BROWN Daren M
From:Susan Hoffman <shortgamesue@yahoo.com>
Sent:Monday, July 31, 2017 6:32 PM
To:GIOELLO Nick R
Cc:Susan Hoffman
Subject:Capital Hill PUD - Questions
Hi Nick. I am a concerned Eugene citizen and live on Spring Blvd. just a few blocks from this
proposed residential project. By way of background, I am retired now but through out my 30+
year career worked for various California & Nevada banks (Wells, US Bank, Bank of the West,
etc.) financing large commercial, industrial and residential projects. Residential projects were
both single family detached and condominiums, with unit totals from a few dozen to as many as
several hundred. I have been going through the Tentative Application documents on your
website regarding the proposed Capital Hill PUD project and there are several issues about
which I have questions. What is your preferred method for discussing these issues?? Phone
call?? Short meeting in your office?? By e-mail?? Issues include:
Lack of draft CC&Rs going into the approval process. (I also assume there are no draft
Rules/Regulations at this point.) I realize that this developer is only preparing the finished lots
for sale and is not going to be involved with the vertical construction; however, as you know,
CC&Rs can be critical in shaping the physical footprint of the project. They also insure the
financial viability of the project (HOA budget, special assessments, maintenance of the open
space, private road, etc.) and provide parameters for community living (regulations on
maintenance of homes & yards, noise, home offices, storage, Airbnb, guest parking, etc.). If the
project's site development is approved and goes forward, at what point will CC&Rs be
drafted?? What happens if, after site development commences, the developer and the city
cannot agree on the format of CC&Rs? Why not address this going in??
How will the potential for "single family attached" housing be handled?If a lot purchaser
decides to build a 2 or 3 unit dwelling, will those units be further broken down into separate tax
lots and sold separately after construction or is it assumed that they will be rentals and that the
lot purchaser will be responsible for compliance with the city's requirements for multi-family units
and his/her tenants' compliance with the CC&Rs, community rules & regs, etc.?
Division of responsibility of the open space between the HOA and individual homeowners. What
is driving this bifurcation?? With whom will the final responsibility rest if open space is polluted
or otherwise in need of maintenance?? Especially for space at the east edge of lots that abut
the Ribbon Trail. Will lot purchasers actually take title to this "open" space??
As far as I know, no (potential) elevations have been provided giving interested parties some
insight as to the visual impact of 30' foot structures, 6 foot high fences, etc. which could
potentially be allowed under the city's R-1 code. How will the project control architectural style,
siding color, roof material, etc. so that there is some design uniformity?
Guest parking. None?
1
Again, I realize that the request as presented is for lot development only; however, the ultimate
goal is home building and creation of a cohesive community. At this point, at least to me, the
path forward to that end needs some clarification. Hope you can help.
Thanks for reading through this. Please advise by return e-mail what would be a good time over
the next week or so to discuss these (and potentially other) issues with you.
Susan Hoffman
(shortgamesue@yahoo.com)
Spring Blvd.
Eugene
2
BROWN Daren M
From:Michael Kuhn <mkuhn@uoregon.edu>
Sent:Monday, June 12, 2017 4:06 PM
To:GIOELLO Nick R
Subject:Capital Hill PUD
Mr. Giello,
I’m sure you’ve been hearing a lot from people in my neighborhood about the Capital Hill PUD: I’m sorry to add to
your inbox. However, I think it’s important for me to reach out given some very concerning unanswered questions
about the development. I live on Cresta de Ruta Street, just below Capital Drive.
First of all, I want to say that there’s is definitely a responsible way that the land at the top of the hill should be
developed. This is a convenient neighborhood for UO and a nice place to live. Development there should happen,
especially given the need for new housing. More development would also hopefully bring more attention to road
access issues in the neighborhood. I would be happy to see this happen.
There are a variety of reasons why the development, as proposed, makes me uncomfortable. Like I said, I’m sure
you’ve heard this before, so I want to keep things brief and clear, so I’ll just mention the two things that are the most
important in my mind.
1. First and foremost: the road access issues. Living on capital hill, I’m always aware of fire and landslide
risk. Half the homes on Cresta and Capital are on stilts that aren’t earthquake safe. The ice storm this December
closed off access to our house for a number of days. In a lot of ways, this is a risky place to live. Getting off the hill
quickly, or getting emergency vehicles up the hill quickly is a serious issue. The city cannot approve this project with
its fingers crossed about emergencies. Frankly, I doubt the adequacy of access given the existing neighborhood
capacity, much less with 40+ new families at the dead-end of a long, narrow, bumpy road. This says nothing about the
impact of construction on the neighborhood given the need for street parking in bad weather when driveways are too
steep to be used, and the lack of sidewalks.
2. Drainage. The hill collects a tremendous amount of water. There are places where after heavy rain, or
heavy watering of the property at the top of the hill, springs drain directly out of the hillside. The large trees help soak
up a lot of that, to prevent slides and erosion. Removing a lot of trees and the resulting canopy, as the proposal calls
for, brings more water to the ground with less capacity for absorption. The steep slope and very wet soil are already
problematic for landslide risk. New units on steep slopes, diverting more water straight into the hillside is genuinely
frightening as a homeowner in the neighborhood.
If the city and the developer have a convincing plan to deal with these issues: great. I really think our city and
neighborhood would all benefit from safe development at the top of Capital Hill. But as is, the plan is really scary for
me because it doesn’t take these issues seriously.
Sincere thanks for your time and attention,
Michael Kuhn, Ph.D.
Assistant Professor
Department of Economics
University of Oregon
1
BROWN Daren M
From:FLOCK Gabriel
Sent:Monday, March 27, 2017 3:11 PM
To:GIOELLO Nick R
Subject:FW: incident on Capital Drive
FYI.
CƩƚƒʹpfisher\[mailto:pfisher@continet.com\]
{ĻƓƷʹMonday,March27,20173:10PM
ƚʹFLOCKGabriel<Gabriel.Flock@ci.eugene.or.us>
{ǒĬƆĻĭƷʹRe:incidentonCapitalDrive
Thanks!Inowthinktherewasprobably50carsparkedonthesideasIhavetraveledthesamepathmanytimessince
then.
Ifyouareallowedtoshareyourtrafficassessment,Lķlovetohearit.
Also,intheRGarticleoftoday,thewritermistakenlycalledthetwoarterialstreetsIwasalludingtoasintersecting
streets.CapitalDrivehastwointersectingstreetsasyouknow,AltaVista&CrestaduRuta;butweonlyhaveone
arterialstreet,SpringBoulevardtogetoffthehillincaseoffireorotheremergenciessinceCapitalDriveinAbut
HendricksParkwhichislinedbyagravelroadownedby99.ΓğƷleastIthinkƷŷğƷƭright...thatźƷƭanEWEBroad,
notacityƩƚğķΓƭƚƷŷĻƩĻƭnowayasecond,alternativearterialroadcouldbeputin.Thankfullyso,asitwouldruin
HendricksParkhaveaslewofcarsgothroughthereeveryminuteoftheday.
CƩƚƒʹFLOCKGabriel
Sent: Monday, March 27, 2017 2:11 PM
To:pfisher
Subject: RE: incident on Capital Drive
HiPeggy,
Thanksforsharingthis.LƒalsopassingitalongtoNickGioelloastheplannerassignedtothisproject.HeandIdidasitevisit
upthereonFriday,soIdohaveafreshsenseofhownarrowthestreetis.Icouldseehowanestatesalemightjamthings
up!GF
CƩƚƒʹpfisher\[mailto:pfisher@continet.com\]
{ĻƓƷʹSaturday,March25,201712:07PM
ƚʹFLOCKGabriel<Gabriel.Flock@ci.eugene.or.us>
{ǒĬƆĻĭƷʹincidentonCapitalDrive
HelloGabe.IŷğǝĻƓƷspokentoyouforawhile,butIthoughtitbesttosharewithyouwhatjusthappenedtomeso
youwouldhaveanexampleofwhathappensoccasionallyonCapitalDriveregardingthe5to6blindscurves
stretching1/4milefromSpringBlvdtomyhouseat2808CapitalDrivejustpastAltaVistaStreet.
BestWishes,
PeggyCźƭŷĻƩΓ/ğƦźƷğƌHillPUDResponseTeam
Thishappenedtoday,Saturday,3/25/17at11:15am.IturnedtheblindcurvenexttoAltaVista,&justasIdid,I
raninto30carsallparkedontheupwardlaneblockinganentirelaneoftraffic.Iproceededaroundtwocars&a
thirdoneapproachedmeinmyrightfullanethreateningmewithaHeadOnCollision.Ihonkedmyhornrepeatedly
1
butherefusedtobudge&startedtoapproachedmefurther.Iliterallyhadnowheretogoas3carswerepiledin
backofme.
a
So,Iparkedmycaronthespot,gotout,&wenttotheŭǒǤƭwindow&explainedhehadtoturnaroundin
drivewayasIĭƚǒƌķƓƷbackout.
Hecursedme&threwalotofinsultsatmebutwhatcouldIdoas3carswerepiledupinbackofme?
Iexplainedtohimthereisnoparkingonblindcurvesasitstoodangerous;&weĭğƓƷseearoundthemuntilweget
rightontopofthem.
Hesaid,Iwasaknowitall!
Ireplied,Iwastryingnottobeinanaccidentwithhim,&heneededtobackdownasIhadnowheretogo.
IhavenevereverwitnessedthisonCapitalDrivebeforeandIlivedherefor25years!AllduebecauseofanEstate
SalesonAltaVista.
2
BROWN Daren M
From:Brent Lorscheider <lorsch2728@pacbell.net>
Sent:Sunday, April 09, 2017 10:40 AM
To:GIOELLO Nick R
Cc:Tom Bruno; Kelley Blewster
Subject:Re: Cap Hill PUD - Utilities
Nick, Regarding my request for information related to sewer availablity and road suitability for the Cap Hill PUD, pls note:
Criteria 7 of the PUD evaluation (9.8320) requires the PUD demonstrate adequate public facilities and services are available
to the site, which would include sewers and roads.
The stated purpose of the land use code is to protect and promote the health, safety, and general welfare
of the public and to preserve and enhance the economic, social, and environmental qualities of the
(9.0020).
community.
The stated goal of the Planning Department, according to their website is to:
Facilitate community dialogue and understanding of land use planning issues
Taken together, the above three objectives/codes imply that I, as a member of the public, should be able to dialogue and ask questions of the
Planning Department about land use planning issues that could affect public, health, safety and general welfare of the public. The information
that I requested in my prior email is very reasonable and pertinent to the topic, and should have been done already, assuming the City is duly
conducting a review to determine if "public services" are available for the subject PUD. Furthermore, this information should be readily
available to the public in order to assuage the public and neighbors, whom have every right to be concerned, about maintaining the protection
of health, safety and general welfare with respect to the subject PUD application
In view of the above, it is incumbent upon the Planning Department to field questions and request for information from the public, seek out the
answers from the respective departments within the City, and then provide those answers, all of which should be done in a timely manner so as
to allow the public to review the answers and have an opportunity to incorporate the sought after information within the PUD review deadlines
for public input. It is unfair to place the burden of obtaining the request for information on the requester with the directive to "make a records
request" as this is not a records request, it is a request for pertinent information pertaining to a pending land use application.
Therefore, I respectfully repeat my request of my prior email of April 5 and ask that the Planning Department abide by its stated goal to
"facilitate community dialogue" by "corralling the requested information" and responding to me in a timely manner.
Nick, I appreciate your assistance on the initial request and realize this repeated request may not be within your authority to grant, in which
case I hereby ask that you refer this request for information, pertinent to the Capital Hill PUD application, to the management of the Planning
Department.
Thx again, Brent Lorscheider, Leader of the Fairmount Neighbors Association PUD Response Effort
1
Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the Capital Hill PUD, i.e.,
the 8 inch sewer at the point of connection and all downstream reaches:
Location
Design drawings
As built drawings
Capacity studies
Age
Condition
Maintenance and cleaning history
Spill or overflow records
On Thursday, April 6, 2017 2:32 PM, GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us> wrote:
Brent,
I am told by Public Works staff that some of the information you are requesting is available at the Building Permit
counter, “mostly location and as-builts”. You can walk in any time and request to see them.
The depth and detail of the other parts of your request will require staff time to retrieve and organize. This must be
requested as a records request through the City Recorder’s Office:
https://www.eugene-or.gov/519/Public-Records
I have attached a form for you.
Thanks,
Nick
From:
Brent Lorscheider \[mailto:lorsch2728@pacbell.net\]
Sent:
Wednesday, April 05, 2017 11:57 PM
To:
GIOELLO Nick R <Nick.R.Gioello@ci.eugene.or.us>
Cc:
Tom Bruno <brunoassoc@aol.com>
Subject:
Cap Hill PUD - Utilities
Hi Nick,
Can u pls forward this request to the appropriate department within the City:
Request for the following information regarding the public sewer reaches that will receive the sewer discharge from the Capital
Hill PUD, i.e., the 8 inch sewer at the point of connection and all downstream reaches:
Location
Design drawings
As built drawings
Capacity studies
Age
Condition
Maintenance and cleaning history
Spill or overflow records
Request for the following information regarding the streets that will bear the traffic burden during construction and post
construction of the Capital Hill PUD, i.e., Capital Drive, Spring Street and Fairmount:
Design drawings
As built drawings
Capacity studies
Age
Maintenance history
Thank you, Brent
2
3
BROWN Daren M
From:amcivor@comcast.net
Sent:Sunday, May 14, 2017 11:39 AM
To:GIOELLO Nick R
Cc:lorsch2728@pacbell.net; John Terhes (jaterhes@gmail.com); conlon-mcivor, maura; David and
Catherine Johnson
Subject:Capital Hill PUD
Attachments:IMG_2418.JPG; IMG_2419.JPG
Hi Mr. Gioello,
The neighbors are very opposed to the Capital Hill PUD proposed by Dr Dreyer. The roads are too
narrow. Pedestrians and bicyclists use Spring St, a narrow road with no sidewalks, all the time. I have
heard an estimate of 100,000 to 200,000 truckloads of building material/removal of trees and debris going
up and down this road as this project is built.
The project is too big, destroys habitat, and impacts on Hendricks Park, the best park in Eugene.
Enclosed are a couple of photos I took this morning on Spring St. I recently saw a Comcast van parked in
the road by the phone pole, and traffic backed up trying to get around it. Imagine a large dump truck.
You'll notice the anti-PUDD signs. They line the neighborhood.
I'm sure you will get more input from the neighborhood associations soon.
Andy McIvor
2460 Malabar Drive
Eugene
1
BROWN Daren M
From:FAVREAU Eric J
Sent:Tuesday, April 18, 2017 8:33 AM
To:GIOELLO Nick R
Subject:FW: traffic on Capital Drive
FYI,fortherecord.
9ƩźĭCğǝƩĻğǒͲ9L
CivilEngineer1|Direct:(541)6822869
CityofEugene|PublicWorksEngineering
99EBroadway,Ste.400|Eugene,OR97401
CƩƚƒʹJasonBrown\[mailto:brownj11@uoregon.edu\]
{ĻƓƷʹMonday,April17,20175:04PM
ƚʹFAVREAUEricJ<Eric.J.Favreau@ci.eugene.or.us>
{ǒĬƆĻĭƷʹRe:trafficonCapitalDrive
DearEric,Iappreciatetheresponse.IamfullyawarethatthePUDplanintendswidentheroadatthesiteofthePUD.Ithinkmyemail
madeclearthatmyĭƚƓĭĻƩƓƭΓğƓķtheconcernsofeverysinglepersonwholivesonCapitalDriveexceptthePUDapplicant(yes,Ihave
spokentothemğƌƌΜΓisthatCapitalDriveisnotsafeatitscurrentleveloftraffic.Adding44unitsandtheattendantconstructionwhile
usto
havingpeopleparkonCapitalwhereitdepartsfromSpringandrisestothetopofthehillissoobviouslynotsafeitcauses
questionthemethodologyofyourstudy,WhenpeopleparkonCapital,youessentialnarrowtheroadtoonewaytraffic,andifyou
significantlyincreasethetrafficwithheavyconstructiontrucksandadditionalresidentialtraffic,youhaveanunsafesituation.Muchof
CapitalDrive(beforeyougettothetopofthehill)hasnosidewalks,whichmeansourchildrenwillhavenowaytowalktoschool.The
busdoesnotcomeuphere,IassumebecausebecausethebottlenecksituationpreventsthebusfromturningğƩƚǒƓķΓğƭitdoesfor
iseveryoneelseonthisroad,thatthetrafficproblemwillleadtoinjuryordeathifthisplanisallowed
thefiretruck.Iamquitesure,as
toproceedbasedonyourconclusions.Ifso,wewillholdyourofficepersonallyresponsible.
Jason
JasonBrown
AssociateProfessorofCreativeWriting
UniversityofOregon
(917)7675386
CƩƚƒʹFAVREAUEricJ<Eric.J.Favreau@ci.eugene.or.us>
5ğƷĻʹMonday,April17,2017at3:47PM
ƚʹJasonBrown<brownj11@uoregon.edu>
{ǒĬƆĻĭƷʹRE:trafficonCapitalDrive
HiJason,
ThankyouforexpressingyourconcernsandobservationsregardingtrafficonCapitalDrive.Theapplicantisproposingtowiden
CapitalDriveattheƭźƷĻƭfrontagetoЋЊwide,whichisconsistentwiththeCityofEugenelocalstreetstandards.AЋЊwide
streetallowsroomfortwowaytrafficwithparkingononeside,whichwillhelpimprovetheexistingconditions.Theapplicantis
alsoproposingaЍwidesidewalkononesideofthestreet,whichshouldresolveconcernsofthestreetnotbeingsafefor
pedestrians.
1
Theapplicanthiredalicensedprofessionalengineertoperformthestreetsafetyandstreetconnectivitystudy.Thestudy
includedasafetyevaluationatexistingandproposeddrivewayintersectionsthatwillreceivetrafficfromtheproposed
developmentandonthefulllengthofCapitalDrivefromSpringBlvdtoHendricksPark.Thestudyconcludedthattheadditionof
developmenttrafficwillnotimpactexistinglevelsofsafetyforroadusersorcreateunsafeconditions.
Ihopethishelpsclarifythings.Pleaseletmeknowifyouhaveanyfurtherquestions.
Thanks,
9ƩźĭCğǝƩĻğǒͲ9L
CivilEngineer1|Direct:(541)6822869
CityofEugene|PublicWorksEngineering
99EBroadway,Ste.400|Eugene,OR97401
CƩƚƒʹEugeneInternetPWE
{ĻƓƷʹMonday,April17,20173:09PM
ƚʹFAVREAUEricJ<Eric.J.Favreau@ci.eugene.or.us>
{ǒĬƆĻĭƷʹFW:trafficonCapitalDrive
Eric,
I am forwarding this message for your review.
Thank you,
Dee
CƩƚƒʹJasonBrown\[mailto:brownj11@uoregon.edu\]
{ĻƓƷʹSunday,April16,201711:52AM
ƚʹEugeneInternetPWE<PWEngineering@ci.eugene.or.us>
{ǒĬƆĻĭƷʹtrafficonCapitalDrive
IamwritingtoreportconcernsaboutCapitalDriveintheFairmontneighborhoodinEugene.MywifeandIhavelivedtherefortwo
years,andinthattimewehaveexperiencedaboutfifteennearaccidents.OntwooccasionsIhadtotryontothecurbinordertoavoid
anothercar,andinfourcasesIalmosthitpedestrianswalkingoncapitaldrivewhereitcurvesleftnearthetop.Thatisablind
hitting
curvethere,andevenifonetravelsunderthespeedlimitthereisnowayofseeingacarcomingfromtheoppositedirection.Orof
seeingapedestrianontheroad.Halfofournearaccidentshaveoccurredatthisblindcurve.Theotherhalfoccurredfurtherdownon
CapitalDrivewherepeopleareallowedtoparkonthestreet.Oneightoccasions,asrecentlyaslastweek,carsspeedingdownthehill
pullaroundtheparkedcarsintooncomingtraffic.ThecarsonCapitalDrivefrequentlyparkonthenarrowsidewalk,forcing
pedestriansontothestreet.Ihavealmosthitseveralstudentswalkinghomeatnightwhencarsarecomingintheoppositedirection.
ThereisnosidewalkatthetopofCapitalDrive,andIķƚƓƷseehowthestudentswholiveuptherearesupposedtogettoschool.The
busdoesnotcomeuptoCapitalDrive,andifitdidtherewouldbenowayofturningaround.
IunderstoodthelimitationsoftheaccesstothetopofCapitalwhenImovedtheretwoyearsago,butIneverwouldhaveconsidered
thatthecitywouldallowsomeonetobuilda44unitPUDattheverytopofCapitalDrive.Apparently,atrafficstudyhasbeendone
thatreportsthattherewouldbenoproblemwithsuchadevelopment.Thatconclusiondefiescommonsenseandtheexperienceof
EVERYpersonwholivesonCapitalDrive.Welivetheredespitethefactthatitisalreadydangerous.Anenormousincreasein
residencesandtheattendantconstructiontrafficwillmakethelocationcompletelyunsafe.
Best,JasonBrown
JasonBrown
2
AssociateProfessorofCreativeWriting
UniversityofOregon
(917)7675386
3
Sean T. Malone
Attorney at Law
259 E. Fifth Ave., Tel. (303) 859-0403
Suite 200-C Fax (650) 471-7366
Eugene, OR 97401 seanmalone8@hotmail.com
May 15, 2017
Via Email and First Class Mail
Robin Hostick, Planning Director
Eugene Planning and Development
99 W. Broadway
Eugene, OR 97401
robin.a.hostick@ci.eugene.or.us
Re: Response to ApplicantÓs March 3, 2017 letter for the Capitol Hill Tentative PUD
Plan Application, PDT 17-001, Map 18030431
Please accept this letter on behalf of the Joint FNA/LHVC Capitol Hill PUD Response
Committee for the Capitol Hill Tentative PUD plan application. In a March 3, 2017, letter, the
applicant Ós attorney concludes that the Capitol Hill PUD Tentative Plan Application cannot meet
1
the clear and objective approval criteria contained in Eugene Code (EC) 9.8325 (i.e., the Needed
Housing Track) for Needed Housing because of three provisions of the EC, including the (1) 30-
foot landscape buffer, see EC 9.8325(3); (2) the prohibition on grading on 20% or greater slopes,
seeEC 9.8325(5); and (3) the prohibition on development over 900-feet, see EC 9.8325(12)(a).
March 3, 2017 Ltr. at 3-4. The applicant then alleges that because the applicant cannot satisfy
these three clear and objective criteria for this particular application, the Needed Housing Statute
is violated (seeORS 197.307(6)) and the City cannot apply the subjective criteria contained in
EC 9.8320 (i.e., the General Track) to the application. As explained below, the applicant
misunderstands the Needed Housing statute.
Referring to ORS 197.307(6), the applicant alleges Ðthat under subsection (6) of the
\[Needed Housing statute\], the City may only apply standards that are not clear and objective if
the applicant also has the right to develop the property under clear and objective standards as
provided for in ORS 197.307(4).Ñ March 3, 2017 letter at 2. The applicant misconstrue s ORS
197.307(6) because, under that provision, the applicant must Ðretain\[\] the option of proceeding
under the approval process that \[applies only clear and objective criteria\].Ñ ORS 197.307(6).
ORS 197.307(6) does not entitle the applicant to the Ðright to developÑ (i.e., approval of an
application for development). It only requires that the applicant have the option of proceeding
under clear and objective standards. The simple fact that the propertyÓs developable area is
reduced (even significantly or entirely) because the application cannot satisfy certain clear and
1
There is not dispute that the three approval criteria listed are clear and objective.
1
objective criteria does not allow the applicant to waive or not comply with the subjective criteria
under the alternative approval process (i.e., the General Track).
The Needed Housing statute does not require that an application for needed housing be
approved for every specific property. If the applicant cannot satisfy the clear and objective
criteria contained in the CityÓs code, then LUBA has explained that the applicant has three
options. In Home Builders AssÓn v. City of Eugene, LUBA explained that an applicant who
cannot Ðavoid denial for failure to meet all clear and objective standardsÑ has three potential
options.Home Builders AssÓn v. City of Eugene, ___ OR LUBA ___ (LUBA No. 2001-059 Feb.
28, 2002). The applicant can (1) Ðmodify the application so that it meets all clear and objective
standards.Ñ Id.The applicant can (2) apply under a different procedure, if available. Id.
(discussing a discretionary adjustment procedure). Finally, the applicant can (3) do nothing and
allow the application to be denied.Id.
An applicantÓs failure to satisfy all clear and objective criteria as it relates to a particular
application for a unique property is not a basis for finding that the CityÓs criteria runs afoul of
ORS 197.307(6)(a). It just means that the application, as submitted, must be modified, applied
for under the alternative track, or be denied. If, as is the case here, the applicant seeks approval
under the alternative process (here, referred to as the General Track, see EC 9.8320), then the
applicant must satisfy the subjective criteria contained therein. The applicant Ðretains the option
of proceeding Ñ under the Needed Housing Track (EC 9.8325). The fact that such an option may
lead to a denial is a result of applying the CityÓs clear and objective standards to a particular
piece of property. Some property is capable of greater development than others when it comes to
EC 9.8325(3) (30-foot landscape buffer), EC 9.8325(5) (prohibition on grading on 20% or
greater slopes); and EC 9.8325(12)(a) (prohibition on development over 900-feet). The simple
fact that these clear and objective standards result in fewer development opportunities for this
particular property does not in and of itself violate the Needed Housing statute.
However, if the particular clear and objective standard is one that could not be satisfied in
all instances (i.e., on any property), then such a clear and objective standard would violate ORS
197.307(6)(a) because the applicant for a PUD could ever satisfy the standard. Such a situation
occurred in Home Builders, slip op at 48. There, a stormwater runoff provision that was clear
and objective prohibited a PUD from creating Ðnegative impacts on natural drainage courses.Ñ
Id. Because rain falls on all developments and all rain transports some pollutants, the standard
would be violated in all instances.See id. (ÐPetitioners submit that rain falls on all development,
and all water moving across ground carries some sediment, creates some turbidity, and has some
erosional component, no matter how minute, and therefore no PUD could possibly comply with
LUCU 9.8325(10).Ñ). LUBA agreed with the petitioners in Home Builders, Ðat least in the
abstract, that imposing a clear and objective standard that is impossible or virtually impossible to
2
meet is a prohibition in the guise of a standard.Ñ Even though the City had a discretionary
approval track (i.e, the General Track), LUBA found that such an Ðopti on is illusory if the clear
and objective standards are impossible to satisfy.Ñ Here, the circumstances are distinguishable
2
LUBAÓs conclusion was somewhat complicated by the fact that LUBA determined that Ð\[i\]t
may not be the case that LUCU 9.8325(10) is impossible to satisfy,Ñ but the city did not
Ðrespond to \[the\] assignment of error at all.Ñ Slip op at 48.
2
because the particular application at issue cannot satisfy the particular clear and objective
standards. Here, it is not the case that the clear and objective standards are violated in all
instances. Similar to the case in Southeast Neighbors Neighborhood AssÓn v. City of Eugene, the
applicantÓs frustration with the needed housing track as applied to this application, Ðdoes not
conv ert an otherwise clear and objective standard into a standard that offends ORS 197.307(4).Ñ
___ Or LUBA ___ (LUBA No 2013-004 July 12, 2013).
As explained above, applying subjective criteria contained in the General Track will not
violate the Needed Housing statute because the applicant retains the option of applying only
clear and objective criteria under the Needed Housing track. The applicantÓs arguments to the
contrary in the March 3, 2017, letter should, therefore, be disregarded.
Sincerely,
Sean T. Malone
Cc:
Clients
3
BROWN Daren M
From:fcassell@comcast.net
Sent:Friday, March 10, 2017 11:34 AM
To:GIOELLO Nick R
Subject:Re: question about capital hill pud planning process
thank you very much.
faris
From:
"GIOELLO Nick R" <Nick.R.Gioello@ci.eugene.or.us>
To:
fcassell@comcast.net
Sent:
Friday, March 10, 2017 9:56:54 AM
Subject:
FW: question about capital hill pud planning process
Faris,Ǥƚǒƌƌprobablyfindthisattachmenthelpfulaswell.
Nicholas R. Gioello, M. Adm.
Associate Planner | Planning Division
City of Eugene
Planning & Development
Avenue
99 West 10
th
Eugene Oregon 97401
p 541.682.5453
f 541.682.5572
nick.r.gioello@ci.eugene.or.us
CƩƚƒʹGIOELLONickR
{ĻƓƷʹFriday,March10,20179:18AM
ƚʹ'fcassell@comcast.net'<fcassell@comcast.net>
{ǒĬƆĻĭƷʹRE:questionaboutcapitalhillpudplanningprocess
HelloFaris,
Theapplicationwasreceivedon3/7/17.Wehave30daystoconductcompletenessreview,whichmeansreviewingallthe
materialssubmittedanddecidingifthereisanythingmissingoradditionalinformationisneeded.Lķsaythat95%ofthetimewe
deemtheapplicationincomplete.Itisthenuptotheapplicanttoresubmitthemissingoradditionalinformation.Every
applicantisdifferentwhenitcomestothispart,soIĭğƓƷevenfathomaguessonhowlongbeforetheyresubmit.
Oncewehavealltheinformationandmaterials,theapplicationisdeemedcomplete.Wethensolicitreferralcommentsfrom
agenciesandCityDepartments,suchasPublicWorksandtheFireDepartment.Astaffreportwillbewrittenbasedonthose
referralcommentsandanindepthanalysisoftheapplicablecodecriteria.ApublichearingisscheduledbeforeaHearings
Officialapproximately50to60daysaftertheapplicationisdeemedcomplete.Publictestimonyontheprojectisacceptedboth
beforethehearinginwritingandverballyduringthehearing.Inmanycasesthepublicrecordisleftopenforseveralweeksafter
thehearing.TheHearingsOfficialwillrenderadecisionwithin15daysfollowingthecloseofrecord.
Hopethishelpsyouunderstandtheprocess.Contactmeifyouhavemorequestions,
Nicholas R. Gioello, M. Adm.
1
Associate Planner | Planning Division
City of Eugene
Planning & Development
99 West 10 Avenue
th
Eugene Oregon 97401
p 541.682.5453
f 541.682.5572
nick.r.gioello@ci.eugene.or.us
CƩƚƒʹfcassell@comcast.net\[mailto:fcassell@comcast.net\]
{ĻƓƷʹWednesday,March08,20179:50AM
ƚʹGIOELLONickR<Nick.R.Gioello@ci.eugene.or.us>
{ǒĬƆĻĭƷʹquestionaboutcapitalhillpudplanningprocess
hello nick
i'm a capital drive neighbor and received the planning department email about the capital hill pud recent
submission of its plans. could you please tell me the steps and deadlines in the planning process for this
pud to win approval?
thank you,
faris cassell
2
RESOLUTION ON THE PROPOSED CAPITAL HILL PUD
Fairmount Neighbors Association Members
Whereas, the proposed Planned Unit Development (PUD)currently proposes to subdivide 5
existing lots into 35 building lots with 43 dwelling units, an increase from 20 lots proposed in
2013during the annexation phase, and
Whereas, the proposed Planned Unit Development (PUD) of 20 lots, proposed in 2013, raised many
neighborhood concerns at that time, and continues to raise neighborhood concerns, and
Whereas, the proposed PUD would have only one practical access route via Spring and Capital, and
one impractical alternative route, via Spring, Madrona and Cresta de Ruta, over roadways that do not
meet the City’s current design standards and are located in high landslide risk areas, and
Whereas the PUD proposes an inherently dangerous road intersection, on the only practical route, at
the existing blind curve just past 2808 Capital Drive, and
Whereas, the proposed PUD increases the risk of landslides on the steep slopes as a result of
the extensive excavation required for building roads, sewers, storm drains, and building pads, and
Whereas, the PUD proposes extensive tree removal including 42% of all trees, and
Whereas the proposed PUD is inconsistent with the South Hill Study’s goal of limiting development
above 901 foot in elevation in order to insure maximum preservation of the natural character of the
south hills, and
Whereas, the proposed PUD will increase traffic on the aforementioned streets, and
on streets adjacent to the access route, which will exacerbate existing congested conditions on these
streets thereby endangering public safety for motorists, bicyclists and pedestrians, and
Whereas, the proposed PUD could impede emergency response efforts due to the aforementioned
traffic concern and will increase the probability of emergency events that will occur due
to additional occupants, and
Whereas, the proposed PUD will increase traffic and noise, and will disrupt and degrade the quality
of the natural environment and area surrounding the site.
Now therefore be it resolved that the Fairmont Neighborhood Association
Members recommend the proposed PUD be denied unless the concerns above can be
adequately addressed by the developer.