PH-2 <br />TAYLOR Becky G <br />To: TAYLOR Becky G <br />Subject: Solal Setback <br />Attachments: OMC_Dist Ridge to N PL.JPG <br />BWAlreadyEdited: Yes <br />BW MessageAction: Forward <br />Elevations show pitch less than 5/12, so <br />the ridge of the dormer on north wall is the <br />shadepoint, not the east-west trending <br />SSB = (2.5 x SPH) + (N divided by 2) - 82:5 ridge of Building 1 <br />Note: since roof slope is less than 5/12, SPH (Solar Point Ht) is height to eave = ° 22.5 feet <br />Note: N = North - South Lot Dimension (max is 90') SSB = (2.5 x 19.167) + (90 / 2) - 82.5 SSB = (47.9175) + (45) - <br />82.5 SSB = JflAJ2TI Feet Horizontal setback from north property boundary to point at grade <br />18.75 directly beneath shadepoint (Eugene City Code Definitions - Chapter 9 <br />So, the distance from the ridge o e Nth? r-operty Line needs to be at east eet, an we're at 42'-6" at the <br />nearest at Building #1(pl se see attached). 1d Bldg#2 is in the clear as per this formula, but it's also fronting the huge <br />cedar trees and the nei bor's vacant lot. \ <br />hould be ridge of dormer on The current property line is invalid, it should be <br />orth wall, which is the the new property line once the development is <br />hadepoint approved, which is 22.5 feet south of the current <br />gropertv line. <br />1 <br />