ftWPIanning <br />March 28, 2018 <br />Colin McArthur, AICP <br />Cameron McCarthy Landscape Architecture & Planning <br />160 East Broadway <br />Eugene, OR 97401 <br />RE: UO North Campus (CU 18-1) <br />Atrium Building <br />99 west 10`h Avenue <br />Eugene, Oregon 97401 <br />Phone: 541-682-5453 <br />Fax: 541-682-5572 <br />www.eugene-or.gov/planning <br />Thank you for your application for a Conditional Use Permit. Our completeness review process <br />provides an opportunity to collaboratively address any items that are unclear, incomplete, or <br />missing before your application is evaluated for consistency with our land use code. We also use <br />this as an opportunity to identify other issues which may be raised during the public process. <br />Based on our review, your application is deemed incomplete at this time. Below is a list of items <br />that need to be addressed: <br />• The written statement needs to address the Riparian Corridors, Wetlands, and <br />Wildlife Habitat (Goal 5) of the Metro Plan, specifically policies C.12, C.13, C.16 and <br />C.17. Staff notes that in reviewing the referenced map in policy C.16 (Goal 5 <br />Significant Wildlife Habitat for the area inside the UGB), it appears that a wildlife <br />habitat corridor and possibly riparian corridor runs adjacent to and through the site. <br />• Please provide a map that shows all parcel boundaries and includes Map and Tax Lot <br />numbers. <br />• Please show the location and width of all public and private easements. It appears <br />that a significant EWEB easement is located on the property but is not shown. <br />• Public Works has indicated that it appears that the wastewater system shown located <br />in the 8th Avenue cul-de-sac does not exist and will need to be shown in the proper <br />location. <br />11 Page <br />