HomeMy WebLinkAboutPUBLIC CORRESPONDENCE - Batch AI mL Kc
From:
GIOELLO Nick R
Sent:
Wednesday, September 20, 2017 8:32 AM
To:
'Brent Lorscheider'
Subject:
RE: Pw enr sewers
Hi Brent,
See this from Public Works staff:
"Yes, he's welcome to come down to the Permit and Information Center to look up as-built drawings and GIS
maps. One of the Permit Techs should be able to help him out with that."
I hope that answers your question,
Nick
-----Original Message-----
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Monday, September 18, 2017 8:47 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Pw enr sewers
Ok but does city have public records like as built drawings or sewer maps? Thx brent
Sent from my iPhone
> On Sep 18, 2017, at 3:12 PM, GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us> wrote:
> Brent,
> Forward your questions to me and I will see if I can get them answered. Engineering prefers questions regarding
Capital Hill go through me first. If it's regarding the information request you filed, I can say that Public Works is working
on it. They say is it time intensive and they will provide whatever they are capable of answering with the referral
comments that will come in several weeks. To answer one of your questions, the sewers leading up the proposed
development are publically owned and maintained.
> Thanks,
> Nick
> Nicholas R. Gioello, M. Adm.
> Associate Planner I Planning Division
> City of Eugene
> Planning & Development
> 99 West 10th Avenue
> Eugene Oregon 97401
> p 541.682.5453
> f 541.682.5572
> nick.r.gioello@ci.eugene.or.us
> -----Original Message-----
> From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
> Sent: Monday, September 18, 2017 11:35 AM
> To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
> Subject: Pw enr sewers
> Nick can I get the name of the sewer person or a contact in public works engineering I think name is Ericthanks Brent
> Sent from my iPhone
z
C---- _7L N'ck
From:
Sent:
To:
Cc:
Subject:
fcassell@comcast.net
Thursday, September 14, 2017 10:50 PM
GIOELLO Nick R
Murchison, CW
fire marsal's office
Hello Nick
Nate said that you're out of the office this week. Hope that means you're getting a well-deserved
break.
I'm writing to ask about comments made to me today by Assistant Fire Marshal Amy Linder. At our
meeting of 9/1, you suggested that I contact the Fire Marshal to ask certain questions. I called their
office shortly after the meeting and left a message with Cathy that several of our group would like to
meet with the Marshal to ask a few questions about CHPU® relating emergency responses. I didn't
hear back so i called again today and left the same message with Robin. Amy returned the call
promptly but said that in a meeting last Thursday you advised the Fire Marshall's office that they
should not speak with us directly, that all contact must go through you.
Is this a misunderstanding? You and Eric had specifically said that several of my questions were
better answered by the Fire Marshall and I should call that office. Could you please explain the
change and help me and the Fire Marshal understand your position?
Thanks,
Faris Cassell
GIOELLO Nick R
Nick
As applicant's representative I am granting the city 30 days off of the 120 day decision clock effective today.
carol
Carol Schirmer
Schirmer Satre Group
Planners, Landscape Architects, Environmental Specialists
375 West 4th
Suite 201
Eugene, OR 97401
www.sch irmersatre.com
PH: (541) 686-4540 x1
Fax: (541) 686-4577
1
ELL Nick
From: GIOELLO Nick R
Sent: Tuesday, September 05, 2017 1:59 PM
To: 'Brent Lorscheider'
Cc: David and Catherine Johnson
Subject: RE: Request for Fire Hydrant Flow Information related to Capital Hill PUD (PDT-17-0001)
Brent,
I can give you the following from an email from the Fire Marshal's Office:
Appendix B of the Fire Code "Fire Flow Requirements for Buildings" Section B105.2 One and two family dwellings
Minimum fire flow for dwellings having a fire flow calculation area that does not exceed 3600 square ft shall be a
1000 gpm for one hour.
As I understand there was no way to meet that so Exception #1 was invoked which allows for a 50% reduction in
the minimum fire flow if dwellings are provided with on approved automatic sprinkler system. Thus sprinklers
required.
I don't know about the other existing hydrants. I would assume that they operate currently at some acceptable level and
that whatever improvements are made to the overall system may also improve the flow rate to those existing hydrants.
However, I am guessing on this. I will defer to our experts who review these issues.
Nick
D'
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Monday, September 04, 2017 11:02 AM.
To: Eugene Public Records Requests <PUBLICRECORDSREQUESTS@ci.eugene.or.us>
Cc: David and Catherine Johnson <cdjohnson617@msn.com>; GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Request for Fire Hydrant Flow Information related to Capital Hill PUD (PDT-17-0001)
FUTURE WATER SUPPLY FOR PROPOSED CAPITAL HILL PUD (PDT-17-0001)
REQUESTOR: Brent Lorscheider, 2625 Capital Drive, Eugene Ph: 6266275049
I am requesting information as part of the Fairmount Neighborhood/Laurel Hill Valley Joint Response Committee for the subject
PUD. If is our understanding that the current water supply system does not have sufficient capacity to accommodate the 37
1
additional homes being proposed. EWEB staff has indicated the determining factor in analyzing future water flow requirements for
the proposed PUD is the flow required for the two additional proposed fire hydrants.
What are the estimated flow requirements for the two new hydrants being proposed in the PUD?
Will the existing fire hydrants in the immediate vicinity require any additional improvements, or will the flow capacity, or availability,
to these existing hydrants need to be increased?
Thank you,
Brent Lorscheider/
Brent Lorscheider
Ph: 6266275049
LL Nick
FUTURE WATER SUPPLY FOR PROPOSED CAPITAL HILL PUD (PDT-17-0001)
REQUESTOR: Brent Lorscheider, 2625 Capital Drive, Eugene Ph: 6266275049
I am requesting information as part of the Fairmount Neighborhood/Laurel Hill Valley Joint Response Committee for the subject
PUD. It is our understanding that the current water supply system does not have sufficient capacity to accommodate the 37
additional homes being proposed. EWEB staff has indicated the determining factor in analyzing future water flow requirements for
the proposed PUD is the flow required for the two additional proposed fire hydrants.
What are the estimated flow requirements for the two new hydrants being proposed in the PUD?
Will the existing fire hydrants in the immediate vicinity require any additional improvements, or will the flow capacity, or availability,
to these existing hydrants need to be increased?
Thank you,
/Brent Lorscheider/
Brent Lorscheider
Ph: 6266275049
G ELL Nick
Brent Lorscheider <lorsch2728@pacbell.net>
Monday, September 04, 2017 10:18 AM
Records Custodian
Brent Lorscheider; GIOELLO Nick R
Public Information Request to EWEB
EWEB Req Water Avail.pdf
Enclosed please find a request for information as it relates to the proposed Capital Hill PUD (PDT-17-0001)
Thank you,
Brent Lorscheider
Address: 2625 Capital Drive, Eugene
Ph: 6266275049
1
Name. Brent Lorseheider, Fairmount Neighbor Association, Response Comm,
Address: 2625 Capital Drive, Eugene 974o3
Phone: 626-627-5049 Email: lorsch2 28 pa li.n
Specific records requested: (continue on back of form if neces_,... '
FUTURE WATER SUPPLY FOR PROPOSED CAPITAL HILL PUD (P-
The application indicates that EWEB utilities are available for the propasu I dwelling units, mostly single family homes,
E
1, Does the currant water supply system have sufficient capacity and pressure (o accommodate all or the 37 new homes being I
proposed?
2, Will EWE B's review of the proposed PUD identify the current system capacity and limitations vis-a-vis the proposed PUD.
3_ Mould a bond be required to insure the applicant completes any "system upgrades or expansions" than might be required?
Requestor asks toe lnspect < eive a cagey inspect and make a copy
In accor r°ce with Oregon Public Records Law and EWEB's Inspection of Public Records Policy, Requestor agrees to
pay EWE' for all fees reasonably calculated to reimburse EWEB for its actual costs in making records available, before
the recc - r - will be released for inspection.
Regue Requests that fees be waived ~ c 2s not request that fees be waived
if requesting a waiver of fees, please state each basis for the waiver request;
Fairmount Neighborhood Association is requesting a foe waiver to,part cipate in the Planning
Process.
Sept 3, 2017
Date , tg.nature of r~eq.e_ :7
For E'K'ES L se: Request is granted Request is denied in whale or in part (see attached)
Req, -_,st
Z ELL Nick
From: GIOELLO Nick R
Sent: Thursday, August 31, 2017 10:05 AM
To: JANISCH Amy C
Subject: FW: Capital Hill PUD
Please add this to Ontrack for Capital Hill PUD per Mr. Conte's request
From: Paul Conte [mailto:paul.t.conte@gmail.com]
Sent: Tuesday, August 29, 2017 12:55 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Capital Hill PUD
Nick,
Please enter the entire contents of this message into the record for PDT 17-1 (Capital Drive).
The earlier documents appear to be cleared up. If I understand correctly:
® The initial PWD referral was solely the checklist. There was no narrative analysis (other than
in comments on the checklist)
® The initial Fire Marshal referral was the multi-page document, including citations to Eugene
Fire Code.
® PWD submitted brief comments which you paraphrased in the completeness letter.
More recently:
® As I understand it, PWD has not submitted any further documents or had further discussions
regarding the plans.
® Based on some discussions, the applicant has submitted revised plans. The street plans are
in L6.0, dated 8-22-17.
Could you please confirm the above?
I have some questions regarding the discussion with the Deputy Fire Marshal and the revised plans:
Is there any written record of the revised analysis supporting the two changes you identified? If not,
why
are
the
explanations of these
changes
not publicly documented
i
® What is the precise extent of "last section of Capital Drive" that was determined could "remain
unimproved"?
® Drawing L6.0 identifies "Proposed Road Widening Pervious Pavement." What is the spec for "pervious
pavement," and specifically does it support the loads necessary to meet the Eugene Fire Code
requirements for a "fire apparatus access road"?
® The earlier comments that you paraphrased from PWD indicated the sections of Capital Drive that
would have to be improved would have to be reconstructed, not just a strip of pavement added. Is this
still the position of PWD and Planning staff?
® On page 3 of the most recent narrative, it states: "See attached and revised Traffic Safety and Street
Connectivity Study." The revised "Tentative PUD Application" indicates a revised "Traffic Safety and
Street Connectivity Study submitted with this Revised Written Statement August 22, 2017." 1 didn't
find the revised study on-line.
® On page 5, same document. A 20-foot pavement meets LVR standard without parking on
either side. To meet the standard, the segment would have to be signed with "no parking"
and enforced.
Thank you for the additional information.
Paul
IHI
On Tue, Aug 29, 2017 at 11:28 AM, GIOELLO Nick R <Nick.R.Gioelloa.ci.eugene.or.us> wrote:
Paul,
I'm not sure if you are having problems viewing documents from the web site. It is true that the folder titled
"Application Completeness Review Letter (3/31/2017)" does not initially show up like all other documents but there is a
hyper link that lets you download it. That letter was the first round of review and includes the Planning checklist, Public
Works checklist and Fire Department comments. I have attached it in case you could not view it or download it.
The second review was my letter dated 6-26-17, and as I explained in another email to you, I took Public Works
comments that came from Eric Favreau via email and cut/pasted them into this letter. There were no additional written
Fire Department comments for the second review.
We did have a meeting with the applicant and Deputy Fire Marshal Mark Dahl to talk about the proposed hammerhead
turnaround at the end of Capital Drive; it was determined that the turnaround could be eliminated and the last section
of Capital Drive remain unimproved. This is what the third submittal by the applicant now shows.
Does that clear up this issue?
Nick
Assoc ia, a-, r 1 _ s
541.682.5453
541.682.5572
nick.r.gioello@ci.eugene.or.us
From: Paul Conte [mailto:paul.t.conte@gmaii.com]
Sent: Saturday, August 26, 2017 7:12 AM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Capital Hill PUD
Nick,
I looked at the documents posted on the city's website and didn't find referral comments from
Public Works or the Fire Marshall. (I see the brief statement on page 2.of your June 26 letter.)
Could you please post or provide those comments.
3
Thank you.
Pau!
On Wed, Aug 23, 2017 at 3:34 PM, GIOELLO Nick R <Nick.R.GioelloLa ci.eugene.or.us> wrote:
The Capital Hilt PUD (PDT 17-1) was resubmitted late yesterday. You can view all submitted documents here:
http://pdd.eugene-or.gov/Land Use/ApplicationDetails?file=PDT-17-0001
Click on the "Documents" tab in the upper right corner.
The applicant has requested that we deem the application complete as of next Tuesday, August 29, 2017. Therefore, a
public hearing will be scheduled within 60 days of that date. You will be notified of that date once it has been
determined.
You can submit comments, questions or testimony directly to me.
Nicholas R. Gloello, M. Adm.
Associate i •anner 1 Pla.nnin Division
Ca
4
541.682.54 5 3
541.682.5572
nick. r.gioellogci.eugene.or.us
ELL Nick
From: Paul Conte <paul.t.conte@gmail.corn>
Sent: Wednesday, August 30, 2017 6:12 PM
To: GIOELLO Nick R
Subject Re: Capital Hill PUD
Thanks Nick, very helpful.
Re the "No Parking" signage and enforcement question Without digging back into the documents,
weren't some of the existin segments of road going to remain with 20' pavement width? Those are
the ones that would need "no parking" (in addition to one side of a 21-foot pavement.
Also, as a note for the staff report to the HO PWD should be involved with careful wording of
any condition of approval re street and associated improvements (curbs, sidewalks, etc.)
For example, 21' is NOT adequate without signage, pavement marking and enforcement to provide
adequate "pullout" areas. I haven't found a spec on the min length of, and max spacing of, the
pullout areas. But somewhere I've seen a 20-foot pullout every 150 feet. You need to be sure that
this requirement is expressed, either in precise figures or by reference to a standard.
We are currently appealing the approval of PDT 13-1 and one of our AoEs will be that the EPC's
condition of "widening the pavement to 20"' in a 20' ROW is ambiguous and the EPC did not explain
how it was even feasible. (if there has to be curb and gutter improvements where the pavement is
widened, then you can't get 20' of paving in 20' of ROW.)
Staff has never bothered to learn the appropriate way to deal with EC 9.8320(6) and similar or
related criteria (e.g., EC 9.8320(7)).
There is a difference between requiring the developer to improve a public street and requiring the
public street to be improved to a certain spec without stating who will do it. It's very simple and is
directly elucidated in Butte Conservancy LUBA decision.
You can read my testimony in PDT 13-1 (or Trautman) in the first remand for the details and copies
of the decision.I would be happy to explain it if you want to discuss by phone.
Paul
On Wed, Aug 30, 2017 at 4:18 PM, GIOELLO Nick R <Nick.R.Gioello(cr ci.eugene.or.us> wrote:
Paul;
1
My answers (in blue font) and Public Works answers (in red font)are imbedded below.
Thanks,
Nick
C 541.682.5453
541.682.5572
nick. r.gioello@ci.eugene.or.us
From: Paul Conte [mailto:paul.t.conte@gmail.com]
Sent: Tuesday, August 29, 2017 12:55 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Capital Hill PUD
Dick,
Please enter the entire contents of this message into the record for PDT 17-1 (Capital Drive).
The earlier documents appear to be cleared up. If I understand correctly:
z
® The initial PWD referral was solely the checklist There was no narrative analysis (other than in
comments on the checklist)
® The initial Fire Marshal referral was the multi-page document, including citations to Eugene
Fire Code.
® PWD submitted brief comments which you paraphrased in the completeness letter.
More recently:
® As I understand it, PWD has not submitted any further documents or had further discussions
regarding the plans.
® Based on some discussions, the applicant has submitted revised plans. The street plans are in
L6.0, dated 8-22-17.
Could you please confirm the above?
I have some questions regarding the discussion with the Deputy Fire Marshal and the revised plans:
® Is there any written record of the revised analysis supporting the two changes you identified? If
not, why
are
the
explanations of these
changes
not publicly documented
3
The earlier comments that you paraphrased from PWD indicated the sections of Capital Drive
that would have to be improved would have to be reconstructed, not just a strip of pavement
added. Is this still the position of PWD and Planning staff? Corrects
On page 3 of the most recent narrative, it states: "See attached and revised Traffic Safety and
Street Connectivity Study." The revised "Tentative PUD ,Application" indicates a revised
"Traffic Safety and Street Connectivity Study submitted with this Revised Written Statement
August 22, 2017." I didn't find the revised study on-line.
On page 5, same document. A 20-foot pavement meets LVR standard without parking on either
side. To meet the standard, the segment would have to be signed with "no parking" and enforced.
They are proposing a 2 ' wide street, is allows for parking o one side of the road.
Location of "No Parking" signs is determined during the PEPI process.
Thank you for the additional information.
Paul
A
On Tue, Aug 29, 2017 at 11:28 AM, GIOELLO Nick R <Nick.R.GioelloCa)ci.eugene.or.us> wrote:
Paul,
I'm not sure if you are having problems viewing documents from the web site. It is true that the folder titled
"Application Completeness Review Letter (3/31/2017)" does not initially show up like all other documents but there is
a hyper link that lets you download it. That letter was the first round of review and includes the Planning checklist,
Public Works checklist and Fire Department comments. I have attached it in case you could not view it or download it.
The second review was my letter dated 6-26-17, and as I explained in another email to you, I took Public Works
comments that came from Eric Favreau via email and cut/pasted them into this letter. There were no additional
written Fire Department comments for the second review.
4
We did have a meeting with the applicant and Deputy Fire Marshal Mark Dahl to talk about the proposed
hammerhead turnaround at the end of Capital Drive; it was determined that the turnaround could be eliminated and
the last section of Capital Drive remain unimproved. This is what the third submittal by the applicant now shows.
Does that clear up this issue?
Nick
541.682.5453
541 .682.5572
nick.r.gioello@ci.eugene.or.us
From: Paul Conte [mailto:paul.t.conte@gmail.comj
Sent: Saturday, August 26, 2017 7:12 AM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Capital Hill PUD
Nick,
I looked at the documents posted on the city's website and didn't find referral comments from
Public Works or the Fire Marshall. (I see the brief statement on page 2 of your June 26 letter.)
5
Could you please post or provide those comments.
Thank you.
Pau[
PI
On Wed, Aug 23, 2017 at 3:34 PM, GIOELLO Nick R <Nick.R.Giocllo c ci.eugene.or.us> wrote:
The Capital Hill PUD (PDT 17-1) was resubmitted late yesterday. You can view all submitted documents here:
htt :Lpdd.eu ene-or.gov/Land se/AgglicationDetails?file=PDT-17-0001
Click on the "Documents" tab in the upper right corner.
The applicant has requested that we deem the application complete as of next Tuesday, August 29, 2017. Therefore,
a public hearing will be scheduled within 60 days of that date. You will be notified of that date once it has been
determined.
You can submit comments, questions or testimony directly to me.
Nicholas R. ioell ,
Associa.t-~ Planner' Planning Division
3
6
541.682 5453
541.682.5572
nick.r.gioello@ci.eugene.or.us
I ELL Nick
The Public Works comments in the letter are the referral comments, there is nothing additional like the typical check
list. The check list was used for the first submittal. For the second submittal we (Planning and Public Works) just
focused on the outstanding remaining issues. I received an email from Eric Favreau with those comments and then
pasted them into y letter. I tweaked a few words to make it more formal such as changing "I do not believe that they
adequately address" to "The applicant has not adequately addressed". I can forward you the email if you want it.
The informational item regarding the reconstruction of Capital Drive was solely in reference to the portion adjacent to.
the PUD between Cresta De Ruta and Hendricks Park. The applicant's plan showed adding asphalt to widen the street
to the required 21 feet between Cresta De Ruta and the terminus at Hendricks Park, which the Public Works comment
was in reference to.
You are correct I did reference the wrong number. Thanks for pointing that out, although I really dislike making simple
mistakes like that, I need to be aware of them.
If you have any other questions, feel free to contact me;
Nick
rr~,
Nichols R. ioe lo, M.
From: Paul Conte [mailto:paul.t.conte@gmail.com]
Sera: Wednesday, August 09, 2017,8:44 AM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Request for information re PDT 17-1 (Capital Drive PUD)
Nick,
In your June 26, 2017 letter to Carol Schirmer, you wrote:
"Informational Items by Public Works
® Capital Drive will need to be fully reconstructed to meet City standards. Simply adding
additional asphalt to widen will not be accepted as Capital Drive is in poor condition and
likely does not meet the City's standards for AC or base thickness. That means that a full 21'
wide street reconstruct will be necessary."
I would appreciate some clarification and follow-up.
1. Could you please provide me (or post on-line) a copy of the referral comments from Public
Works in reference to the item, above.
2
(BTW, I think-you wrote the incorrect file number. s/b PDT 17-1, not PDT 17-3)
Thank you,
Paul Conte
541.344.2552
I L Nick
On Tuesday, August 1, 2017, 11:38:18 AM PDT, GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us> wrote:
Hello Susan,
Given the depth of your comments and questions, I think either phone or in person would be the most
beneficial. Which do you prefer?
Thank you,
Nick
Nicholas R. Gioello, M. Adm.
Associate Planner ( Planning Division
City of Eugene
Planning & Development
99 West 10th Avenue
Eugene Oregon 97401
p 541.682.5453
f 541.682.5572
1
nick.r.gioello@ci.eugene.or.us
From: Susan Hoffman [mailto:shortgamesue@yahoo.com]
Seat: Monday, July 31, 2017 6:32 PM
T: GIOELLO Nick R <Nick.R.Gioelio@ci.eugene.or.us>
Cc; Susan Hoffman <shortgamesue@yahoo.com>
Subject. Capital Hill PUD - Questions
requirements for multi-family units and his/her tenants' compliance with the cRs,
community rules res, etc.?
As far as I know, no (potential) elevations have been provided giving interested parties
some insight as to the visual impact of 30' foot structures, 6 foot high fences, etc. which
could potentially be allowed under the city's -1 code. How will the project control
architectural style, siding color, roof material, etc. so that there is some design uniformity?
Guest parking. Done?
Again, I realize that the request as presented is for lot development only; however, the
ultimate goal is home building and creation of a cohesive community. At this point, at
least to e, the path forward to that end needs some clarification. Hope you can help.
Thanks for reading through this. Please advise by return e-mail what would be a good
time over the next week or so to discuss these (and potentially other) issues with you.
Susan Hoffman
(shortgamesue@yahoo.com)
Spring Blvd.
Eugene
3
I m L IWme
Z ® 0
From: Eugene Internet PWE
Sent: Tuesday, July 18, 2017 9:53 AM
To: GIOELLO Nick R
,Subject: FW: Parking problems on Capital Drive
Good morning, Nick.
I have been advised that questions/comments regarding the upcoming work on Capital Drive should be forwarded to
you. As such, I am forwarding this message which came to PWE.
Thank you,
Dee Kremer
Administrative Specialist
Public Works, Engineering
541-682-5291
From: Gyl Elliott [mailto:gyllie96@yahoo.coml
Sent: Friday, July 14, 2017 3:47 PM
To: Eugene Internet PWE <PWEngineering@ci.eugene.or.us>
Subject: Parking problems on Capital Drive
We live next to an Air Bnb on 2635 Capital Drive. There are several cars (3 or more)
parked on our street every day and night through the summer. This summer, cars have
begun to park facing the wrong way and encroaching on the yellow painted curb. This
means that we cannot make the turn into our driveway.
We have called Parking compliance and Police with no results. We understand that a
proposed PUD on Capital Hill will only exacerbate this problem and so we want you to be
aware that it is already untenable.
What can be done to reduce illegal parking on Capital Drive? Please advise.
Sincerely,
Cyl Elliott
2625 Capital Drive
Eugene, OR 97403
I L Nick
From:
GIOELLO Nick R
Sent:
Wednesday, June 21, 2017 11:34 AM
To:
'Brent Lorscheider'
Subject:
RE: South Hills Study
Hi Brent,
The Capital Hill PUD resubmittal is in and posted online. I'm assuming you can navigate our website easily by now. If not
here's a link to the search pager
http://pdd.eugene-or.gov/LandUse/ApplicationSearch
Thanks,
Dick
Nil'
s
ir:-,er ; r
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Wednesday, April 26, 2017 2:12 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: South Hills Study
Thanks Nick you're available to talk this afternoon by phone
Sent from my iPhone
On Apr 26, 2017, at 9:31 AM, GIOELLO Nick R <Nick.R.Gioello (z-ci.eLi.C3ene.or.us> wrote:
Brent, take a look at this portion of a previous staff report as an example of what parts of the South Hills
Study {SHS} are considered in the review.
As per the SHS resolution that adopted the policies as land use regulations, it also clarifies the SHS only
applies to property over 500 feet in elevation and south of 18th Avenue, which this site obviously is.
When providing opposing testimony, you can make an argument if you think there are other applicable
policies in the SHS that should apply.
Thanks,
dick
1
Fromm Brent Lorscheider [mailto:lorsch2728 acbell.net]
Sent: Friday, April 21, 2017 12:27 AM
Toe GIOELLO Nick R <Tick.R.Gioelio2ci.eugene.or.us>
Cc: Jason Brown <brownill uoregon.edu>
Subject: South Hills Study
Nick, I know you mentioned this before, but I could use additional clarification on the applicability of the South
Hills Study. Which portions of the SHS does the Planning Department considers in a PUD review? And I believe
that the City authorized the restriction to said portions in a later Council Action, sometime around 2000?, do you
know the Council File number for that action?
Thx, Brent
<Aerie Park portion staff report SHS.pdf>
2
Ga ELL Nark .
From: GIOELLO Nick R
Sent: Wednesday, April 26, 2017 9:31 AM
To: 'Brent Lorscheider'
Subject: RE: South Hills Study
Attachments: Aerie Park portion staff report SHS.pdf
Brent, take a look at this portion of a previous staff report as an example of what parts of the South Hills Study (SHS) are
considered in the review.
As per the SHS resolution that adopted the policies as land use regulations, it also clarifies the SHS only applies to
property over 500 feet in elevation and south of 18th Avenue, which this site obviously is.
When providing opposing testimony, you can make an argument if you think there are other applicable policies in the
SHS that should apply.
Thanks,
Nick
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Friday, April 21, 2017 12:27 AM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Cc: Jason Brown <brownjll@uoregon.edu>
Subject: South Hills Study
Nick, I know you mentioned this before, but I could use additional clarification on the applicability of the South Hills Study. Which
portions of the SHS does the Planning Department considers in a PUD review? And I believe that the City authorized the restriction
to said portions in a later Council Action, sometime around 2000?, do you know the Council File number for that action?
Thx, Brent
1
GIOELLO Nick R
won=
From:
GIOELLO Nick R
Sent:
Tuesday, April 25, 2017 2:00 PM
To:
'Brent Lorscheider'
Subject:
RE: Criteria 7
Brent,
We will get a referral letter from Public Works that will give us information regarding wastewater, storm/drainage,
streets, and traffic.
EWEB will give us a referral letter with conceptual comments for water, electricity and their right of way/easement
issues. I assume they will provide something that indicates significant improvements or upgrades will need to be made
to existing infrastructure. Not sure if they limit it to specific lots being developed or a blanket no further development
until upgrades are made, as there could possibly be some capacity available for several more homes there (I don't think
there is based on my phone conversation and them saying there was barely enough pressure now for the existing
homes). The city has a requirement that prior to issuing a building permit, the developer needs to provide a water
service availability letter from EWEB.
I don't know if we can or will require a bond for water service, we only do that type of thing for large public
infrastructure that a developer will be building and then turning over to the City. I'll have to ask senior staff about that.
Nick
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Tuesday, April 25, 201712:20 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Criteria 7
I assume each of the agencies that provide the Public Facilities and Services Elements issue a letter of intention, or something
to that effect, for water, wastewater, storm/drainage, streets (transportation), electricity, solid waste (which is private),
schools, we also consider Fire. I am particularly interested in water, Fire Department, sewer, streets, and stormdrainage.
Will EWEB identify the system improvements required to be performed by the developer, and in this case, since the
improvements are so costly, will the developer be required to submit bond or sign an agreement to do the work as a
condition of final PUD approval?
On Tuesday, April 25, 2017 11:04 AM, GIOELLO Nick R <Nick. R.Gioello(@ci.eugene.or.us> wrote:
Brent, take a look at the Metro Plan:
https://www.eugene-or.gov/848/Studies-Adopted-Plans-and-Archives
Look at section G. Public Facilities and Services Element.
1
It generally includes: water, wastewater, storm/drainage, streets (transportation), electricity, solid waste (which
is private), schools, we also consider Fire and Police services as public facilities/service.
Hope this helps,
Nick
Nicholas R. Gioello, M. Adm.
Associate Planner Planning Division
City of Eugene
Planning & Development
99 West 10th Avenue
Eugene Oregon 97401
p 541.682.5453
f 541.682.5572
nick.r.gioello@ci.eugene.or.us
From: Brent Lorscheider fmailto:lorsch2728@pacbell.net]
Sent: Monday, April 24, 2017 11:59 PM
To: GIOELLO Nick R <Nick.R.GioelloQci.eugene.or.us>
Subject: Criteria 7
Nick,
What are the "Public Services" referenced in EC 9.8320 (7) ?
Thx, Brent
PS: Can u give me a call tomorrow? 626-627-5049
2
GIOELLO Nick
From:
GILLESPIE Scott N
Sent:
Monday, April 17, 2017 8:56 AM
To:
Brent Lorscheider
Cc:
GIOELLO Nick R; FAVREAU Eric J
Subject:
RE: Cap Hill PUD - Utilities
Hi Brent,
Sorry for the late reply. All development proposals are reviewed for sewer service against sewer basin master
plans and engineering design standards. Each individual development is not required to submit an
engineering study to confirm capacity. Consistency with basin master planning and providing minimum
collection main sizing serves as confirmation of capacity under City sewer service policies. The proposed
points of connection and main extensions are consistent with engineering standards and have been confirmed
with our sewer planning engineers.
Thanks,
Scott Gillespie, PE
Public Works Engineering
99 East Broadway, Suite 400
Eugene, OR 97401
541-682-2706
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Monday, April 10, 2017 2:31 PM
To: GILLESPIE Scott N <Scott.N.Gillespie@ci.eugene.or.us>
Subject: Fw: Cap Hill PUD - Utilities
Hi Scott,
Regarding my request for information pertaining to the Capital Hill PUD:
1. I assume your department must conduct some type of sewer capacity analysis to determine if an existing sewer has sufficient
capacity for a proposed development tie-in. I believe the Cap Hill Pud proposes to connect up to 44 dwelling units to an existing 8
inch public sewer, does/will that sewer have capacity for the additional flow from the development?
On Monday, April 10, 2017 2:08 PM, GIOELLO Nick R <Nick.R.Gioello a( ,ci.eugene.or.us> wrote:
Hi Brent,
I received the following from Scott Gillespie, Civil Engineer II and Development Review Manager, after I asked
him for clarification why part of your request triggered a formal Public Information Request:
Hi Nick,
The justification is on the PIR request form. His request is extensive (likely a Level 1) requiring many
previous years, multiple divisions, multiple staff, multiple databases, multiple archives and multiple
pages. A request of this nature would also typically trigger a review from the City Attorney's Office due
to its size and breadth. This information is not typically reviewed by PW staff during a land use
application as there are not criteria that directly speak to asset management and maintenance
operations.
We keep basic information at the PIC so people can easily see the design of their street or where (or
how big) their utilities are. This information is available through GIS and is easily queried. It generally
includes these items from his list:
® Location
® As-constructs
® Age
The remaining items on his list can be provided with a Public Records Request from the City
Recorder's Office.
Thanks,
Scott Gillespie, PE
Public Works Engineering
99 East Broadway, Suite 400
Eugene, OR 97401
I hope this clarifies the issue for you,
Nick
Nicholas R. Gioello, M. Adm.
Associate Planner I Planning Division
City of Eugene
Planning & Development
99 West 10th Avenue
Eugene Oregon 97401
p 541.682.5453
f 541.682.5572
nick. r. iq oello )ci.eugene.or.us
From: Brent Lorscheider fmailto:lorsch2728@pacbell.net]
Sent: Sunday, April 09, 2017 10:40 AM
To: GIOELLO Nick R <Nick. R. Gioello(a_ci.eugene.or.us>
Cc: Tom Bruno <brunoassocaaol.com>; Kelley Blewster <kel Isand(o)earthlink. net>
Subject: Re: Cap Hill PUD - Utilities
Nick, Regarding my request for information related to sewer availablity and road suitability for the Cap Hill PUD, pis note:
Criteria 7 of the PUD evaluation (9.8320) requires the PUD demonstrate adequate public facilities and
services are available to the site, which would include sewers and roads.
The stated purpose of the land use code is to protect and promote the health, safety, and general
welfare of the public and to preserve and enhance the economic, social, and environmental
qualities of the community. (9.0020).
The stated goal of the Planning Department, according to their website is to:
Facilitate community dialogue and understanding of land use planning issues
Taken together, the above three objectives/codes imply that 1, as a member of the public, should be able to dialogue and
ask questions of the Planning Department about land use planning issues that could affect public, health, safety and
2
general welfare of the public. The information that I requested in my prior email is very reasonable and pertinent to the
topic, and should have been done already, assuming the City is duly conducting a review to determine if "public
services" are available for the subject PUD. Furthermore, this information should be readily available to the public in
order to assuage the public and neighbors, whom have every right to be concerned, about maintaining the protection of
health, safety and general welfare with respect to the subject PUD application
In view of the above, it is incumbent upon the Planning Department to field questions and request for information from the
public, seek out the answers from the respective departments within the City, and then provide those answers, all of which
should be done in a timely manner so as to allow the public to review the answers and have an opportunity to incorporate
the sought after information within the PUD review deadlines for public input. It is unfair to place the burden of.obtaining
the request for information on the requester with the directive to "make a records request" as this is not a records request,
it is a request for pertinent information pertaining to a pending land use application.
Therefore, I respectfully repeat my request of my prior email of April 5 and ask that the Planning Department abide by its
stated goal to "facilitate community dialogue" by "corralling the requested information" and responding to me in a timely
manner.
Nick, I appreciate your assistance on the initial request and realize this repeated request may not be within your authority
to grant, in which case I hereby ask that you refer this request for information, pertinent to the Capital Hill PUD
application, to the management of the Planning Department.
Thx again, Brent Lorscheider, Leader of the Fairmount Neighbors Association PUD Response Effort
Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the
Capital Hill PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches:
Location
Design drawings
As built drawings
Capacity studies
Age
Condition
Maintenance and cleaning history
Spill or overflow records
On Thursday, April 6, 2017 2:32 PM, GIOELLO Nick R <Nick. R.Gioeilo(a,ci.eugene.or.us> wrote:
Brent,
I am told by Public Works staff that some of the information you are requesting is available at the Building
Permit counter, "mostly location and as-builts°. You can walk in any time and request to see them.
3
The depth and detail of the other parts of your request will require staff time to retrieve and organize. This
must be requested as a records request through the City Recorder's Office:
https://www.eugene-or.gov/519/Public-Records
I have attached a form for you.
Thanks,
Nick
From: Brent Lorscheider rmailto:lorsch2728(a,pacbell.net]
Sent: Wednesday, April 05, 2017 11:57 PM
To: GIOELLO Nick R <Nick. R.Gioello(a7ci.eugene.or.us>
Cc: Tom Bruno <brunoassoc(@aol.com>
Subject: Cap Hill PUD - Utilities
Hi Nick,
Can u pls forward this request to the appropriate department within the City:
Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the
Capital Hill PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches:
Location
Design drawings
As built drawings
Capacity studies
Age
Condition
Maintenance and cleaning history
Spill or overflow records
Request for the following information regarding the streets that will bear the traffic burden during construction and post
construction of the Capital Hill PUD, i.e., Capital Drive, Spring Street and Fairmount:
Design drawings
As built drawings
Capacity studies
Age
Maintenance history
Thank you, Brent
4
I LL Nick
From: Brent Lorscheider <lorsch2728@pacbell.net>
Sent: Thursday, April 13, 2017 11:49 PM
To: GIOELLO Nick R
Subject: Re: Needed Housing
Thx Nick, Interesting info. Do you know of any other HO decisions, or appeals that address PUD applications wherein Needed
Housing was a consideration in the review and/or appeal process ? If so, could I get a copy of those decision(s). Phx, Brent
On Monday, April 10, 2017 8:55 AM, GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us> wrote:
Brent,
i have attached several documents that should give you a better understanding of needed housing and answer
your questions. I copied the Oregon Revised Statutes that cover needed housing and the Goal 10 language. I
have also given you a discussion (see Attachment A of the Chamotee Trails PUD memorandum) from our City
Attorney's office that provides a comprehensive overview of "needed housing" for a very recent project that
went through public hearing, and I also included the portion of the Hearings Official's decision that rules on the
needed housing issue.
Thank you,
Nick
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Wednesday, April 05, 2017 4:34 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Re: Needed Housing
What constitutes needed housing, pricewise? how much housing is needed? and by when? what are the enabling city
ordinances?
On Wednesday, April 5, 2017 4:01 PM, GIOELLO Nick R <Nick. R.Gioello(@c;i.eugene.or.us> wrote:
Brent,
There is no point person on needed housing. I can field your questions, If I don't have an answer I can find
someone who can answer it.
Nick
From: Brent Lorscheider [mailto:lorsch2728(o-)_pacbell.net]
Sent: Wednesday, April 05, 2017 8:07 AM
To: GIOELLO Nick R <Nick.R.Gioello a(7.ci.eugene.or.us>
Subject: Needed Housing
Hi Nick,
I would like to learn more about "needed housing" in Eugene. Can you direct me to the point person or guru for the City
on this topic?
1
Tnx, Brent
2
T L Nick
From:
Brent Lorscheider <lorsch2728@pacbell.net>
Sent:
Wednesday, April 05, 2017 11:57 PM
To:
GIOELLO Nick R
Cc:
Tom Bruno
Subject:
Cap Hill PUD - Utilities
Hi Mick,
Can u pls forward this request to the appropriate department within the City:
Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the Capital Hill
PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches:
Location
Design drawings
As built drawings
Capacity studies
Age
Condition
Maintenance and cleaning history
Spill or overflow records
Request for the following information regarding the streets that will bear the traffic burden during construction and post construction
of the Capital Hill PUD, i.e., Capital Drive, Spring Street and Fairmount:
Design drawings
As built drawings
Capacity studies
Age
Maintenance history
Thank you, Brent
1
GIOELLO Nick
Fri : pfisher <pfisher@continet.com>
Sent: Friday, March 31, 2017 3:06 PM
Tai: GIOELLO Nick R
Subject: Capital Hill PUD Conversation
Nick, it was a pleasure talking with you today RE: Eweb Water Distribution System, the Transportation.
problems with fire, etc on hill, & also, the Time line for PUD Response.
Thank you for all of your help. Please feel free to call me at: 541-687-0651 or email me
at: pfisher@continet.com.
f
Rest Regards,
Peggy Fisehr
GIOELLO Nick
i Brent,
I've had more time to go over the application. I have also talked to a few more knowledgeable staff, and there is no
criteria in the code that allows us to ask how much construction traffic or limit construction traffic to a site. Since its not
in the code, there is no code reference I can give you. There are some things that limit construction activity, such as
when construction can start and end (time of day) and Erosion Control has limits on the slope integrity, dirt and debris
aspect related to construction and making sure that kind of stuff does not leave the site (for more info on Erosion,
contact Ed Fredette - Erosion Control Specialist, 541-501-0358, or ed.w.fredette@ci.eugene.or.us).
We do know the number of trees proposed for removal, it is shown in a table on sheet L4.0 of the plans; 312 trees to be
removed. I talked to one of our engineers and it seems typical at this stage that there is no quantifiable way to know
exactly in cubic yardage how much cut and fill will be required. That is not known until the full grading plans are finished.
For the improvements to Capital Drive, which is City owned, they would submit the full grading plans when applying for
the Privately Engineered Public Improvement permit (you'll hear referred to as a PEPI permit by most staff). The private
street, driveways, stromwater and other utility work and associated grading is looked at through the Building Permit.
You can talk to more knowledgeable staff than I by calling Public Works Engineering at 682-8400.
I'm sorry, I do not know the code sections that these areas I've described are located in. I believe that the staff I've
directed you too should be able to give you the code references you are asking.
Hope this helps,
Dick
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Tuesday, March 28, 2017 10:47 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: another question
Hi Nick,
Another question on PUD process. In the neighborhood meeting of November 2017, I asked a number
of questions related to estimated construction activities, like how much excavation, how much fill,
how many trees removed, how many truck trips, etc will be required for: (1) land development work,
and (2) home construction. The developers agent has declined to answer these questions and has
taken the position that this pertinent information is not part of the PUD application and approval
process--further claiming these questions will not be answered until the building permit phase of the
development process. Can you please direct me to the code section(s) that supports this position?
Thx, Brent
1
G--'4 ALL is
From: GIOELLO Nick R
Sent: Friday, March 31, 2017 8:31 AM
To: 'Brent Lorscheider'
Subject: RE: road standards
Attachments: Design Standards for Streets.pdf
Hey Brent,
It's in EC 9.6870, which also references the attached document. I highly suggest discussing these standards with
someone in Public Works (682-8400) to fully understand how they are applied.
Nick
From: Brent Lorscheider [mailto:lorsch2728@pacbell.net]
Sent: Thursday, March 30, 2017 11:10 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: road standards
Nick,
I recall you mentioning road standards and how Capital does not meet the standards. I believe the current standard is 21 foot
wide? Does the current standard include a sidewalk for an area like Capital Drive, Spring, and Cresta de ruta? Is this covered in land
development code, or some other section of eugene code, or another set of regulations ? thx. Brent
LL Nick 7~
Wm= WRIMM
From: FLOCK Gabriel
Sent: Monday, March 27, 2017 8:20 AM
To: GIOELLO Nick R
Subject: FW: incident on Capital Drive
FYI
From: pfisher [mailto:pfisher@continet.com]
Sent: Saturday, March 25, 2017 12:07 PM
To: FLOCK Gabriel <Gabriel.Flock@ci.eugene.or.us>
Subject: incident on Capital Drive
Hello Gabe. I haven't spoken to you for awhile, but I thought it best to share with you what just happened to
me so you would have an example of what happens occasionally on Capital Drive regarding the 5 to 6 blinds
curves stretching 1/4 mile from Spring Blvd to my house at 2808 Capital Drive just past Alta Vista Street.
Best Wishes,
Peggy Fisher-Capital Hill PUD Response Team
IJ S
ffi
I ELL Nick R
1-1
Faris, you'll probably find this attachment helpful as well.
r s kon
From: GIOELLO Nick R
Sent: Friday, March 10, 2017 9:18 AM
To: 'fcassel I @comcast. net' <fcassell@comcast.net>
Subject: RE: question about capital hill pud planning process
Hello Faris,
The application was received on 3/7/17. We have 30 days to conduct completeness review, which means reviewing all
the materials submitted and deciding if there is anything missing or additional information is needed. I'd say that 95% of
the time we deem the application incomplete. It is then up to the applicant to resubmit the missing or additional
information. Every applicant is different when it comes to this part, so I can't even fathom a guess on how long before
they resubmit.
Once we have all the information and materials, the application is deemed complete. We then solicit referral comments
from agencies and City Departments, such as Public Works and the Fire Department. A staff report will be written based
on those referral comments and an in-depth analysis of the applicable code criteria. A public hearing is scheduled
before a Hearings Official approximately 50 to 60 days after the application is deemed complete. Public testimony on
the project is accepted both before the hearing in writing and verbally during the hearing . In many cases the public
record is left open for several weeks after the hearing. The Hearings Official will render a decision within 15 days
following the close of record. -
Hope this helps you understand the process. Contact me if you have more questions,
rich-_ L s R. Gi 4 f . Adr
As ori,- to Pl i n g D i=J'si n
nick. r.gic., 10 >ci.eugene.or.us
From: fcassellPcorncast.net [rnailto:fcassell@corncast.net]
Sent: Wednesday, March 08, 2017 9:50 AM
To: GIOELLO Nick R <Nick.R.Gioello2cLeugene.or.us>
Subject: question about capital hill pud planning process
hello nick
I'm a capital drive neighbor and received the planning department email about the capital hill pud
recent submission of its plans. could you please tell me the steps and deadlines in the planning
process for this pud to win approval?
thank you,
faris cassell
2
l . i
TYPE III APPLICATION EVENT FL
The application, accompanied by a fee is submitted to
10
l
ff
h
d
f
Application Submitted
e Permit an
In
ormation Center,
P
anning Sta
at t
99 West 10th Avenue (See EC 9.7010).
The city shall review the application and, within 30
Completeness Review
Completed
days of its receipt, determine whether the application
is complete or incomplete then notify the applicant
accordingly.
Application
Deemed Complete
Application
Deemed
Applicant has 180 days to resubmit complete
Incomplete
application materials.
At least 30 days prior to the public hearing, the city
Public Hearing Notice
hearin
to
h
ll
il
itt
ti
f th
ubli
Mailed
g
s
a
ma
a wr
en no
ce o
e p
c
those parties specified under EC 9.7315.
A public hearing will be held within 60 days of the
®
i
ti
th
t
n
li
ti
i
c
m
l
t
it
'
d
t
Public Hearing
erm
na
on
a
a
app
ca
on
s
o
p
e
e,
c
y
s
e
unless the applicant agrees to a longer time period.
Planning staff shall make the staff report available at
least 7 days prior to the hearing (See EC 9.7320).
Unless the applicant agrees to a longer time period,
Decision
within 15 days following the close of the record, the
review authority shall approve, approve with
conditions, or deny the application (See EC 9.7330).
Within 5 days after the Hearings Official or Historic
Notice of Decision
®
h
ll
il
i
d
d
d
i
i
h
i
Mailed
ma
Rev
ew Boar
ren
ers a
ec
s
on, t
e c
ty s
a
notice of the decision to those parties specified in EC
9.7335.
Within 12 days of the date of the mailing of the notice
Appeal
i
l
d
h
d
h
d
b
Submitted
on may
e appea
e
to t
e
of
ecision, t
e
ecis
Planning Commission on a form approved by the city
manager (See EC 9.7655).
Public Hearing Notice
At least 10 days prior to the public hearing, the city
Unless appealed, the
Mailed
shall mail written notice of public hearing to those
decision is final on
parties specified in EC 9.7665.
the 13th day after
the notice of
Appeal
The Planning Commission shall hold a public hearing
decision is sent.
Public Hearing
within 45 days of appeal receipt unless the applicant
and appellant agree to a longer time period. The staff
report shall be available at least 7 days prior to the
public hearing (See EC 9.7660 & 9.7670).
v
Appeal Decision
The Planning Commission shall affirm, reverse or
(Final)
modify any decision, determination, or requirement
within 15 days of the close of the record, unless the
applicant and appellant agree to a longer time period.
The decision is final on the local level (See EC 9.7680).
Notice of Appeal
Within 5 days after a decision by the Planning
Decision Mailed
Commission is rendered, notice of the decision shall be
Revised: 3/2014
mailed to those parties specified in EC. 9.7685.
IC2 L -lick
From: King Schneider <124kink_key40@comcast.net>
Sent: Friday, March 10, 2017 3:07 PM
To: GIOELLO Nick R
Subject: Re: Capital Hill PUD
Hi Nick
Thanks. I probably have more than enough to digest if I get into the documents. I'm pretty well acquainted
with the drawings (although I'm not sure the ice storm left all the trees). I was in touch with Faris later on,
too. I'll most likely contact you in a week or so, if I get barraged by neighbors questions.
Kingsley
Sent from my iPhone
On Mar 10, 2017, at 2:54 PM, GIOELLO Nick R <Nick.R.Gioello(&,,ci.eugene.or.us> wrote:
Hi Kingsley,
I understand Matt Denberg met with you today and gave you a copy of the time frame for this project.
We can certainly meet whenever you would like. The time for public input is after we have deemed the
project complete, but I'm certainly not opposed to meeting prior to that to discuss initial concerns of the
neighborhood. I'm always willing to pass that kind of information on to the applicant. Let me know
when you would like to meet.
Thanks,
Nick
N c l- S
T-ig Division
nick.r.gioello@ci.eugene.or.us
From: 124kink key40@comcast.net [mailto:124kink key40@comcast.net]
Sent: Thursday, March 09, 2017 5:17 PM
To: GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Subject: Capital Hill PUD
Hello,
1
My name is Kingsley Schneider. I am coordinating the Fairmount Neighbors response
to this PUD and require some of the parameters of the response.
I need a timeline for Planning to respond to the Dreyers, and whether the Dept would
entertain any of our response during your initial review for completeness.
I don't have your phone number, but would like to talk to you either in person or by
phone to determine what (and when) should be included in our response.
Icy address is:
2784 Central Blvd, Eugene OR 97403.
541 302 1569 (Cell 541 968 2445)
124kink key4@comcast.net
Nick
thank you very much.
Faris
Fro : "GIOELLO Nick R'° <Nick.R.Gioello@ci.eugene.or.us>
To: fcassell@comcast.net
Sent: Friday, March 10, 2017 9:56:54 AM
Subject: FW: question about capital hill pud planning process
Faris, you'll probably find this attachment helpful as well.
_1 E_ :vision
From: GIOELLO Nick R
Sent: Friday, March 10, 2017 9:18 AM
To: 'fcassell@comcast.net' <fcasselI@comcast. net>
Subject: RE: question about capital hill pud planning process
Hello Faris,
The application was received on 3/7/17. We have 30 days to cond,uct completeness review, which means reviewing all
the materials submitted and deciding if there is anything missing or additional information is needed. I'd say that 95% of
the time we deem the application incomplete. It is then up to the applicant to resubmit the missing or additional
information. Every applicant is different when it comes to this part, so I can't even fathom a guess on how long before
they resubmit.
Once we have all the information and materials, the application is deemed complete. We then solicit referral comments
from agencies and City Departments, such as Public Works and the Fire Department. A staff report will be written based
on those referral comments and an in-depth analysis of the applicable code criteria: A public hearing is scheduled
before a Hearings Official approximately 50 to 60 days after the application is deemed complete. Public testimony on
the project is accepted both before the hearing in writing and verbally during the hearing . In many cases the public
record is left open for several weeks after the hearing. The Hearings Official will render a decision within 15 days
following the close of record.
1
Hope this helps you understand the process. Contact me if you have more questions,
nick.r,gioello,ci.eugene.or.us
From: fcassell@comcast.net [rnailto:fcasseii@corncast.net]
Sent: Wednesday, March 08, 2017 9:50 AM
To: GIOELLO Nick R <Nici<.R.Gioelio@ci.eugene.or,us>
Subject: question about capital hill pud planning process
hello nick
I'm a capital drive neighbor and received the planning department email about the capital hill pud
recent submission of its plans. could you please tell me the steps and deadlines in the planning
process for this pud to win approval?
thank you,
faris cassell
2