A <br />Exhibit D <br />a ri [°I tI <br />As of January, 2017, the City of Eugene's adopted transportation system plan is Trans Plan. However, the City is in the process of <br />adopting a new local transportation system plan, the Eugene 2035 Transportation System Plan. Regardless of which plan serves <br />Eugene at the time of UGB adoption, amendments will need to be made. Those amendments will include updates to 1) language <br />regarding the current adopted comprehensive plan, 2) five additional projects (below), 3) references to the number of projects and <br />financial information regarding the cost of those projects, and 4) all maps. Specific textual amendments will be drafted when the plan <br />to be amended has been identified. <br />Transportation System Plan 2035 <br />Anticipated Project List Amendments for UGB Expansion <br />Beyond 20 years: <br />Urbanization of existine streets: <br />Existing Terry <br />Street to Clear <br />Lake Road <br />To be completed upon development: <br />Extend Terry Street consistent with major collector standards, <br />Clear Lake <br />UD-16 including provision of two travel lanes, center turn lane, <br />Road to <br />sidewalks on both sides of the road, bike lanes and planting <br />Airport Road <br />strips <br />Extend Theona Drive consistent with neighborhood collector <br />Highway 99 <br />standards, including provision of two travel lanes, sidewalks <br />UD-17 <br />to Terry <br />on both sides of the road, bike lanes, and alternating planting <br />Street <br />strips/parking bays <br />0.8 $8.7M <br />0.8 $5.7M <br />January 2017 Draft <br />consistent with major collector standards, <br />including provision of two travel lanes, center <br />turn lane, sidewalks on both sides of the road, <br />and planting strips <br />