My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Employment, Parks, Schools Ordinance (County) (all other)- Planning Commission Recommendation (3 of 4)
>
OnTrack
>
CA
>
2017
>
CA 17-1
>
Employment, Parks, Schools Ordinance (County) (all other)- Planning Commission Recommendation (3 of 4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2017 1:48:03 PM
Creation date
5/22/2017 2:16:45 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
17
File Sequence Number
1
Application Name
UGB ADOPTION PACKAGE
Document Type
Misc.
Document_Date
5/22/2017
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
C. First Priority Land - Apply State's Factors for Dismissal of <br />Candidate Land <br />There is no land designated for urban reserves around Eugene. Therefore, there is no first priority land <br />to consider for the proposed UGB expansion. <br />d. Second Priority Land - Apply State's Factors for Dismissal of <br />Candidate Land <br />The school expansion study area includes 1,518 acres of second priority land, shown on the Second <br />Priority Land within Study Area map below. There are five distinct areas of second priority land. As <br />shown on the map above entitled "Land Use Designations," the largest area of second priority land in <br />the study area is the Eugene Airport, designated "Government and Education" (Metro Plan), and <br />"Airport" (Lane County Rural - <br />Comp Plan). The other <br />second priority areas are <br />designated "Rural <br />Residential" (Metro Plan), <br />"Rural Commercial" (Metro <br />Plan), "Residential" (Lane <br />County), and a single tax lot <br />of "Industrial" (Lane County). <br />The determination of the <br />City's need for an additional <br />school site to serve the <br />Bethel School District is <br />discussed above under <br />Section II, while Section III <br />addresses the characteristics <br />required to make a site <br />suitable for a school <br />expansion. These site <br />characteristics fall into two <br />categories: location-based <br />and other site characteristics. <br />Analysis of location-based <br />site characteristics (below) is <br />the first step in evaluating <br />whether any of the second <br />priority land in the study area <br />has the characteristics <br />necessary to make it suitable <br />to accommodate the needed <br />school facility. <br />City of Eugene Urban Growth Boundary Study <br />School Land Evaluation <br />Second Priority Land within Study Area <br />■ <br />A <br />Land Inside UGB <br />Major Streets <br />Water Bodies <br />E,,gene <br />- Second Priority Land within Study Area <br />® Other Land Within School Expansion Study Area <br />Appendix A to Findings May 2017 Page 15 <br />
The URL can be used to link to this page
Your browser does not support the video tag.