Modification to Final Conditional Use Permit MDA 09-05 approved
December 11, 2009.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 8
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
demonstrate compliance with application submittal requirements. The applicable criteria and
standards are specified at:
EC 9.7215 Type III Application Requirements and Criteria Reference;
EC 9.3725 S-RP Riverfront Park Special Area Zone Approval Criteria;
EC 9.8815 Willamette Greenway Permit Approval Criteria and Standards;
EC 9.3715 S-RP Riverfront Park Special Area Zone Development Standards;
EC 9.3720 S-RP Riverfront Park Special Area Zone Public Facilities;
EC 9.6735 Outdoor Lighting Standards.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 9
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
This page is intentionally blank.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 10
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
2.0INTRODUCTION AND PURPOSE
2.1 Site Description
The area of campus within the City of Eugene Riverfront Park Special Area Zone (S-RP) is
comprised of about 77 acres of land owned by the University of Oregon, making up approximately
25% of the universityÈs nearly 300-acre campus. Called ÅNorth CampusÆ for the purposes of this
land use application, this area of campus is north of Franklin Boulevard and uniquely situated.
First and foremost, it features two water bodies, the Willamette River and the Millrace. In addition,
the Union Pacific Railroad runs through the entire length of the property, dividing the land into
ÅnorthÆ and ÅsouthÆ of the railroad tracks. The area north of the tracks contains remnants of a
riparian river edge, large open grassyareas, a bike path, two physical education and recreation
fields, and access to the Frohnmayer Bridge. This land was previously industrial and contains up
to 20-feet of fill, causing the river bank to be steep. The area south of the tracks contains a mix of
university and research park uses, including the universityÈs central power station and other
buildings related to the operations of the university, fine art studios, the Urban Farm, university
research, buildings that were developed as part of the Riverfront Research Park, surface parking
lots, and a bike path along the Millrace. Franklin Boulevard (a state highway) lies just south of the
property. The property is an important connector to Downtown Eugene and future EWEB property
development.
Figure 2-1. Context Map
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 11
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Figure 2-2. Campus Context Map
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 12
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
2.2Introduction/Master Site Plan
The key component of this Conditional Use Permit request, as required by the City of Eugene
Riverfront Park Special Area Zone (S-RP), is a for all land in the zone. EC 9.3725
Master Site Plan
states:
ÅThe master site plan for developments proposed within the S-RP zone shall be reviewed
through the conditional use permit process provided in this land use code.Æ
The purpose of the Master Site Planfor this Conditional Use Permit request is to connect people
to the Willamette River and accommodate essential future development, allowing the University of
3
Oregon to meet its mission of teaching, discovery, and service. The universityÈs mission and
purpose of the Master Site Plan align with the fundamental purpose of the S-RP zone to Åprovide
for activities and uses that complement the research and educational functions of the Oregon
4
State System of Higher Education in general and the University of Oregon in particularÆand meets
the objective to Årecognize the natural amenities of the site, balancing the opportunity for
development to use those amenities with the publicÈs interest in proper protection and, where
appropriate,use of them.Æ
Being able to provide the necessary facilities and environments for current needs, growth and
unforeseen change is critical to the success of faculty, students, and the operations of the
university. Accommodating facilities that support the full breadth of student success aligns with
the universityÈs purpose, which is devoted to Åeducating the whole person, and to fostering the
next generation of transformational leaders and informed participants in the global community.Æ
Through these pursuits, the university enhances the social, cultural, physical, and economic
wellbeing of our students, Oregon, the nation, and the world. Planning for the full breadth of
essential facilities in a way that facilitates the restoration of the riverfront, connects campus to the
river, and makes use of land that the university owns is consistent with the universityÈs values, in
particular with regard to:
The success of the students, faculty, and staff who work and learn here.
The unique geography, history and culture of Oregon that shapes our identity and spirit.
Our shared charge to steward resources sustainably and responsibly.
The Master Site Plan (further described in Section 5 and included in Exhibit A) commits the area
between the railroad tracks and Willamette River primarily to conservation and open space
opportunities and concentrates most of the potential building development south of the railroad
tracks. It carefully balances the long-term needs of the university and desires of the community as
a whole, addressing key interests in bicycle and pedestrian connectivity, river access, riparian
restoration, safety, and active uses. Specifically, the Master Site Plan:
3
UO Mission: The University of Oregon is a comprehensive public research university committed to
exceptional teaching, discovery, and service. We work at a human scale to generate big ideas. As a
community of scholars, we help individuals question critically, think logically, reason effectively,
communicate clearly, act creatively, and live ethically.
4
As discussed in Section 8.1, all references to the Oregon State System of Higher Education shall be
considered references to the University of Oregon.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 13
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Strictly limits potential development north of the railroad tracks by establishing a 200-foot
development setback from top of bank.
Dedicates 31acres of 77 acres to conservation in addition to other open space.
North of the railroad tracks, dedicates 25 of 42 acres to conservation along the entire length of
the universityÈs riverfront.
Restricts building coverage and heights well beyond the code allowances.
Limits vehicular access and parking primarily to south of the tracks, and contains no new
through-roads.
Limits recreation field coverage to three fields (a net increase of one field) and commits to
treating stormwater and mitigating lighting impacts if they are built.
Of the 42 acres between the railroad tracks and Willamette River, the Master Site Plan proposes:
60% for conservation
20% for other open space
16% (maximum) for recreation fields
4% (maximum) for buildings
The Master Site Plan is a set of drawings that establishes a regulatory framework well beyond
code requirements that the university chooses to impose on itself. It contains a regulatory plan, a
conceptual site plan showing a scenario of potential development over the course of decades, and
conceptual plans for pedestrian and bicycle, vehicle, and service vehicle primary circulation. It is
based on the Framework Vision Project (an 18-month-long planning study that was landscape-
focused and explored how the university could accommodate growth on campus, further
described in Section 3), a Conceptual Study of the universityÈs land between the railroad tracks
and the Willamette River (further described in Section 3), and the land use code requirements for
the Conditional Use Permit. It has been informed by feedback from university and community
stakeholders gathered through public outreach (further described in Section 4).
2.3 Purpose (Why the University Needs a Conditional Use Permit)
Unlike the majority of campus, which is in the Public Land Zone, the entire North Campus
(delineated by the S-RP zone) needs a Conditional Use Permit in order for any development to
occur. This is not a typical Conditional Use Permit application. It is not for a site-specific known
development; rather, it is for a vast area of land for most of which the university has no definitive
plans and/or funding to improve yet. However, a Conditional Use Permit is required for this area
because of its unique and special location along the Willamette River.
The university knows that it needs some of the land in North Campus for future buildings and year-
round recreation fields, as found in the Framework Vision Project. It has limited land holdings and
limited development opportunities and, as the university grows, it wants to do it in a way that
preserves and improves upon the quality of campus that people enjoy today, with its beautiful
interconnected open spaces, thoughtfully-designed buildings, and high-quality pedestrian
environment. The university would be able to achieve this if it can accommodate growth and
change in this part of campus. This Conditional Use Permit would be a first step in allowing the
University of Oregon to plan for the future and improve the area. If the university does not receive
a new Conditional Use Permit for North Campus, its ability to accommodate growth and change
will be extremely limited, forcing the university to be unable to respond effectively to needs and
opportunities. Consequences include but are not limited to:
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 14
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Locating new buildings in places that are inappropriate for those building types (such as an
administrative building in areas of campus that are reserved for classrooms or student
services).
Building in designated open spaces.
Having to purchase adjacent land and build in neighboring areas with potential negative
impacts to neighbors.
Further spreading university uses off-campus.
Having limited or no options for surge or replacement space, which will become all the more
necessary as the university builds and improves research facilities and offices for current and
new tenure-track faculty.
Not being able to attract new faculty and students due to the inability to provide essential
facilities;
KeepingNorth Campus in a situation where areas continue to be unsafe and an eyesore.
Remaining isolated from the Willamette River, UOÈs most underappreciated natural asset.
Connecting to the river will open opportunities for research, teaching outdoors, recreation,
improving the ecology of the riverÈs edge, and improving pedestrian and bicycle connectivity.
At the time the previous Conditional Use Permit was in place, the subject property was reserved
primarily for the purposes of a research park, controlled by a university entity separate from the
general university campus. Unlike the previous Conditional Use Permit, this permit would be
primarily for the purpose of university uses, extending the general university campus across
Franklin Boulevard. It would include a mix of university uses and university-related uses, such as
but not limited to research, academic, administrative, outdoor recreation, outdoor research and
education, conservation, and university housing. All of these uses are permitted in the zone.
In addition, the proposed Master Site Plan for this Conditional Use Permit request is physically
very different from that of the previous Conditional Use Permit (see Exhibit J, Attachment 4). The
previous Master Site Plan proposed building development throughout the site and very close to
the riverÈs edge and included public through-roads north and south of the tracks. The current
proposed Master Site Plan (described throughout this document and in detail in Section 5)
concentrates most of the building development south of the tracks, places strict limitations on
development north of the tracks (including a 200-foot setback) to maximize conservation and open
space opportunities, contains no new through-roads, and restricts vehicle circulation and parking
primarily to south of the tracks.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 15
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
This page is intentionally blank.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 16
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
3.0 PLANNING PROCESS
3.1 Planning Context
The Master Site Plan for this Conditional Use Permit request is based on:
The Campus Physical Framework Vision Project (Framework Vision Project);
The Conceptual Study for the land between the railroad tracks and Willamette River; and
The requirements of the Eugene Code (in particular, the approval criteria for the Conditional
Use Permit and Willamette Greenway Permit).
This Conditional Use Permit request is part of a four-step planning process for North Campus.
The four steps include:
1.The Campus Physical Framework Vision Project (University of Oregon process -
completed);
2.The North Campus Conditional Use Permit (City of Eugene process - underway);
3.The North Campus Amendment to the (University of Oregon process -
Campus Plan
forthcoming); and
4.The Campus Planning Process (University of Oregon process for any future projects à as
needed).
Figure 3-1. North Campus Planning Process (see Exhibit J, Attachment 5 for full size)
3.2 Framework Vision Project
Commissioned by the university in 2014, the Campus Physical Framework Vision Project
(Framework Vision Project) was an 18-month-long study by a team of nationally-regarded
landscape architects and campus planners that was landscape-focused and explored how the
university could accommodate growth and change on campus. Because the Framework Vision
Project is not an adopted plan, but a tool for informing the universityÈs , amendments
Campus Plan
to the will also be necessary to implement its recommendations. The
Campus PlanCampus Plan
amendment for North Campus, which is part of the universityÈs internal planning process, will be
undertaken and adopted after the CityÈs Conditional Use Permit review and approval process.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 17
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Completed in 2016 by Robert Sabbatini with PLACE Studio and Perkins + Will, the purpose of the
Framework Vision Project was to create a comprehensive physical framework vision of open
spaces and buildings, which would bring greater specificity to the and better inform
Campus Plan
decisions on how to accommodate growth and change, and preserve the beauty and functionality
of the campus. While the Framework Vision Project did not establish whether or not (and how
much) the university would grow, it assessed a series of different enrollment growth scenarios to
help prepare the university to address potential growth in an informed and thoughtful way. The
study looked at enrollment scenarios of 24,500 students (the enrollment at the time), 28,000
students, 31,000 students, and 34,000 students.
Overall, the Framework Vision Project found that the current campus, which includes the North
Campus area, has the capacity to accommodate growth to 34,000 students and beyond. It found
that the campus can meet expansion needs by building upon the established and well-functioning
framework of open spaces and pedestrian connectors. It also noted the universityÈs location along
the Willamette River as an incredible opportunity that was underappreciated, and recommended
ways to better connect campus to the river and improve the ecology of the riverÈs edge.
Pertaining to North Campus, the Framework Vision Project found that the university needs some of
this land to meet future growth. It found that the land north of the railroad tracks would be needed
for three year-round physical recreation fields in addition to the two current fields (referred to as
5
outdoor classrooms) in alignment with the Campus Plan because they are an essential element of
the universityÈs mission.
The Framework Vision Project conducted extensive outreach to inform ideas and recommended
actions. Throughout the study, the project team solicited feedback from a project advisory group,
the Space Advisory Group, and the Campus Planning Committee, and from the wider community
at five open houses and two public lectures. The project team also developed the interactive
MyCampus survey and received feedback from nearly 1,400 students, faculty, staff, alumni and
neighbors. Numerous siting options were tested to determine how best to accommodate the
diverse mix of anticipated university uses (buildings, outdoor classrooms, and open spaces) within
the context of preserving and enhancing the special and unique features of the campus
environment.
3.3 Conceptual Study for the Land between the Railroad Tracks and the River
In the summer of 2017, the university hired Cameron McCarthy Landscape Architecture and
Planning to assist with the North Campus Conditional Use Permit project, including a Conceptual
Study for the land between the railroad tracks and the Willamette River to further inform the
development of the City-required Master Site Plan. The purpose of the Conceptual Study was to
5
ÅOutdoor classroomsÆ is the term used in the for open spaces that serve as vital classrooms
Campus Plan
rd
(, 3 Edition, 2014, page 42). Outdoor classrooms used for curricular offerings include
Campus Plan
Gerlinger Green, all existing recreational fields, tennis courts, and the Urban Farm. Other open spaces
may also serve informally (i.e., unscheduled) as outdoor classrooms. Many of these are designated open
spaces in the . Designated open spaces are significant open spaces on campus, which are
Campus Plan
rd
the fundamental and historic open spaces within the universityÈs open-space framework (, 3
Campus Plan
.
Edition, 2014, page 27 No buildings are allowed in these open spaces, and building projects must
contribute toward their enhancement.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 18
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
6
develop conceptual site plan options exploring how physical education and recreation fields (also
known as outdoor classrooms), support facilities, restoration, river access, a reconfigured bike
7
path, areas for outdoor teaching, and other university uses could work together on the site.
Because of the unique location along the river and strong interest in this area from members of the
university and wider community, the university decided to do further study to test the ideas of the
Framework Vision Project and understand what was feasible.
The Conceptual Study included a Riparian Assessment and Management Report (by Mason, Bruce
& Girard, Exhibit B), which provided a functional assessment of the riparian corridor along the
8
Willamette River and Millrace Outfall and upland habitat in the eastern portion of the study area.
Riparian restoration goals for the Conceptual Study were informed by the report and confirmed by
community feedback.
The Conceptual Study went through multiple iterations to develop conceptual site plan options.
As described in the Public Outreach section (Section 4), the Conceptual Study engaged in
extensive outreach to inform the study. The Conceptual Study resulted in two final options that
show how the universityÈs needs and community desires could work together (included in Exhibit
J, Attachments 7A and 7B). The Conceptual Study found that:
Only four fields would be feasible (two new fields and two replacement fields), considering site
limitations, operational considerations, and riparian restoration goals. Therefore, one field
could not be accommodated in North Campus;
There would be enough room to lay back (re-grade) the bank to a more natural slope and
provide riparian restoration areas at a width of at least 200 feet from the top of bankin many
locations;
It would be possible to align the bike path closer to the river (in the required 100-foot
conservation setback) as well as align it further away outside the 100-foot setback; and
The need to accommodate future development in North Campus is greater than the
9
Framework Vision Project suggests; therefore, limited building development north of the
tracks could be proposed.
6
The Framework Vision Project identified a need for three year-round recreational fields in addition to the
two existing grass recreational fields, totaling five fields in North Campus. Through further study and work
with the focus group during the Conceptual Study, the project team found a need to replace the two
existing grass fields with year-round fields. The existing fields are not playable year-round due to poor
drainage, recovery time after use, and other maintenance considerations.
7
Several disciplines use the riverfront as an outdoor classroom, including courses in Anthropology, Art,
Biology, Environmental Studies, Geology, Earth Sciences, History, Landscape Architecture, the Library,
and through the Museum of Natural and Cultural History. (Information provided by Bitty Roy, UO
Professor of Biology, Institute of Ecology and Evolution.)
8
Overall. the Riparian Assessment found that the study area provides many of the necessary functions and
values necessary for healthy local aquatic and terrestrial ecosystems, but that the previous land uses have
degraded or removed the historic, native vegetation composition in many locations. The report provides
recommendations for riparian management, addressing protection of water quality, revegetation and
habitat enhancement, erosion control, promoting biodiversity, and recreation,
9
While the Framework Vision Project noted that the land north of the tracks would not be needed for
buildings, it did not take into account all of the space that the university currently leases off-campus, some
of which the university may consider consolidating on campus one day. Also, the Framework Vision
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 19
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Through consideration of the reduction in the number of fields, community feedback, and further
analysis of potential university needs, the university determined it would propose a limited number
of buildings north of the railroad tracks in the areas closest to existing and planned public
infrastructure. While none of the potential buildings have been assigned specific uses, potential
building types (that came up as ideas and potential needs during the Conceptual Study) include a
10
field house to support the recreation fields, a facility for the Outdoor Program, research
greenhouses, an academic and/or research building focused on ecology, and other potential
academic/and or research buildings. The conceptual study confirmed that the scale of these
buildings could be accommodated in the limited areas. During the Conceptual Study, some
members of the university and wider community questioned the universityÈs need to locate
physical education and recreation fields north of the tracks due to their concern about the impact
of year-round fields (if artificial turf with field lights) on the river environment and wildlife. When the
Framework Vision Project assessed locations for fields, it found that they could not be
accommodated on existing campus open spaces due to their required dimensions. Amongst
many other considerations, siting the fields elsewhere on campus would displace other uses that
needed to be in those locations (in addition, a field would not necessarily fit in these locations). It
is also not possible to locate recreational fields on top of buildings or parking structures because
the required field footprint greatly exceeds possible building footprints. Possible locations for
recreational fields on campus lands were reassessed as part of the Conceptual Study and
confirmed the results of the Framework Vision Project.
The decision to allow physical education and recreation fields (outdoor classrooms) in North
Campus is based on the need for physical education and recreational classes and activities to be
in proximity to the students and other classroom facilities. The universityÈs current recreational
fields (four artificial turf fields and two grass fields) accommodate thousands of students in
physical education, club sports, and intramural sports annually. In addition, they accommodate
open recreation for students and the community, university and community events, marching band
practice, and summer camps.
Specific timing for when the university will need additional recreation field capacity is not known.
At the time the need is identified, the university would follow the process in the and
Campus Plan
conduct a site selection study. If the university decides to build new fields in North Campus
(which would include a replacement of the existing two fields), the university would carefully
consider field surface materials and implement design strategies to mitigate the impact of fields
and potential lighting on the environment and wildlife. In addition, the fields would be configured
to maximize their distance from the riverÈs edge, as shown in the Conceptual Study and further
refined in the Master Site Plan (which further reduces the number of allowable recreation fields to
Project suggested building sites in other areas of campus that may not be feasible. Therefore, the need to
accommodate future development in North Campus is greater than the study suggests. As mentioned, the
Framework Vision Project is not an adopted plan, but a study which serves as a tool for informing changes
to the Campus Plan and decisions related to campus development.
10th
The Framework Vision Project identifies its current Outdoor Program location on 18 Avenue and
University Street as a potential site for a future academic building, which if developed, would displace the
current Outdoor Program facility. The project team explored the idea of locating a replacement facility
near the river because of the programÈs relationship to the river and outdoors. Being located near the river
would be beneficial to its aquatic programs and nature courses.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 20
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
three, and establishes a 200-foot setback from top of bank). This would allow for riparian
restoration areas to be much wider than the 100-foot conservation setback required by the code.
Through careful analysis of the site (including the Riparian Assessment and Management Report),
and confirmed through engagement with UO faculty in the Ecology Focus Group, the project team
determinedthat the edge of the river and riparian buffer were most critical in terms of restoration
priorities because of the need to protect water quality and provide beneficial shade to aquatic
11
species dependent on cooler water. In addition, most ecological functions need at least a 100-
12
to 200-foot riparian buffer, with 200 feet accommodating the functions more optimally. It should
be noted that the proposed 200-footsetback is from the top of high bank. When factoring the
distance from the riverÈs edge to top of high bank, the proposed setback is about 250 to 300 feet
and further from the riverÈs edge in most areas. The proposed setback allows more area for:
Providing shade and cover that is beneficial to fish, birds, and animals (and not good for most
13
invasive plants);
Removing the existing fill and re-grading the river bank to a more natural slope, allowing trees
14
to better access water, improving groundwater recharge, and improving views and access to
the river;
Improving flood storage function, removing sediment and contaminants, improving erosion
15
control, and increasing channel stability;
Providing habitat for sensitive species;
Passive recreation, such as soft trails;
16
Outdoor teaching related to ecology; and
Creating a buffer from other potential uses, such as recreational fields and the bike path.
After the Conceptual Study, in response to stakeholder and wider community feedbackgathered
throughout the process, the university revised and clarified the Master Site Plan and Conditional
Use Permit application in the following ways for the area north of the railroad tracks. All of these
commitments are well beyond what the code would require (as further described in the description
of the Master Site Plan (Section 5).
Established a development setback of 200 feet from the top of bank (of the Willamette River
and Millrace Outfall) for buildings and recreational fields, expanding opportunity for riparian and
upland habitat restoration (required setback is 100 feet);
Furtherreduced the proposed coverage (maximum footprint) of potential buildings (from 18%
to 15% in Area 4, from 2% to 0.5% in Area 5, and from 25% to 16% in Area 6). This reduces
the potential scale and quantity of buildings;
Furtherreduced the proposed height of potential buildings proposed east of the Frohnmayer
Bridge from 45 feet to 37 feet. This also helps to reduce the scale of buildings;
11
Riparian Assessment and Management Report by Mason, Bruce & Girard, 2018, pg. 10.
12
UO Riverfront Botanical Survey Presentation, 2012, Professor Bitty Roy, Institute of Evolution and Ecology
and Biology Department.
13
UO Riverfront Botanical Survey Presentation, 2012, Professor Bitty Roy, Institute of Evolution and Ecology
and Biology Department.
14
Riparian Assessment and Management Report by Mason, 2018, Bruce & Girard, pg. 11.
15
Riparian Assessment and Management Report by Mason, 2018, Bruce & Girard, pg. 10-11.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 21
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Reduced the allowable quantity of potential recreational fields from five to three to allow for a
200-foot minimum setback . This would still accommodate the necessary types of physical
education classes and field sports, and would likely accommodate the anticipated demand if
the fields were designed to be year-round. This greatly increases the distance of the fields and
potential field lights from the riverÈs edge and 100-foot required conservation area;
Added an additional bike path optionfurther from the riverÈs edge, outside the 100-foot
required conservation setback;
Committed to mitigating impacts on stormwater runoff from potential fields;
In addition to meeting code requirements, committed to implementing further strategies to
mitigate adverse impacts of field lighting and bike path lighting toward the river; and
Committed to restoring the riverÈs edge and Millrace conservation area as funds are available,
and implementing best maintenance practices for managing riparian areas, consistent with the
universityÈs existing Integrated Pest Management Plan.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 22
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
4.0 PUBLIC OUTREACH
In addition to the public outreach efforts included in the development of the Framework Vision
Project, the North Conditional Use Permit project and concurrent Conceptual Study (of the land
between the railroad tracks and the Willamette River) involved extensive outreach with a wide
range of stakeholders in order to inform the Conceptual Study and Master Site Plan. Stakeholder
engagement included groups internal to the university and stakeholders external to the university.
Internal efforts focused on faculty, staff, students, and administrators. External efforts focused on
community leaders, business leaders, city and agency representatives, neighboring property
owners, river and ecology advocates,neighborhood associations, and other interested parties.
This section summarizes the outreach that occurred in formally scheduled meetings. Many
conversations, one-on-one meetings, information-sharing and phone calls also took place that
were not formally scheduled.
The public process started in July 2017. Outreach to-date has included:
Eight focus group meetings (five internal, two external, and one combined internal/external);
Two public open houses;
Two neighborhood meetings;
Information-sharing meetings with internal and external stakeholders and interested parties
(ongoing);
Individual interviews with community members representing key interests;
Three Campus Planning Committee meetings;
Five e-updates to an e-mail list of interested parties;
Five e-updates to the community stakeholder focus group;
Three updates in Around-the-O; and
Sharing information on the project web page (ongoing), including open house materials and
providing a function for public comment.
It should be noted that the university also conducted outreach one year prior to the project, from
May 2016 through October 2016, to understand areas of concern and interest. This effort included
meetings with the Campus Planning Committee, faculty in the College of Design and Biology,
PE&REC, Club Sports, Office of the Vice President for Research and Innovation, and
representatives of neighborhood associations, adjacent community organizations, and local
government (planning, transportation, parks and recreation).
Below is a more detailed description of the outreach meetings to-date:
Internal Outreach
Ecology Focus Group
The Ecology focus group was comprised of representatives from the departments of Biology,
Geography, Environmental Studies, Landscape Architecture, and the Urban Farm Program and the
Institute for Ecology and Evolution. The Ecology focus groupÈs expertise in ecology and landscape
design delivered important feedbackregarding the current use of the area for research and
outdoor learning, areas of ecological significance, design considerations, and recommendations
for conservation, restoration, and enhancement. The Ecology group met on July 12 and July 26,
2017 and in a combined meeting with the PE & REC Focus Group and Outdoor Program Group on
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 23
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
August 29, 2017, and in a combined meeting with PE & Rec Focus Group and members from the
Community Focus Group on October 18, 2017.
Physical Education & Recreation Focus Group
The Physical Education and Recreation focus group was comprised of representatives from the
Department of Physical Education and Recreation, Intramural Sports, and Club Sports. The group
provided feedback on current and future programmatic needs for students in physical education
programs, open recreation, intramural sports, and club sports. The PE & REC Focus Group met
on July 6, 2017, and in a combined meeting with the Ecology Focus Group and Outdoor Program
Group on August 29, 2017, and in a combined meeting with the Ecology Focus Group and
members from the Community Focus Group on October 18, 2017.
Outdoor Program Focus Group
The UO Outdoor Program provided feedback on recreation program opportunities, river access,
and support facilities. The focus group discussed the programmatic requirements for a potential
new replacement facility near the river. The Outdoor Program Focus Group met on July 6, 2017
and in a combined meeting with the Ecology Focus Group and PE & REC Group on August29,
2017. Members were invited to but did not attend the combined meeting with the PE & REC
Focus Group, Ecology Focus Group and members from the Community Focus Group on October
18, 2017.
Information-Sharing Meetings
Members of the Project Team met with the units that make up
Campus Planning and
(Campus Planning, Design and Construction, Utilities and Energy,
Facilities Management
Facilities Services, and Sustainability) to review project status and gather feedback related to
the operations of campus. Meetings occurred on September 14, 2017, and October 17, 2017.
Members of the Project Team met with representatives in the
Office of the Vice President for
on October 9, 2017 to share project information and gather
Research and Innovation
feedback related to the interests and needs of faculty research and research related to the
university.
Members of the Project Team met with the on December 11,
UO Executive Leadership Team
2017 to share the project status and gather feedback.
Campus Planning staff provided an update to the in December 2017.
Space Advisory Group
Campus Planning and Facilities Management and Campus Planning Committee Chair provided
information about the public process to the on February 14, 2018.
University Senate
Campus Planning staff were invited to the
Student Recreation Center Student Advisory
meeting on February 23, 2018 and provided information about the proposal.
Board
Campus Planning staff met with interested students, faculty, and staff to provide information
about the proposal in May and June 2018, and will continue to do so. Meetings to-date were
with representatives of the ,
Associated Students of University of OregonClimate Justice
, , and faculty in the departments of Biology and
LeagueStudent Sustainability Center
Economics, amongst others.
Academic Units with Facilities in the North Campus Area
On September 6, 2017, members of the Project Team met with representatives of academic units
that have current facilities in the project area. These units included College of Design, the School
of Art and Design, and the Urban Farm Program. The purpose of the meeting was to share
information about the project, gather key information about their use of the area, and address
concerns.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 24
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Campus Planning Committee
Members of the Project Team met with the Campus Planning Committee (CPC) on October 10,
October 27, and November 28, 2017. The CPC is a university committee that advisesthe
President on long-range campus development with regard to the design of campus. The
committee includes wide representation from university faculty, staff, and students. The CPC is
the primary author of proposed amendments and periodic updates to the Campus Plan. CPC
meetings are open to the public and notification of regular meetings is provided to Eugene
Neighborhood Association chairs. At the November meeting, the CPC reviewed the draft North
Campus Master Site Plan and approved it for moving forward through the Conditional Use Permit
applicationprocess, with the understanding that it would come back to the CPC during the
amendment process. CPC meeting minutes are included as Exhibit I.
Campus Plan
External Outreach
Community Focus Group
An external community focus group met twice during the public process, members of which also
met with CPFM staff during the project scoping process for the project. These meetings were
comprised of members outside the University of Oregon, such as community leaders, business
leaders, city and agency representatives, neighboring property owners, river and ecology
advocates, neighborhood associations, and other interested parties. The group focused
specifically on the area between the railroad tracks and the river. Participants discussed key
topics such as connectivity, river access, riparian restoration, safety, and active uses, and
provided feedback on the Conceptual Study options. The Community Focus Group met on
August 8, 2017 and September 13, 2017, and some members attended a combined meeting with
the internal focus groups on Oct 18, 2017.
Stakeholder Interviews
The Project Team conducted in-depth interviews with several key stakeholders including business
owners of surrounding property, leadership from applicable neighborhood associations and
committees, representation from non-profit groups, EWEB, and the Environmental Legal Alliance
Worldwide (ELAW). Interviews focused on perceptions of the North Campus area, access,
connectivity, environmental considerations, and community recreational use.
City of Eugene Planning and Development
The Project Team met with City of Eugene Planning and Development staff on July 31, 2017 and
November 2, 2017. The first meeting focused on project overview and scope of work and the
second meeting focused on project updates and identifying land use requirements. Additionally,
the Project Team held a project consultation meeting with City staff on January 5, 2017, which is a
formal pre-requisite to filing a Type III land use application.
Information-Sharing Meetings
A Project Team representative presented to the
City of EugeneÈs Active Transportation
on October 12, 2017 to give a project overview and gather feedback. The ATC
Committee
emphasized the need to ensure that the riverfront bike path is maintained as a key
transportation corridor as well as for recreational use, and that connections to the river remain
paramount.
A Project Team representative presented to the on November 7,
Lane Transit District Board
2017 to give a project overview and gather feedback.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 25
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
A Project Team representative presented at the fall meeting on November 8,
River Districts
2017 to give a project overview and gather feedback.
Campus Planning and Facilities Management presented to the
Chamber of Commerce Local
on April 6, 2018.
Government Affairs Council
Campus Planning met with interested parties in June 2018 to provide information about the
proposal and will continue to do so.Meetings to-date were with representatives of the
,
Willamette RiverkeeperMcKenzie River Trust, Whilamut Natural Area Citizen Planning
and.
Committee, Nearby Nature
Combined Outreach
Combined Focus Group
A combined focus group meeting was held on October 18, 2007 and included internal and external
focus group representatives. This meeting focused on the draft Master Site Plan and the two
illustrative conceptual site plan options for the Conceptual Study area, and gathered feedback
from attendees. It also included a presentation on the Riparian Assessment and Management
Report, prepared by environmental consultants with the Project Team.
Community Open House (2)
Two community open house events were held on November 8, 2017 and January 11, 2017,
respectively. Articles in the ÅAround the OÆ newsletter preceded each open house. Invitations to
attend were emailed in advance to all faculty and staff and individuals on the interested parties list,
which was a comprehensive list developed through the internal and external outreach processes.
The Project Team presented displays consisting of the draft Master Site Plan, Conceptual Study
materials, context maps, and supporting information and reports. In addition, open house
materials were posted to the project web page. The first open house event had 89 attendees that
signed in. The second open house event had 57 attendees that signed in. To date, over 80
comments were received at the two public open houses and by mail, e-mail, and via the project
web page comment function. Examples of open house materials are included in Exhibit J.
Neighborhood Meeting (2)
Two neighborhood meetings were also held on November 8, 2017 and January 11, 2017,
respectively. The neighborhood meetings utilized the presentation materials from the open house
events. The neighborhood meetings followed the prescribed neighborhood/applicant meeting
procedures as specified in EC 9.7007. Documentation regarding the neighborhood/applicant
meetings is provided as Exhibit E.
Fairmount Neighborhood Association Meeting
Representatives from the project team provided a project update to the Fairmount Neighborhood
Association on December 5, 2017, at the associationÈs regular monthly meeting.
Documentation
Additional outreach methods included several email updates to internal and external stakeholders
between meetings a project website maintained and regularly updated by CPFM staff with
responses to frequently asked questions. The university also made project update
announcements in Around-the-O on August 1, 2017, October 31, 2017, and January 9, 2018.
A summary of all scheduled outreach meetings and key outreach activities conducted for the
proposal is included as Exhibit E Outreach Summary.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 26
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
5.0 MASTER SITE PLAN DESCRIPTION / SUMMARY OF PROPOSAL
EC 9.3725 states:
ÅThe master site plan for developments proposed within the S-RP zone shall be reviewed
through the conditional use permit process provided in this land use code.Æ
The Master Site Plan is a set of drawings that establishes a regulatory framework and
demonstrates compliance with the code and additional restrictions that the university chooses to
impose on itself. It is required by the zoning code and serves as the framework for this Conditional
Use Permit proposal. The Master Site Plan set contains a regulatory plan, a conceptual site plan
showing a scenario of potential maximum or likely development, and conceptual plans for
pedestrian and bicycle, vehicle, and service vehicle primary circulation. Supporting documents
include an existing conditions plan and conceptual plans for utilities. The Master Site Plan
documents are included in Exhibit A. Following is a description of the Master Site Plan drawings:
Regulatory Plan (Sheet L01)
The Regulatory Plan is the guiding component of the Master Site Plan. Its purpose is to establish
restrictions that the university chooses to impose on itself beyond the code requirements. It
delineates development sites and conservation areas, and describes the intent of each of these
areas. It documents boundaries that have regulatory implications, including the Willamette River
ordinary high water line, top of bank, and /WR conservation area setback (100 feet). It establishes
a 200-foot riparian enhancement setback from the top of bank for any potential buildings and
recreational fields west of Riverfront Parkway, facilitating riparian restoration beyond the code
requirement. It identifies proposed public facilities such as bike path options, trails, viewpoints,
and paddle craft launch sites. Unless noted, all uses are permitted as in the S-RP zone and /WR
Overlay.
The Regulatory Plan concentrates most of the potential building development south of the railroad
tracks and commits the area between the railroad tracks and Willamette River primarily to riparian
restoration and open space opportunities. It strictly limits potential development north of the
railroad tracks by imposing a 200-foot setback and restrictions on building coverage, building
heights, field coverage, and vehicular access and parking well beyond the code allowances.
The Regulatory Plan results in 31 acres of 77 acres being dedicated to riparian restoration in
addition to other open space that would be provided within development sites. The university will
restore the riparian river edge and Millrace conservation area as funds are available.
Area 1
Extend campus and open-space framework across Franklin Boulevard; provide
Intent:
major connection to the Willamette River; concentrate development south of the railroad
tracks per code.
Compliant with S-RP Zone.
Maximum Building Coverage:
85 feet
Maximum Building Height:
Compliant with S-RP Zone and /WR Overlay.
Setbacks:
Compliant with S-RP Zone.
Vehicular Access and Parking:
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 27
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Area 2
Extend campus and open-space framework across Franklin Boulevard; provide
Intent:
major connection to the Willamette River; concentrate development south of the railroad
tracks per code.
Compliant with S-RP Zone.
Maximum Building Coverage:
85 feet
Maximum Building Height:
Compliant with S-RP Zone and /WR Overlay.
Setbacks:
Compliant with S-RP Zone.
Vehicular Access and Parking:
Area 3
Establish riparian conservation area as a key feature of the open-space framework
Intent:
and enable restoration of the Millrace. Uses limited to those permitted through the /WR
Overlay, except development allowed on prior developed land per code.
Compliant with /WR Overlay.
Maximum Building Coverage:
Compliant with /WR Overlay.
Maximum Building Height:
Compliant with /WR Overlay.
Setbacks:
Compliant with /WR Overlay.
Vehicular Access and Parking:
Area 4
Concentrate development proximate to existing and planned infrastructure; enable
Intent:
expansion and restoration of the riparian river edge; allow for additional open space
between development and the Willamette River and Millrace Outfall; and allow for potential
to preserve vernal pools.
15%
Maximum Building Coverage:
45 feet
Maximum Building Height:
200-foot riparian enhancement setback as defined in Regulatory Plan. All other
Setbacks:
setbacks compliant with S-RP zone and /WR Overlay.
Vehicular access from the west only. Surface parking
Vehicular Access and Parking:
and access to parking, shall be located to the rear or side of the building along the railroad
tracks. No independent parking structures are allowed.
Area 5
Accommodate future needs for physical education and recreation fields and
Intent:
support facilities in location that maximizes potential for other open space improvements;
enable expansion and restoration of the riparian river edge and the Millrace Outfall. Treat
stormwater runoff from potentialrecreational fields and mitigate adverse impacts of field
lighting toward the river.
0.5%
Maximum Building Coverage:
15 feet
Maximum Building Height:
47%
Maximum Field Coverage:
200-foot riparian enhancement setback as defined in Regulatory Plan. All other
Setbacks:
setbacks compliant with S-RP zone and /WR Overlay.
Restricted vehicle access. Parking limited primarily to
Vehicular Access and Parking:
service, loading, and ADA.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 28
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Area 6
Concentrate development proximate to existing and planned infrastructure; allow
Intent:
for potential to preserve and restore remnant oak savannah.
16%
Maximum Building Coverage:
37 feet
Maximum Building Height:
200-foot riparian enhancement setback west of Riverfront Parkway as defined
Setbacks:
in Regulatory Plan. All other setbacks compliant with S-RP zone and /WR Overlay.
Restricted vehicle access. Parking limited primarily to
Vehicular Access and Parking:
service, loading, and ADA.
Area 7
Protect the riverÈs edge; establish riparian conservation area as a key feature of the
Intent:
open-space framework; enable restoration and laying back the bank; allow for research,
outdoor teaching, passive recreation, river access opportunities, and other uses permitted
in /WR Overlay per code.
Compliant with /WR Overlay.
Maximum Building Coverage:
Compliant with /WR Overlay.
Maximum Building Height:
Compliant with /WR Overlay.
Setbacks:
Compliant with /WR Overlay.
Vehicular Access and Parking:
Conceptual Site Plan (Sheet L02)
The Conceptual Site Plan depicts a scenario of potential maximum or likely development over the
course of decades and duration of the Conditional Use Permit. Proposed development is required
to conform to the code standards and restrictions in the Regulatory Plan. The Conceptual Site
Plan illustrates potential buildings and recreation fields within the development sites. The
arrangement and location of buildings and fields is not intended to be precise, but the general
location relative to regulatory boundaries established in the code and Regulatory Plan. North of
the tracks, the building and field footprints represent the maximum footprint that might occur.
South of the tracks, the building footprints represent a likely development pattern based on typical
university development that complies with the allowances in the code.
Pedestrian and Bicycle Primary Circulation Plan (Sheet L03)
The Pedestrian and Bicycle Primary Circulation Plan illustrates primary circulation routes, access
points, and crossings that the university proposes to maintain or provide. It depicts the general
location of these elements and the direction of travel for the primary routes. It does not depict all
paths that would be part of the circulation system, as those would be determined during the
design process of a development project. This plan includes two proposed alignment options for
the Ruth Bascom Riverfront Path, one that shows the path closer to the riverÈs edge and one that
shows it further. This is not for the purpose of constructing two bike paths, but rather to allow for
flexibility in the placement of the bike path at the time of an actual project. The features of each
alignment could be interchangeable. Below is a description:
The northern alignment proposes a new bridge crossing over the mouth of the Millrace Slough,
which is intended to enable future removal of the existing culvert and crossing and more
comprehensive restoration of the slough. The alignment extends under the south abutment of
the Frohnmayer bridge and extends eastward in order enable a future extension to
Knickerbocker bridge on the north side of the railroad tracks. The alignment allows for bank
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 29
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
layback and riparian restoration, but not to the extent proposed in the southern alignment. The
alignment responds to desires for public access along the river, enhanced safety by activating
the riverÈs edge and improving sightlines, and improved ecological function.
The southern alignment utilizes the existing culvert crossing within the Millrace Slough to
transverse this feature. The alignment does not extend east, and connects to Riverfront
Parkway and Millrace Drive, which is the current eastward travel pattern for pedestrians and
bicyclists. Shifting the bike path further from the river allows for more area devoted to bank
layback and riparian restoration, and lessens the steepness of the proposed transition from the
ordinary high water line to top of bank line. The alignment responds to desires to expand the
riparian area, improve ecological function, and minimize conflicts between recreation and
habitat uses.
Primary circulation routes extend east-west through the area between the railroad tracks and
Franklin Boulevard and along Millrace Drive; east-west along the Millrace; north-south from Onyx
Street; north-south along the gallery walk connection to the Frohnmayer Bridge; north-south along
Riverfront Parkway; and, east-west along the river via the aforementioned bike path alignment
options.
Two railroad crossings exist, one at Riverfront Parkway and one at Gallery Walk. The university
proposes potential new railroad crossings at Alder Street and west of Gallery Walk. These
crossings are intended to be underpasses. Two bridge crossings currently exist over the Millrace,
at Onyx Street and at Gallery Walk. The university proposes two additional bridge crossings over
the Millrace, one west of Onyx Street and one east of Riverfront Drive. Lastly, the university
proposes an overpass crossing over Franklin Boulevard west of Onyx Street to better connect the
historic campus core to the North Campus area.
Private Vehicle Primary Circulation Plan (Sheet L04)
The Private Vehicle Primary Circulation Plan illustrates primary circulation for private vehicles,
managed access, and primary access points that the university proposes to maintain or provide.
Private vehicle circulation is synonymous with unrestricted access. Managed access is
synonymous with access for loading/unloading and ADA needs associated with buildings and uses
in those areas. It does not depict all routes that would be part of the circulation system, as those
would be determined during the design process of a development project. Private vehicle primary
circulation is limited to Riverfront Parkway, Millrace Drive, and a proposed access drive serving
Area 4 extending from City-owned property to the west. Managed access would be allowed north
of Riverfront Parkway, north of the Onyx intersection, and west of Riverfront Parkway on Millrace
Drive.
Service Vehicle Primary Circulation Plan (Sheet L05)
The Service Vehicle Primary Circulation Plan illustrates primary routes, access points, and
crossings for service and delivery vehicles, police vehicles, and emergency vehicles that the
university proposes to maintain or provide. It depicts the general location of these elements and
the direction of travel for the primary routes. It does not depict all routes that would be part of the
circulation system, as those would be determined during the design process of a development
project. Primary service circulation routes extend east-west along Millrace Drive and through Area
1; east-west through Area 5 and 6 along the northern edge of the railroad right-of-way; north-south
along Onyx Street; and north-south along Riverfront Parkway. A proposed new crossing occurs at
the west extent of Area 1, connecting that area across the Millrace to property to the west that
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 30
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
would allow access to Franklin Boulevard. An additional crossing over the Millrace is proposed
west of Onyx Street in the same general location of the proposed pedestrian crossing.
Below is a summary table of how the proposed Master Site Plan (guided by the Regulatory Plan)
compares with the code requirements.
Figure 5-1. Comparison of Code Requirements and Proposal
Code Requirement Proposed
Required Setbacks/Conservation Areas Proposed Setbacks/Conservation Areas
100-foot setback/conservation area from top of 100-foot setback/conservation area from top of high
high bank bank
40-foot setback/conservation area from 40-foot setback/conservation area from Millrace top
Millrace top of high bank of high bank
Required Additional Setbacks from River and Proposed Additional Setbacks from River and
Millrace Outfall Millrace Outfall
None 200-foot riparian enhancement setback from top of
high bank (prohibits buildings and recreational fields)
Required Implementation of Riparian Proposed Implementation of Riparian Restoration
Restoration
None (although a riparian assessment and Commitment to restoring the riverÈs edge and
management report is required for the Millrace conservation area as funds are available.
application)
Required Integrated Pest Management Proposed Integrated Pest Management
None Propose to implement best maintenance practices for
managing riparian areas, consistent with universityÈs
existing IPM plan.
Allowed Building Coverage Proposed Building Coverage
40 to 50% (estimated based on requirement of Area 4: 15% (32,000 sf max footprint west of
40% living plant material; allows 60% for Millrace Outfall)
buildings and site development)
Area 5: 0.5% (3,000 sf max footprint between
Millrace Outfall and Frohnmayer Bridge)
Area 6: 16% (33,600 sf max footprint east of
Frohnmayer Bridge)
Allowed Field Coverage Proposed Field Coverage
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 31
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
50% (estimated based on requirement of 40% Area 5: 47%
living plant material; allows 60% for buildings
and site development)
Allowed Building Height Proposed Building Height
No height limit outside a 75-foot setback from Areas 1 & 2: 85 feet (south of tracks)
the top of high bank (no buildings proposed
Area 4: 45 feet (west of Millrace Outfall)
within 75 feet; therefore, height limit does not
apply)
Area 5: 15 feet (between Millrace Outfall and
Frohnmayer Bridge)
Area 6: 37 feet (east of Frohnmayer Bridge)
(Required) Vehicle Access and Parking Proposed Vehicle Access and Parking Restrictions
Restrictions
No restrictions regarding where vehicle access Area 4: Specifying vehicle access to west only and
and parking can be located on development parking to rear or side of building only (along railroad
sites tracks); no independent parking structure (meaning
Area 4 cannot contain a parking structure without
another building use)
Areas 5 & 6: Specifying managed access only and
parking limited primarily to ADA, service, and loading
(proposed building coverage also precludes parking
structure)
Required Stormwater Treatment Proposed Stormwater Treatment
None for artificial turf fields Propose to implement strategies to mitigate adverse
impacts of recreational fields on stormwater runoff.
Required Lighting Standards for Field Lights Proposed Lighting Standards for Field Lights
Lighting fixtures (for playing fields) shall be Propose to implement further strategies to mitigate
specified, mounted, and aimed so that their adverse impacts of recreational field lighting toward
beams fall within the primary playing area and the river.
immediate surroundings, and so that no direct
illumination is directed off the site.
Required Lighting Standards for Bicycle Path Proposed Lighting Standards for Bicycle Path
Except for pedestrian/bike tunnels, the Propose to implement further strategies to mitigate
walkway or pathway shall be illuminated to a adverse impacts of bike path lighting toward the river.
minimum average maintained luminance of .3
foot-candle and not to exceed a maximum
average maintained luminance of .9 foot-
candle.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 32
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
6.0 EXISTING CONDITIONS AND SITE HISTORY
6.1 Subject Property
The North Campus project area is comprised of 15 tax lots (Table 3-1), all of which are designated
University Research by the Metro Plan and Riverfront Research Park Special Area Zone (S-RP)
with Water Resources Conservation overlay (/WR) by the Eugene Zoning Ordinance. Table 6-1.
UO North Campus Tax Lots includes the map and tax lot number, plan and zone designations, and
acreage of subject tax lots.
Table 6-1. UO North Campus Tax Lots
TAX
MAP PLAN DESIGNATION ZONING DESIGNATION ACRES
LOT
17-03-32-21 00300 University Research Riverfront Park Special Area (S-RP) 32.90
17-03-32-14 01800 University Research Riverfront Park Special Area (S-RP) 16.95
17-03-32-24 05300 University Research Riverfront Park Special Area (S-RP) 8.36
17-03-32-14 02300 University Research Riverfront Park Special Area (S-RP) 2.50
17-03-32-14 00103 University Research Riverfront Park Special Area (S-RP) 2.46
17-03-32-14 02200 University Research Riverfront Park Special Area (S-RP) 2.37
17-03-32-14 01400 University Research Riverfront Park Special Area (S-RP) 2.30
17-03-32-14 02000 University Research Riverfront Park Special Area (S-RP) 2.28
17-03-32-14 00105 University Research Riverfront Park Special Area (S-RP) 1.55
17-03-32-14 01600 University Research Riverfront Park Special Area (S-RP) 1.32
17-03-32-14 02500 University Research Riverfront Park Special Area (S-RP) 1.24
17-03-32-14 02600 University Research Riverfront Park Special Area (S-RP) 1.22
17-03-32-14 02400 University Research Riverfront Park Special Area (S-RP) 0.89
17-03-32-14 02700 University Research Riverfront Park Special Area (S-RP) 0.64
17-03-32-14 00100 University Research Riverfront Park Special Area (S-RP) 0.43
TOTAL 77.4
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 33
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
6.2 Site History
Before 1846, most of level areas of Eugene were prairie. Riparian forests existed along the
17
Willamette River, extending inland an average of 300 yards. The river was subject to frequent
18
change and flooding, resulting in large deposits of silt, sand, and gravel. The Millrace was a
couple of disconnected sloughs until 1851 to 1852, when Hilyard Shaw and Avery Smith linked
19
them together to use as a power source for industry. From 1900 to 1945, Eugene experienced
20
exponential growth. During this time, much of the riparian forest was cleared for orchards of
walnut and filbert and sand and gravel mining (due to the rise of the automobile and demand for
21
material to build roads).
The university began purchasing land near the Millrace in the late 1930s, and over the next thirty
years it would continue to purchase the lands that make up the North Campus area today. This
land is comprised of four large parcels: the Millrace Parcel and Silva Parcel, located south of the
railroad tracks; and the Western Parcel and North of the Railroad Tracks Parcel, located north of
the railroad tracks.
22
The university acquired the Millrace Parcel in 1938 and the Silva Parcel in the 1950Ès. Prior to the
23
universityÈs ownership of the lands, they were agricultural, using the Millrace for irrigation.The
Anchorage Restaurant and a bathing and canoeing resort were also located on the Millrace Parcel
near Franklin Boulevard beginning in the 1910Ès and into the 1930Ès to support the growing
24
recreational use of the Millrace. The Silva Parcel contained orchards and also used the Millrace
25
for the transportation of products. In 1940 to 1941, the railroad was moved from Franklin
26
Boulevard to its current location, north of these parcels.
The university built its power plant on the Millrace Parcel in the early 1950Ès, along with
27
warehouses, shops, and an administration building for campus operations. Uses related to
university research followed as did uses related to the School of Architecture and Allied Arts (now
College of Design), including fine arts studios and the Urban Farm. These uses continue today.
From the early 1970Ès to about 1990, the Silva Parcel contained university research uses, including
28
an herbarium and a facility for animal research. A Coca-Cola bottling plant was built just west of
17
Henry W. Lawrence and Ann P. Bettman, , (Eugene: Henry
The Green Guide: EugeneÈs Natural Landscape
Lawrence and Ann P. Bettman, 1982), 20-22; Urquhart, ÅEugene Geography,Æ 8.
18
Lawrence and Bettman, 24; Urquhart, ÅEugene Geography,Æ 7.
19
City of Eugene, ÅEugene Millrace: A History,Æ Eugene: City of Eugene, 1979; Lawrence and Bettman, 26;
Urquhart, ÅGeography of Eugene,Æ Chapter 1, 2, 6, 18.
20
Lawrence and Bettman, 31.
21
Lawrence and Bettman, 37, 50.
22
City of Eugene, ÅEugene Millrace: A History.Æ
23
L.R. Squier Associates, ÅEnvironmental Site Assessment, Silva Area, Riverfront Research Park, University
of Oregon,Æ environmental site assessment, University of Oregon, Eugene, Oregon, 1990, 4.
24
ÅInsurance Maps of Eugene, Oregon,Æ New York: Sanborn Map Company, 1925, sheet 79, ÅDigital
Sanborn Maps 1867-1970,Æ ProQuest, http://sanborn.umi.com/
25
L.R. Squier Associates, ÅEnvironmental Site Assessment, Silva Area.Æ
26
L.R. Squier Associates, ÅEnvironmental Site Assessment, Western Parcel,Æ 6.
27
L.R. Squier Associates, ÅEnvironmental Site Assessment, Millrace Parcel,Æ 4.
28
L.R. Squier Associates, ÅEnvironmental Site Assessment, Silva Area,Æ 5.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 34
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
29
the Silva Parcel in the 1970Ès on property that was not owned by the university. The orchard use
30
continued until about 1990.
Figure 6-2. Site History Context Map
31
The university acquired the Western Parcel and North of the Railroad Tracks Parcel in 1968.
From the 1930Ès to 1968, Eugene Sand and Gravel Company occupied both parcels, using the
land for sand and gravel mining. During that time period, the company operated sand and gravel
32
quarries on both sides of the river. The Western Parcel contained a gravel screening plant and
concrete plant and two settlement ponds for settling fine sediments before discharge into the
33
Willamette River. The North of the Railroad Tracks parcel contained an asphalt plant.
29
L.R. Squier Associates, ÅEnvironmental Site Assessment, Silva Area,Æ 5, 7.
NOTE: source used 1974 aerial photo.
30
L.R. Squier Associates, ÅEnvironmental Site Assessment, Western Parcel,Æ 4.
31
L.R. Squier Associates, ÅEnvironmental Site Assessment, Western Parcel,Æ 5; L.R. Squier Associates,
ÅEnvironmental Site Assessment, Parcel North of the Railroad Tracks,Æ 5.
32
L.R. Squier Associates, ÅEnvironmental Site Assessment, Silva Area,Æ 6-7.
33
L.R. Squier Associates, ÅEnvironmental Site Assessment, Parcel North of the Railroad Tracks,Æ 5.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 35
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
From 1975 to 1990, the university leased the Western Parcel to EWEB for use as outdoor storage
of power poles, water pipe, cable reels, transformers, and trailers. The property became known as
34
the Åpole yard property.Æ By 1987, all Eugene Sand and Gravel buildings had been demolished.
In the early 1970Ès, the university removed the asphalt plant on the North of Railroad Tracks
Parcel. Fill materials began to appear on the property with some vegetative regrowth, and the
35
footbridge across the river was also built by this time. In 1978, the university developed a plan to
36
use most of the land north of the tracks for recreational fields. Shortly after, the Riverfront Fields
were constructed using student funds. By the mid-1980Ès, the land was covered with vegetation
37
and the university had built the bike path.
In 1983, the university and City of Eugene identified the current North Campus area as a potential
site for a possible private/public joint venture development, emphasizing research facilities, which
may be complemented by University programs. This led to joint City-University planning efforts for
a research park (called the Riverfront Research Park) that included: the CityÈs adoption ofthe
Riverfront Park Study (1985); the CityÈs adoption of a special zoning district to guide development
of the research park, the Riverfront Park Special Area (S-RP) Zone (1987); and the CityÈs approval
of a Conditional Use Permit for the entire zone, establishing a 20-year timeline for the proposed
development. The planning process for the Riverfront Research Park was contentious, and all of
the previously described efforts were appealed to the Oregon Land Use Board of Appeals (LUBA).
38
While LUBA ruled in favor of the City of Eugene in each case (in 1986, 1987, and 1989,
respectively), implementation of the Riverfront Research Park continued to be met with resistance
by community members. This includedan appeal to LUBA for a request to extend the Conditional
Use Permit timeline for 3 years (to 2012), in which LUBA ruled in favor of the City, and an effort to
stop the Oregon Research Institute building from being built north of the railroad tracks (on the
Western Parcel). Under the now-expired Conditional Use Permit, the university built three
buildings through public-private ventures that are part of the Riverfront Research Park today.
These buildings are all located on the Silva Parcel.
In 2013, the neighboring EWEB property (immediately to the west) was master planned and
rezoned to the Downtown Riverfront Special Area Zone(S-DR) to facilitate commercial and
residential development and to enhance the connection between downtown and the Willamette
River. In 2010, the City of Eugene rezoned much of the area immediately south of the North
Campus area to the Walnut Station Special Area Zone (S-WS) for the purpose of facilitating
compatible infill, higher density living opportunities, and mixed use development, implementing the
vision of the Walnut Station Specific Area Plan.
Today, the area south of the railroad tracks includes: the central power station and chiller plant;
warehouses, storage areas and administrative buildings that are part of the operations of campus;
university research facilities; fine arts studios; the Urban Farm; a public bike path along the
Millrace; the developed portion of the Riverfront Research Park; and surface parking lots related to
the uses and for general campus. North of the railroad tracks contains the Ruth Bascom bike
34
L.R. Squier Associates, ÅEnvironmental Site Assessment, Western Parcel,Æ 5.
35
L.R. Squier Associates, ÅEnvironmental Site Assessment, Parcel North of the Railroad Tracks,Æ 5.
36
Lawrence and Bettman, 50.
37
L.R. Squier Associates, ÅEnvironmental Site Assessment, Parcel North of the Railroad Tracks,Æ 5.
38
Stotter vs. City of Eugene, October 10, 1989.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 36
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
path, two recreational fields, and the Frohnmayer Bridge. Pumping of the Millrace is currently
maintained by the university.
The site of the current Knight Campus for Accelerating Scientific Impact project is located along
the north side of Franklin Boulevard between Onyx Street and Riverfront Parkway. It is not located
in the S-RP zone (and not subject to the Conditional Use Permit requirement), but will serve as an
important connection between the current main campus and the North Campus area.
6.3 Environment
As part of the site analysis phase of the project, environmental consultants with Mason, Bruce &
Girard (MB&G) conducted a riparian assessment of the project area to determine the extent of
Goal 5 and Goal 15 conservation areas and to assess the functional quality of the riparian corridor.
Riparian areas are typically defined as vegetated areas located adjacent to water that form an
interface between terrestrial and aquatic environments. These areas protect water quality, remove
contaminants, recharge groundwater, provide habitat for wildlife species, and provide flood
storage and channel stability. The City of Eugene code (EC) states that the applicable Water
Resources Conservation overlay zone, Ånot only conserves the physical resources but also
protects the water quality within the resource areas as a fundamental and essential requirement for
continued survival of these biological systemsÆ (EC 9.4900). The overlay zone establishes
conservation setbacks that guide the planning, implementation, and management standards for
multi-use development. These setbacks are established landward from a waterbodyÈs top-of-
high-bank (TOHB) or a waterbodyÈs ordinary high water mark (OHWM). Riparian areas within the
City are defined in the EC by a 100-foot setback from the TOHB and a 120-foot setback from the
OHWM.
Existing conditions within the project area have been altered in comparison to historical conditions
due to various prior development, vegetation management, and soil compaction. Most notably,
the project area contains a large amount of fill, which has altered physical and biological function
of the riparian habitat. The use of riprap, introduction of invasive species, and impact of foot traffic
has also degraded the bank of the Willamette River. However, the project area still functions as
habitat for several terrestrial and aquatic species. The project area also includes approximately 33
acres of disturbed habitat in the form of maintained grassy fields. These fields are partially within
the 100-year floodplain. The project area is divided into aquatic habitat, riparian habitat, and
upland habitat for analysis, and further split into the Millrace Slough, and the Willamette River.
The project area was analyzed for baseline functional conditions, which include temperature and
shade, channel stability, flood storage, groundwater recharge, sediment and contaminant removal,
and fish and wildlife habitat. Overall, the assessment documented riparian functions at 57 points
throughout the Study area. The project area provides many of the necessary functions necessary
for healthy aquatic and terrestrial ecosystems. However, these ecosystems are also influenced by
other factors that occur outside of the Study area. More explicitly, the streambank of the
Willamette River is conducive to supporting native aquatic species, and the riparian vegetation
along the Willamette River and Millrace Slough streambanks reduces erosion, supports
groundwater recharge, and provides shade and habitat for wildlife species.
The project area has a history of disturbances associated with multiple land uses that have
degraded the native vegetation composition throughout the site. In addition, it is expected that
areas with compacted soils may have reduced riparian/floodplain functions. Lastly, there are
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 37
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
areas of the site that are in need of large-scale invasive plant removal. Restoration actions should
focus on immediate benefit to riparian function, such as the removal of concrete riprap along the
shoreline of the Willamette River. Pristine areas along the riparian corridor should be protected
and enhanced to maintain a well-functioning ecosystem.
The complete Riparian Assessment and Management Report is included as Exhibit B.
6.4 Infrastructure
The site analysis phase of the project included an evaluation of utility infrastructure within and
surrounding the project area for the purposes of supporting proposed development, as prepared
by consultants with BHE Group. The evaluation focused on stormwater, sanitary sewer, and water
systems, with additional analysis of existing steam, power, communications, and natural gas
utilities within the study area.
Soils and Groundwater
Relatively thick deposits of fill are present in the project area, between Riverfront Parkway (on the
east) and the Millrace (on the west). Fill deposits range from 5È-15È deep, and are predominantly 9È
deep. Fill material in this area consists of silt with some sand and gravel, and may have
significantly lower infiltration rates than the native sand and gravel soils. Geotechnical
investigation and infiltration testing is recommended for future development. Seasonal high
groundwater depth ranges from 10È-15È within the project area. Oregon Water Resources
Department well log data indicates a similar depth to groundwater within the project area.
Stormwater
Stormwater runoff from the project area predominantly drains via sheet flow, and enters the
Willamette River. The land slope within the project area is generally flat, with localized depressions
throughout. A significant amount of stormwater is expected to infiltrate into the underlying soil. In
areas where infiltration rates are low, runoff likely ponds at the ground surface before migrating
overland to the river. Per Sheet C01 Storm Drain Plan (Exhibit A), existing public storm drain
mains are located along Riverfront Parkway flowing north and south, Millrace Drive flowing west,
and Franklin Boulevard flowing west. Two additional public lines exist to the north of the tracks,
one of which has an existing destination point in the Willamette River. Potential future destinations
points or extensions connect to the two lines to the north of the tracks, and both flow east. An
additional potential future destination points or extensions may occur along the Millrace leading to
the outfall. Existing private storm drain mains are located south of the tracks, predominantly to the
west of Riverfront Parkway.
Sanitary sewer
Existing gravity-fed public sanitary sewer infrastructure is readily available to areas north of the
railroad tracks and east of the Millrace, however gravity-fed sanitary sewer is not readily available
for the building sites west of the Millrace. Per Sheet C02 Sanitary Sewer Plan (Exhibit A), existing
public sanitary sewer mains are located along Riverfront Parkway flowing south, Millrace Drive
flowing west, and Franklin Boulevard flowing west. One additional public line exists to the north of
the tracks, which flows south. Potential future destinations points or extensions connect to public
lines to the west of Riverfront Parkway. Existing private sanitary sewer mains are located south of
the tracks, predominantly to the west of Riverfront Parkway and flow south.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 38
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Water
Public water mains are available within close proximity to the west and east ends of the project
area. Per Sheet C03 Water Supply Plan (Exhibit A), existing public water mains and associated fire
hydrants are located along Riverfront Parkway to the west, along Millrace Drive down to Garden
Avenue and Moss Street, along Alder Street, and along Franklin Boulevard. One additional public
line exists to the north of the tracks, which curves west. Potential future destination points or
extensions connect to the public line north of the tracks. Existing private water mains and
associated fire hydrants are located south of the tracks, to the west of Riverfront Parkway.
Other Utilities
Natural gas service does not currently extend to the project area. Two major existing underground
public (EWEB) power lines extend through the Study area. A 12kV feeder extends from the EWEB
old steam plant site to the south side of Frohnmayer Bridge, and then splits, and extends north
across the bridge, and south across the railroad tracks. A 115 kV transmission line extends from
the old EWEB steam plant, along the north edge of the railroad tracks point just north of the
Central Power Station, where it turns south and crosses under the railroad tracks. Large vaults
(9Èx13È) with access manholes are located intermittently along the underground power runs.
Relocation of the underground EWEB power lines is not anticipated and vaults are expected to
remain in place. A major EWEB fiber optic line runs parallel to the 115 kV transmission line north
of the railroad tracks. The status and use of other communications lines north of the railroad
tracks are unknown. An EWEB steam corridor extends through the site. The steam system is no
longer active, but some of the pipes within the corridor are being utilized as conduits for other
purposes. EWEB intends to maintain the easement for the steam corridor.
6.4 Transportation
The North Campus Area is located north of Franklin Boulevard, classified as a major arterial and
state highway. Vehicles access the property primarily from Onyx Street (a university-owned local
street), Riverfront Parkway (a local street), and Millrace Drive (a local street), where university
surface parking lots are located in proximity to these access points. Riverfront Parkway currently
continues north of the tracks, where it ends in a stub; north of the tracks, vehicle access is limited
to service and emergency vehicles.
North of the tracks, the Ruth Bascom Bicycle Path goes east-west along the property until
Riverfront Parkway. It provides access west by connecting to the former EWEB property, north via
the Frohnmayer Bridge, and south via Gallery Walk (a university path) and Riverfront Parkway. An
east-west public bicycle path exists along the Millrace, where it provides a connection east to the
CityÈs bicycle route along Garden Avenue (and ultimately the Knickerbocker Bridge).
Pedestrian circulation is accommodated on the bicycle (multi-use) paths and pathways within the
universityÈs property. Pedestrian crossings on Franklin Boulevard are located at Onyx Street and
Riverfront Parkway/Agate Street. The EmX bus rapid transit station is located at Agate Street and
Franklin Boulevard. The site is also served by bus lines 91, 98, and the Diamond Express.
This land use application is supported by a Transportation Assessment report, which is included
as Exhibit D.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 39
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
This page intentionally left blank.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 40
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
7.0 SUBMITTAL REQUIREMENTS
Described following are each of the required procedural and information requirementsnecessary
for the submittal of the Conditional Use Permit application. Findings of compliance with applicable
provisions are provided in Section 8 Approval Criteria and Standards.
7.1 Conditional Use Permit
.1 Filing Fee
The application review fee of $6,822.31 is included with the initial submittal.
.2 Submittal Format Requirements
Three (3) print copies and one (1) electronic copy of the written statement and exhibits are
provided as part of this submittal and are folded to 11Æ by 17Æ or smaller, where applicable.
Findings of compliance with applicable criteria at EC 9.3725, S-SP Riverfront Park Special Area
Zone Approval Criteria, and EC 9.8815, Willamette Greenway Permit Approval Criteriaare provided
in Sections8.1 and 8.2.
.3 Written Statement
This request is to be held against the General criteria, as opposed to the Needed Housing criteria.
Section 8.1 provides findings that explain how the application satisfies all applicable approval
criteria in the Eugene Code at EC 9.3725.
.5 Neighborhood/Applicant Meeting Requirements
Item 1: Exhibit E includes the list of persons to whom notice was mailed pursuant to EC
9.7007(5) and a signed statement that notice was posted and mailed to those on the
list.
Item 2: Exhibit E includes a copy of the notice.
Item 3: Exhibit E includes a copy of the meeting notes and sign-in sheet described in EC
9.7007(9).
Item 4: Exhibit E includes a copy of the site plan presented at the meeting.
.4 General Site Plan Requirements
Item 1: Date, north arrow, and standard scale are included on multiple sheets of the Plan
Set (Exhibit A).
Item 2: The AssessorÈs Map and tax lot numbers applicable to the project are shown on
Sheet G00 Cover Sheet (Exhibit A).
Item 3: Sheet G00 Cover Sheet (Exhibit A) includes a vicinity map.
Item 4: Sheet L02 Site Plan (Exhibit A) shows the current building footprints and the
location of existing and proposed structures.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 41
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Item 5: Details will be provided on individual projects regarding amount and percent
increase in total building square footage and reviewed by the city through the
standard development process as they become available.
Item 6: Details will be provided on individual projects regarding elevation drawings that
depict the scale and appearance of the proposed buildings and reviewed by the city
through the standard development process as they become available.
Item 7: Details will be provided on individual projects regarding the total area of impervious
surface that is existing and proposed and reviewed by the city through the standard
development process as they become available.
Item 8: The Commercial Zone Development Standards at EC 9.2170 through 9.2175do not
apply to this request.
Item 9: Details will be provided on individual projects regarding the width and location of all
existing and proposed public and private easements and reviewed by the city
through the standard development process as they become available.
Item 10: Details will be provided on individual projects regarding all proposed grading for
streets, building areas, and other proposed development and reviewed by the city
through the standard development process as they become available.
Item 11: Details will be provided on individual projects regarding existing and proposed
occupancy classification, construction type, and gross building size for each
structure and reviewed by the city through the standard development process as
they become available.
.5 Wastewater Requirements
Item 1: Details will be provided on individual projects regarding location and flow line
elevation of the existing public wastewater sewer system and reviewed by the
city through the standard development process as they become available.
Proposed possible connection point(s) are shown on Sheet C02 Sanitary Sewer
Plan (Exhibit A).
Item 2: Sheet C02 Sanitary Sewer Plan (Exhibit A) shows the existing and potential
wastewater sewer layout, including service to the site.
.6 Water Supply Requirements
Item 1: Existing and proposed water mains and their diameters are shown on Sheet C03
Water Supply Plan (Exhibit A).
Item 2: Details will be provided on individual projects regarding existing and proposed fire
hydrants and reviewed by the city through the standard development process as
they become available.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 42
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
.7 Storm Drainage Requirements
Item 1: Sheet C01 Storm Drainage Plan (Exhibit A) shows the location of the existing
piped public system at the proposed connection point(s). Details will be
provided on individual projects regarding and flow line elevation and reviewed by
the city through the standard development process as they become available.
Item 2: Details will be provided on individual projects regarding drainage-ways and
reviewed by the city through the standard development process as they become
available. Sheet L01 Regulatory Plan (Exhibit A) shows the top of bank lines for the
Willamette River and Millrace.
Item 3: Floodplain and floodway boundaries, as well as base flood elevations across the
site, are shown on Sheet S01 Existing Conditions (Exhibit A).
Item 4: Stormwater Drainage Analysis Reports will be provided on individual projects
and reviewed by the city through the standard development process as they
become available.
Item 5: Within the Plan Set (Exhibit A), Sheet C01 Storm Drainage Plan shows existing
and possible future extension of storm drainage. Proposed grading and
landscape plans will be provided on individual projects and reviewed by the city
through the standard development process as they become available.
Item 6: Stormwater analysis will be provided on individual projects and reviewed by the
city through the standard development process as they become available.
Item 7: The stormwater system, or portions thereof, are proposed for private
maintenance. The Operations and Maintenance (O & M) Plan will confirm such
management of existing and proposed facilities on the subject site.
.8 Tree Preservation Requirements
Item 1: Details will be provided on individual projects regarding potential tree-removal
and reviewed by the city through the standard development process as they
become available.
Item 2: Details will be provided on individual projects regarding potential location, size,
and species of existing trees and reviewed by the city through the standard
development process as they become available.
Item 3: Details will be provided on individual projects regarding critical root zones of
trees and reviewed by the city through the standard development process as
they become available.
.9 Natural Features Assessment and Delineation of Applicable Boundaries on
Site Plan (in accordance with EC 9.8440(2)(a)
Item 1: Details will be provided regarding on-site vegetation and reviewed by the city
through the standard development process as they become available.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 43
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Item 2: No rare animal species (i.e., those that are proposed for listing or are listed under
State or Federal law) or their habitats exist on the project site and are therefore
not documented as such.
Item 3: No prominent topographic features are present on the project site, as shown on
Sheets S01 Existing Conditions and L02 Site Plan (Exhibit A).
Item 4: Several wetlands, intermittent and perennial stream corridors, and riparian areas
are present on the project site, and are documented in the
Riparian Assessment
(Exhibit B).
and Management Report
Item 5: The project site includes several areas identified in any City-adopted natural
resource inventory. These Goal 5 resources are shown on Sheet L01 Regulatory
Plan (Exhibit A).
Item 6: Amitigation plan addressing restoration or replacement of significant natural
features in accordance with EC 9.8440(2)(c) is not required.
Item 7: There are several significant natural resources on the project site, and a narrative
report from a qualified professional that provides an evaluation of these
resources, anticipated impacts to these resources, and proposed mitigation for
these resources is included as the
Riparian Assessment and Management Report
(Exhibit B).
.10 Landscaping Requirements
Item 1: Details will be provided regarding the location, species, and size of existing and
proposed landscaping and reviewed by the city through the standard
development process as they become available.
Item 2: Details will be provided regarding proposed irrigation methods and reviewed by
the city through the standard development process as they become available.
Item 3: Existing and proposed open space is shown on Sheet L02 (Exhibit A).
Item 4: Details will be provided regarding proposed type and size of existing and
proposed fencing and/or landscape buffering and reviewed by the city through
the standard development process as they become available.
.11 Contour Intervals
Item 1: Details will be provided regarding contour intervals and reviewed by the city
through the standard development process as they become available.
.12 Parking Area Requirements
Item 1: Details will be provided on individual projects regarding location, number, and
dimensions of proposed parking spaces and reviewed by the city through the
standard development process as they become available.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 44
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Item 2: Details will be provided on individual projects regarding the location, number,
and dimensions of proposed bicycle parking spaces and reviewed by the city
through the standard development process as they become available.
Item 3: Details will be provided on individual projects regarding traffic circulation will be
reviewed by the city through the standard development process as they become
available.
Item 4: Details will be provided on individual projects regarding proposed landscaping
and screening for parking areas and reviewed by the city through the standard
development process as they become available.
Item 5: Details will be provided on individual projects regarding curbs and other means
of protecting landscaping and reviewed by the city through the standard
development process as they become available.
Item 6: Details will be provided on individual projects regarding parking area lighting and
reviewed by the city through the standard development process as they become
available.
Item 7: Details will be provided on individual projects regarding parking area lighting and
reviewed by the city through the standard development process as they become
available.
.13 Street and Utility Improvement Requirements
Item 1: Details will be provided regarding proposed existing and proposed public and
private improvements and reviewed by the city through the standard
development process as they become available.
Item 2: Details will be provided regarding whether public improvements are proposed to
be constructed privately or publicly and reviewed by the city through the
standard development process as they become available.
Item 3: Details will be provided regarding the location, size, and species of existing
street trees and reviewed by the city through the standard development process
as they become available.
Item 4: Details will be provided regarding the location of existing and proposed
streetlights and reviewed by the city through the standard development process
as they become available.
Item 5: Utility plans will be provided on individual projects and reviewed by the city
through the standard development process as they become available.
.14 Street and Public Access Way Requirements
Item 1: Exhibit D Trip Generation Estimate Report contains the estimated number of peak
hour trips based on the proposal.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 45
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Item 2: Per EC 9.6850 through 9.6870, the classification of all streets in the vicinity of the
project site are as follows: Franklin Boulevard, major arterial; Millrace Drive, local
street; and Riverfront Parkway, a local street.
Item 3: Details will be provided regarding potential slope easements and reviewed by the
city through the standard development process as they become available. The
project site contains no potential slope easements. This item is not required on the
site plan.
Item 4: Details will be provided regarding a street center profile using ground elevations and
reviewed by the city through the standard development process as they become
available. The project site contains no potential slope easements. This item is not
required on the site plan.
Item 5: Details will be provided regarding alterations to right-of-ways and paving of existing
streets and intersections and reviewed by the city through the standard
development process as they become available.
Item 6: Details will be provided regarding existing and proposed curbs and sidewalks on-
site and adjacent to the project site and reviewed by the city through the standard
development process as they become available.
Item 7: The proposed development does not alter existing street connectivity, therefore
illustration of street connectivity, and applicable street connectivity standards are
not required.
Item 8: Details will be provided regarding illustrations of Vision Clearance Areas and
reviewed by the city through the standard development process as they become
available.
Item 9: The proposed development will not alter access for secondary emergency vehicles.
Item 10: Sheet L02 Site Plan (Exhibit A) shows the street names for all existing streets, both
public and private, in accordance with EC 9.6855.
Item 11: The proposed development does not alter streets surrounding the site, therefore
illustration of the radii of all curves on the site plan is not required.
Item 12: The project does not propose transit-related facilities (e.g., bus stops, park and ride
stations, or transit stations), but the site is in proximity to an EmX transit station on
Franklin Boulevard.
Item 13: The street grade atÄand in the vicinityÄof the project site does not exceed 12
percent.
Item 14: Sheet L02 Site Plan (Exhibit A) shows no existing private access driveways to the
project site. The property does not front a street under Lane County jurisdiction.
Accordingly, the driveway locations for adjacent properties are not required
elements of the site plan.
Item 15: No special setbacks in accordance with EC 9.6750 apply to the project site.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 46
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
.15 Supporting Analysis and Documents
Item 1: A Geotechnical Analysis will be provided on individual projects and reviewed by
the city through the standard development process as they become available.
Item 2: A wetland determination from the ODSL and wetland delineation report will be
provided on individual projects and reviewed by the city through the standard
development process.
Item 3: A legal description of the property, suitable for recording and typed and on 8.5Æ
by 11Æ white sheet of paper with no letterhead, is provided as Exhibit F.
7.2 Willamette Greenway Permit
.1 Filing Fee
The application review fee of $4,813.44 is included with the initial submittal.
.2 Submittal Format Requirements
Three (3) print copies and one (1) electronic copy of the written statement and exhibits are
provided as part of this submittal and are folded to 11Æ by 17Æ or smaller, where applicable.
Findings of compliance with applicable criteria at EC 9.3725, S-SP Riverfront Park Special Area
Zone Approval Criteria, and EC 9.8815, Willamette Greenway Permit Approval Criteriaare provided
in Sections 6.1 and 6.2.
.3 Written Statement
A detailed written statement describing how this request is consistent with all applicable criteria
(Section 9.8815 of the Eugene Code) is provided in Section 6 Approval Criteria and Standards. No
adjustments are requested.
.4 Property Review Checklist
A Public Works Property Review Checklist is not applicable to the request.
.5 General Site Plan Requirements
Item 1: The location of the Willamette River ordinary low water line and the distance from
the proposed development is shown on Sheet L02 Site Plan (Exhibit A), along with
the Greenway Boundary line.
Item 2: Sheet G00 Cover Sheet (Exhibit A) includes a vicinity map.
Item 3: Sheet L02 Site Plan (Exhibit A) shows the current building footprints and the
location of existing and possible proposed structures.
Item 4: A tabulation of coverage, including the amount of area covered by building(s),
parking, and the amount of area devoted to open space will be provided on
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 47
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
individual projects and reviewed by the city through the standard development
process as they become available.
Item 5: Details will be provided regarding elevation drawings that portray the scale and
appearance of proposed buildings and reviewed by the city through the standard
development process as they become available.
Item 6: Details will be provided regarding all proposed grading for streets, building areas,
and other proposed development and reviewed by the city through the standard
development process as they become available.
Item 7: Date, north arrow, and standard scale are included on multiple sheets of the Plan
Set (Exhibit A).
Item 8: The AssessorÈs Map and tax lot numbers applicable to the project are shown on
Sheet G000 Cover Sheet (Exhibit A).
.6 Landscaping and Vegetation
Item 1: Details will be provided regarding location, species and size of existing vegetation
and reviewed by the city through the standard development process as they
become available.
Item 2: Details will be provided regarding a proposed landscaping scheme and reviewed by
the city through the standard development process as they become available.
Item 3: Details will be provided regarding irrigation and reviewed by the city through the
standard development process as they become available.
Item 4: Sheet L02 Site Plan (Exhibit A) shows proposed open space. Details will be
provided regarding landscaping for open space and reviewed by the city through
the standard development process as they become available.
Item 5: Details will be provided regarding size and species of existing trees on site that are
8 inches or more in diameter at DBH and reviewed by the city through the standard
development process as they become available.
.7 Significant Fish and Wildlife Habitat
Item 1: There are several existing significant fish and wildlife habitats noted on the site
(as required by Section 9.8815(5) of the Eugene Code) and are detailed in the
(Exhibit B).
Riparian Assessment and Management Report
Item 2: Details will be provided regarding specific locations of these habitats and reviewed
by the city through the standard development process as they become available. A
broad overview of sites habitats is provided on Sheet L02 Site Plan (Exhibit A).
Item 3: Details will be provided regarding specific locations of these habitats and reviewed
by the city through the standard development process as they become available. A
broad overview of sites habitats is provided on Sheet L02 Site Plan (Exhibit A).
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 48
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
.8 Public Access -- Parking Area Development
Item 1: Details will be provided regarding location, number, and dimensions of existing and
proposed parking spaces, including aisle widths and disabled parking spaces and
reviewed by the city through the standard development process as they become
available.
Item 2: Details will be provided regarding location, dimensions, and number of bicycle
parking spaces, including long-term and short-term bicycle parking, and reviewed
by the city through the standard development process as they become available.
Item 3: Details will be provided on individual projects regarding proposed landscaping
and screening for parking areas and reviewed by the city through the standard
development process as they become available.
Item 4: Details will be provided on individual projects regarding curbs and other means
of protecting landscaping and reviewed by the city through the standard
development process as they become available.
Item 5: Details will be provided on individual projects regarding height and location of
parking area lighting and reviewed by the city through the standard development
process as they become available.
Item 6: Details will be provided on individual projects regarding designated carpool and
vanpool parking spaces for developments with 20 or more employees and
reviewed by the city through the standard development process as they become
available.
.9 Wastewater Requirements
Item 1: Details will be provided on individual projects regarding location and flow line
elevation of the existing public wastewater sewer at proposed connection point(s)
and reviewed by the city through the standard development process as they
become available.
Item 2: Existing and possible future wastewater sewer layout is shown on Sheet C02
Sanitary Sewer Plan (Exhibit A).
.10 Water Supply
Item 1: Diameter of existing and possible future water main is shown on Sheet C03 Water
Supply Plan (Exhibit A).
Item 2: Details will be provided on individual projects regarding existing and proposed fire
hydrants and reviewed by the city through the standard development process as
they become available.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 49
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
.11 Contour Intervals
Item 1: One-foot contour intervals for ground slopes up to five percent will be provided on
individual projects and reviewed by the city through the standard development
process as they become available.
Item 2: Two-foot contour intervals for ground slopes between five and ten percent will be
provided on individual projects and reviewed by the city through the standard
development process as they become available.
Item 3: Five-foot contour intervals for ground slopes exceeding ten percent will be provided
on individual projects and reviewed by the city through the standard development
process as they become available.
Item 4: Bench marks used will be provided on individual projects and reviewed by the city
through the standard development process as they become available.
Item 5: Existing vegetation to be preserved shall be shown on contour map and will be
provided on individual projects and reviewed by the city through the standard
development process as they become available.
.12 Storm Drainage Requirements
Item 1: Details will be provided on individual projects regarding location and flow line
elevation of the existing piped public system at proposed connection point(s) and
reviewed by the city through the standard development process as they become
available.
Item 2: Details will be provided on individual projects regarding existing and proposed
storm drainage, including disposition of stormwater for all lots and reviewed by the
city through the standard development process as they become available.
Item 3: Details will be provided on individual projects regarding a description of the
extent to which a watercourse will be altered or relocated as a result of proposed
development, including a stormwater analysis of pre- and post-development
flows, and reviewed by the city through the standard development process as
they become available.
Item 4: Bench mark used will be provided on individual projects and reviewed by the city
through the standard development process as they become available.
Item 5: A stormwater analysis (3 copies) will be provided on individual projects regarding
any contributing stormwater runoff to a drainage-way that addresses the
capacity and any erosion issues of the downstream system, and reviewed by the
city through the standard development process as they become available.
Item 6: Details will be provided on individual projects regarding areas subject to Federal
Emergency Management Agency (FEMA) regulations regarding inundations or
stormwater overflow, all areas covered by water, and the location, width, and
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 50
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
direction of flow of all water courses and the base flood elevation, and reviewed by
the city through the standard development process as they become available.
.13 Public Access -- Circulation
Item 1: Details will be provided on individual projects regarding traffic circulation and
width of travel lanes, and will be reviewed by the city through the standard
development process as they become available.
Item 2: Details will be provided on individual projects regarding location and dimension
of existing and proposed curb cuts, and will be reviewed by the city through the
standard development process as they become available.
Item 3: Existing and proposed pedestrian walkways and bicycle paths (including
dimensions) and how they connect with adjacent properties are shown on Sheet
L03 Pedestrian and Bicycle Primary Circulation Plan.
Item 4: Details will be provided on individual projects regarding location and dimension
of public sidewalks, and will be reviewed by the city through the standard
development process as they become available.
Item 5: Existing and proposed public access connections to, and along, the Willamette
River are shown on Sheet L02 Site Plan (Exhibit A).
.14 Supporting Analysis and Documents
Item 1: A Geotechnical Analysis will be provided on individual projects and reviewed by
the city through the standard development process as they become available.
Item 2: A wetland determination from the ODSL and wetland delineation report will be
provided on individual projects and reviewed by the city through the standard
development process as they become available.
Item 3: A legal description of the property included in this application is provided in
Exhibit F. The legal description is typed on an 8" x 11" white sheet of paper so
that it is suitable for recording.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 51
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
This page is intentionally left blank.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 52
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
8.0 APPROVAL CRITERIA & STANDARDS
Under Oregon Revised Statute (ORS) 352, the university has broad authority with respect to the
property it owns and controls. As noted previously, this application is a request for City of Eugene
Conditional Use and Willamette Greenway permit approval in accordance with the review
procedures and approval criteria at EC 9.3725 and EC 9.8815. The approval criteria are provided
in text with findings describingcompliance with each stated criteria in plain text. The findings
bold
demonstrate that the proposal conforms to all applicable criteria and standards.
8.1 S-RP Riverfront Park Special Area Zone Approval Criteria (EC 9.3725)
EC 9.3725 S-RP Riverfront Park Special Area Zone Review Procedures. The master site
plan for developments proposed within the S-RP zone shall be reviewed
through the conditional use permit process provided in this land use code. For
the purpose of this review, the following criteria shall be applied in lieu of the
criteria provided in EC 9.8090 Conditional Use Permit Approval Criteria -
General:
(1) Criteria for all Development.
(a) The proposed development shall be consistent with the
Metropolitan Area General Plan, Riverfront Park Study, and other
applicable policy documents or functional plans.
Metropolitan Area General Plan
The Metropolitan Area General Plan (Metro Plan) was amended in 1985 through adoption of
Ordinance No. 19348 which established the land use classification of as
ÅUniversity/ResearchÆ
follows:
ÅThis category represents property which is located in proximity to the University of Oregon
campus. It is primarily intended to accommodate light industrial, research and
development, and office uses related to activities, research and programs of the University
of Oregon. The designation also allows for mixed use development, including a limited
range of retail and service uses and multiple-family dwellings. Commercial activities in this
category are intended to serve the day-to-day needs of employees working in and near
University/Research areas. Activities, such as general retail and office, will continue to be
located in other appropriately designated areas.Æ
Ordinance No. 19348 applied the classification to the subject property
ÅUniversity/ResearchÆ
included in this application. Following adoption of the Metro Plan amendment, the City of Eugene
adopted Ordinance No. 19470 in 1987, which established the Riverfront Park Special Area Zone
(S-RP), to guide development of the subject property. The primary uses permitted within the zone
are programs and activities carried out by institutions of the Oregon State System of Higher
Education and facilities for basic or applied research and development that complement the
research and educational activities of the Oregon State System of Higher Education. The Oregon
State System of Higher Education, also known as the Oregon University System (OUS), was
disbanded in 2015 by Senate Bill 80. In July of 2013, the State Legislature passed Senate Bill 270,
which allowed the University of Oregon to establish an independent governing board separate and
distinct from the State Board of Higher Education. As provided for in Section 171 of Senate Bill
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 53
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
270, all references to the Oregon State System of Higher Education shall be considered references
to the University of Oregon.
The application does not involve a Metro Plan amendment. The following findings address the
consistency of the application with applicable policies of the Metro Plan to demonstrate that
adoption of the Conditional Use Permit will not make the Metro Plan internally inconsistent.
The findings only address policies that apply to the proposal, and do not discuss those portions of
the Metro Planthat (1) apply to land uses other than the current designations for the subject
property, or (2) clearly apply only to specific development applications (e.g., site plan review
submittals or subdivisions). All Metro Plan policies were evaluated in consideration of their
applicability to the Conditional Use Permit and the following policies were found to be applicable
to the proposal. The findings demonstrate how the application is consistent with, and are in fact
supported by the policy directions contained in the Metro Plan.
Environmental Resources Element
Riparian Corridors, Wetlands, and Wildlife Habitat (Goal 5)
C.12. Property owners may pursue efforts to protect natural vegetation and
wildlife habitat areas on their land to conserve these areas, e.g.,
through conservation easements, public acquisition, donation, land
trusts, etc.; and local governments are encouraged to assist in these
efforts.
The property owner, University of Oregon, is a public institution. Therefore, conservation
easements, public acquisition, donation, land trusts, etc. as specific tools are not necessary to
protect natural vegetation and wildlife habitat. The
Riparian Assessment and Management Report
prepared by Mason, Bruce & Girard (Exhibit B) outlines key species of interest and mechanisms for
conserving crucial habitat by incorporating ecological, riparian restoration, and conservation
techniques along the riverbank. Other than the listed seven sensitive aquatic species and nine rare
species in the report, there are no other documented occurrences of sensitive or rare wildlife
species within the subject site. Per the report findings, the site contains the appropriate aquatic,
upland, and riparian habitat to support all eight of the rare species listed. However, significant on-
site habitat for riverbank species is limited to the riparian corridor and is shown on Sheets L02 and
S01 Site Plan and Existing Conditions (Exhibit A). Additional measures that can improve the
habitat and subsequent proliferation of historically-present species, as well as generally improve
the river corridor include large-scale invasive plant removal, and removal of concrete riprap along
the shoreline. The report found that vegetated riparian areas reduce the speed and intensity of
floodwaters by providing resistance to flows, which in turn reduces downstream flooding and
fosters riverbank habitat. However, areas that perform these functions within the development site
were found to be historically reduced to narrow strips along the river, reducing flood storage
function and habitat. In order to improve these functions, the Applicant seeks to incorporate as
many applicable restoration techniques as possible as funding becomes available.
In addition, all parcels within the subject site that abut the Willamette River have /WR Water
Resource Conservation overlay zoning. Pursuant to EC 9.4920(1)(c)(1.), Category A streams with a
distinguishable high bank have a 100 foot setback applied to top of bank (TOB) as part of the /WR
overlay zoning. The proposal does not change protections established by the 100-foot /WR
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 54
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
conservation setback in EC 9.4920(1)(c)(1.) or affect inventoried Goal 5 Resources such as water or
natural vegetation. According to the provisions at EC 9.3715(2)(a), the Applicant could propose
development, including structures, parking areas, streets, and access drives, beginning at 35 feet
from the top of bank of the river. However, as illustrated on Sheet L01 Regulatory Plan (Exhibit A),
the proposal includes a required 100-foot conservation setback extending from the Willamette
River and Millrace top of bank lines. Further, the Applicant proposes a conservation setback of
200-feet for buildings and recreational fields along most of the length of the property, as shown on
Sheet L01 Regulatory Plan. It is important to note that since this 200-foot setback is determined
from the top of bank, the setback equates to 250-300 feet as measured from the waterÈs edge.
Based on the above findings, this standard is satisfied.
C.13. Wetland, riparian corridor, or wildlife habitat sites inside the UGB
identified after adoption of the applicable Goal 5 inventory of significant
sites, that have not been previously considered for inclusion in the
inventory, shall be addressed in the following manner:
a. The jurisdiction within which the natural resource is located shall
study the site according to the requirements in the Goal 5
administrative rule.
b. Upon the completion of the study, the affected jurisdiction shall
determine whether the identified natural resource is significant
according to the adopted significance criteria of the affected
jurisdiction.
c. If the newly identified site is determined significant, the affected
jurisdiction shall complete the Goal 5 requirements for the site,
which includes adoption of protection measures for sites
identified for protection.
d. The affected jurisdiction will notify affected property owners and
interested parties throughout the process.
In prepared by Mason, Bruce & Girard (Exhibit
The Riparian Assessment and Management Report
B), MB&G identified several wetlands and oak savannah not included in the inventory that are
candidates for inclusion.
C.16. The map titled Goal 5 Significant Wildlife Habitat for the area inside the
Metro Plan Boundary and outside the UGB, dated January 2004,
adopted and incorporated here, shall be used to identify significant
wildlife habitat for purposes of notifying the Oregon Department of Fish
and Wildlife concerning applications for development permits or other
land use decisions affecting significant wildlife habitat on the Goal 5
inventory for areas outside the UGB and inside the Plan Boundary. The
map is on file at the Lane County Land Management Division.
The map titled Goal 5 Significant Wildlife Habitat was consulted to identify significant wildlife
habitat. The city has the ability to notify Oregon Department of Fish and Wildlife concerning
applications for development permits or other land use decisions affecting significant wildlife
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 55
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
habitat on the Goal 5 inventory. However, the subject site is inside the UGB and not between the
UGB and Metro Plan boundary. Therefore, this standard does not apply.
C.17. The map titled Goal 5 Significant Riparian Corridors for the area inside
the Metro Plan Boundary and outside the UGB, dated January 2004,
adopted and incorporated here, shall be used to identify significant
riparian corridors for purposes of applying Goal 5 riparian protection
provisions in Lane Code Chapter 16 for areas outside the UGB and
inside the Plan Boundary. The map is on file at the Lane County Land
Management Division.
The map titled was consulted to identify
Goal 5 Significant Riparian Corridors significant riparian
. However, the subject site is inside the UGB and not between the UGB and Metro Plan
corridors
boundary. Therefore, this standard does not apply.
Open Space (Goal 5)
C.21. When planning for and regulating development, local governments shall
consider the need for protection of open spaces, including those
characterized by significant vegetation and wildlife. Means of
protecting open space include but are not limited to outright
acquisition, conservation easements, planned unit development
ordinances, streamside protection ordinances, open space tax
deferrals, donations to the public, and performance zoning.
The Willamette River and its associated bank are key habitat for vegetation and wildlife, and must
be preserved accordingly. To align with these values, the proposal seeks to incorporate as much
conservation area and open space as practicable, and support existing wildlife and vegetation
habitat along the river through targeted development and restoration and enhancement
recommendations.
The subject site is 77 acres, and includes 5,125 lineal feet of frontage along the Willamette River.
Of these 77 acres, 31 acres, or 40% of the site acreage, is proposed for conservation and riparian
restoration. Of the 42 acres between the railroad tracks and river, 25 acres, or 60% of the site
acreage, is proposed for conservation and riparian restoration. More explicitly, this includes the
required conservation area setback along the Willamette River within the site of 100 feet from top
of bank. In addition, the Applicant proposes a conservation setback of 200-feet for buildings and
recreational fields along most of the length of the property, as shown on Sheet L01 Regulatory
Plan (Exhibit A). This 200-foot setback is determined from the top of bank; when measure from
the waterÈs edge, this setback equates to 250-300 feet. This would increase the size of the total
area dedicated to conservation to approximately 31 acres, which the university would restore as
funds are available and for which it would implement best maintenance practices for managing
riparian areas, consistent with the universityÈs existing Integrated Pest Management Plan.
The Applicant has established a Regulatory Plan, Sheet L01 Regulatory Plan Exhibit A, that applies
more self-imposed, stringent development regulations than is required by code in order to facilitate
restoration, open space improvements, and for viewsheds to be protected. For example, the
Applicant has established regulations regarding maximum building coverage. North of the tracks,
the Applicant is proposing maximum building coverages well below what is allowed by the code.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 56
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
The applicable S-RP zone states thatat least 40% of the portion of the development site shall be
landscaped with living plant materials, requiring the building coverage and site elements to be
contained within 60% of the development site (implying an allowed building coverage of 40% to
50%). To the west of the Millrace (Area 4), the Applicant proposes a maximum building coverage
of 15%; to the east of Riverfront Parkway (Area 6), the Applicant proposes a maximum building
coverage of 16%. Between the Millrace and the Riverfront Parkway (Area 5), the Applicant
proposes a maximum building coverage of 0.5%, and maximum field coverage of 47%. The
maximum building coverage south of the tracks is proposed to comply with existing S-RP
coverage standards. Through complying with maximum building coverage significantly under that
allowed by code, the Applicant demonstrates a clear commitment to preserving open space to the
greatest extent practicable.
In addition, the Applicant has established maximum building heights north of the tracks that are
well below the code allowance. The applicable S-RP zone states that there is no height limitation
for a structure outside 75 feet of the top of the south bank of the Willamette River. As the
Applicant proposes that all development occur outside the 100-foot setback (and most buildings
occur outside a 200-foot setback), theoretically no building height maximums are applicable by
code. The applicant proposes a 45-foot maximum building height to the west of the Millrace (Area
4), and 37 feet east of Riverfront Parkway (Area 6). In the land between the Millrace and Riverfront
Parkway (Area 5), the applicant is proposing a 15-foot height limit to allow for the potential
construction of recreation and outdoor classroom support facilities. For areas south of the tracks,
the Applicant has established a maximum building height of 85 feet, which would allow for a range
of building heights similar to campus buildings across Franklin Boulevard.
These regulations are a commitment to preserving the ecological integrity of the site. By imposing
stringent limitations on building coverage and building height north of the tracks, the Applicant
demonstrates a commitment to protecting open space and shifting more concentrated
development south of the tracks, which was favored and confirmed through internal and external
outreach.
Outside of development regulations imposed by the Applicant, it is important to note that the siteÈs
preservationis also supplemented by additional state regulations. The Willamette River adjacent
to the development site is identified as a Goal 5 Water Resource. The Willamette River is a
Category A resource, meaning it is designated for protection with a 100-foot conservation setback.
In addition, the development site contains a Category A Wetland, labeled site WR-4 on the Goal 5
Inventory. This Riverfront Park/Millrace wetland requires a conservation setback of 50 feet. Both
of these setbacks have been incorporated in the Master Site Plan by the Applicant on Sheet L01
Regulatory Plan (Exhibit A). In addition, protection of significant riparian vegetation is ensured
through existing established /WR protection provisions in EC 9.4900-9.4980, which are not
affected by the proposal.
As shown on Sheet L01 Regulatory Plan (Exhibit A), the regulations dedicate significant acreage to
conservation and riparian restoration, imposes stringent limitations on development north of the
tracks to maximize riparian restoration and open space opportunities, which will result in a
significant increase in the amount of accessible landscape and recreational open space areas
within the subject site. Based on these findings, the proposal is consistent with Policy C.21.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 57
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Natural Hazards (Goal 7)
C.31. When development is allowed to occur in the floodway or floodway
fringe, local regulations shall control such development in order to
minimize the potential danger to life and property. Within the UGB,
development should result in in-filling of partially developed land.
Outside the UGB, areas affected by the floodway and floodway fringe
shall be protected for their agricultural and sand and gravel resource
values, their open space and recreational potential, and their value to
water resources.
The subject property is located within the UGB. Portions of the subject property adjacent to the
Willamette River are located within the FEMA regulated floodway and floodplain, as shown in
Sheet S01 Existing Conditions (Exhibit A). The proposal does not advance development in ways
that are inconsistent with current standards nor does it modify or exempt existing regulatory
protection measures. By choosing to provide a riparian enhancement setback of 200 feet from the
top of bank for buildings and fields where practicable, the proposal appropriately considers the
impacts of potential flooding.
In addition, by incorporating ecological and riparian restoration techniques along the riverbank,
flooding impacts can be mitigated. More explicitly, the
Riparian Assessment and Management
prepared by Mason, Bruce & Girard found that vegetated riparian areas reduce the speed
Report
and intensity of floodwaters by providing resistance to flows, which in turn reduces downstream
flooding and leads to effective flood storage. However, areas that perform these functions within
the development site were found to be historically reduced to narrow strips along the river,
reducing flood storage function. In order to improve these functions, the Applicant seeks to
incorporate as many applicable restoration techniques as possible as funding becomes available.
Two techniques proposed in the report include large-scale invasive plant removal, and removal of
concrete riprap along the shoreline. Both of these techniques can aid flood storage capacity.
The proposal also supports the need to infill partially developed land by providing the additional
services needed by the University in a more cohesive and organized way on a site that is
connected to public utilities. Based on these findings, the proposal is consistent with Policy C.31.
Willamette River Greenway, River Corridors, and Waterways Element
D.2. Land use regulations and acquisition programs along river corridors
and waterways shall take into account all the concerns and needs of
the community, including recreation, resource, and wildlife protection;
enhancement of river corridor and waterway environments; potential
for supporting non-automobile transportation; opportunities for
residential development; and other compatible uses.
Accounting for the needs and concerns of the community are at the foundation of the proposal
and land use process. The ApplicantÈs proposal addresses recreation, resource, and wildlife
protection; enhancement of river corridor and waterway environments; emphasis on supporting
non-automobile transportation; opportunities for residential development; and other compatible
uses.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 58
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Facilitating recreation, resource, and wildlife protection is at the forefront of this proposal. In
addition to findings presented in C.21 and D.2, incorporated by reference herein, the Applicant
takes considerable care to expand recreational opportunities for the general public, and increase
support for wildlife habitat. More explicitly, the proposal includes two options for realigning the
Ruth Bascom Riverbank Path, which runs east-west through the subject site. In order to enable
realignment of the path, the proposal provides options for locating the path along the river,
spanning the Millrace Slough, extending under Frohnmayer Bridge, and enabling a future east
extension; or, along the northern extents of the proposed development sites, utilizing the existing
crossing over the Millrace Slough, and connecting to Riverfront Parkway, Millrace Drive, and
Garden Avenue. Either option provides for improved public access to the riverfront, and enhanced
outdoor recreation opportunities.
Also, the proposal will increase the amount of recreation capacity within downtown and the
riverfront area by providing recreational fields, and expanded access to the river for passive
recreation, fishing, swimming, and launching personal paddle crafts. While the current proposal
does not include specific plans for residential development, this does not preclude residential
development for student housing from being included on the site at a future time.
In order to support wildlife, the proposal draws from the findings of the
Riparian Assessment and
(Exhibit B), which found several key sensitive aquatic species, and rare
Management Report
species historically documented within one mile of the site:
Sensitive Aquatic Species
Chinook salmon () Ã federally threatened (Federal ESA)
Oncorhynchus tshawytscha
Chinook salmon () Ã federally threatened (Federal ESA)
Oncorhynchus tshawytscha
Steelhead ()
Oncorhynchus mykiss
Steelhead ()
Oncorhynchus mykiss
White sturgeon ()
Acipenser transmontanus
Western brook lamprey ()
Lampetra richardsoni
Pacific lamprey () Ã species of concern (Federal ESA)
Lampetra tridentate
Rare Species (ORBIC)
Western pond turtle () Ã sensitive critical (State ESA)
Actinemys marmorata
Retrorse sedge ()
Carex retrorsa
Painted turtle () Ã sensitive critical (State ESA)
Chrysemys picta
Townsend's big-eared bat () Ã sensitive critical (State ESA)
Corynorhinus townsendii
Bald eagle () Ã sensitive vulnerable (State ESA)
Haliaeetus leucocephalus
Bradshaw's lomatium () Ãendangered (State ESA)
Lomatium bradshawii
Oregon chub () Ã sensitive critical (State ESA)
Oregonichthys crameri
Bull trout (Coastal population) () Ã sensitive critical/vulnerable (State ESA)
Salvelinus confluentus
There are no other documented occurrences of sensitive or rare wildlife species within the subject
site. Per the report findings, the site contains the appropriate aquatic, upland, and riparian habitat
to support all eight of the rare species listed above. However, significant on-site habitat for
riverbank species is limited to the riparian corridor and is shown on Sheets L02 and S01 Site Plan
and Existing Conditions (Exhibit A). Additional measures that can improve the habitat and
subsequent proliferation of historically-present species, as well as generally improve the river
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 59
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
corridor include the aforementioned restoration techniques as described in the findings for Policy
C.31.
In order to support non-automobile transportation, the ApplicantÈs proposal provides for the
aforementioned realignment of the bike path, as well as several potential crossings of the railroad
tracks, the Millrace, and Franklin Boulevard, to improve circulation on the site, as shown onSheet
L03 Pedestrian and Bicycle Primary Circulation Plan (Exhibit A). These crossings serve to provide
better access from Franklin Boulevard into the site, or across the railroad tracks. While the exact
locations of these crossings are to be determined based on future development, adding crossings
will foster a safer and more accessible pedestrian and cyclist environment. Based on these
findings, the proposal is consistent with Policy D.2.
D.3. Eugene, Springfield, and Lane County shall continue to cooperate in
expanding water-related parks and other facilities, where appropriate,
that allow access to and enjoyment of river and waterway corridors.
This policy is aimed at intergovernmental cooperation between Eugene, Springfield, and Lane
County to expand parks, other facilities, and public access opportunities. The university has a
long history of collaboration with local entities, and anticipates the continuation of these
partnerships as applicable to this proposal. As such, the proposal is consistent with Policy D.3.
D.5. New development that locates along river corridors and waterways
shall be limited to uses that are compatible with the natural, scenic,
and environmental qualities of those water features.
The proposal envisions a restored river edge that celebrates the universityÈs connection to the
river. The proposal dedicates a minimum of 23 acres to conservation and an additional 7 acres to
allow for expanded riparian restoration. The proposal increases educational and recreational
access to the river, increases active recreation opportunities, and extends the development of
campus across Franklin Boulevard while concentrating the development south of the railroad
tracks.
Primary resources utilized to inform the proposal include EugeneÈs Goal 5 Inventory and Water
Resources Conversation Plan and the prepared by
Riparian Assessment and Management Report
Mason, Bruce & Girard. As noted previously, the Applicant proposes a regulation structure for
proposed development that exceeds the requirements of city code in order to preserve the
environmental quality of the site. The proposal operates under the development criteria permitted
in the S-RP Zone as a determinant for allowable uses on the subject site. Notably, the S-RP Zone
includes height standards that restrict the maximum height of buildings as development
approaches the Willamette River, thus limiting the scale of buildings near the resource. The
maximum height of buildings in the S-RP zone is 45 feet when located within 75 feet of the top of
the south bank of the Willamette River. Otherwise, no height limit applies. By proposing a setback
of 200-feet for buildings and recreational fields along most of the length of the property, as shown
on Sheet L01 Regulatory Plan, the Applicant is naturally retaining scenic viewsheds. Finally, per
EC 9.3710 S-RP Riverfront Park Special Area Zone Permitted Uses, the development site allows
programs and activities carried out by institutions of the Oregon State System of Higher Education
outright as a primary use. Given this finding, the Applicant is acting in accordance with city code,
while seeking to incorporate environmental considerations to the greatest extent practicable.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 60
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
By enabling realignment of the bike path, undertaking riparian restoration as feasible, and
providing more safe and clear means of access to the river, the proposal ultimately seeks to
improve the natural and scenic qualities of the river, and respect the environmental quality of the
site. Based on these findings, the proposal is consistent with Policy D.5.
D.6. New industrial development that locates along the Willamette and
McKenzie Rivers shall enhance natural, scenic, and environmental
qualities.
The proposal does not include new industrial development, and such development is not
anticipated. Therefore, Policy D.6. is addressed to the greatest extent practicable.
D.8. Within the framework of mandatory statewide planning goals, local
Willamette River Greenway plans shall allow a variety of means for
public enjoyment of the river, including public acquisition areas,
residential areas, and commercial areas.
D.9. Local and state governments shall continue to provide adequate public
access to the Willamette River Greenway.
Through extensive public involvement feedback, the proposal seeks to enhance the publicÈs
physical access to the river by addressing several key goals: improving the ecological quality of
the site, increasing public safety, improving ease of access to the river through provision of public
facilities (bike path, a personal paddle craft launch, swimming docks, soft trails, viewpoints, etc.),
and expand scenic views. The Willamette Greenway Criteria (EC 9.8815) findings, presented in
Section 5.2, detail all of the ways in which this proposal provides for public enjoyment of the river.
The proposal provides a variety of site components, such as a realigned multi-modal path along
the river, designated pathways with benches to improve pedestrian access to the river bank, and
river access for boats, swimmers, and fishing.
The subject site is also entirely within the city limits. The Applicant owns all parcels within the
subject site. Existing public access along the Willamette River is provided by the Ruth Bascom
Riverbank Path, a paved multi-use path that extends through the subject site. As noted, the
proposal includes two options for realigning the bike path, which runs east-west through the
subject site. The proposal provides options for locating the path along the river, spanning the
Millrace Slough, extending under Frohnmayer Bridge, and enabling a future east extension; or,
along the northern extents of the proposed development sites, utilizing the existing crossing over
the Millrace Slough, and connecting to Riverfront Parkway, Millrace Drive, and Garden Avenue.
Either option provides for improved public access to the riverfront, and enhanced outdoor
recreation opportunities. As illustrated on Sheets L01 and L03 Regulatory Plan and Pedestrian
and Bicycle Primary Circulation Plan (Exhibit A), the proposal connects the bike path throughout
the site, while providing for a consistent multi-use path that provides ample landscape and open
space between the path and the river. Per EC 9.3710 S-RP Riverfront Park Special Area Zone
Permitted Uses, this development site is designated for Åprograms and activities carried out by
institutions of the Oregon State System of Higher Education.Æ As such, the universityÈs status as a
public institution ensures the continued provision of public access along the Willamette River.
Overall, the proposal ensures the continued provision of adequate public access along the river.
Based on these findings, the proposal is consistent with Policies D.8 and D.9.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 61
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Environmental Design Element
E.2. Natural vegetation, natural water features, and drainage-ways shall be
protected and retained to the maximum extent practical. Landscaping
shall be utilized to enhance those natural features. This policy does not
preclude increasing their conveyance capacity in an environmentally
responsible manner.
E.4. Public and private facilities shall be designed and located in a manner
that preserves and enhances desirable features of local and
neighborhood areas and promotes their sense of identity.
E.5. Carefully develop sites that provide visual diversity to the urban area
and optimize their visual and personal accessibility to residents.
As noted, the university is applying the required conservation area setbacks for both the
Willamette River, and the Millrace, and additional setback for the Willamette River and Millrace
Outfall, and will implement riparian restoration strategies as funding becomes available.
The proposal incorporated the feedback and input of many community members, who attended
several meetings regarding the project (see K.3). Throughout the public involvement process, the
proposal evolved in response to input, as demonstrated by the Community Open House Materials
included as Exhibit J. As such, many community members reported that the proposal enhanced
desirable features of their community, by increasing public safety and improving access to the
riverfront.
The proposal is designed to facilitate recreational, pedestrian-friendly redevelopment. As
illustrated on Sheets L02 and L05 Site Plan and Service Vehicle Primary Circulation Plan (Exhibit
A), the proposal will result in open recreational space, enhanced riparian areas adjacent to the
Willamette River, and expanded outdoor educational uses. The proposal does not change or
affect existing /WR overlay zone protections established in EC 9.49(1)(c)(1.) and other applicable
protection measures and development standards.
In addition, development standards in the S-RP Zone are site-specific and designed to be
compatible with the surrounding areas. The S-RP Zone includes development standards that
regulate building height and form as well as circulation patterns and view corridors, which are
designed to ensure compatibility with adjacent properties and protection of the Willamette River
Greenway. The proposal complies with S-RP Zone development standards and enforces even
more stringent requirements.
It is important to note that the University of Oregon has its own regulatory structure regarding
development and project design on campus. This structure includes abiding by the policies and
standards in the , and an extensive Campus Planning Committee design review
Campus Plan
process. The incorporates more stringent and refined requirements for urban design
Campus Plan
elements than the Eugene Code, which have been translated into clear and objective development
standards. The design elements within the are intended to facilitate the
Campus Plan
redevelopment vision of this proposal. Based on these findings, the proposal is consistent with
Policies E.2 through E.5.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 62
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Transportation Element
Land Use
F.3. Provide for transit-supportive land use patterns and development,
including higher intensity, transit-oriented development along major
transit corridors and near transit stations; medium- and high-density
residential development within mile of transit stations, major transit
corridors, employment centers, and downtown areas; and development
and redevelopment in designated areas that are or could be well served
by existing or planned transit.
F.4. Require improvements that encourage transit, bicycles, and
pedestrians in new commercial, public, mixed use, and multi-unit
residential development.
The subject site is located in proximity to the downtown core and major transit corridors along
Franklin Boulevard. The proposal involves improved connection to the Ruth Bascom Riverbank
Path and development standards proposed through the S-RP Zone that encourage transit, bicycle,
and pedestrian use within the development. Therefore, the proposal is consistent with Policies F.3
and F.4.
Transportation System Improvements: Bicycle
F.22. Construct and improve the regionÈs bikeway system and provide bicycle
system support facilities for both new development and
redevelopment/expansion.
F.24. Require bikeways to connect new development with nearby
neighborhood activity centers and major destinations.
As noted, existing public access along the Willamette River is provided by the Ruth Bascom
Riverbank Path, a paved multi-use path that spans the extent of the subject site. More explicitly,
the proposal includes two options for realigning the Ruth Bascom Riverbank Path, which runs
east-west through the subject site. The proposal provides options for locating the path along the
river, spanning the Millrace Slough, extending under Frohnmayer Bridge, and enabling a future
east extension; or, along the northern extents of the proposed development sites, utilizing the
existing crossing over the Millrace Slough, and connecting to Riverfront Parkway, Millrace Drive,
and Garden Avenue. Either option provides for improved public access to the riverfront, and
enhanced outdoor recreation opportunities, as illustrated on Sheets L02 and L05 Site Plan and
Service Vehicle Primary Circulation Plan (Exhibit G Plan Set).
Provisions of the S-RP Zone ensure high-quality public amenities along the riverfront including
bike parking, ample setbacks to preserve the riverbank and natural areas, adequate lighting, and
controlled building mass and scale to preserve viewsheds. The proposal also provides several
potential crossings to improve circulation to and within the site, as shown on Sheet L03 Pedestrian
and Bicycle Primary Circulation Plan (Exhibit A). These crossings serve to provide better access
from Franklin Boulevard into the site, and across the railroad tracks to the northern portion of the
site. While the exact locations of these crossings are to be determined, additional crossings will
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 63
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
foster a safer and more accessible pedestrian and cyclist environment. All of these features
establish an interconnected system within the development site and provide direct routes between
destination points and Franklin Boulevard. By maintaining and enabling connection to the path
and increasing site connectivity, Policies F.22 and F.24 are addressed.
Transportation System Improvements: Pedestrian
F.26. Provide for a pedestrian environment that is well integrated with
adjacent land uses and is designed to enhance the safety, comfort, and
convenience of walking.
F.27. Provide for a continuous pedestrian network with reasonably direct
travel routes between destination points.
The proposal is designed to foster a vibrant and active pedestrian environment that is integrated
with on-site and adjacent uses. Provisions of the S-RP Zone ensure high-quality public amenities
along the riverfront including bike parking, ample setbacks to preserve the riverbank and natural
areas, adequate lighting, and controlled building mass and scale to preserve viewsheds. The
proposal provides for a continuous pedestrian network via realignment of the Ruth Bascom
Riverbank Path, as illustrated on Sheets L02 and L05 Site Plan and Service Vehicle Primary
Circulation Plan (Exhibit A), as well as several possible crossings to improve circulation on the site,
as shown on Sheet L03 Pedestrian and Bicycle Primary Circulation Plan (Exhibit A). These
crossings serve to provide better access from Franklin Boulevard into the site, or across the
railroad tracks. While the exact locations of these crossings are to be determined, additional
crossings will foster a safer and more accessible pedestrian and cyclist environment. All of these
features establish an interconnected system within the development site and provide direct routes
between destination points and Franklin Boulevard. The proposal does not involve arterial or
collector roadways. Based on these findings, the proposal is consistent with Policies F.26 and
F.27.
Public Facilities and Services Element
Services to Development Within the Urban Growth Boundary: Planning and
Coordination
G.5. The cities shall continue joint planning coordination with major
institutions, such as universities and hospitals, due to their relatively
large impact on local facilities and services.
The proposal, in part, is a result of joint planning coordination between the City of Eugene and the
University of Oregon through participation and involvement in the planning process. Based on
these findings, the proposal is compliant with Policy G.5.
Services to Development Within the Urban Growth Boundary: Storm water
G.16. Manage or enhance waterways and open storm water systems to
reduce water quality impacts from runoff and to improve storm water
conveyance.
G.19. Maintain flood storage capacity within the floodplain, to the maximum
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 64
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
extent practical, through measures that may include reducing
impervious surface in the floodplain and adjacent areas.
By incorporating ecological and riparian restoration techniques along the Willamette River, flooding
impacts can be mitigated. More explicitly, the
Riparian Assessment and Management Report
prepared by Mason, Bruce & Girard found that vegetated riparian areas reduce the speed and
intensity of floodwaters by providing resistance to flows, which in turn reduces downstream
flooding and leads to effective flood storage. However, areas that perform these functions within
the development site were found to be historically reduced to narrow strips along the river,
reducing flood storage function. In order to improve these functions, the Applicant seeks to
incorporate as many applicable restoration techniques as possible as funding becomes available.
Two techniques proposed in the report include large-scale invasive plant removal, and removal of
concrete riprap along the shoreline.
The Applicant has established self-imposed regulations regarding setbacks and maximum building
coverage which reduce the acreage of impervious surface on the site. For example, the required
conservation area setback within the site is 100 feet along the Willamette River and 40 feet along
the Millrace. However, along the Willamette River and the Millrace Outfall, the Applicant proposes
a riparian enhancement setback of 200-feet for buildings and recreational fields along most of the
length of the property, as shown on Sheet L01 Regulatory Plan (Exhibit A). This setback
requirement keeps impervious development well out of range of valuable riparian area, and fosters
flood storage capacity within the floodplain. Along the Millrace, the Applicant proposes to
maintain and enhance the conservation area and to restrict development to uses permitted in a
conservation area.
The Applicant has established a Regulatory Plan, Sheet L01 Regulatory Plan Exhibit A, that applies
more self-imposed, stringent development regulations than is required by code in order to facilitate
land in conservation, to manage and enhance waterways, and for viewsheds to be protected. For
example, the Applicant has established regulations regarding maximum building coverage. North
of the tracks, the Applicant is proposing maximum building coverages well below what is allowed
by the code. The applicable S-RP zone states that at least 40% of the portion of the development
site shall be shall be landscaped with living plant materials, requiring the building coverage and
site elements to be contained within 60% of the development site (implying an allowed building
coverage of 40% to 50%). To the west of the Millrace (Area 4), the Applicant proposes a
maximum building coverage of 15%; to the east of Riverfront Parkway (Area 6), the Applicant
proposes a maximum building coverage of 16%. Between the Millrace and the Riverfront Parkway
(Area 5), the Applicant proposes a maximum building coverage of 0.5%, and maximum field
coverage of 47%. The maximum building coverage to the south of the tracks is proposed to
comply with existing S-RP coverage standards. Based on these findings, the proposal is
consistent with Policies G.16 and G.19.
Parks and Recreation Facilities Element
H.4. Encourage the development of private recreational facilities.
H.7. The City of Eugene shall cooperate with the University of Oregon in the
resolution of any loss of recreational facilities associated with
development in the Riverfront Park.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 65
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
The proposal does not result in any loss of recreational facilities, and instead proposes new
facilities that, when not in use by the University, can be made available for community use through
partnership with the University of Oregon Department of Physical Education and Recreation.
Additional facilities unconditionally open to the public include the realigned bike path, improved
access to the river via soft trails and view points, and a proposed personal paddle craft launch
point. Therefore, this policy is satisfied.
Citizen Involvement Element
K.3. Improve and maintain local mechanisms that provide the opportunity
for residents and property owners in existing residential areas to
participate in the implementation of policies in the Metro Plan that may
affect the character of
In addition to the public outreach efforts included in the development of the Framework Vision
Project, the North Conditional Use Permit project and concurrent Conceptual Study (of the land
between the railroad tracks and the Willamette River) involved extensive outreach with a wide
range of stakeholders in order to inform the Conceptual Study and Master Site Plan. Stakeholder
engagement included groups internal to the university and stakeholders external to the university.
Internal efforts focused on faculty, staff, students, and administrators. External efforts focused on
community leaders, business leaders, city and agency representatives, neighboring property
owners, river and ecology advocates, neighborhood associations, and other interested parties.
This section summarizes the outreach that occurred in formally scheduled meetings. Many
conversations, one-on-one meetings, information-sharing and phone calls also took place that
were not formally scheduled.
The public process started in July 2017. Outreach to-date has included:
Eight focus group meetings (five internal, two external, and one combined internal/external);
Two public open houses;
Two neighborhood meetings;
Information-sharing meetings with internal and external stakeholders and interested parties
(ongoing);
Individual interviews with community members representing key interests;
Three Campus Planning Committee meetings;
Five e-updates to an e-mail list of interested parties;
Five e-updates to the community stakeholder focus group;
Three updates in Around-the-O; and
Sharing information on the project web page (ongoing), including open house materials and
providing a function for public comment.
It should be noted that the university also conducted outreach one year prior to the project, from
May 2016 through October 2016, to understand areas of concern and interest. This effort included
meetings with the Campus Planning Committee, faculty in the College of Design and Biology,
PE&REC, Club Sports, Office of the Vice President for Research and Innovation, and
representatives of neighborhood associations, adjacent community organizations, and local
government (planning, transportation, parks and recreation).
Below is a more detailed description of the outreach meetings to-date:
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 66
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Internal Outreach
Ecology Focus Group
The Ecology focus group was comprised of representatives from the departments of Biology,
Geography, Environmental Studies, Landscape Architecture, and the Urban Farm Program and the
Institute for Ecology and Evolution. The Ecology focus groupÈs expertise in ecology and landscape
design delivered important feedback regarding the current use of the area for research and
outdoor learning, areas of ecological significance, design considerations, and recommendations
for conservation, restoration, and enhancement. The Ecology group met on July 12 and July 26,
2017 and in a combined meeting with the PE & REC Focus Group and Outdoor Program Group on
August 29, 2017, and in a combined meeting with PE & Rec Focus Group and members from the
Community Focus Group on October 18, 2017.
Physical Education & Recreation Focus Group
The Physical Education and Recreation focus group was comprised of representatives from the
Department of Physical Education and Recreation, Intramural Sports, and Club Sports. The group
provided feedback on current and future programmatic needs for students in physical education
programs, open recreation, intramural sports, and club sports. The PE & REC Focus Group met
on July 6, 2017, and in a combined meeting with the Ecology Focus Group and Outdoor Program
Group on August 29, 2017, and in a combined meeting with the Ecology Focus Group and
members from the Community Focus Group on October 18, 2017.
Outdoor Program Focus Group
The UO Outdoor Program provided feedback on recreation program opportunities, river access,
and support facilities. The focus group discussed the programmatic requirements for a potential
new replacement facility near the river. The Outdoor Program Focus Group met on July 6, 2017
and in a combined meeting with the Ecology Focus Group and PE & REC Group on August 29,
2017. Members were invited to but did not attend the combined meeting with the PE & REC
Focus Group, Ecology Focus Group and members from the Community Focus Group on October
18, 2017.
Information-Sharing Meetings
Members of the Project Team met with the units that make up
Campus Planning and
(Campus Planning, Design and Construction, Utilities and Energy,
Facilities Management
Facilities Services, and Sustainability) to review project status and gather feedback related to
the operations of campus. Meetings occurred on September 14, 2017, and October 17, 2017.
Members of the Project Team met with representatives in the
Office of the Vice President for
on October 9, 2017 to share project information and gather
Research and Innovation
feedback related to the interests and needs of faculty research and research related to the
university.
Members of the Project Team met with the on December 11,
UO Executive Leadership Team
2017 to share the project status and gather feedback.
Campus Planning staff provided an update to the in December 2017.
Space Advisory Group
Campus Planning and Facilities Management and Campus Planning Committee Chair provided
information about the public process to the on February 14, 2018.
University Senate
Campus Planning staff were invited to the
Student Recreation Center Student Advisory
meeting on February 23, 2018 and provided information about the proposal.
Board
Campus Planning staff met with interested students, faculty, and staff to provide information
about the proposal in May and June 2018, and will continue to do so. Meetings to-date were
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 67
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
with representatives of the ,
Associated Students of University of OregonClimate Justice
, , and faculty in the departments of Biology and
LeagueStudent Sustainability Center
Economics, amongst others.
Academic Units with Facilities in the North Campus Area
On September 6, 2017, members of the Project Team met with representatives of academic units
that have current facilities in the project area. These units included College of Design, the School
of Art and Design, and the Urban Farm Program. The purpose of the meeting was to share
information about the project, gather key information about their use of the area, and address
concerns.
Campus Planning Committee
Members of the Project Team met with the Campus Planning Committee (CPC) on October 10,
October 27, and November 28, 2017. The CPC is a university committee that advises the
President on long-range campus development with regard to the design of campus. The
committee includes wide representation from university faculty, staff, and students. The CPC is
the primary author of proposed amendments and periodic updates to the Campus Plan. CPC
meetings are open to the public and notification of regular meetings is provided to Eugene
Neighborhood Association chairs. At the November meeting, the CPC reviewed the draft North
Campus Master Site Plan and approved it for moving forward through the Conditional Use Permit
application process, with the understanding that it would come back to the CPC during the
amendment process. CPC meeting minutes are included as Exhibit I.
Campus Plan
External Outreach
Community Focus Group
An external community focus group met twice during the public process, members of which also
met with CPFM staff during the project scoping process for the project. These meetings were
comprised of members outside the University of Oregon, such as community leaders, business
leaders, city and agency representatives, neighboring property owners, river and ecology
advocates, neighborhood associations, and other interested parties. The group focused
specifically on the area between the railroad tracks and the river. Participants discussed key
topics such as connectivity, river access, riparian restoration, safety, and active uses, and
provided feedback on the Conceptual Study options. The Community Focus Group met on
August 8, 2017 and September 13, 2017, and some members attended a combined meeting with
the internal focus groups on Oct 18, 2017.
Stakeholder Interviews
The Project Team conducted in-depth interviews with several key stakeholders including business
owners of surrounding property, leadership from applicable neighborhood associations and
committees, representation from non-profit groups, EWEB, and the Environmental Legal Alliance
Worldwide (ELAW). Interviews focused on perceptions of the North Campus area, access,
connectivity, environmental considerations, and community recreational use.
City of Eugene Planning and Development
The Project Team met with City of Eugene Planning and Development staff on July 31, 2017 and
November 2, 2017. The first meeting focused on project overview and scope of work and the
second meeting focused on project updates and identifying land use requirements. Additionally,
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 68
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
the Project Team held a project consultation meeting with City staff on January 5, 2017, which is a
formal pre-requisite to filing a Type III land use application.
Information-Sharing Meetings
A Project Team representative presented to the
City of EugeneÈs Active Transportation
on October 12, 2017 to give a project overview and gather feedback. The ATC
Committee
emphasized the need to ensure that the riverfront bike path is maintained as a key
transportation corridor as well as for recreational use, and that connections to the river remain
paramount.
A Project Team representative presented to the on November 7,
Lane Transit District Board
2017 to give a project overview and gather feedback.
A Project Team representative presented at the fall meeting on November 8,
River Districts
2017 to give a project overview and gather feedback.
Campus Planning and Facilities Management presented to the
Chamber of Commerce Local
on April 6, 2018.
Government Affairs Council
Campus Planning met with interested parties in June 2018 to provide information about the
proposal and will continue to do so. Meetings to-date were with representatives of the
,
Willamette RiverkeeperMcKenzie River Trust, Whilamut Natural Area Citizen Planning
and.
Committee, Nearby Nature
Combined Outreach
Combined Focus Group
A combined focus group meeting was held on October 18, 2007 and included internal and external
focus group representatives. This meeting focused on the draft Master Site Plan and the two
illustrative conceptual site plan options for the Conceptual Study area, and gathered feedback
from attendees. It also included a presentation on the Riparian Assessment and Management
Report, prepared by environmental consultants with the Project Team.
Community Open House (2)
Two community open house events were held on November 8, 2017 and January 11, 2017,
respectively. Articles in the ÅAround the OÆ newsletter preceded each open house. Invitations to
attend were emailed in advance to all faculty and staff and individuals on the interested parties list,
which was a comprehensive list developed through the internal and external outreach processes.
The Project Team presented displays consisting of the draft Master Site Plan, Conceptual Study
materials, context maps, and supporting information and reports. In addition, open house
materials were posted to the project web page. The first open house event had 89 attendees that
signed in. The second open house event had 57 attendees that signed in. To date, over 80
comments were received at the two public open houses and by mail, e-mail, and via the project
web page comment function. Examples of open house materials are included in Exhibit J.
Neighborhood Meeting (2)
Two neighborhood meetings were also held on November 8, 2017 and January 11, 2017,
respectively. The neighborhood meetings utilized the presentation materials from the open house
events. The neighborhood meetings followed the prescribed neighborhood/applicant meeting
procedures as specified in EC 9.7007. Documentation regarding the neighborhood/applicant
meetings is provided as Exhibit E.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 69
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Fairmount Neighborhood Association Meeting
Representatives from the project team provided a project update to the Fairmount Neighborhood
Association on December 5, 2017, at the associationÈs regular monthly meeting.
Documentation
Additional outreach methods included several email updates to internal and external stakeholders
between meetings a project website maintained and regularly updated by CPFM staff with
responses to frequently asked questions. The university also made project update
announcements in Around-the-O on August 1, 2017, October 31, 2017, and January 9, 2018.
A summary of all scheduled outreach meetings and key outreach activities conducted for the
proposal is included as Exhibit E Outreach Summary.
Riverfront Park Study
A. Land Use Element
1. The City of Eugene shall apply the Special Development District
to property under University ownership.
The Special Development District zoning classification has been applied to the subject property
through the adoption of the Riverfront Research Park Special Area Zone (S-RP). Therefore, this
policy is addressed.
2. The City of Eugene shall consider Special District zoning for
other properties within the Riverfront Park Study area only at the
request of affected property owners.
This policy recognizes that the existing mix of zoning districts reflects existing land use patterns.
Changes in zoning will follow decisions by property owners regarding future use of their property.
Application of the Special District to properties not owned by the University of Oregon will be
evaluated on the ability of the subject site to meet the objectives and goals of the proposed use.
This proposal does involve or anticipate any changes or alterations to current zoning, as all
properties in question are currently owned by the University of Oregon. Therefore, this policy is
addressed.
3. For land zoned SD, Special Development, development
proposals shall be considered on a case-by-case basis through
the conditional use permit process.
This process provides a high degree of flexibility for development proposals and allows the city to
make development-related decisions on the basis of their conformance with predetermined
standards. This policy also recognizes that a large portion of the North Campus area lies within
the boundaries of the Willamette Greenway. Under the Conditional Use Permit process called for
in the Riverfront Research Park Special Area Zone (S-RP), new development located within the
Greenway boundaries must also comply with Willamette Greenway criteria specified in the Eugene
Code (EC 9.8815) and presented in Section 5.3. This proposal not only addresses S-RP and
Willamette Greenway approval criteria, but also includes compliance with additional development
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 70
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
regulations. By seeking a conditional use permit, this proposal in itself is in compliance with this
policy.
4. The following uses shall be permitted in the SD district for the
Riverfront Park area:
a) University programs and activities.
b) Uses related to the activities, research, and programs of
the University of Oregon, including light industrial,
research and development, and office.
c) A limited range of retail and non-retail uses permitted in
the C-I, Neighborhood Commercial District (see Appendix
B, Exhibit A).
d) Other retail and non-retail uses that complement
University activities.
e) Multiple-family dwellings.
The intent of this policy is to provide for a variety of uses within the subject property, and to
balance this development potential against its possible impact on other portions of the community.
This policy establishes direction to tie the development in this area to the primary distinguishing
feature, which is its proximity to the University of Oregon. This policy recognizes that the area's
proximity to the university is unique and it is this proximity which should ultimately determine the
range of uses uniquely appropriate for the site. The range of service uses permitted in the S-RP
Zone are limited to those which might be necessary to provide some of the services needed to
support employment and residential development in the area. The Zone is not intended to
duplicate the extensive range of services available in the commercial areas around the University
of Oregon, along Franklin Boulevard, and in the downtown area. As such, the proposal envisions
the site as a strategic location primarily for university programs and activities along with university-
related uses. Such uses include but are not limited to research, academic, administrative, physical
education and recreation, outdoor research and education, conservation, and university housing.
By focusing on university programs and activities, the proposal is in accordance with this policy.
The proposal does not suggest uses that are not permitted in the zone. Therefore, this policy is
satisfied.
5. Development standards within the SD, Special Development
District, applied to the Riverfront Park, shall be designed to:
a) Provide for intensity of development while recognizing the
environmental and open space attributes and
requirements of the area.
b) Recognize that proximity to alternate transportation
facilities may provide opportunities to reduce parking
requirements for certain industrial uses.
c) Provide for signing standards consistent with the
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 71
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
purpose of the district.
d) Allow for a mixture of uses in the SD, Special
Development District.
e) Ensure that development in the Riverfront Park is
primarily related to University activities and programs.
This policy outlines the criteria against which a development proposal will be measured. The
policy prioritizes university and university-related uses, and supports the preservation of
environmental attributes, and the coordination of development with alternative transportation. The
proposal aligns with these three qualities, as the proposal centers around university and university-
related uses, while also improving access along the Willamette River, providing options for a more
pedestrian and bike-friendly network within the site and to Franklin Boulevard. Therefore, this
policy is satisfied.
6. Working with the City of Springfield and Lane County, the City of
Eugene shall seek an amendment to the Metropolitan Plan
which would designate a portion of the property within the
Riverfront Park Study area owned by the University of Oregon
for "University/Research" activities.
This policy recognizes that the subject property is owned by the University of Oregon and is
designated for University/Research activities. The proposal takes this fact into consideration, as
proposed development directly falls within this category of use. Proposed development includes
recreational fields for university use, as well as public open space along the river which will also
have an educational and research function. Any potential new building would be for uses
permitted in this zone. The proposal does not include uses not permitted in the zone. Therefore,
the proposal satisfies the requirements of this policy.
B. Transportation Element
1. The City, if possible in conjunction with a developer, shall work
with the Oregon Department of Transportation (ODOT) and the
Southern Pacific Railroad to increase the number of points of
access to undeveloped property within the Riverfront Park Study
area.
This policy recognizes that existing access into the subject site is limited. The policy
acknowledges that: 1) Franklin Boulevard is a State highway and subject to access controls by the
ODOT; and 2) Union Pacific Railroad will be a future participant in negotiating access through the
railroadÈs right-of-way. Currently, the proposal seeks to improve access to the site through
additional crossings of the railroad tracks, Millrace and Franklin Boulevard, and will enable a more
pedestrian and bike-friendly experience, as well as improved access to the EmX. Therefore, this
policy is satisfied.
2. The City shall work with the Lane Transit District, the University
of Oregon, and employers in the Riverfront area to maximize the
use of alternate modes of transportation. Facilities and programs
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 72
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
will be developed to work toward the goal of accommodating a
substantial number of the trips made to new development within
the Riverfront Park Study area through modes other than the
single-occupancy automobile.
Eugene has been successful in encouraging the use of alternate transportation modes. A
significant level of alternate mode usage reduces potential impacts on the already limited area-
wide parking; reduces the requirements for public expenditures on street improvements; and
provides opportunity for more intense development within the subject site, south of the railroad
tracks and adjacent to Franklin Boulevard. This policy recognizes that the proximity of potential
development to the University of Oregon and downtown Eugene increases the ability to rely on
alternative transportation modes for all types of trips. The policy also recognizes that aggressive
action by the City, Lane Transit District, and the University of Oregon will be required to achieve
the alternate mode objectives. For instance, University of Oregon has a robust transportation
demand management program that relies heavily on public transportation, walking, and bicycling,
consistently resulting annually in more than 80% of the students and more than 40% of faculty and
staff using alternate modes as their primary mode of commuting. Proposing university uses in the
North Campus area will continue the same pattern of commuting as for the rest of campus.
Therefore, this policy is satisfied.
3. The City shall use its Capital Improvement Programming process
to identify projects, their implementation schedules, and
anticipated funding sources needed to provide transportation
facilities to service development in the Riverfront Study Area.
Special efforts shall be made to secure non-City funding for
capital improvements whenever possible.
This policy acknowledges the CityÈs process of capital improvement programming as the
appropriate mechanism to identify timing and funding sources for publicly constructed projects
aimed at accommodating transportation demand from future development. This policy also
recognizes that funding of any particular project identified in the Capital Improvement Program can
come from a variety of sources, and that, in any case, the City should make strong efforts to find
outside funding sources for transportation projects involved in development of the North Campus
area. The Applicant will continue to coordinate with the city regarding public capital
improvements, however the future development projects within the project site will be funded by
the Applicant. Therefore, this policy is satisfied.
4. The City shall pursue construction of projects intended, by
design and timing, to avoid Level of Service "E" in the Franklin
Boulevard corridor.
Following approval of CU 88-16 in 1989, the North Campus area was the subject of extensive
transportation analysis. The area was included in the analysis conducted for the
Central Area
. Several improvement projects were required or recommended as a
Transportation Study (CATS)
result of proposed development, all of which have been implemented:
Franklin Boulevard and Onyx Street: Reconstruction of the intersection and signal;
Franklin Boulevard at Agate Street: Reconstruction of the intersection and signal;
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 73
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Downtown/Franklin Boulevard signal systems: Implementation of optimal signal timings;
ththth
including 18 Avenue and 19 Avenue in the system; and, new controllers at 18 Avenue and
University Street at Alder Street;
th
Agate Street at 18 Street: Reconstruction of the intersection;
th
Agate Street at 15 Street: Reconstruction of the intersection;
th
11 Street and Kincaid Street: Construction of new signal.
The City and Lane Transit District have coordinated extensively to plan and construct the bus rapid
transit system, EmX. Franklin Boulevard is currently served by an EmX line extending from
Downtown Eugene to Springfield Station and the project area is adjacent to a primary transit
station at Franklin Boulevard and Agate Street. Additional improvements to improve the capacity
and function of Franklin Boulevard were conditioned and required as part of the approved
Conditional Use Permit for Matthew Knight Arena and have also been implemented.
Based on the above findings, implementation of planned improvements to accommodate
proposed development of the North Campus area in accordance with CU 88-16, and given that
the trip generation resulting from the current proposal is less than was approved in the prior
Conditional Use Permit in 1989, the proposal will not result in a Level of Service of ÅEÆ on Franklin
Boulevard, a requirement of the . Therefore, this criterion is satisfied.
Riverfront Park Study
5. Required transportation projects will be phased and the phasing
schedule will depend upon the level of participation of non-
public funds (i.e., participation by a developer) and the level of
actual development.
This policy acknowledges that phasing of transportation projects will be required. The policy also
recognizes that the phasing schedule could appropriately be accelerated through non-public
funding of projects (or portions of projects). The proposal does not involve any required
transportation projects, and is instead limited to campus improvements. This policy is satisfied.
6. The City shall encourage the University of Oregon, Lane County,
and the Oregon Department of Transportation to participate
financially in transportation improvements involved in the
Riverfront Park Development area.
This policy recognizes that a number of agencies will be involved in funding future transportation
improvements. For example: 1) because Franklin Boulevard is a State facility, ODOT participation
in funding improvements is appropriate; and 2) funding of pedestrian sidewalks and crossings of
Franklin Boulevard (especially those above-grade) by the University of Oregon might be
appropriate. While the proposed development does not dictate partners and funding mechanisms
for transportation improvements, the university has successfully forged such partnerships in the
past, and will implement these working relationships as projects become viable. This policy is
satisfied to the greatest extent practicable.
7. The City, in cooperation with the University and developers, shall
develop a plan for a comprehensive bicycle path network for the
Riverfront Study area including: 1) the South Bank Bike Trail; 2)
the Mill Race Bike Path (included in the Eugene Bikeways
Master Plan); and 3) new paths providing access between
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 74
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Franklin Boulevard and the south Bank Trail and to destinations
within the study area.
This policy recognizes the importance of bicycles as a component of the transportation system
and the need to achieve high levels of bicycle use to reduce traffic demands on the street system.
A bikeway network providing direct access to buildings and covered bicycle parking areas can
help attain the highest possible levels of bicycle commuting. In addition, sensitively integrated
paths can help make the area attractive and support improved access to the river and the Ruth
Bascom Riverfront Path System. With these principles in mind, the proposal seeks to improve the
bicyclist experience for commuters and recreational cyclists alike by connecting the bike path to
the east and west along the Willamette River to form a cohesive multi-modal path, and providing
improved access across the railroad tracks and Franklin Boulevard, as shown on Sheet L03
Pedestrian and Bicycle Primary Circulation Plan (Exhibit A). Through improvement to the
comprehensive bicycle path network within the site, the proposal addresses this policy.
C. Environment Element
1. The City of Eugene shall protect the riparian strip along the
southern bank of the Willamette River within the study
boundaries by: 1) directing future development away from this
environmentally sensitive area; 2) establishing a buffer strip
beginning at the top of the bank and extending a minimum of 35
feet to the south; 3) establishing a deeper setback to protect the
east Millrace outfall and the heavily used bicycle/pedestrian area
around the south approaches of the Autzen Bike Bridge; and 4)
developing, with the University of Oregon and the Eugene Water
& Electric Board and other major property owners along the
river's banks, an active management plan intended to enhance
the environment of the natural vegetation along the river's edge.
In this area, the riparian strip refers to the narrow vegetative
strip along the steep south bank of the river. This policy is
intended to protect the riparian strip along the river which will
result in: 1) preservation of valuable natural elements; 2)
riverbank stabilization; and 3) protection of developable property
from potential debris during major flooding (a rare possibility).
This policy also recognizes that development within the
Riverfront Park Study area provides unique opportunities to
create more of an urban edge along portions of the river through
sensitive location of buildings along the river, and that location
of some public improvements can occur within the buffer and
riparian strip. For example, a bicycle/pedestrian path could
appropriately be included within the buffer strip and a public
plaza and public access improvements could appropriately
extend to the river through the riparian strip.
/WR Conservation Overlay Zone regulations establish a minimum required 100-foot conservation
setback from the Willamette River top of bank. The Applicant has proposed a setback of 200-feet
for buildings and recreational fields along most of the length of the property, as shown on Sheet
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 75
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
L01 Regulatory Plan, throughout the majority of the site in order to provide an increased riparian
buffer, and to protect natural viewsheds where practicable. It is important to note that since this
200-foot setback is determined from the top of bank, the setback equates to 250-300 feet as
measured from the waterÈs edge. The proposal includes two potential alignments of the Ruth
Bascom Riverfront Path, to provide access to the river. Proposed setbacks of 200 feet are also
included around the Millrace Outfall to protect the area as a significant natural water feature.
Therefore, this policy is satisfied.
2. The existing Millrace which passes through a portion of the
study area is an important environmental and historic city
feature. Development occurring in the Riverfront Park shall
maintain or improve visual and bicycle/pedestrian access to and
along the Millrace, expanding its use for public recreation while
at the same time recognizing its role as a storm runoff channel.
This policy recognizes the value of the Millrace in Eugene, both as an historic feature and
environmental asset for recreation and stormwater runoff. The policy is intended to ensure that
future development adjacent to the Millrace enhances its continued public use. The proposal
protects the Millrace to the greatest extent possible by maintaining a 40-foot conservation setback
from the top of bank, and incorporating recommendations for improving natural vegetation around
the Millrace Outfall including setback of 200-feet for buildings and recreational fields. This 200-
foot setback equates to 250-300 feet when measured from the waterÈs edge. Therefore, this
policy is satisfied.
3. Development occurring in the Riverfront Park area shall be
designed to preserve a significant cluster of black locust, English
oak, and redleaf plum trees located just east of the current
location of the bicycle path.
This policy recognizes that while most of the riparian corridor contains invasive vegetation that
should be removed, this existing stand of trees adds to the important vegetative cover in the area.
The significant cluster of trees referenced in the above policy is located in Area 6, east of
39
Riverfront Parkway and the proposed bike path alignment options. The cluster is almost entirely
located within the /WR conservation area adjacent to the Willamette River. As illustrated on Sheet
L02 Site Plan (Exhibit A), future building development is sited and designed to preserve this tree
cluster. In addition, the proposal includes recommendations to restore and improve native
vegetation, both along the riverbank and throughout the site. Preserving native trees is one
method of ecological restoration, and is ensured by the protections established in the /WR
Conservation Overlay Zone. Therefore, this policy is satisfied.
4. Development in the Riverfront Park area shall, when possible,
maintain and enhance the public's physical access to the river
and the riparian strip along its banks.
This policy recognizes that development should occur in concert with continued public access to
39
. University of Oregon and City of Eugene.
Riverfront Research Park Master Plan and Design Guidelines
December 1988. Page 32.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 76
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
the river. It directs that, where possible, development plans should maintain and improve physical
access by the public to the river and its edge. Physical access includes pedestrian and bicycle
access along the river, pedestrian access to the river bank, and access to the riverbanks for
swimming, fishing, and launching small paddle craft. As noted in Policy C.1 (Environment),
protection of the conservation area along the river will be balanced with the need for public access
to the river. Through extensive feedback through public involvement, the proposal seeks to
enhance the publicÈs physical access to the river by improving the ecological quality of the site,
public safety, ease of access of public facilities, and views, and by developing a cohesive bike
path along the river. By including these aspects as key components of the proposal, this policy is
sufficiently addressed.
D. Public Services and Amenities Element
1. Transportation improvements shall be required in the first
phases of development to ensure adequate vehicular access,
including access for emergency vehicles.
The site is currently adequately served by existing transportation improvements, including the
railroad underpass along Riverfront Parkway. The proposal includes transportation improvements
that take into account service vehicles, and private transportation as shown on Sheets L03
Pedestrian and Bicycle Primary Circulation Plan and L05 Service Vehicle Primary Circulation Plan
(Exhibit A). These improvements will be phased appropriately to ensure adequate access to the
site at all times. Therefore, this policy is satisfied to the great extent practicable.
2. The City will work with the University of Oregon and developers
in financing and developing public amenities to serve the
Riverfront Park area.
The Applicant will coordinate with the City on the financing and development of public amenities,
such as realignment of the Ruth Bascom Riverfront Path and additional river access points, to
serve the project area. Therefore, this policy is addressed.
3. The City shall investigate ways of financing public facilities in a
timely manner, using techniques beyond traditional support from
the general fund.
This policy is aimed at the city, and therefore is not applicable to the proposal.
4. The City shall ensure that in the context of development in the
Riverfront Park area, the existing bike-pedestrian facility is
relocated closer to the river bank and sensitively integrated into
the area. In addition, the primary transportation circulation
system serving the area shall include illuminated bicycle-
pedestrian facilities.
This policy directs that the path be located between future development and the river. Staying
true to this vision, the proposal provides two options for relocating the bike path between future
development and the river. One option is an alternative to locate the bicycle path within the 100-
foot conservation setback along the river to provide better public access to the river and its
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 77
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
viewshed. Therefore, this policy is addressed.
5. As development occurs in the Riverfront Park area, privately
financed amenities will be designed to supplement the amenities
which are publicly financed.
Future development will follow university processes and support will be designed to support public
amenities. This policy is addressed to the greatest extent practicable.
(b) Based on technical analysis (particularly with respect to
transportation facilities), planned public facilities shall be shown to
accommodate the requirements of the proposed development.
Exhibit D is a preliminary trip generation analysis for the North Campus area. Trip generation was
th
estimated using the Institute of Transportation Engineers (ITE) Trip Generation Manual, 10Edition.
thth
The manual is updated on a regular basis, with the 4 edition being in effect in 1987 and the 10
edition now in effect. Universities (Land Use Code 550 Ã University/College) and research facilities
(Land Use Code 760 Ã Research Center) are among the uses studied and reported in both editions
of the Trip Generation Manual.
Following the approval of CU 88-16 in 1989, the UO secured approval to develop between 1.2
million and 1.8 million square feet within the North Campus area. At this time, enrollment at UO
was approximately 17,600 students and the campus had approximately 4,919,000 gross square
feet of development. This equates to a ratio of 3.578 students per 1,000 gross square feet of
building area. Applying this ratio to the 1989 Long-term Development Plan produces an estimate
of approximately 4,300 to 6,450 net new students in the 1.2 to 1.8 million square feet of planned
development. Under each respective land use category (University Code 550; Research Center
Code 760), the student population suggested a daily total of 10,350-15,550 trips, and the gross
floor area suggested a daily total of 6,445-9,285 trips.
Under the current proposal, the UOÈs current student population of approximately 21,300 students
is accommodated within approximately 6.642 million gross square feet of development, or a ratio
of 3.207 students per 1,000 gross square feet. Applying this ratio to the long-range development
plan suggests 3,600 more students could be accommodated, and ultimately suggests 7,035 daily
trips could be expected.
After the previous CUP was approved in 1989, the North Campus area was the subject of
extensive transportation analysis. Several improvement projects were required or recommended
as a result of proposed development, all of which have been implemented:
Franklin Boulevard and Onyx Street: Reconstruction of the intersection and signal;
Franklin Boulevard at Agate Street: Reconstruction of the intersection and signal;
Downtown/Franklin Boulevard signal systems: Implementation of optimal signal timings;
ththth
including 18 Avenue and 19 Avenue in the system; and, new controllers at 18 Avenue and
University Street at Alder Street;
th
Agate Street at 18 Street: Reconstruction of the intersection;
th
Agate Street at 15 Street: Reconstruction of the intersection;
th
11 Street and Kincaid Street: Construction of new signal.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 78
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
The City and Lane Transit District have coordinated extensively to plan and construct the bus rapid
transit system, EmX. Franklin Boulevard is currently served by an EmX line extending from
Downtown Eugene to Springfield Station and the project area is adjacent to a primary transit
station at Franklin Boulevard and Agate Street. Additional improvements to improve the capacity
and function of Franklin Boulevard were conditioned and required as part of the approved
Conditional Use Permit for Matthew Knight Arena and have also been implemented.
Based on the above findings, the trip generation resulting from the current proposal is less than
was approved in CU 88-16, and the trip generation is further offset by improvements to facilities
that have occurred since the approval of the last Conditional Use Permit. Along with
implementation of planned improvements to accommodate proposed development of the North
Campus area, planned public facilities will accommodate the requirements of the proposed
development. Therefore, this criterion is satisfied.
(c) The proposed development shall protect visual access from main
entry points from Franklin Boulevard to the river/riparian vegetation.
The proposal does not involve changes to the project area that negatively affect visual access from
main entry points from Franklin Boulevard such as Riverfront Parkway.
The Applicant has established a Regulatory Plan, Sheet L01 Regulatory Plan Exhibit A, that applies
more self-imposed, stringent development regulations than is required by code in order to facilitate
riparian restoration, open space improvements, and for viewsheds to be protected. For example,
the Applicant has established regulations regarding maximum building coverage. North of the
tracks, the Applicant is proposing maximum building coverages well below what is allowed by the
code. The applicable S-RP zone states that at least 40% of the portion of the development site
shall be shall be landscaped with living plant materials, requiring the building coverage and site
elements to be contained within 60% of the development site (implying an allowed building
coverage of 40% to 50%). To the west of the Millrace (Area 4), the Applicant proposes a
maximum building coverage of 15%; to the east of Riverfront Parkway (Area 6), the Applicant
proposes a maximum building coverage of 16%. Between the Millrace and the Riverfront Parkway
(Area 5), the Applicant proposes a maximum building coverage of 0.5%, and maximum field
coverage of 47%. The maximum building coverage to the south of the tracks is proposed to
comply with existing S-RP coverage standards. By maintaining current access points from
Franklin Blvd, as well as electing to impose height limitations, the Applicant demonstrates a
commitment to protecting visual access through regulation of building mass and scale. Therefore,
this criterion is satisfied
(2) Criteria for Development Within Willamette Greenway Boundaries.
(a) Compliance with the criteria in EC 9.3725(1) Criteria for all
Development above.
Findings presented under EC 9.3725(1) satisfy this criterion, and are incorporated by reference
herein.
(b) The height and bulk of the proposed development shall be designed
to consider the impacts on public open space, especially the buffer
strips along the Willamette River and Millrace, and to adhere to the
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 79
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
height limitations specified along the Willamette River. Building
setbacks shall be varied to avoid the effect of a continuous wall
along the minimum setback line and to adhere to the requirement
for protection of designated features (i.e., Millrace and pedestrian
linkage to the Autzen Stadium footbridge).
As noted, the Applicant has established a Regulatory Plan, Sheet L01 Exhibit A, that applies more
self-imposed, stringent development regulations than is required by code in order to facilitate
riparian restoration, open space improvements, and for viewsheds to be protected. For example,
the Applicant has established regulations regarding maximum building coverage that limit the
height and bulk of development in consideration of open space preservation. North of the tracks,
the Applicant is proposing maximum building coverages well below what is allowed by the code.
The applicable S-RP zone states that at least 40% of the portion of the development site shall be
shall be landscaped with living plant materials, requiring the building coverage and site elements to
be contained within 60% of the development site (implying an allowed building coverage of 40%
to 50%). To the west of the Millrace (Area 4), the Applicant proposes a maximum building
coverage of 15%; to the east of Riverfront Parkway (Area 6), the Applicant proposes a maximum
building coverage of 16%. Between the Millrace and the Riverfront Parkway (Area 5), the
Applicant proposes a maximum building coverage of 0.5%, and maximum field coverage of 47%.
The maximum building coverage to the south of the tracks is proposed to comply with existing S-
RP coverage standards.
In addition, the Applicant has established maximum building heights north of the tracks that are
well below the code allowance. The applicable S-RP zone states that there is no height limitation
for a structure outside 75 feet of the top of the south bank of the Willamette River. As the
Applicant proposes that all development occur outside the 100-foot setback, theoretically no
building height maximums are applicable by code. The applicant proposes a 45-foot maximum
building height to the west of the Millrace (Area 4), and a 37-foot maximum east of Riverfront
Parkway (Area 6). In the land between the Millrace and Riverfront Parkway (Area 5), the applicant
is proposing a 15-foot height limit to allow for the potential construction of recreation and outdoor
classroom support facilities. For areas south of the tracks, the Applicant has established a
maximum building height of 85 feet, which would allow for a range of building heights similar to
campus buildings across Franklin Boulevard.
Outside of development regulations imposed by the Applicant, it is important to note that the open
space preservation within the site is also supplemented by additional state regulations. The
Willamette River adjacent to the development site is identified as a Goal 5 Water Resource. The
Willamette River is a Category A resource, meaning it is designated for protection with a required
100-foot setback. In addition, the development site contains a Category A Wetland, labeled site
WR-4 on the Goal 5 Inventory. This Riverfront Park/Millrace wetland requires a setback of 50 feet.
Both of these setbacks have been incorporated in site design by the Applicant on Sheet L01
Regulatory Plan (Exhibit A). In addition, protection of significant riparian vegetation is ensured
through existing established /WR protection provisions in EC 9.4900-9.4980, which are not
affected by the proposal.
The above findings demonstrate that proposal includes varied setbacks, that building development
will not result in a continuous wall along the setback, and that open space and riparian area
conservation recommendations ensure protection of designated features. Therefore, this criterion
is satisfied.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 80
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
(c) To the greatest possible degree, the intensification, change of use,
or development will provide the maximum possible landscaped
area, open space, or vegetation between the activity and the river.
The Applicant has established regulations regarding maximum building coverage. As noted, the
Applicant has established a Regulatory Plan, Sheet L01 Regulatory Plan Exhibit A, that applies
more self-imposed, stringent development regulations than is required by code in order to facilitate
riparian restoration, open space improvements, and for viewsheds to be protected. For example,
the Applicant has established regulations regarding maximum building coverage. North of the
tracks, the Applicant is proposing maximum building coverages well below what is allowed by the
code. The applicable S-RP zone states that at least 40% of the portion of the development site
shall be shall be landscaped with living plant materials, requiring the building coverage and site
elements to be contained within 60% of the development site (implying an allowed building
coverage of 40% to 50%). To the west of the Millrace (Area 4), the Applicant proposes a
maximum building coverage of 15%; to the east of Riverfront Parkway (Area 6), the Applicant
proposes a maximum building coverage of 16%. Between the Millrace and the Riverfront Parkway
(Area 5), the Applicant proposes a maximum building coverage of 0.5%, and maximum field
coverage of 47%. The maximum building coverage to the south of the tracks is proposed to
comply with existing S-RP coverage standards.
Through complying with maximum building coverage significantly under that allowed by code, the
Applicant demonstrates a clear commitment to preserving open space to the greatest extent
practicable. This finding, combined with the intent to continue to use the site for its intended
range of uses permitted in the S-RP, such as university and research uses, demonstrates the
proposal does not change the schedule of permitted uses on the site, and provides the maximum
possible landscaped area. Therefore, the criterion is satisfied.
(d) To the maximum extent practicable, the proposed development
shall provide for protection and enhancement of the natural
vegetative fringe along the Willamette River. This means protection
and enhancement of trees and understory characteristic of native
vegetation within the riparian strip along the Willamette River. It also
means removal, and active management to prevent reintroduction
of, disturbance vegetation such as Himalayan blackberries and
English ivy. As used herein, the riparian strip means the area
between the top of the river bank and the waterÈs edge.
By incorporating ecological and riparian restoration techniques along the riverbank, the proposed
development shall provide for protection and enhancement of the natural vegetative fringe along
the Willamette River. More explicitly, the prepared
Riparian Assessment and Management Report
by Mason, Bruce & Girard found that vegetated riparian areas within the development site were
historically reduced to narrow strips along the river. In order to enhance the natural vegetative
fringe, the Applicant seeks to incorporate as many applicable restoration techniques as possible
as funding becomes available. Two techniques proposed in the report include large-scale invasive
plant removal, and removal of concrete riprap along the shoreline.
The Applicant has also established self-imposed regulations regarding setbacks on the site. For
example, the required conservation area setback within the site is 100 feet. However, the
Applicant proposes a riparian enhancement setback of 200-foot for buildings and recreational
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 81
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
fields along most of the length of the property, as shown on Sheet L01 Regulatory Plan (Exhibit A).
It is important to note that since this 200-foot setback is determined from the top of bank, the
setback equates to 250-300 feet as measured from the waterÈs edge. This setback requirement
preserves the riparian fringe and maximizes riparian restoration opportunities to the greatest extent
possible.
(e) To the greatest possible degree, necessary and adequate public
access will be provided to and along the river by appropriate legal
means.
As used in this section, the words Ågreatest possible degreeÆ are
drawn from Statewide Planning Goal 15 (F.3.b.) and are intended to
require a balancing of factors so that each of the identified
Greenway criteria is protected to the greatest extent possible
without precluding the requested use. Goal 15 (C.3.j.) provides that
Ålands committed to urban uses within the Greenway shall be
permitted to continue as urban uses.Æ
This policy recognizes that development should occur in concert with continued public access to
the river. It directs that, where possible, development plans should maintain and improve physical
access by the public to the river and its edge to the greatest possible degree. Physical access
includes pedestrian and bicycle access along the river, pedestrian access to the river bank, and
access to the riverbanks for swimming, fishing, and launching small paddle craft. Protection of the
conservation area along the river will be balanced with the need for public access to the river.
Through extensive feedback through public involvement, the proposal seeks to enhance the
publicÈs physical access to the river by improving the ecological quality of the site, public safety,
ease of access of public facilities, and views, and by developing a cohesive bike path along the
river. By including these aspects as key components of the proposal, this policy is sufficiently
addressed.
(3) Interpretation. In the event any of the terms used in these S-RP zone
provisions require interpretation, the planning and development director
shall be responsible for such interpretation.
The Applicant acknowledges this criterion and accepts the planning and development directorÈs
interpretation should any provisions require interpretation.
8.2 Willamette Greenway Permit (EC 9.8815)
Statewide Planning Goal 15, Willamette River Greenway, provides that:
ÅThe qualities of the Willamette River shall be protected, conserved, enhanced and
maintained consistent with lawful uses present on December 6, 1974. Intensifications of
uses, changes of use or developments may be permitted after this date only when they are
\[other standards\]
consistent with the Willamette Greenway Statute, this Goal and.Æ
Regarding Åother standards,Æ EC 9.8800-9.8825 provides that:
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 82
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
ÅEC 9.8800 Purpose of Willamette Greenway Permits. Intensifications of uses, changes in
use, or development require special consideration before being permitted within the
boundaries of the Willamette River Greenway. * * * Urban uses may be allowed but
conditions of approval may be imposed as are deemed necessary to carry out the purpose
and intent of the Willamette River Greenway, and to ensure that any intensifications of uses,
changes in use, or developments within the Willamette Greenway boundaries are
compatible with nearby uses within the Willamette Greenway.Æ
ÅEC 9.8805 Applicability. Willamette Greenway permit applications are required for
intensification of uses, changes in use, or developments within the boundaries of the
Willamette River Greenway * * * .
As illustrated on Sheet L01 Regulatory Plan (Exhibit A), approximately 74.2 acres of the subject site
are within the boundaries of the Willamette River Greenway. As noted, the proposal requires
special consideration and approval of a Willamette Greenway permit to allow development to
proceed in accordance with the master plan vision and to ensure compatibility with nearby uses.
As used in this section, the words "the greatest possible degree" are drawn from Oregon
Statewide Planning Goal 15 (F.3.b.) and are intended to require a balancing of factors so that each
of the identified Willamette Greenway criteria is met to the greatest extent possible without
precluding the requested use.
EC 9.8815 Willamette Greenway Permit Approval Criteria and Standards. Willamette
Greenway permit approval may be granted only if the proposal conforms to all
the criteria in subsections (1) through (4), and the applicable standards of
subsection (5) as follows:
(1) To the greatest possible degree, the intensification, change of use, or
development will provide the maximum possible landscaped area, open
space, or vegetation between the activity and the river.
Findings of fact that address this standard are described under Criterion C for Development Within
Willamette Greenway Boundaries. These findings are incorporated by reference herein.
(2) To the greatest possible degree, necessary and adequate public access
will be provided along the Willamette River by appropriate legal means.
Findings of fact that address this standard are described under Criterion E for Development Within
Willamette Greenway Boundaries. These findings are incorporated by reference herein.
(3) The intensification, change of use, or development will conform with
applicable Willamette Greenway policies as set forth in the Metro Plan.
Findings of fact that address this standard are described under Criteria A-E for Development
Within Willamette Greenway Boundaries. These findings are incorporated by reference herein.
(4) In areas subject to the Willakenzie Area Plan, the intensification, change
of use, or development will conform with that planÈs use management
considerations.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 83
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
The subject site is not within the boundaries of the Willakenzie Area Plan. Therefore, this criterion
is not applicable.
(5) In areas not covered by subsection (4) of this section, the intensification,
change of use, or development shall conform with the following
applicable standards:
(a) Establishment of adequate setback lines to keep structures
separated from the Willamette River to protect, maintain, preserve,
and enhance the natural, scenic, historic, and recreational qualities
of the Willamette Greenway. Setback lines need not apply to water
related or water dependent activities as defined in the Oregon
Statewide Planning Goals and Guidelines (OAR 660-15-000 et seq.).
The subject property does not have an established Willamette Greenway setback line. As
illustrated on Sheets L01 Regulatory Plan (Exhibit A), the Applicant proposes the establishment of
a Willamette Greenway setback line to keep structures separated from the river and to protect,
maintain, preserve, and enhance the natural, scenic, historic, and recreational qualities of the
Willamette Greenway. The proposed setback line is coterminous with the required 100-foot
conservation area setback from the top of bank of the Willamette River as established by the /WR
Conservation Overlay Zone.
Section C.3 of Goal 15 sets out use management considerations and requirements for local plans
and implementing measures. Subsection (k) provides for the Greenway setback. Other relevant
considerations include providing adequate public access to the river, protection of significant fish
and wildlife habitat, and enhancing and protecting the natural vegetative fringe along the River.
Through establishment of the setback line, this criterion is satisfied.
(b) Protection of significant fish and wildlife habitats as identified in the
Metropolitan Plan Natural Assets and Constraints Working Paper.
Sites subsequently determined to be significant by the Oregon
Department of Fish and Wildlife shall also be protected.
As noted, the majority of the subject site is within the Willamette River Greenway, a natural asset,
as identified in the . The Willamette River is
Metro Natural Assets & Constraints Working Papers
adjacent to the site and is identified as a Goal 5 Water Resource by the
Goal 5 Water Resource
. As identified on the
Conservation PlanAdopted Protection Designations for the Eugene Goal 5
dated November 14, 2005, the
Wetland, Riparian, and Upland Wildlife Habitat Inventories Map
Willamette River is categorized a Category A Stream. All parcels within the subject site that abut
the Willamette River have /WR Water Resource Conservation overlay zoning. Pursuant to EC
9.4920(1)(c)(1.), Category A streams with a distinguishable high bank have a 100 foot setback
applied to top of bank (TOB) as part of the /WR overlay zoning. The proposed amendments do not
change protections established by the required 100-foot /WR conservation setback in EC
9.4920(1)(c)(1.) or affect inventoried Goal 5 Water Resources.
In order to support wildlife habitat, the proposal draws from the findings of the
Riparian
(Exhibit B), which found several key sensitive aquatic
Assessment and Management Report
species, and rare species historically documented within one mile of the site:
Sensitive Aquatic Species
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 84
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Chinook salmon () Ã federally threatened (Federal ESA)
Oncorhynchus tshawytscha
Chinook salmon () Ã federally threatened (Federal ESA)
Oncorhynchus tshawytscha
Steelhead ()
Oncorhynchus mykiss
Steelhead ()
Oncorhynchus mykiss
White sturgeon ()
Acipenser transmontanus
Western brook lamprey ()
Lampetra richardsoni
Pacific lamprey () Ã species of concern (Federal ESA)
Lampetra tridentate
Rare Species (ORBIC)
Western pond turtle () Ã sensitive critical (State ESA)
Actinemys marmorata
Retrorse sedge ()
Carex retrorsa
Painted turtle () Ã sensitive critical (State ESA)
Chrysemys picta
Townsend's big-eared bat () Ã sensitive critical (State ESA)
Corynorhinus townsendii
Bald eagle () Ã sensitive vulnerable (State ESA)
Haliaeetus leucocephalus
Bradshaw's lomatium () Ãendangered (State ESA)
Lomatium bradshawii
Oregon chub () Ã sensitive critical (State ESA)
Oregonichthys crameri
Bull trout (Coastal population) () Ã sensitive critical/vulnerable (State ESA)
Salvelinus confluentus
There are no other documented occurrences of sensitive or rare wildlife species within the subject
site. Per the report findings, the site contains the appropriate aquatic, upland, and riparian habitat
to support all eight of the rare species listed above. However, significant on-site habitat for
riverbank species is limited to the riparian corridor and is shown on Sheets L02 Site Plan and S01
Existing Conditions (Exhibit A). Additional measures that can improve the habitat and subsequent
proliferation of historically-present species, as well as generally improve the river corridor include
the aforementioned restoration techniques in C.31. There has not been any other subsequent
determinations of significant sites on the subject property. Based on these findings, this criterion
is satisfied.
(c) Protection and enhancement of the natural vegetative fringe along
the Willamette River to the maximum extent practicable.
Outside of aforementioned development regulations imposed by the Applicant, the siteÈs
preservation is supplemented by state regulations. The Willamette River adjacent to the
development site is identified as a Goal 5 Water Resource. The Willamette River is a Category A
resource, meaning it is designated for protection with a required 100-foot setback. In addition, the
development site contains a Category A Wetland, labeled site WR-4 on the Goal 5 Inventory. This
Riverfront Park/Millrace wetland requires a setback of 50 feet. Both of these setbacks have been
incorporated by the Applicant on Sheet L01 Regulatory Plan (Exhibit A) which protects natural
vegetative fringe, and the Applicant proposes an additional 200-foot riparian setback for buildings
and recreational fields to allow for expanded riparian restoration. When this 200-foot setback is
measured from the waterÈs edge, the setback equates to 250-300 feet. In addition, protection of
significant riparian vegetation is ensured through existing established /WR protection provisions in
EC 9.4900-9.4980, which are not affected by the proposal. Therefore, this policy is satisfied.
(d) Preservation of scenic qualities and viewpoints as identified in the
Metropolitan Plan Natural Assets and Constraints Working Paper.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 85
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
The Paper does not identify any scenic
Metropolitan Natural Assets and Constraints Working
qualities or viewpoints on the subject site. This criterion does not apply.
(e) Maintenance of public safety and protection of public and private
property, especially from vandalism and trespass in both rural and
urban areas to the maximum extent practicable.
As provided by Goal 15, Willamette River Greenway, Section J (OAR 660-015-0005):
ÅNothing in this Goal is intended to authorize public use of private property. Public use of
private property is a trespass unless appropriate easements and access have been acquired
in allowance with law to authorize such use.Æ
The Applicant (University of Oregon) is a public institution and owns all parcels within the subject
site. The proposal does not encourage trespass on private property. All public improvements will
be constructed in accordance with standards specified in EC 9.6505 and EC 9.3715. S-RP Zone
development standards are consistent with those in the land use code and will contribute to foster
public safety and protection of public and private property. Based on these findings, this criterion
is satisfied.
(f) Compatibility of aggregate extraction with the purposes of the
Willamette River Greenway and when economically feasible,
applicable sections of state law pertaining to Reclamation of Mining
Lands (ORS Chapter 517) and Removal of Material; Filling (ORS
Chapter 541) designed to minimize adverse effects to water quality,
fish and wildlife, vegetation, bank stabilization, stream flow, visual
quality, noise, safety, and to guarantee necessary reclamation.
The proposal does not involve aggregate extraction nor will it have any impact on existing
aggregate resources. This criterion does not apply.
(g) Compatibility with recreational lands currently devoted to
metropolitan recreational needs, used for parks or open space and
owned and controlled by a general purpose government and
regulation of such lands so that their use will not interfere with
adjacent uses. As used in this section, the words "the greatest
possible degree" are drawn from Oregon Statewide Planning Goal
15 (F.3.b.) and are intended to require a balancing of factors so that
each of the identified Willamette Greenway criteria is met to the
greatest extent possible without precluding the requested use.
The proposal includes new facilities that, when not in use by the university, can be made available
for community use through partnership with the University of Oregon Department of Physical
Education and Recreation. Additional facilities open to the public include the realigned bike path,
improved access to the river via soft trails and view points, and a proposed personal paddle craft
launch point. Therefore, this policy is satisfied.
(6) When site review approval is required, the proposed development will be
consistent with the applicable site review criteria.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 86
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
The proposal does not involve or require Site Review. This criterion does not apply.
(7) The proposal complies with all applicable standards explicitly addressed
in the application. An approved adjustment to a standard pursuant to
provisions beginning at EC 9.8015 of this land use code constitutes
compliance with the standard.
The above findings demonstrate compliance with applicable standards explicitly addressed in this
application. No adjustment to standards are requested or needed. Based on these findings, this
criterion is satisfied.
8.3 S-RP Riverfront Park Special Area Zone Development Standards
Demonstration of compliance with the S-RP developments standards is not an explicit requirement
of the Conditional Use Permit or Willamette Greenway Permit approval criteria. The proposal
addresses said criteria, to the greatest extent practicable, and in recognition of the nature of the
proposal, a Master Site Plan, in order to demonstrate that future development will be consistent
with development standards.
EC 9.3715 S-RP Riverfront Park Special Area Zone Development Standards. In order to
allow an overall development that is consistent with the purpose and intent of
the S-RP Riverfront Park Special Area Zone as well as its unique location
adjacent to the Willamette River and Millrace, the following development
standards shall prevail. In the event the development standards here conflict
with the general standards of this land use code, the standards provided here
supersede any conflicting provisions.
(1) Parking Requirements. The parking requirements for new construction
provided here attempt to balance encouragement of use of alternative
travel modes with the need for automobile storage; more parking than
the minimums specified here may need to be provided. Parking and off-
street loading areas shall be designed, laid out, and constructed in
accordance with the parking area design, improvements, buffering, and
dimensions as specified in EC 9.6420 Parking Area Standards. Required
parking shall be determined for each separate occupancy within a
building or on a development site. For example, in a combined industrial
and office business, parking shall be required for the industrial use at a
ratio of one space per 500 square feet and the office portion at one space
per 400 square feet. Required parking shall be located within 400 feet of
structures to be served unless a greater separation is specifically
approved through the master development plan approval process. For
that portion of the special area zone located between the Willamette
River and the railroad tracks, up to 50 percent of the required parking
may be provided north of the Willamette River if approved through the
master site plan approval process as outlined in EC 9.3725 S-RP
Riverfront Park Special Area Zone Review Procedures. Required parking
may be provided through joint use of parking facilities, subject to the
requirements of EC 9.6430 Shared Off-Street Parking.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 87
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
(a) Required parking shall be provided at the following ratios, rounded
up to the nearest whole number:
1. Industrial uses - 1 for each 500 square feet of gross floor area.
2. Retail uses - 1 for each 300 square feet of gross floor area.
3. Office uses - 1 for each 400 square feet of gross floor area.
4. University uses - 1 for each 400 square feet of gross floor area.
5. Multiple-family dwellings - 1 for each dwelling unit, plus 1 guest
parking space for each 3 units.
The proposal involves University uses and includes 1,343,300 gross square feet of new buildings,
as shown in Table L02-2 Proposed Building Coverage (Exhibit A). Based on the proposed gross
floor area, and the ratio provided for University uses above, 3,424 parking spaces would be
required to serve the full North Campus build-out.
In July 1997, the City of Eugene accepted a study that concluded the university was in compliance
with applicable city codes regulating the supply of automobile and bicycle parking. This study
included justification for a 50% reduction in the required automobile parking, as described in the
EC 9.8030(10). Based on the application of the 50% reduction to the number of parking spaces
required by EC 9.3715(1)(a), 1,712 parking spaces are required to serve the complete North
Campus build-out, for most of which there are no definitive development plans or dedicated
funding to construct improvements.
Exhibit G City of Eugene Parking Code Compliance Report contains the annual analysis of student
enrollment and automobile parking spaces on campus during calendar year 2016 with the intent of
measuring continued compliance with City codes regulating required parking. One of the
provisions of the study is that the university compare enrollment from the previous year with the
amount of parking supply to ensure continued compliance. Following is the analysis:
Average full-time enrollment, 2016: 20,079
Parking spaces required: (20,079 / 3.5) x .5 = 2,869 spaces
Parking spaces supplied on the Eugene campus: 3,607 spaces
The analysis shows that the campus currently contains a surplus of 738 parking spaces. Sheet
L02 Site Plan (Exhibit A) identifies two future parking structures planned for construction in the
North Campus area. The proposed structures are located in Area 2, east of Riverfront Parkway
and north of Millrace Drive, and are planned to have a combined capacity of 1,110 parking
40
spaces. Some of the planned parking supply in North Campus is intended to address Knight
Campus requirements per the Walnut Station Special Area Zone (S-WS) requirements, and other
parking supply is intended to replace existing surface parking displaced by future Knight Campus
and North Campus development and provide additional capacity for future parking removal.
40
University of Oregon Campus Physical Framework Vision. Appendix A: Coverage and Capacity; page A-
18. March 15, 2016.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 88
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
In addition to the future North Campus parking structures, the Campus Physical Framework Vision
proposes additional future parking facilities located in other areas of campus that are intended to
provide capacity to serve the needs of up to 34,000 student full-time equivalents.
Compliance with (1)(a)4. above will be evaluated at the time of development and the CityÈs land
use review component of the Construction Permit approval process ensures that parking
standards will be met on a project by project basis. Based on these findings, this standard is
satisfied.
Based on the above findings, this standard is satisfied.
(b) Bicycle parking: Bicycle spaces shall be provided as follows:
1. Non-residential uses - the minimum number of spaces shall
equal 15 percent of the number of required automobile spaces.
2. Multiple-family dwellings - 1 space per unit.
3. Locking and cover shall be provided for all required spaces.
4. Required spaces shall be located no farther than 2 times the
distance between building entrances used by automobile
occupants and the automobile parking spaces closest to those
entrances.
5. Each required space must be at least 6 feet long and 2 feet
wide, with a minimum overhead clearance of 6 feet.
As noted, 1,712 vehicle parking are required to serve the complete North Campus build-out, for
most of which there are no definitive development plans or dedicated funding to construct
improvements. Based on the ratio specified at (1)(b)1. above, 257 bicycle parking spaces are
required for development that entails entirely non-residential uses. Future development could
include student housing, a multiple-family use, which will be assessed per (1)(b)2. above as one
required space per dwelling unit. Sheet L02 Site Plan (Exhibit A) demonstrates that there is
sufficient space within the development sites to accommodate the required number of bicycle
parking spaces.
The North Campus area is within the boundaries of the universityÈs Bike Management Program,
which regulates bicycle parking campus-wide. The requirement for campus bicycle parking is 1
space per 5 average full-time equivalent students and the ratios for the entire campus are 50%
short term open; 25% short term covered; and, 25% long term.
Compliance with (1)(b)1. above will be evaluated at the time of development and the CityÈs land
use review component of the Construction Permit approval process ensures that bicycle parking
standards, including type, location, and design characteristics, will be met on a project by project
basis. Based on these findings, this standard is satisfied.
(2) Setback Requirements. Development within the S-RP zone shall comply
with the following setbacks:
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 89
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
(a) All structures, parking areas, streets, and access drives shall
maintain a minimum setback of 35 feet from the top of the south
bank of the Willamette River. A map indicating the location of the
top of the south bank is on file with the cityÈs planning and
development department.
EC 9.3715 specifies that the development standards in the S-RP Zone supersede any conflicting
provisions with the general standards. The /WR Water Resources Conservation Overlay Zone
applies a 100-foot conservation setback to the Willamette River and a 40-foot conservation
setback to the Millrace, as measured from the top of bank. According to the provisions at (2)(a)
above, the Applicant could propose development, including structures, parking areas, streets, and
access drives, beginning at 35 feet from the top of bank of the river.
As illustrated on Sheet L01 Regulatory Plan (Exhibit A), the proposal includes a required 100-foot
conservation setback extending from the Willamette River and Millrace top of bank lines. Further,
the Applicant proposes a riparian enhancement setback of 200-feet for buildings and recreational
fields along most of the length of the property, as shown on Sheet L01 Regulatory Plan. Since this
200-foot setback is determined from the top of bank, the setback equates to 250-300 feet as
measured from the waterÈs edge. Based on the above findings, and because the proposal does
not involve development within 35 feet of the top of bank, this standard is satisfied.
(b) All structures, parking areas, streets, and access drives shall
maintain a minimum setback of 15 feet from the south side of the
bicycle path located (or as to be relocated) adjacent to the top of
the river bank. If the setback specified herein requires a greater
distance than the 35 feet specified under Section 9.3715(2)(a), the
greater distance shall be maintained.
As illustrated on Sheet L02 Site Plan (Exhibit A), the proposal includes two options for realignment
of the bicycle path referenced in (2)(b) above. Sheet L02 Site Plan further illustrates that all
proposed structures, parking areas, street, and access drives are more than 15 feet from the south
side of the alignment options. Therefore, this standard is satisfied.
(c) Solar access shall be provided to at least 60 percent of the following
designated areas:
1. The south bank of the Willamette River.
2. The bicycle path located (or as to be relocated) adjacent to the
top of the river bank.
3. The Autzen Stadium footbridge protection area defined in
Section 9.3715(2)(e) below.
4. Active recreation areas defined in the master site plan.
The solar access required herein shall be provided at noon from
February 21 to October 21 of any year. If building setbacks
necessary to ensure this solar access are greater than would
otherwise be required, the greater setback shall be required.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 90
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
As illustrated on Sheet L02 Site Plan (Exhibit A), the proposal does not include any proposed
structure that impact solar access to the features listed in (2)(c) above. Therefore, this standard is
satisfied.
(d) The Millrace shall be maintained as an open channel through the S-
RP zone with the following setbacks:
1. No structure, street, access drive, or parking area shall be
located adjacent to the east Millrace outfall within the area
defined by the bicycle path as it existed on May 11, 1987. This
area is indicated on the map referenced in subsection (2)(a) of
this section.
2. No structure, street, access drive, or parking area shall be
located within 15 feet of the top of the banks of the Millrace in
all areas within the S-RP zone except for the area described
under EC 9.3715(2)(d)1. above where a greater setback is
required. Except for the east Millrace outfall area described
under EC 9.3715(2)(d)1. above, street or access drive crossings
that are needed for circulation may be approved as part of the
master development plan.
As illustrated on Sheet L01 Regulatory Plan (Exhibit A), the proposal does not include any
structures, streets, access drives, or parking areas located adjacent to the east Millrace outfall or
within 15 feet of the top of banks of the Millrace, with the exception of proposed crossings that are
needed for pedestrian, bicycle, and service vehicle circulation, as illustrated on Sheets L03
Pedestrian and Bicycle Primary Circulation Plan and L05 Service Vehicle Primary Circulation Plan
(Exhibit A). Based on these findings, this standard is satisfied.
(e) All structures and parking areas shall maintain a setback of 50 feet
on both sides of a straight line between the existing pedestrian
underpass under the railroad tracks and the Autzen Stadium
footbridge to provide visual linkage between the two structures.
This area is indicated on the map referenced in subsection (2)(a) of
this section.
As illustrated on Sheet L01 Regulatory Plan (Exhibit A), the proposal does not include any
structures or parking areas located within 50 feet of a straight line between the existing pedestrian
underpass under the railroad track and the Autzen Stadium (Frohnmayer) footbridge. Therefore,
this standard is satisfied.
(f) Multiple-family dwellings shall have interior yards of not less than 10
feet between buildings, without regard as to the location of the
property line, or no interior yards required if the buildings abut or
have a common wall, except where a utility easement is recorded
adjacent to an interior lot line, in which event there shall be an
interior yard of no less than the width of the easement.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 91
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
As noted, there are no definitive development plans or dedicated funding to construct
improvements. Future development could include university-owned housing, a multiple-family
use. Compliance with (2)(f) above will be evaluated at the time of development and the CityÈs land
use review component of the Construction Permit approval process ensures that interior yard
standards will be met on a project by project basis. Based on these findings, this standard is
satisfied.
(g) Except as provided above, all structures other than multiple-family
dwellings shall have no setback requirements.
Public improvements, including pedestrian and bicycle trails, public
plazas, and similar amenities, but excluding roads and parking areas, are
exempt from the setback requirements specified above.
Compliance with (2)(g) above will be evaluated at the time of development and the CityÈs land use
review component of the Construction Permit approval process ensures that this will be met on a
project by project basis. Based on these findings, this standard is satisfied.
(3) Required Building Separation and Profile Offsets. All buildings located
within 75 feet of the top of the south bank of the Willamette River shall
observe the following profile and separation requirements:
(a) The maximum building profile as seen from end to end of the side(s)
facing the river shall not exceed 200 lineal feet in total horizontal
length.
(b) Any building elevation parallel to the river shall not continue along
an uninterrupted, continuous plane for more than 100 feet. For the
purpose of this requirement, an uninterrupted, continuous plane is a
wall having no variation in exterior surface along its length of more
than 5 feet as measured at a perpendicular line from the plane of the
wall.
(c) Each building shall be separated by at least 50 feet from an
adjoining building, measured parallel to the river.
No building shall have a total horizontal length of more than 300 feet as
measured on its longest axis.
As noted, EC 9.3715 specifies that the development standards in the S-RP Zone supersede any
conflicting provisions with the general standards. The /WR Water Resources Conservation Overlay
Zone applies a 100-foot conservation setback to the Willamette River and a 40-foot conservation
setback to the Millrace, as measured from the top of bank. According to the provisions at (2)(a)
above, the Applicant could locate buildings within 75 feet from the top of bank of the river.
As illustrated on Sheet L01 Regulatory Plan (Exhibit A), the proposal includes a required 100-foot
conservation setback extending from the Willamette River and Millrace top of bank lines. Further,
the Applicant proposes a riparian enhancement setback of 200-feet for buildings and recreational
fields along most of the length of the property, as shown on Sheet L01 Regulatory Plan. Since this
200-foot setback is determined from the top of bank, the setback equates to 250-300 feet as
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 92
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
measured from the waterÈs edge. Based on the above findings, and because the proposal does
not involve development within 75 feet of the top of bank, this standard is satisfied.
(4) Coverage Requirements. Coverage requirements within the S-RP zone
shall be as follows:
(a) For that portion of a development site allocated for multiple-family
residential use, the maximum permitted coverage by buildings and
structures shall be 50 percent.
(b) For that portion of a development site allocated for all uses other
than multiple-family residential, at least 40 percent of that portion of
the site to be developed shall be landscaped with living plant
materials. Natural areas (e.g., along the Millrace or from the top of
the bank along with the Willamette River south) may be included in
the 40 percent computation. The amount of open space may be
reduced to 30 percent if 40 percent of the required parking for the
development or phase thereof is provided either below grade, at
grade but under a structure, or in a parking structure.
Public amenities such as plazas, pedestrian or bicycle trails, and similar
improvements shall be considered open space when computing
coverage. When computing coverage within the S-RP zone, structures
owned by the Oregon State System of Higher Education and in existence
as of May 11, 1987 shall not be included.
Sheet L01 Regulatory Plan (Exhibit A) is a tabulation of site coverage does not allow building
coverage to exceed the above limits. The proposed building and field coverage limitations
demonstrate that the coverage requirements in (4) above can be met in all development areas.
The nature of this proposal is a long-range Master Site Plan. Compliance with this standard will be
evaluated at the time of development and the CityÈs land use review component of the
Construction Permit approval process ensures that the standard will be met as development
occurs. Based on these findings, this standard is satisfied.
(5) Height Limitation. No portion of a structure located within 75 feet of the
top of the south bank of the Willamette River shall exceed 45 feet in
height above grade (not to exceed 3 stories). There is no height limitation
for a structure or a portion thereof outside the area described above.
As noted, the proposal does not include any structures located within 75 feet of the Willamette
River top of bank. As illustrated on Sheet L01 Regulatory Plan (Exhibit A), the Applicant proposes
height limitations in all development areas in order to ensure that development is compatible with
the existing campus and scenic qualities of the Willamette River. Based on these findings, this
standard is satisfied.
(6) Signs. Signs within the S-RP zone shall conform to the provisions of EC
9.6670 Central Commercial Sign Standards, except for any area located
within 200 feet of the centerline of Franklin Boulevard in which area the
provisions of EC 9.6675 Highway Commercial Sign Standardsshall apply.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 93
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
No signs facing the river shall be permitted within 75 feet of the top of the
south bank of the Willamette River, except identity signs not exceeding
12 square feet in surface area which are not more than 5 feet above
grade if ground-mounted or 10 feet above grade if wall-mounted.
Compliance with this standard will be evaluated at the time of development and the CityÈs land use
review component of the Construction Permit approval process ensures that the standard will be
met as development occurs. Based on these findings, this standard is satisfied.
8.4 S-RP Public Facilities (EC 9.3720)
Demonstration of compliance with the S-RP Public Facilities standards is not an explicit
requirement of the Conditional Use Permit. The proposal addresses said criteria, to the greatest
extent practicable, and in recognition of the nature of the proposal, a Master Site Plan, in order to
demonstrate that future development will be consistent with public facility standards.
EC 9.3720 S-RP Riverfront Park Special Area Zone Public Facilities. Within the S-RP zone,
the following standards shall govern installation of improvements that are of
benefit to the public and ensure public access:
(1) A continuous, two-way (Class I) bicycle path shall be provided through
the development along the river and at other locations designated in the
Eugene Bikeways Master Plan.
The Pedestrian and Bicycle Primary Circulation Plan (Sheet L03, Exhibit A Plan Set) illustrates
primary circulation routes, access points, and crossings that the university proposes to facilitate
improved access to the North Campus area. The proposal includes two proposed alignment
options for the Ruth Bascom Riverfront Path, a continuous, two-way bicycle path through the
development site. One option shows the path further north closer to the riverÈs edge, and one
option shows it further south. These options provide several key benefits:
The northern alignment proposes a new bridge crossing over the mouth of the Millrace Slough,
which is intended to enable future removal of the existing culvert and crossing and more
comprehensive restoration of the slough. The alignment extends under the south abutment of
the Frohnmayer Bridge and extends eastward in order enable a future extension to
Knickerbocker bridge on the north side of the railroad tracks. The alignment allows for bank
layback and riparian restoration, but not to the extent proposed in the southern alignment. The
alignment responds to desires for public access along the river, enhanced safety by activating
the riverÈs edge and improving sightlines, and improved ecological function.
The southern alignment utilizes the existing culvert crossing within the Millrace Slough to
transverse this feature. The alignment does not extend east, and connects to Riverfront
Parkway and Millrace Drive, which is the current eastward travel pattern for pedestrians and
bicyclists. Shifting the bike path further from the river allows for more area devoted to bank
layback and riparian restoration, and lessens the steepness of the proposed transition from the
ordinary high water line to top of bank line. The alignment responds to desires to expand the
riparian area, improve ecological function, and minimize conflicts between recreation and
habitat uses.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 94
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Based on the proposalÈs intent to implement of one of the aforementioned options for bike path
realignment, this standard is satisfied.
(2) Pedestrian-scale lighting shall be provided along the bicycle paths
required above.
Provisions of the S-RP Zone inherently ensure high-quality public amenities along the riverfront
including bike parking, ample setbacks to protect the riverbank, and adequate lighting.
Pedestrian-scale lighting will be provided along the bicycle path as required, and will be reviewed
by the city through the standard development review process for a future bike path alignment. As
discussed later, bike path lighting will comply with code standards for outdoor lighting. In
addition, the university will implement other best practices to mitigate adverse impacts of the
lighting toward the river. Therefore, this standard is satisfied.
(3) Street lights shall be provided along all public streets within the S-RP
zone.
Streetlights are provided along all existing public streets. No additional public streets are
proposed. Therefore, this standard is satisfied.
(4) Street trees shall be provided along all public streets within the S-RP
zone.
Street trees are provided along all existing public streets. No additional public streets are
proposed. Therefore, this standard is satisfied.
(5) Setback sidewalks shall be provided along all public streets within the S-
RP zone, unless an alternative pedestrian circulation system of
substantial equivalency is specifically approved as part of the master site
plan approval process.
The proposal does not involve new public streets. Existing public streets within the subject site
include Riverfront Parkway and Millrace Drive. The portion of Riverfront Parkway between Millrace
Drive and the Millrace has setback sidewalks. Millrace Drive and other portions of Riverfront
Parkway have curbside sidewalks. As illustrated on Sheet L03 Pedestrian and Bicycle Primary
Circulation Plan, the proposal includes an expanded and improved pedestrian circulation system.
The Applicant requests flexibility to develop curbside sidewalks along Millrace Drive, in conjunction
with future building development, in order to match existing conditions and respond to site
constraints. Millrace Drive is a low-volume and low-speed public street. The construction of
curbside sidewalks enable the ability to create a larger landscape area, as opposed smaller
landscape areas on either side of the sidewalk). In consideration of the request for flexibility and
the above findings, this standard is satisfied to the greatest extent practicable.
(6) Provision shall be made for security, such as lighting, between any
parking areas located outside the boundaries of the S-RP zone and the
development site the parking is intended to serve.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 95
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
Provisions for security, such as lighting, will be provided between any parking areas located
outside the boundaries of the S-RP zone and the development site, and will be reviewed by the
city through the standard development review process. Therefore, this standard is satisfied.
(7) All utilities shall be installed underground unless specifically exempted
through the master site plan approval process. Exceptions shall be made
for such features as padmounted transformers, switch cabinets, back
flow prevention devices and closures needed to safely operate and
maintain utility systems.
All existing utilities that serve the subject site are provided underground. Any additional utilities
needed for the site, aside from those excepted above, will be installed underground and reviewed
through the standard development review process. Therefore, this standard is satisfied to the
maximum extent practicable.
8.5 Outdoor Lighting Standards (EC 9.6725)
Proposed development within the North Campus area is subject to Outdoor Lighting Standards at
EC 9.6725 and will require Lighting Permits, as specified in EC 9.6725(6)(a). This section identifies
applicable standards that apply to distinct areas within the subject site based on the establishment
of outdoor lighting classifications (EC 9.6725(8)). All lighting fixtures are required to be cutoff with
additional shielding, as necessary to direct light within the boundaries of the development site.
There are three distinct lighting classification areas within the subject site: conservation areas,
general development areas, and the recreation fieldsÈ development area.
Conservation Areas (Area 3 and 7)
Conservation areas are identified as Areas 3 and 7 on Sheet L01 Regulatory Plan (Exhibit A) and
are within the Intrinsically Dark Areas (O-1) classification. Within this area, lighting is discouraged
except where it is desirable to illuminate walkways, bike paths or other areas to be used after dark.
The following standards apply. In addition, the university will implement other best practices to
mitigate adverse impacts of the lighting toward the river.
ÅExcept for pedestrian/bike tunnels, the walkway or pathway shall be illuminated to a minimum
average maintained luminance of .3 foot-candle and not to exceed a maximum average
maintained luminance of .9 foot-candle.
The pedestrian/bike tunnel shall be illuminated to a minimum average maintained luminance of
4.0.
Any other lighting fixtures not illuminating walkways, bike paths, or tunnels shall be designed to
direct light downward, and light sources shall have an initial output of no more than 1,500
lumens.Æ
General Development Areas (Area 1, 2, 4, and 6)
General development areas are identified as Areas 1, 2, 4, and 6 on Sheet L01 Regulatory Plan
(Exhibit A) and are within the High Ambient Light Areas (O-4) classification, which applies to:
Å\[P\]ortions of colleges and universities, high schools, the fairgrounds, and other areas zoned
PL determined by the planning director to have a high level of nighttime activity.Æ
Recreation Fields Development Area (Area 5)
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 96
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
In addition, the proposed recreation fields will be used for intramural sports and similar activities
that have unique lighting needs, consistent with EC 9.6725(12) Lighting of Outdoor Performance
Facilities use. The following standards apply. In addition the university will implement other best
practices to mitigate adverse impacts of field lighting toward the river.
ÅDesign Plan: A lighting design plan shall be submitted which shows in detail the proposed
lighting installation. The design plan shall include a discussion of the lighting requirements of
various areas and how those requirements will be met.
Dual System: The main lighting of the event (spotlighting or floodlighting, etc.) shall be turned
off no more than 60 minutes after the end of the event. A low level lighting system shall be
installed to facilitate patrons leaving the facility, cleanup, nighttime maintenance, etc. The low
level lighting system shall provide an average horizontal illumination level, at grade level, of no
more than 3.0 foot-candles with a uniformity ration (average to minimum) not exceeding 4:1.
Primary Playing Areas: Where playing fields or other special activity areas are to be illuminated,
lighting fixtures shall be specified, mounted, and aimed so that their beams fall within the
primary playing area and immediate surroundings, and so that no direct illumination is directed
off the site.
Parking Areas: Lighting for parking areas shall comply with EC 9.6725(9).
Pedestrian/Bike path Areas: Lighting for pedestrian and bike pathways shall comply with EC
9.6725(8)(b).Æ
As noted, all outdoor lighting is subject to a Lighting Permit issued by the building and permit
services manager. Proposed lighting associated with development will be reviewed through the
Lighting Permit and Application Approval Process as specified in EC 9.6725(7). This review
process ensures that any proposed outdoor lighting will be consistent with the above standards
based on the applicable lighting classification and use.
8.6 Duration of Approval
EC 9.7340(2) contains the following provision concerning the duration of a Conditional Use Permit
approval:
ÅUnless the hearings official designates otherwise, a conditional use permit approval shall
expire 18 months after the effective date of approval unless actual construction or alteration
has begun under a required permit, or in the case of a permit not involving construction or
alteration, actual commencement of the authorized activity has begun. However, the
applicant may submit a modification application at any time before the 18-month period has
expired, requesting an extension of the approval period. The applicant may request more
than one extension. Under no circumstances, however, can the total combined extension
periods exceed 36 months from the original expiration date.Æ (emphasis added)
EC 9.7340(4) contains the following provision concerning the duration of a Willamette Greenway
permit approval:
ÅUnless the decision specifies otherwise, a Willamette Greenway permit approval shall
expire 18 months after the effective date of approval unless actual construction or alteration
has begun under a required permit, or in the case of a permit not involving construction or
alteration, actual commencement of the authorized activity has begun. However, the
applicant may submit a modification application at any time before the 18-month period has
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 97
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
expired, requesting an extension of the approval period. The applicant may request more
than one extension. Under no circumstances, however, can the total combined extension
periods exceed 36 months from the original expiration date. * * *.Æ (emphasis added)
When CU 88-16 was approved, the hearings official designated a 20-year completion timeline.
Given the precedent from the prior approval and duration of estimated timeline for completion, the
Applicant requests that the hearings official recognize this unique aspect of the proposal and
prevent the need for repeated extension requests in the future by granting a 30-year completion
timeline. This Conditional Use Permit request is unique because it is for a vast area of land (77
acres), for most of which the university has no definitive plans and/or funding to improve yet. This
land use approval is required by the S-RP zone and needed by the university so that it can move
forward with current planned projects and accommodate future projects as the needs arise. The
typical timeline for university capital projects is three to six years to secure funding and complete
construction. Even if multiple projects were underway at once (which would be unlikely), full
buildout for the number of projects and improvements possible in the Master Site Plan would take
at least 30 years or longer.
CU 88-16 did not involve a request for a Willamette Greenway permit, as those provisions did not
exist in the EC at the time of application. Therefore, the Applicant request that the planning
director specify a 30 year completion timeline in the decision in order to align with the completion
timeline requested of the hearings official for the Conditional Use Permit.
8.7 Conclusion
Based on the preceding findings and criteria, and the evidence incorporated herein, this request
for concurrent Conditional Use and Willamette Greenway permit approval for a project permitted
under the purview of the S-RP Zone demonstrates compliance with all applicable approval criteria
and standards.
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 98
UNIVERSITY OF OREGON
NORTH CAMPUS
CONDITIONAL USE & WILLAMETTE GREENWAY PERMIT APPLICATION
EXHIBITS
Cameron McCarthy FINAL SUBMITTAL | June 22, 2018 EXHIBITS
˽˾̃̂ ȲŵûɷǨȀûșʑ ƕÌ ƔǨÓƕŵˍ ȳÓŵˍ Ɣǧ ̅̃̀˼˿
ȲŴúɶǧǿúȘʐ ƔË ƔǧÒƔŴ
̂˝˽̀˝˾˼˽̄ ˾ˏ˾˼ ǘŪ
ÒƔËË Œ!ǧǿŴ
ǿȘ!Ūǘ
Ŵ
Ɣ
5
ǧ
Ș
Ɣ
5
5
ʐ
Ū
Œ
ǧ
Ŵ
Ɣ
5
Ɣ
Ŵ
Ҍ
O 5
H
W
kélŅ|ˏ
O
H
W
O
ÒŒ˝{Œ
H
W
{Ǩ"ɽŵ aʑˏ
O
H
W
O
H
W
kélŅ|ˏ
O
H
W
ļˏ˞˾˽˼˼˷˼˿˾˷˽͉̃ȲƔ ŴƕǨșé k"ūǙȳȀ kȲǘ˞kûɷûœ˞{ɼÒ͉Œ!Ŵ{ Ȳǿ˞ËûÓȳǨ ˿˷ǿ"ŵûș"Ǩʑ ǿɽǨː|ɽÓ
˽̃˿˿
ǘǨƕĽlș ˻ˏ
ļȳŵ ˽́ˍ ˾˼˽̄
{"șˏ
ǧɷː ˻ˏ{"șˏ
˻
||˝ūū˝ʑʑ
ǿèȘ ȘúȘŒǿèȘ ȘúȘŒ
ǿ!ŴúȘ!ǧʐ
ǿɼǧ ǘŒ!Ŵ
00200'400'
ǿèȘ ˻
k˼˾
SCALE: 1"=200'
ŒÒŴ{
Ș!ʊ ŒƔȘ aƔȲŴ{!ǧʐ
˽˾̃̂ ȲŵûɷǨȀûșʑ ƕÌ ƔǨÓƕŵˍ ȳÓŵˍ Ɣǧ ̅̃̀˼˿
˽̃˷˼˿˷˿˾˷˾˽
Ș"ʋ Œƕș ˼˼˿˼˼
˽̃˷˼˿˷˿˾˷˾̀
Ș"ʋ Œƕș ˼́˿˼˼
ȲŴúɶǧǿúȘʐ ƔË ƔǧÒƔŴ
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾̃˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˼˽˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˼˽˼́˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾̂˼˼
˽̃˷˼˿˷˿˾˷˽̀
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˽̂˼˼
Ș"ʋ Œƕș ˼˾́˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˽̀˼˼
˽̃˷˼˿˷˿˾˷˽̀
˽̃˷˼˿˷˿˾˷˽̀˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾˿˼˼
Ș"ʋ Œƕș ˼˼˽˼˿Ș"ʋ Œƕș ˼˾˾˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾̀˼˼
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˽̄˼˼
ǿȘ!Ūǘ
˽̃˷˼˿˷˿˾˷˽̀
Ș"ʋ Œƕș ˼˾˼˼˼
kŪ
kélŅ|ˏ
ɶǿ
{Ǩ"ɽŵ aʑˏ
kélŅ|ˏ
˽̃˿˿
ǘǨƕĽlș ˻ˏ
Ëbː ̅ˍ ˾˼˽̄
ļȳŵ ˽́
{"șˏ
ǧɷː ˻ˏ{"șˏ
˻
||˝ūū˝ʑʑ
Œ!Ŵ{ Ȳǿ
ǿȲaŪúȘȘ!Œ
ǿèȘ ȘúȘŒǿèȘ ȘúȘŒ
Ș!ʊ ŒƔȘǿ
˼˟˽˼˼˟˾˼˼˟̀˼˼˟
ǿèȘ ˻
Ș!ʊ ŒƔȘǿ
Œ˼̂
˽
˽ˠ ̽ ˾˼˼˟˷˼ˠ
˽˾̃̂ ȲŵûɷǨȀûșʑ ƕÌ ƔǨÓƕŵˍ ȳÓŵˍ Ɣǧ ̅̃̀˼˿
ȲŴúɶǧǿúȘʐ ƔË ƔǧÒƔŴ
̂˝˽̀˝˾˼˽̄ ˾ˏ˾˼ ǘŪ
ÒƔËË Œ!ǧǿŴ
ǿȘ!Ūǘ
Ŵ
Ɣ
5
ǧ
Ș
Ɣ
5
5
ʐ
Ū
Œ
ǧ
Ŵ
Ɣ
5
Ɣ
Ŵ
Ҍ
5
kélŅ|ˏ
ÒŒ˝{Œ
{Ǩ"ɽŵ aʑˏ
kélŅ|ˏ
ļˏ˞˾˽˼˼˷˼˿˾˷˽͉̃ȲƔ ŴƕǨșé k"ūǙȳȀ kȲǘ˞kûɷûœ˞{ɼÒ͉Œ!Ŵ{ Ȳǿ˞ʋûȀșûŵÓ kƕŵ|ûșûƕŵȀ ǘœ"ŵː|ɽÓ
˽̃˿˿
ǘǨƕĽlș ˻ˏ
ļȳŵ ˽́ˍ ˾˼˽̄
{"șˏ
ǧɷː ˻ˏ{"șˏ
˻
||˝ūū˝ʑʑ
ǿèȘ ȘúȘŒǿèȘ ȘúȘŒ
ʊúǿȘúŴÒ
kƔŴ{úȘúƔŴǿ
00200'400'
ǿèȘ ˻
ǿ˼˽
SCALE: 1"=200'
UNIVERSITY OF OREGON
NORTH CAMPUS CONDITIONAL USE PERMIT PROJECT
Conditional Use Permit
Stormwater, Sanitary Sewer, and Water Analysis Report
Prepared for:
Cameron McCarthy Landscape Architects LLP
160 E Broadway
Eugene, OR 97401
(541) 485-7385
U
niversity of Oregon
Campus Planning and Facilities Management Department
1295 Franklin Boulevard
Eugene, OR 97403
(541) 346-2319
January 11, 2018
Revised June 15, 2018
BHEGroup, Inc.
940 Willamette Street, Suite 310
Eugene, OR 97401
541.686.8478
www.bhegroupinc.com
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
Table of Contents
Introduction .....................................................................3
Stormwater .....................................................................3
Existing Conditions and Drainage Patterns ..................................... 3
Soil and Groundwater Conditions ................................................... 3
Stormwater Management Approach for Future Development .......... 4
Sanitary Sewer ................................................................7
Water ..............................................................................8
|2
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
INTRODUCTION
This report provides an evaluation of the stormwater, sanitary sewer, and water supply
infrastructure requirements to support the UO North Campus Conditional Use Permit (CUP). This
report includes an analysis of stormwater management requirements to demonstrate compliance
with applicable City Code requirements.
STORMWATER
Existing Conditions and Drainage Patterns
The existing site south of the railroad tracks is fully developed with buildings, parking lots, walkways,
outdoor storage areas, and green space (i.e. lawns, landscaping, gardens, and riparian areas). The
existing site north of the railroad tracks (the Riverfront Area) consists primarily of vegetated land with
paved bike and pedestrian paths. The most significant impervious surface within the Riverfront area
idor extending from the north end of Riverfront Parkway to a point near
Autzen footbridge.
Stormwater runoff from the site is ultimately conveyed to the Millrace or the Willamette River. Existing
drainage basin boundaries and destination points are shown on Drawing C01 and summarized as
follows:
South Millrace Basin (Basin A): This basin represents the majority of the site south of the railroad
tracks and is characterized as the area that drains by gravity to the Millrace. The majority of the
drainage in this basin is collected and conveyed through piped conveyance systems, but
drainage adjacent to the Millrace is conveyed by sheet flow. The piped conveyance systems
discharge to the Millrace through multiple outfalls.
Riverfront Pump Station Basin (Basin B): This basin includes the area served by the Riverfront
Pump station, and includes land south and north of the railroad tracks. Drainage within this basin
is conveyed through public piped conveyance systems within Riverfront Parkway and Millrace
Drive. The storm drain system enters the ted in Riverfront
Parkway and th
the north bank of the Millrace (located under the Riverfront Parkway bridge).
North Athletic Field Basin (Basin C): This basin includes the athletic field located near the south
end of the Autzen footbridge. Surface and subsurface drainage from the field is conveyed to the
private outfall.
North Millrace / Willamette Basin (Basin D): This basin includes the remaining land in the
Riverfront area that is conveyed to the Millrace or Willamette River through sheet flow or shallow
surface flow. Flows from this basin are distributed throughout the length of the adjacent Millrace
and River.
Hilyard Street Outfall Basin (Basin E): Although this basin is not within the North Campus CUP
boundary, it is adjacent to the east edge of the CUP boundary and is noted here for context.
This basin includes the cul-de-sac at the north terminus of Hilyard Street and may include some
of the paved yard/lot located north of the cul-de-sac. Drainage from this basin is conveyed
public outfall to the Willamette River.
Soil and Groundwater Conditions
Soils: Based on City of Eugene and Natural Resource Conservation Service (NRCS) mapping, the
soils throughout the site are classified as sandy and gravelly soils with relatively high infiltration rates,
with Hydrologic Soil Group (HSG) classification of A or B. However, geotechnical boring log data,
available from the 1990 Riverfront Research Park Environmental Site Assessment (ESA), indicates
|3
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
differing conditions. Specifically, deposits of fill are present in multiple locations throughout the site.
Fill deposits The historical borings indicate
fill material may have a high silt content and may have a significantly lower infiltration rates than the
native sand and gravel soils.
Groundwater: Monitoring well data presented in the 1990 ESA indicates seasonal high groundwater
-
data indicates a similar depth to groundwater within the study area.
Future Geotechnical Investigation: Future development projects will include geotechnical
investigation, infiltration testing, groundwater measurement, and engineering studies to determine if
and where infiltration is feasible.
Stormwater Management Approach for Future Development
Development within the site will adhere to the applicable stormwater management requirements at
the time of the development. The City of Eugene stormwater management requirements are set
forth by Eugene Code (EC) Section 9.6790-9.6796 and the Eugene Stormwater Management
Manual (SWMM). The 2014 SWMM is the current edition at the time of this report. Additional
regulatory requirements may apply to projects impacting waters of the state. The following is a
summary of the applicable stormwater management standards and the approach for stormwater
management for development and redevelopment at the site.
Stormwater Destination / Flood Control (EC 9.6791): EC 9.6791 and SWMM Section 1.4.3 require
projects to demonstrate that the receiving public storm drain systems have adequate hydraulic
capacity to handle increase flows from proposed development or redevelopment. The site is located
entirely within the Willamette River Basin, which has not historically experienced flooding problems.
As such, prescriptive flow control or detention requirements do not apply. However, detention may
be appropriate for certain localized areas where the receiving storm drain system does not have the
capacity to accept additional flows. The following provides a summary of the potential destination
points within the site and applicable flood control considerations.
Onsite Infiltration: Onsite infiltration will be utilized to the maximum extent feasible, in accordance
with EC 9.6792 (see Water Quality, below). Piped stormwater conveyance systems will likely be
required to accommodate overflow from infiltration systems, or provide primary conveyance in
areas where infiltration is not feasible due to soil conditions, environmental concerns, or other
factors. Piped conveyance systems will discharge to existing public or private storm drainage
infrastructure or waterways at the one of the destination points listed below.
South Millrace (Basin A / Destination Point A): Destination Point A is the Millrace located south
of the railroad tracks and upstream from the Millrace control structure, and is the destination
point for the Basin A. The Millrace and downstream conveyance system is a public stormwater
system.
The water level within the Millrace is governed by a control structure located at the west end of
the site. The control structure consists of an adjustable weir gate that can be manually operated
(lowered) during extreme storm events. In 2008, the City of Eugene modified the Millrace control
structure to lower the water level and address localized flooding issues observed during the 2006
flood. Based on discussions with City staff, the control structure has adequately addressed
|4
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
flooding concerns. However, future modification to the control structure may be required
depending on the grading and hydraulic requirements for future projects adjacent to the Millrace.
The conveyance system downstream from the control structure consists of dual box culverts
extending under the railroad tracks. The Millrace continues as an open channel downstream
from the railroad tracks and passes through another culvert at the bike path crossing prior to
discharging to the Willamette River.
It is anticipated that future development within Basin A will maintain similar drainage patterns and
will continue to drain to Destination Point A. Redevelopment may include new or reconfigured
piped conveyance systems and new outfalls to the Millrace, and the delineation of Basin A may
change over time. However, the existing piped conveyance systems and outfalls will remain
intact to some degree. There are no known capacity issues with the public drainage system for
Destination Point A, but redevelopment projects within Basin A will need to assess capacity
issues within the existing private storm drain system on a project-by-project basis. New outfalls
to the Millrace may be subject to additional stormwater management requirements under the
Endangered Species Act. Refer to Destination Point D for further discussion.
Riverfront Pump Station (Basin B / Destination Point B): Destination Point B is Riverfront Pump
Station, and is the destination point for the Basin B. The public storm drain systems within
Riverfront Parkway and Millrace Drive are expected to have adequate capacity and depth to fully
accommodate redevelopment within Basin B on the south side of the railroad tracks. The public
storm drain system extending north of the railroad tracks is expected to accommodate future
development within the existing limits of Basin B north of the railroad tracks, and may be capable
of serving a larger basin area east and west of the existing limits of Basin B. Future projects
north of the railroad tracks will need to assess pump station limitations with City staff if the limits
of Basin B are expanded with redevelopment.
It should be noted that the Riverfront Parkway pump station and the surrounding land surface is
within a depression. This area is below the base flood elevation at the adjacent Willamette River
and below the water surface elevation of the Millrace. Drainage for this area relies entirely on the
pumping systems and there is no overland conveyance route for floodwater to escape. Because
of this, special care should be taken when extending the Riverfront Parkway storm drain system
to the area north of the railroad tracks, to ensure that flood risks are considered. Grading
modifications north of the railroad tracks should be designed with similar precautions.
North Athletic Field Basin (Basin C / Destination Point C):
private piped outfall to the Willamette River located just west of Autzen footbridge and is the
destination point for Basin C. Redevelopment projects within the Riverfront area may utilize the
existing piped conveyance system upstream from Destination Point C. Depending on
stormwater management strategies, it may be possible to expand the contributing basin area for
Destination Point C, however, this system is relatively shallow and may not be suitable for
extension significantly beyond the existing basin area.
North Millrace / Willamette Basin (Basin D / Destination Point D): Proposed development within
the area north of the railroad tracks (Riverfront area) will utilize onsite infiltration and will maintain
sheet flow drainage patterns to the Millrace and Willamette River where practical. Where onsite
infiltration and sheet flow are not practical, piped conveyance will be required. It may be possible
to extend piped conveyance systems from Destination Points B, C, and E, but those systems
|5
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
may not be capable of serving the entire Riverfront Area. New outfalls to the Millrace and
Willamette River may be required. Possible outfall locations are shown on Drawing C01.
New outfalls may be subject
to the US Army Corps (COE) / Oregon DSL permitting process. Outfalls permitted under the
COE/DSL process are expected to be subject to the 2014 National Marine Fisheries Services
(NMFS) document NWR-2013-10411, Standard Procedures for Endangered Species (SLOPES)
for Stormwater, Transportation or Utilities. These standards involve more rigorous treatment,
flow control, and LID requirements for new development contributing to the outfall. Exemptions
to the NMFS flow control standards may apply for outfalls discharging directly to the Willamette
River.
Hilyard Street Outfall (Basin E / Destination Point E): The City has developed a concept plan for
a future roundabout at the location of the existing cul-de-sac at the north terminus of Hilyard
Street. The roundabout will provide access to the EWEB Riverfront property and possible access
to the western edge of the UO Riverfront property. Public storm drain infrastructure may be
reconstructed and extended as part of that project and may serve as a destination point for
stormwater runoff from UO Riverfront property within this area. The existing outfall and public
system is relatively shallow, so future extensions may not be feasible unless the public system is
reconstructed at a greater depth.
Stormwater Water Quality (EC 9.6792): Stormwater runoff from new or redeveloped impervious
surfaces must be treated for water quality. Treatment methods must be selected in the following
order:
Priority 1: Onsite Infiltration using Vegetated / Low Impact Development (LID) Methods.
Priority 2: Onsite Filtration using Vegetated / Low Impact Development (LID) Methods.
Priority 3: Onsite Mechanical Treatment with Payment of 50% LID Fee.
Priority 4: No Onsite Treatment with Payment of 100% LID Fee (for Offsite Mitigation)
Onsite infiltration must be utilized where feasible. Lower priority methods may be utilized if required
due to site constraints, poor infiltration rates, shallow groundwater, steep topography, or space
constraints. Treatment methods and onsite infiltration feasibility will be evaluated on a project-by-
project basis, and will depend on the findings of the geotechnical investigations. Treatment methods
will conform to the standards of the SWMM. Notable stormwater treatment exemptions and
alternatives are summarized below:
Treatment of existing equivalent onsite areas may be utilized in lieu of treatment for new
development.
City standards do not require stormwater treatment for synthetic turf fields unless the athletic
fields incorporate an impervious surface into the field cross section. However, redevelopment
projects may voluntarily elect to include stormwater treatment through infiltration or other means.
Treatment is not required for new or replaced impervious surfaces less than 1,000 square feet,
constructed within a 12-month period.
Stormwater treatment is not required for projects that replace existing impervious surface for the
purpose of maintenance or repair of the continuance of the current function, provided that less
than 50% of the storm drainage system is replaced.
|6
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
Stormwater Flow Control (EC 9.6793): Flow control standards apply when stormwater is discharged
to a headwater stream or a pipe that discharges to a head
These conditions are not present for this project and flow control is not required. See the Stormwater
Destination / Flood Control section for further discussion about possible detention/retention.
Stormwater Oil Control (EC 9.6794): In the context of this site, oil control standards apply to projects
that will result in more than 100 vehicles per 1,000 square feet of gross floor area or more than 100
off-street parking spaces.
Stormwater Source Control and Environmental Issues (EC 9.6795): Stormwater source control
standards include prescriptive design criteria for activities that present a risk of point source pollution,
such as loading areas, trash collection areas, storage of liquid materials, and storage of bulk
materials. These standards will apply to future development and redevelopment projects within the
site.
The source control standards also apply to land with suspected or known contamination. There
have been historic environmental issues throughout the study area, including releases of laboratory
wastes, petroleum hydrocarbons, and coal gas tar. Investigation and remediation activity has
occurred since the time of the 1990 Environmental Site Assessment. DEQ records indicate the site
Future development projects will include environmental
review to ensure the requirements of SWMM Section 3.8 are addressed.
If onsite stormwater management (infiltration) systems are pursued with future development, DEQ
and an environmental professional should be consulted to ensure stormwater infiltration does not
have adverse environmental impacts.
Stormwater Operations and Maintenance: Stormwater facilities will be privately operated and
maintained. An Operations and Maintenance Plan will be included with development review
submittals for future projects.
SANITARY SEWER
Existing gravity-fed public and private sanitary sewer infrastructure is available within the majority of
the site south of the railroad tracks and within the eastern portion of the site north of the railroad
tracks (Riverfront area). Gravity-fed sanitary sewer systems are not readily available within the
western side of the Riverfront area, but pumped systems are possible. Existing and possible future
destination points are shown on Drawing C02 and summarized below:
Riverfront Pump Station System (Destination A): Riverfront pump station is a public pump station
serving the eastern half of the site south of the railroad tracks. The pump station is located at
the intersection of Riverfront Parkway and Millrace Drive. The pump station discharges
e main extending to the south through Riverfront Parkway,
-fed main in Franklin Boulevard. Sanitary drainage is
public sanitary sewer mains, extending east and west
within
end of Millrace Drive, and then north under the pedestrian underpass under the railroad tracks.
The mains within Millrace Drive are available to serve adjacent future development to the north
and south of Millrace Drive and is capable of being extended farther to the west as a private
|7
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
expected to be capable of serving the
majority of the Riverfront area east of the Millrace. Capacity of the public mains and pump station
will need to be confirmed with future development.
UO Pump Station (Destination B): A private pump station located just east of Onyx and just north
of the Millrace currently serves the Central Power Station and Planning/Facilities Management
areas of the site. This system may be extended to the west for future development west of the
Central Power station, but due to topography and limited system depth, additional pumping
systems may be required. With future development, the eastern portion the current pump station
drainage area (near the Zebrafish facility) may be modified to drain to the Riverfront Pump Station
system. Private mainlines upstream from the pump station will be relocated and/or extended to
accommodate future buildings and infrastructure.
th
East 8 Avenue System (Destination C): This
th
sewer line within East 8 Avenue, which currently terminates the
th
intersection of Hilyard and East 8
th
public sewer near the intersection of Hilyard and East 8
ground surface and is not likely deep enough to provide gravity-fed drainage for the proposed
building sites. However, extending th public gravity-fed line across the railroad tracks to the
proposed roundabout may provide a destination point for future pumped sanitary sewer systems
within the westernmost building sites in the Riverfront area.
Broadway / Franklin System (Destination D): This alternative destination point explores extension
of
that runs west within Broadway and Franklin. Two potential connection points and boring
locations are shown in Drawing C02. This alternative would involve easements and railroad
crossings, would likely be explored only if other alternatives are not available.
WATER SUPPLY
Public and private water mains are available within the site south of the railroad tracks, as shown on
Drawing C03. Redevelopment south of the railroad tracks will include relocation and/or extension
of existing private water mains and services to accommodate the proposed buildings and
infrastructure
Public water mains are available within close proximity to the proposed development sites at the
west and east ends of the Riverfront area. Possible future connection points are shown on Figure 4
and summarized below:
Riverfront Parkway System (Connection A): An existing dead-ic (EWEB) main
extends to a point near the south end of the Autzen footbridge. The dead-end main connects
nt Parkway and Millrace Drive.
Alder / Hilyard System (Connection B)ic (EWEB) main extending
from Alder to the old EWEB steam plant. This line crosses the railroad tracks north and west of
the Alder Street alignment. At the north side of the tracks, the main extends into, or very close
to UO property before extending to the west within the railroad right-of-way. Potential future
connections could occur at the north side of the railroad crossing or the Hilyard Street right-of-
way if access near the railroad crossing is problematic.
|8
UO North Campus June 15, 2018
Conditional Use Permit Stormwater, Sanitary Sewer, and Water Analysis Report
New public and private fire hydrants will be required with redevelopment throughout the site. New
hydrant locations will conform to the Oregon Fire Code.
Based on past pressure/flow test data in the area, the static pressure within the public system is
expected to range between 68-72 psi, depending on the time of day. Both the Riverfront Parkway
th
and East 8 Avenue systems are expected to produce adequate fire flows. However, flow test
information should be obtained to confirm available pressures and flows. Looped systems may be
preferred to improve flows and circulation.
|9
MEMORANDUM
June 22, 2018 Project #: 21562
Date:
Colin McArthur, AICP
To:
Zachary Bugg, PhD, Diego Arguea, PE, and Phill Worth
From:
University of Oregon North Campus Conditional Use Permit Application
Project:
Transportation Assessment
Subject:
The University of Oregon proposes to develop up to 1,369,500 square feet of new university uses and
research related to the university on the North Campus, an area generally bounded by Franklin Boulevard
to the south and the Willamette River to the north. This document includes a transportation assessment
of the proposed North Campus, including potential transportation-related impacts to the existing
transportation system. This assessment has been prepared to support the accompanying conditional use
permit for the North Campus. While a formal traffic impact analysis is not required for conditional use
)
prepared to address the safety and operations of the existing
ability to accommodate all modes (City Code 9.3725 and Eugene Planning Letter, March 28, 2018
Attachment A).
The assumptions and methodology contained in this document are based upon previous studies for
University of Oregon, including the proposed Knight Campus for Accelerating Scientific Impact, and
discussions with City of Eugene staff. No specific long-term timeframe has been established for buildout
of the North Campus, so this assessment assumes a horizon year of 2035, which is concurrent with the
Figure 1 displays a map of
the site vicinity, including identified potential study intersections, and Figure 2 shows the proposed
Master Site Plan for the North Campus Conditional Use Permit application.
SCOPE OF THE REPORT
This assessment estimates the transportation-related impacts associated with the proposed North
Campus. The study intersections and scope of this assessment were identified after a scoping process
with City staff. The assessment included herein is the result of this scoping process and represents the
recommended trip generation, growth assumptions, study intersections and agreed-upon methodology
for operational assessments. The following intersections are considered as part of this transportation
H:\\21\\21562 - U of O Riverfront Master Plan\\dwgs\\figs\\21562_TIA.dwg Jun 13, 2018 - 2:54pm - acary Layout Tab: FIG 2_Site Plan
Figure
Proposed Site Plan
2
Eugene, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 4
assessment, based on the potential impact of 50 or more net new trips during a weekday AM or PM peak
hour. Millrace Drive/Riverfront Parkway
1.Franklin Boulevard/E 11th Avenue
2.Franklin Boulevard/Onyx Street
3.Franklin Boulevard/Riverfront Parkway-Agate Street
4.Franklin Boulevard/Villard Street
Per scoping discussions with City staff and consistent with previous traffic analysis conducted for the
Knight Campus for Accelerating Scientific Impact, the weekday PM peak hour was identified as the critical
time period for this assessment. This document evaluates the following transportation issues:
Existing land-use and transportation-system conditions within the site vicinity during the
weekday PM peak hour;
Developments and transportation improvements planned in the study area;
Forecast year 2035 background traffic conditions (without the proposed North Campus)
during the weekday PM peak hour, based on the Eugene Transportation System Plan;
Trip generation and distribution estimates for the proposed North Campus;
Forecast year 2035 (with the proposed North Campus) total traffic conditions during the
weekday PM peak hour; and,
On-site traffic operations and circulation.
EXISTING CONDITIONS
The existing conditions identify the site conditions and current operational and geometric characteristics
of the roadways within the study area. These conditions will be compared with future conditions later in
this report.
Kittelson & Associates, Inc. (KAI) staff visited and inventoried the proposed North Campus project area
and surrounding study area in October 2017. At that time, KAI collected information regarding site
conditions, adjacent land uses, existing traffic operations, and transportation facilities in the study area.
Site Conditions and Adjacent Land Uses
The proposed North Campus is located on approximately 77 acres bounded by the Willamette River to
the north and Millrace Drive to the south. The site currently includes a mix of university, research park,
and recreation uses, including the university central power station and other buildings related to the
operations of the university, fine art studios, the Urban Farm, university research facilities, three
buildings that were developed as part of the Riverfront Research Park, surface parking lots, public bike
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 5
paths, and two recreation fields. Adjacent land uses are predominantly institutional (university) and
recreational, with some commercial to the south along Franklin Boulevard.
Transportation Facilities
Each of the study area roadways is summarized in Table 1 (Reference 1).
Table 1: Existing Transportation Facilities and Roadways in the Study Area
Functional National Highway
Number of Posted Bicycle On-Street
Roadway Sidewalks
Classification System (NHS)
Lanes Speed Lanes Parking
(Eugene) Designation
Franklin Blvd Major Arterial Statewide Highway6 35 mph Yes No No
1
Agate St Minor Arterial None 2 25 mph Yes Yes No
11th Ave Minor Arterial Intermodal Connector 3 25 mph Yes No No
Riverfront Pkwy Local Street None 2-3 25 mph Yes Yes No
Millrace Dr Local Street None 2 25 mph Yes No No
Onyx St Local Street None 2 25 mph Yes No No
Villard St Local Street None 2-3 25 mph Yes No Yes
Jurisdiction of Franklin Boulevard currently under City of Eugene
1
Roadway Facilities
Figure 3 illustrates the existing lane configurations and traffic control devices at the study intersections.
The primary roadway within the study area is Franklin Boulevard, which is a major arterial that connects
th
the site location with downtown Eugene to the west and Interstate 5 to the east. Agate Street and 11
Avenue are both minor arterials and connect the site vicinity with other areas of Eugene. Riverfront
Parkway, Millrace Drive, Onyx Street, and Villard Street are all classified as local streets. Within the study
area, parking is generally regulated by UO staff and is provided at several surface lots. Metered on-street
parking is available on Villard Street. U-turns are allowed at intersections along Franklin Boulevard to
account for the presence of a grassy median. At the Franklin Boulevard/Onyx Street intersection,
westbound left turns and U-turns are accomplished via a short jug-handle in the northeast corner of the
intersection.
Pedestrian and Bicycle Facilities
Field observations and counts revealed a high level of pedestrian and bicycle activity on the study area
roadways, including movements crossing and parallel to Franklin Boulevard, consistent with the
surrounding University-associated land uses and generally urban environment. Each of the study area
roadways has sidewalks on both sides, but there are no separate bicycle facilities other than bicycle lanes
along Agate Street/Riverfront Parkway and in the eastbound direction on Franklin Boulevard between
13 th Avenue and Villard Street. Video observations at the study intersections revealed that pedestrian
push buttons are activated during nearly every cycle of the weekday AM and PM peak hours at the
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 6
intersections along Franklin Boulevardthe traffic operations review accounted for this as described
later in this report.
The extension of Riverfront Parkway, north of Millrace Drive serves as a pedestrian and bicycle facility
and prohibits vehicular activity. This multi-use pathway has a grade-separated undercrossing of the
freight railroad that runs parallel with Franklin Boulevard. It also connects with the Ruth Bascom
Riverfront Bike Path and other pedestrian and bicycle facilities throughout the North Campus area. A
second grade-separated multi-use pathway undercrossing of the railroad is located approximately 420
feet to the west that connects to a pedestrian-bicycle bridge across the Millrace.
The Ruth Bascom Riverfront Bike Path currently runs through the center of the proposed North Campus,
connecting the north leg of the Riverfront Parkway/Millrace Drive intersection with points west along
the Willamette River, and it will be maintained in North Campus development per Figure 2.
Transit Facilities
Regional transit service is provided via Lane Transit District via the following bus routes (Reference 2):
The Emerald Express (EmX) Bus Rapid Transit service connects the site with West Eugene,
Downtown Eugene, Downtown Springfield, Gateway Mall, and Sacred Heart Medical Center
at Riverbend. Weekday service is provided from approximately 6:00 AM to 12:00 AM, with
headways as low as 10 minutes during most of the day. Service is more limited on weekends.
Buses run within the median of Franklin Boulevard and stop on the east side of Franklin
Boulevard/Agate Street.
Route 91: McKenzie Bridge connects the site vicinity and Eugene with localities to the east of
Eugene, including Springfield, Waterville, Leaburg, and McKenzie Bridge. Service is provided
twice during the morning and afternoon commutes. Multiple transit stops are located along
Franklin Boulevard near the site.
Route 98: Cottage Grove connects the site vicinity and Eugene with areas south of Eugene,
including Lane Community College, Creswell, and Cottage Grove. Eight buses serve the route
during a typical weekday, with a span of service from approximately 6:00 AM to 8:00 PM.
Multiple transit stops are located along Franklin Boulevard near the site.
Diamond Express connects the study area with the Eugene Amtrak Station and Oakridge.
Service is provided twice during the morning and afternoon commutes. Transit stops are
provided in either direction of Franklin Boulevard adjacent to the site.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 8
Traffic Volumes and Peak Hour Operations
Manual turning movement counts were obtained for the study intersections in May 2017 while classes
were in regular session. Counts were obtained on a mid-weekday from 2:30 to 6:30 PM, and the system-
wide PM peak hour was found to occur between 4:55 PM and 5:55 PM. Figure 4 provides a summary of
the year 2017 turning-movement counts for the weekday PM peak hour. Attachment Bcontains the
traffic count worksheets used in this study.
Current Levels of Service
All level-of-service analyses described in this report were performed in Synchro 9 in accordance with the
procedures stated in the 2000 Highway Capacity Manual (Reference 3). All intersection level-of-service
evaluations used the peak 60-minute flow rate during the weekday PM peak hour. The transportation
system will likely operate under conditions better than those described in this report during time periods
outside the PM peak hour.
Figure 4 summarizes the level-of-service assessment for the study intersections under the weekday PM
peak hour existing traffic conditions. The City of Eugene defines level-of-
acceptable performance at signalized intersections. At unsignalized intersections, the critical movement
must operate at LOS D or better.
As the figure shows, each of the study intersections currently operates at an acceptable level of service
during the weekday PM peak hour. Cincludes the level-of-service worksheets under
existing traffic conditions.
Traffic Safety
Oregon Department of Transportation (ODOT) provided the latest five years of reported crash data at
the study intersections 1, which includes the period from January 1, 2011 to December 31, 2015. Table 2
summarizes the reported crash data at the study intersections, including the crash severity and crash
type of each crash.
1
With the transition of Franklin Boulevard from State to City jurisdiction, ODOT no longer maintains a high-crash list for
any of the study intersections within the study area.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 10
Table 2: ODOT Reported Crash Data (January 1, 2011 to December 31, 2015)
Crash Severity Crash Type
Total Crash
Intersection
Fixed Head Rear Side-
Crashes Rate*
Injury PDO Turning Angle Pedestrian
Object On End swipe
Millrace Dr/
0 1 1 0 0 0 0 0 0 1 0.26
Riverfront Pkwy
Franklin Blvd/
3 3 0 1 1 1 2 1 0 6 0.10
11th Ave
Franklin Blvd/
6 2 0 0 4 0 4 0 0 8 0.13
Onyx St
Franklin Blvd/
3 10 0 0 12 0 0 0 1 13 0.22
Riverfront Pkwy/Agate St
Franklin Blvd/
10 8 1 0 5 0 6 5 1 18 0.34
Villard St
*Per million entering vehicles
A review of the reported crash data did not reveal any specific crash trends or deficiencies, and each of
the intersection crash rates was found to be well below 1.00 per million entering vehicles. E
contains the reported crash data received from ODOT.
YEAR 2035 BACKGROUND TRAFFIC CONDITIONS
The year 2035 background traffic assessment
operate without the proposed North Campus. The assessment includes traffic attributed to planned
developments within the study area and general growth in the region but does not include traffic
associated with the North Campus.
General Background Growth
The 2035 City of Eugene Transportation System Plan (TSP) was reviewed to estimate future volumes
along Franklin Boulevard within the study area (Reference 4). The TSP-recommended improvements are
based on estimated turning movement volumes at two study intersections: Franklin Boulevard/11 th
2
Avenue and Franklin Boulevard/Agate Street/Riverfront Parkway. The Transportation Impact Analysis
report for the recently approved Knight Campus development also was reviewed and incorporated into
the 2035 background conditions. This approach provides a reasonable worst-case assessment, given that
the TSP anticipated growth on the UO campus, as well as in the immediate vicinity.
Planned Developments and Transportation Improvements
The Knight Campus for Accelerating Scientific Impact will replace several existing university-related and
other land uses north of Franklin Boulevard between Onyx Street and Riverfront Parkway, with full build-
2
The final adopted TSP does not include forecast volumes in the primary document. Rather, the volumes applied to this
analysis are based on technical memoranda and analysis included in the TSP Technical Appendix, Volume 2.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 11
out expected by 2020. Both automobile and non-automobile trips associated with the Knight Campus
were included in the 2035 background traffic assessment as in process trips.
Levels of Service
Figure 5 displays the year 2035 background traffic volumes at the study intersections, as well as the
corresponding traffic levels of service. As shown, each of the study intersections is forecast to continue
operating at acceptable levels of service during the weekday PM peak hour. E
the year 2035 background traffic levels of service worksheets.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 13
NORTH CAMPUS DEVELOPMENT PLAN
The North Campus will be developed on an approximately 77-acre site. Existing development includes a
mix of university, research park, and recreation uses, including the university central power station and
other buildings related to the operations of the university, fine art studios, the Urban Farm, university
research facilities, three buildings that were developed as part of the Riverfront Research Park, surface
parking lots, public bike paths, and two recreation fields. The proposed development will displace
approximately 240,604 square feet of existing university uses and construct up to 1,369,500 square feet
of new university uses, including additional university research uses and research related to the
university. This study assumes that all passenger car access to the site is expected to occur via proposed
parking facilities to be located at the Riverfront Parkway/Millrace Drive intersection. UO anticipates
providing approximately 1,100 vehicle parking stalls in this vicinity, including the 400+ space parking
garage to be built as a part of the Knight Campus development, which is expected to be completed by
2020.
Trip Generation
Trip generation estimates for the proposed North Campus were developed based on trip rates included
th
in Trip Generation, 10 Edition, published by the Institute of Transportation Engineers (ITE, Reference 5).
Two ITE trip generation land uses were considered for the site: University/College (land use code 550)
and Research and Development Center (land use code 760). The University/College code estimates trip
generation based upon the number of students and employees anticipated to attend or work at a
University/College facility, while the Research and Development Center code estimates trips based upon
the building area (in square feet). While the Research and Development Center land use was used to
estimate the trip generation associated with the recently-approved Knight Campus, the University of
Oregon no longer emphasizes research and development activities as the primary use for the North
Campus but foresees it as one of many activities that will occur. The 2018 North Campus Master Site Plan
anticipates a similar range of uses to those that already exist on the campus. As such, the University Land
Student/Faculty Ratio
Per scoping discussions, the North Campus is forecast to accommodate a student population increase of
3,209 students. Table 3 displays the estimated site-generated trips associated with this student
population increasethis represents a combination of student and faculty trips. Based on data provided
by University staff, the North Campus is expected to maintain the current approximate proportions of 82
percent students and 18 percent faculty/staff/employeesthis is reflected in Table 3.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 14
Mode Split
A recent University mode split survey indicated approximately 84 percent of students and 42 percent of
staff commute to campus by non-automobile modes. Discussion of additional pedestrian and bicycle
demand on the transportation system is provided later in this document.
Table 3: Estimated Trip Generation
Weekday PM Peak Hour
Land Use ITE Code Size Weekday Trips Total In Out
University 550 3,209 students 4,428 513 164 349
Student Trips (82%) 3,632 421 134 287
Staff Trips (18%) 796 92 30 62
Non-automobile Student Trips (84%) (3,050) (354) (113) (241)
Non-automobile Staff Trips (42%) (334) (39) (13) (26)
Net New Automobile Trips 1,044 120 38 82
As shown, the proposed North Campus is expected to generate approximately 1,044 net new weekday
daily automobile trips, of which 120 will occur during the PM peak hour (38 in, 82 out).
Trip Distribution and Assignment
Trips associated with the proposed North Campus were distributed as follows:
25 percent to the north along Coburg Road,
25 percent to the west along Broadway,
5 percent to the south along Patterson Street,
15 percent to the south along Agate Street,
5 percent to the south along Villard Street, and
25 percent to the east along Franklin Boulevard.
This trip distribution pattern was based upon previous University of Oregon studies and knowledge of
surrounding demographics and regional land uses. It has been assumed that all automobile trips will
access the North Campus via the proposed parking garage to be located at the northeast corner of the
Riverfront Parkway/Millrace Drive intersection. This is a reasonable worst-case assumption, as it places
all North Campus parking demand in one location. Figure 6 displays the assignment of trips to the study
intersections.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 16
PEDESTRIAN AND BICYCLE TRIPS
Pedestrian and bicycle access to the North Campus will occur at the following locations:
Via the Ruth Bascom Riverfront Bike Path and a parallel sidewalk, which is a northward
extension of Riverfront Parkway. This connection also serves as the main pedestrian route to
the parking garage at the northeast corner of Riverfront Parkway/Millrace Drive.
Via a second railroad underpass connecting to existing university buildings, a bridge across
the Millrace and to facilities on Onyx Street.
To the west via the Ruth Bascom Riverfront Bike Path, which connects to Hillyard Street
toward Downtown Eugene.
To the north via the Frohnmayer Bridge over the Willamette River, which connects to Day
Island and the sports complex.
Table 4 displays the estimated peak hour pedestrian and bicycle demand associated with the North
Campus.
Table 4. Peak Hour Pedestrian and Bicycle Trips
Weekday PM Peak Hour
Mode
Total In Out
Pedestrian 301 97 204
Bicycle 92 29 63
Students and UO employees are expected to travel between areas of campus primarily by walking or
biking. Connections include signalized crossings of Franklin Boulevard at Villard, Agate-Riverfront and
Onyx. An enclosed pedestrian bridge over Franklin Boulevard is anticipated with construction of the
Knight Campus buildings, providing an option for safe, attractive and all-weather crossing directly
between both areas of campus.
Intersections along Franklin Boulevard at Onyx Street, Riverfront Parkway and Villard are signalized and
have pedestrian crossings (with median refuges), ramps, and signal heads. In general, these pedestrian
and bicycle crossing facilities are adequate to accommodate the increased demand associated with
buildout of the North Campus.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 17
YEAR 2035 TOTAL TRAFFIC CONDITIONS
2035 total traffic volumes, including trips from the proposed North Campus. The site-generated trips
shown in Figure 6 were added to the year 2035 background traffic volumes shown in Figure 5 to calculate
the year 2035 total traffic volumes shown in Figure 7.
Levels of Service
The weekday PM peak hour turning movement volumes shown in Figure 7 were used to conduct an
operational assessment at each study intersection to determine the year 2035 total traffic levels of
service. The assessment includes the additional pedestrian and bicycle volume expected to use the study
intersections. As shown in Figure 7, each of the study intersections is forecast to continue operating at
an acceptable level of service during the weekday PM peak hour. F
total traffic level of service worksheets.
PARKING AND CIRCULATION IMPACTS
For this assessment, all automobile trips associated with the North Campus (summarized in Table 3 and
illustrated in Figure 6) have been assumed to be assigned to proposed parking facilities located near the
intersection of Riverfront Parkway and Millrace Drive. UO intends to construct approximately 402-spaces
in a parking structure near this intersection with the Knight Campus development and to complete that
construction in 2020. In compliance with City code, UO anticipates constructing additional vehicle parking
capacity to accommodate estimated peak demands from the North Campus, in areas served by Riverfront
Parkway and Millrace Drive and possibly in other long-term future locations not yet identified.
Based on recent analysis, the parking demand for the Knight Campus development was estimated to be
approximately 148 occupied stalls. Parking demand for the North Campus is based on the daily trip
generation estimate of 1,044 daily trips. Employees are estimated to make 462 of these weekday trips,
which would produce a maximum peak parking demand of 231 vehicles (462 trips divided by two trips
per parked vehicle). Students, guests and visitors are expected to make the remaining 582 weekday trips.
Unlike employees, most student, guest and visitor trips are parked for less than a full day. A high
assumption would be that these trips are parked approximately 4 hours (or half a day), and that a high
percentage (75%) occur during the same four-hour period (say between 10:00 AM and 2:00 PM). This
results in a peak parking demand by students, guests and visitors of approximately 220 spaces sometime
during the middle of the typical weekday when classes are in session. The resulting total parking demand
estimate of the Knight Campus and the North Campus is approximately 600 parked vehicles during the
peak hour of parking demand. Therefore, additional vehicle parking capacity, beyond the garage to be
constructed with the Knight Campus, is likely to be needed to address the potential parking demand
resulting from buildout of the North Campus. As previously stated, UO intends to meet this demand by
complying with City code and providing additional parking within the study area of this assessment.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 19
CONCLUSIONS AND RECOMMENDATIONS
The results of this transportation assessment indicate the proposed North Campus can be completed
while maintaining acceptable levels of service and traffic operations for all modes on the surrounding
transportation system. The assessment supports the following findings:
Existing Traffic Conditions
Each of the study intersections currently operates at an acceptable level of service during the
weekday PM peak hour.
A review of historical crash data did not reveal any patterns or trends in the site vicinity that
would require mitigation associated with the transportation impacts of the North Campus.
Year 2035 Background Traffic Conditions
Turning movement volumes along Franklin Boulevard were obtained from the Eugene TSP.
Trips associated with the approved Knight Campus for Accelerating Scientific Impact, to be
located just south of the proposed North Campus, were included as in process traffic.
No funded transportation improvements were identified within the study area.
Each of the study intersections is forecast to continue operating at an acceptable level of
service during the weekday PM peak hour for all modes.
Proposed Development Plan
The proposed North Campus includes up to 1,369,500 square feet of new university uses and
research related to the university and is expected to accommodate up to 3,209 new students.
The proposed North Campus is expected to generate approximately 1,044 net new weekday
daily automobile trips, of which 120 will occur during the PM peak hour (38 in, 82 out).
Approximately 84 percent of new student trips and approximately 42 percent of new staff
trips are non-automobile, per the results of a University travel behavior survey.
Year 2035 Total Traffic Conditions
Each of the study intersections is forecast to continue operating at an acceptable level of
service during the weekday PM peak hour for all modes.
Pedestrian and Bicycle Traffic
The proposed North Campus is expected to generate approximately 301 pedestrian trips in
the weekday PM peak hour.
The proposed North Campus is expected to generate approximately 92 bicycle trips in the
weekday PM peak hour.
Kittelson & Associates, Inc. Portland, Oregon
University of Oregon North Campus Conditional Use Permit Application Project #: 21562
June 15, 2018 Page 20
Pedestrians and bicyclists will access the North Campus from four access points.
the increased demand associated with the proposed North Campus.
Parking and Circulation Impacts
All automobile trips associated with the North Campus are assumed to be assigned to
proposed parking facilities near the Riverfront Parkway/Millrace Drive intersection.
Peak parking demand estimated for the Knight Campus and buildout of the North Campus is
expected to be accommodated with existing and planned parking facilities in the North
Campus area and in accordance with City code.
Kittelson & Associates, Inc. Portland, Oregon
Attachment A
Eugene Planning Letter,
March 28, 2018
Attachment B
Turning Movement Counts
Type of peak hour being reported: Intersection PeakMethod for determining peak hour: Total Entering Volume
LOCATION:QC JOB #:
Riverfront Parkway -- Millrace Dr14432502
CITY/STATE:DATE:
Eugene, ORWed, May 24 2017
Peak-Hour: 4:55 PM -- 5:55 PM
02
0.00.0
Peak 15-Min: 5:00 PM -- 5:15 PM
000
0.00.00.0
600157
0.00.00.00.6
0.67
62
0.00.0
9315535
0.00.00.62.9
6229
0.00.03.4
16037
0.62.7
2011810
08
216910
01
141451
NANA
NANANANA
NANA
5-Min CountRiverfront ParkwayRiverfront ParkwayMillrace DrMillrace DrTotalHourly
Period(Northbound)(Southbound)(Eastbound)(Westbound)Totals
Beginning At
LeftThruRightULeftThruRightULeftThruRightULeftThruRightU
4:55 PM001000000100710010
5:00 PM1030000000101700022
5:05 PM0070000000201700026
5:10 PM0030000000002500028
5:15 PM0000000000001410015
5:20 PM1001000000001300015
5:25 PM0031000000001300017
5:30 PM1020000000001500018
5:35 PM0230000000001100016
5:40 PM0040000002001000016
5:45 PM102000000300500011
5:50 PM00100000000080009203
5:55 PM00000000000000000193
6:00 PM00000000000000000171
6:05 PM00000000000000000145
6:10 PM00000000000000000117
6:15 PM00000000000000000102
6:20 PM0000000000000000087
6:25 PM0000000000000000070
6:30 PM0000000000000000052
6:35 PM0000000000000000036
6:40 PM0000000000000000020
6:45 PM000000000000000009
6:50 PM000000000000000000
Peak 15-MinNorthboundSouthboundEastboundWestbound
Flowrates
LeftThruRightULeftThruRightULeftThruRightULeftThruRightUTotal
All Vehicles40520000000120236000304
Heavy Trucks0040000000004
148
Pedestrians16244860
Bicycles016013001010123
Railroad
Stopped Buses
Comments:
Report generated on 10/19/2017 1:12 PMSOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Type of peak hour being reported: Intersection PeakMethod for determining peak hour: Total Entering Volume
LOCATION:QC JOB #:
Franklin Blvd -- E 11th Ave14432526
CITY/STATE:DATE:
Eugene, ORWed, May 24 2017
Peak-Hour: 4:55 PM -- 5:55 PM
00
0.00.0
Peak 15-Min: 5:05 PM -- 5:20 PM
000
0.00.00.0
1007001590
1.20.00.01.4
0.84
11611007
3.01.2
116105831593
3.00.01.93.0
00432
0.00.03.0
583432
1.93.0
0000
00
1100
00
6000
NANA
NANANANA
NANA
5-Min CountFranklin BlvdFranklin BlvdE 11th AveE 11th AveTotalHourly
Period(Northbound)(Southbound)(Eastbound)(Westbound)Totals
Beginning At
LeftThruRightULeftThruRightULeftThruRightULeftThruRightU
4:55 PM00320000008700548400257
5:00 PM00280000008300447400229
5:05 PM004100000094006210300300
5:10 PM0045000000111006611600338
5:15 PM0036000000109005210700304
5:20 PM003600000013600357600283
5:25 PM004700000010000427200261
5:30 PM00320000009800399900268
5:35 PM00420000006500527300232
5:40 PM002400000010300507600253
5:45 PM00370000007400455900215
5:50 PM0032000000101004268002433183
5:55 PM000000000000000002926
6:00 PM000000000000000002697
6:05 PM000000000000000002397
6:10 PM000000000000000002059
6:15 PM000000000000000001755
6:20 PM000000000000000001472
6:25 PM000000000000000001211
6:30 PM00000000000000000943
6:35 PM00000000000000000711
6:40 PM00000000000000000458
6:45 PM00000000000000000243
6:50 PM000000000000000000
Peak 15-MinNorthboundSouthboundEastboundWestbound
Flowrates
LeftThruRightULeftThruRightULeftThruRightULeftThruRightUTotal
All Vehicles004880000001256007201304003768
Heavy Trucks001200002401220068
12
Pedestrians12000
Bicycles0000000000000
Railroad
Stopped Buses
Comments:
Report generated on 10/19/2017 1:12 PMSOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Type of peak hour being reported: Intersection PeakMethod for determining peak hour: Total Entering Volume
LOCATION:QC JOB #:
Onyx St -- Franklin Blvd14432528
CITY/STATE:DATE:
Eugene, ORThu, May 25 2017
Peak-Hour: 4:55 PM -- 5:55 PM
4014
0.00.0
Peak 15-Min: 5:05 PM -- 5:20 PM
25510
0.00.00.0
14371841398
1.60.00.01.6
0.91
14361374
2.91.7
149137201478
2.70.00.02.8
29121
0.00.00.0
5151
0.00.0
86231
30
774214
10
293481
NANA
NANANANA
NANA
5-Min CountOnyx StOnyx StFranklin BlvdFranklin BlvdTotalHourly
Period(Northbound)(Southbound)(Eastbound)(Westbound)Totals
Beginning At
LeftThruRightULeftThruRightULeftThruRightULeftThruRightU
4:55 PM10101130010700011901234
5:00 PM30401010011431113410263
5:05 PM20201030011621014102270
5:10 PM20302050013020313402283
5:15 PM10100020013620212300267
5:20 PM40200010211951011310248
5:25 PM40101020011412111001237
5:30 PM20001110214121211001264
5:35 PM21100120212121011811253
5:40 PM2010111021276108702231
5:45 PM4040212001154109300226
5:50 PM2010002019680092112042980
5:55 PM000000000000000002746
6:00 PM000000000000000002483
6:05 PM000000000000000002213
6:10 PM000000000000000001930
6:15 PM000000000000000001663
6:20 PM000000000000000001415
6:25 PM000000000000000001178
6:30 PM00000000000000000914
6:35 PM00000000000000000661
6:40 PM00000000000000000430
6:45 PM00000000000000000204
6:50 PM000000000000000000
Peak 15-MinNorthboundSouthboundEastboundWestbound
Flowrates
LeftThruRightULeftThruRightULeftThruRightULeftThruRightUTotal
All Vehicles200240120400015282442015920163280
Heavy Trucks0000000320024056
240
Pedestrians441211668
Bicycles312106200100025
Railroad
Stopped Buses
Comments:
Report generated on 10/19/2017 1:12 PMSOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Type of peak hour being reported: Intersection PeakMethod for determining peak hour: Total Entering Volume
LOCATION:QC JOB #:
Riverfront Pkwy/Agate St -- Franklin Blvd14432575
CITY/STATE:DATE:
Eugene, ORWed, May 24 2017
Peak-Hour: 4:55 PM -- 5:55 PM
18144
0.62.3
Peak 15-Min: 5:10 PM -- 5:25 PM
1322227
0.80.00.0
148544151051
1.52.30.01.7
0.89
12941036
3.01.7
156923101388
2.71.30.02.9
296667
1.00.01.5
253369
1.21.1
310201
11
7920145
00
440340
NANA
NANANANA
NANA
5-Min CountRiverfront Pkwy/Agate StRiverfront Pkwy/Agate StFranklin BlvdFranklin BlvdTotalHourly
Period(Northbound)(Southbound)(Eastbound)(Westbound)Totals
Beginning At
LeftThruRightULeftThruRightULeftThruRightULeftThruRightU
4:00 PM200401270079144010010232
4:05 PM350401190190270011350286
4:10 PM360100325025615106510196
4:15 PM300304671396172010810278
4:20 PM29060004029120009430249
4:25 PM32440533018513206320217
4:30 PM25150058026617007410204
4:35 PM162400560086182011400253
4:40 PM222501130110316008420240
4:45 PM17070117018822107900224
4:50 PM23130136015321007000182
4:55 PM13050021004114211095102662827
5:00 PM31050441303871620100302682863
5:05 PM41180311304101144068102592836
5:10 PM281304317001012000115202942934
5:15 PM27020321700147161097003122968
5:20 PM2107021802130141094102813000
5:25 PM21170131301134240085202923075
5:30 PM1806003140281252079302333104
5:35 PM2915051504118212082002733124
5:40 PM2608032100283132092102423126
5:45 PM221401040193183068102163118
5:50 PM1917010800105293061002343170
5:55 PM162300580196191085002363140
Peak 15-MinNorthboundSouthboundEastboundWestbound
Flowrates
LeftThruRightULeftThruRightULeftThruRightULeftThruRightUTotal
All Vehicles304448036241680815122008012241203548
Heavy Trucks4000040324012056
352
Pedestrians484088176
Bicycles05006012003118
Railroad
Stopped Buses
Comments:
Report generated on 10/12/2017 9:33 AMSOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Type of peak hour being reported: Intersection PeakMethod for determining peak hour: Total Entering Volume
LOCATION:QC JOB #:
Villard St -- Franklin Blvd14432536
CITY/STATE:DATE:
Lane, ORWed, May 24 2017
Peak-Hour: 4:55 PM -- 5:55 PM
9550
2.10.0
Peak 15-Min: 5:10 PM -- 5:25 PM
333527
3.00.03.7
1008648887
1.90.00.01.8
0.91
1264815
2.81.8
1505177641373
2.51.71.62.7
130873
2.30.01.4
267211
1.51.9
12030
30
053224
30
95050
NANA
NANANANA
NANA
5-Min CountVillard StVillard StFranklin BlvdFranklin BlvdTotalHourly
Period(Northbound)(Southbound)(Eastbound)(Westbound)Totals
Beginning At
LeftThruRightULeftThruRightULeftThruRightULeftThruRightU
4:55 PM13601120410514068021226
5:00 PM1609032501759748301215
5:05 PM121605860310119354511216
5:10 PM80704910111617278000252
5:15 PM100400160314614227301262
5:20 PM1311101110211613445902228
5:25 PM101400100511922166720238
5:30 PM101603400010320267801234
5:35 PM110302340110319158211236
5:40 PM1605033406796264811180
5:45 PM10080320028413215600181
5:50 PM1314020406117114364102302698
5:55 PM000000000000000002472
6:00 PM000000000000000002257
6:05 PM000000000000000002041
6:10 PM000000000000000001789
6:15 PM000000000000000001527
6:20 PM000000000000000001299
6:25 PM000000000000000001061
6:30 PM00000000000000000827
6:35 PM00000000000000000591
6:40 PM00000000000000000411
6:45 PM00000000000000000230
6:50 PM000000000000000000
Peak 15-MinNorthboundSouthboundEastboundWestbound
Flowrates
LeftThruRightULeftThruRightULeftThruRightULeftThruRightUTotal
All Vehicles1244880204432024151217632528480122968
Heavy Trucks0004000164012036
156
Pedestrians8816052
Bicycles00000039100013
Railroad
Stopped Buses
Comments:
Report generated on 10/19/2017 1:12 PMSOURCE: Quality Counts, LLC (http://www.qualitycounts.net) 1-877-580-2212
Attachment C
Existing Conditions Level of
Service Worksheets
HCM Unsignalized Intersection Capacity Analysis
1: Riverfront Pkwy & Millrace Dr
HCM Signalized Intersection Capacity Analysis
2: 11th Ave & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
3: Franklin Blvd & Onyx St
HCM Signalized Intersection Capacity Analysis
3: Franklin Blvd & Onyx St
HCM Signalized Intersection Capacity Analysis
4: Agate St/Riverfront Pkwy & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
4: Agate St/Riverfront Pkwy & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
5: Villard St & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
5: Villard St & Franklin Blvd
Attachment D
ODOT Crash Data
Attachment E
Year 2035 Background
Conditions Level of Service
Worksheets
HCM Unsignalized Intersection Capacity Analysis
1: Riverfront Pkwy & Millrace Dr
HCM Signalized Intersection Capacity Analysis
2: 11th Ave & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
3: Franklin Blvd & Onyx St
HCM Signalized Intersection Capacity Analysis
3: Franklin Blvd & Onyx St
HCM Signalized Intersection Capacity Analysis
4: Agate St/Riverfront Pkwy & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
4: Agate St/Riverfront Pkwy & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
5: Villard St & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
5: Villard St & Franklin Blvd
Attachment F
Year 2035 Total Conditions
Level of Service Worksheets
HCM Unsignalized Intersection Capacity Analysis
1: Riverfront Pkwy & Millrace Dr
HCM Signalized Intersection Capacity Analysis
2: 11th Ave & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
3: Franklin Blvd & Onyx St
HCM Signalized Intersection Capacity Analysis
3: Franklin Blvd & Onyx St
HCM Signalized Intersection Capacity Analysis
4: Agate St/Riverfront Pkwy & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
4: Agate St/Riverfront Pkwy & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
5: Villard St & Franklin Blvd
HCM Signalized Intersection Capacity Analysis
5: Villard St & Franklin Blvd
UO North Campus Conditional Use Permit Project
Outreach Meeting Summary (revised 6/21/18)
Meetings and Presentations
Internal (UO)
May 5, 2016: Scoping Phase -Campus Planning Committee
May 16, 2016: Scoping Phase -Campus PlanningCommittee
August 4, 2016: Scoping Phase -College of Design Faculty/LandscapeFocus
October 26, 2016: Scoping Phase-PE & REC, Club Sports
October 11, 2016: Scoping Phase -Office of Vice President for Research and
Innovation
October 27, 2016: Scoping Phase-Presentation to College of DesignFaculty
July 6, 2017: Outdoor Program FocusGroup
July 6, 2017: Physical Education and Recreation FocusGroup
July 12, 2017: Ecology FocusGroup
July 26, 2017: Ecology FocusGroup
August 29, 2017: Combined Focus Groups (Ecology/Physical Education and
Recreation/Outdoor Program)
September 6, 2017: Art Department/Product Design/UrbanFarm
September 14, 2017: Campus Planning and Facilities ManagementUnits
October 9, 2017: Office of Vice President for Research andInnovation
October 10, 2017: Campus Planning Committee Meeting
October 17, 2017: Campus Planning and Facilities ManagementUnits
October 19, 2017: Combined Focus Groups (Ecology/Physical Education and
Recreation/Outdoor Program/Members from Community StakeholderGroup)
October 27, 2017: Campus Planning Committee Meeting
November 8, 2017: Community Open House
November 8, 2017: Neighborhood Meeting
November 28, 2017: Campus Planning CommitteeReview
December 2017: Space AdvisoryGroup
December 11, 2017: UO Executive LeadershipTeam
January 11, 2018: Community Open House
January 11, 2018: Neighborhood Meeting
February 14, 2017: University Senate Meeting
February 23, 2018: Student Recreation Center Student Advisory Board Meeting
May & June 2018: Follow-up meetings with interested parties, including representatives
of the Associated Students of University of Oregon, Climate Justice League,
Student Sustainability Center, and faculty in the departments of Biology and
Economics, amongst others.
External(Community)
June 2, 2016: Scoping Phase ÃCommunityMeeting
Oct 24, 2016: Scoping Phase ÃCity Planning and Development
August 9, 2017: Community Stakeholder Group
September 13, 2017: Community StakeholderGroup
Cameron McCarthy 1
October 12, 2017: City Active Transportation Committee
November 2, 2017: City Planning andDevelopment
November 7, 2017: LTD BoardMeeting
November 8, 2017: River Districts FallMeeting
November 8, 2017: Community Open House
November 8, 2017: NeighborhoodMeeting
December 6, 2017: Fairmount Neighborhood Association
January 5, 2017: City Planning andDevelopment
January 11, 2017: Community Open House
January 11, 2017: Neighborhood Meeting
January & February 2017: Meetings with City Executive Leadership and Elected
Officials
April 6, 2018: Chamber of Commerce Local Government Affairs Council
June 2018: Meetings with interested parties, including representatives of Willamette
Riverkeeper (Eugene/Springfield), McKenzie River Trust, Whilamut Natural Area
Citizen Planning Committee, and Nearby Nature.
Community Interviews
Neighboring Business and PropertyOwners
RiverAdvocates
Ecology Advocates
Neighborhood Associations
E-Updates to Interested PartiesList
August 3, 2017: Project Launch
October 26, 2017: Save the Date: Open House#1
November 6, 2017: Reminder: Open House#1
December 21, 2017: Save the Date: Open House#2
January 5, 2018: Reminder: Open House #2
E-Updates to Community StakeholderGroup
August 3, 2017: Invite: Meeting #1 (August9)
August 17, 2017: Meeting #1Summary
September 7, 2017: Invite: Meeting #2 (September 13)
October 3, 2017: Meeting #2Summary
November 22, 2017: Outreach Summary of Issues and Opportunities
Around-the-O Updates
August 1, 2017
October 31, 2017
January 9, 2018
Project Web Page
https://cpfm.uoregon.edu/north-campus-conditional-use-permit
Cameron McCarthy 2