Loading...
HomeMy WebLinkAboutApplication Materials (4/1/15)EG46 –Fox Hollow RF Justification March 6, 2015 Coverage Justification EG46 ATT is proposing a new site , near the intersection of Amazon Drive and Fox Hollow Rd. in the city of Eugene, Oregon. & Exhibits A Exhibit B This is an ATT service area that has weak signal coverage as shown in and also in even after the & EG46 addition of another proposed new sitenear Blanton Ridge. As can be seen, there is a large 4G LTE 700 MHz coverage gap in all areas not shaded in green. While the target coverage area has voice grade service today, it does not have adequate 4G LTE service within the 700 MHz frequency band. As ATT’s technology improves and expands from 2G and 3G to 4G LTE, & the company is committed to meeting all wireless communication needs of its customers by delivering faster data speeds and more reliable and expansive voice and data connections, whether its customers are in buildings, in vehicles, or outdoors. ATT’s addition of new technology will also reduce the number of dropped calls and otherwise address its customers’ reported & service issues in the area. The gap was determined as a result of analyzing a combination of customer complaints, service requests, and from RF engineering design analysis. The planned service coverage improvement is mostly along Amazon Drive between HilyardStreet and Snell Street, and the surrounding residential areas on the to East sides of Amazon Drive and also to the West going up the hill along portion of Fox Hollow Rd.. Exhibit C shows the projected coverage from the proposed candidate with an antenna tip height of 70 feet. This is the height where an ATT wireless device can be reliably used to make and receive telephone calls and use data service in the presence & of varying signals.The proposed antenna tip height is the minimum necessary to fill the LTE 700 MHz coverage gap relative to nearby complementary wireless facilities. Exhibits D, E, and F show the coverage from alternate site candidates on existing light standards near the proposed site. Two antenna heights are required since antennas are flush mounted to pole and a second mounting height is needed to complete the array. As illustrated in these exhibits, the alternate candidates are not adequate to fill the LTE 700 MHz coverage gap or are otherwise not feasible. Exhibit A –Existing 4G LTE 700 MHz Coverage Map Service Area BEFOREProposed Site Addition. N EG42 EG46 Exhibit B –New 4G LTE 700 MHz Coverage Map Service Area With Other Proposed New Site Addition (EG42 -Blanton Ridge). Coverageexpansionfrom otherproposednewsite EG42,BlantonRidge. N EG42 EG46 Exhibit C –New 4G LTE 700 MHz Coverage Map Service Area AFTERProposed New Site Addition at Antenna Tip Height of 70 feet. Coverageexpansionfrom otherproposednewsite EG42,BlantonRidgeand EG46,FoxHollow. N EG42 EG46 Analyses of Alternate Site Locations •AT&T Engineers evaluated 3 other candidates to see if the towers would work •Alternate#1 is an existing 30-ft light standard near the proposed site with an 18-ft permitted extension. Coverage is shown in Exhibits D[1,2]. Antenna Alternate Site# 2 height is below the surrounding tree height which significantly Proposed impacts the coverage of this Candidate site. It is ineffective as shown. •Alternate#2 is an existing 45-ft light standard near the proposed Alternate Site# 1 site with an 18-ft permitted extension. Coverage is shown in Exhibits E[1,2]. Antenna height is below the surrounding tree height which significantly impacts coverage of this site. It is ineffective as shown. •Alternate#3 is an existing 30-ft light standard near an assisted living center with an 18-ft permitted extension. Coverage is shown in Exhibits F[1,2]. Alternate Site# 3 Site location is too far south which significantly impacts the coverage of this site. It is . ineffective as shown In addition to the radio frequency analysis of these sites, AT&T considered factors like zoning, space for ground equipment, and lease availability in determining the location AT&T Proprietary (Internal Use Only) of the proposed site. Not for use or disclosure outside the AT&T companies except under written agreement Analyses of Alternate Site Locations (Continued) Alternate Site# 2 Alternate Site# 1 AT&T Proprietary (Internal Use Only) Not for use or disclosure outside the AT&T companies except under written agreement – Exhibit D.1 Alternate Candidate New 4G LTE 700 MHz Coverage Map Service Area AFTERAlternate Site #1 at Antenna Tip Height of 48 feet. (1 st Antenna Array on a Utility Pole with an 18-ft Extension) Coveragelossduetolower antennaheightwhichisbelow thesurroundingtreeheight. Twoantennaarraysare requiredsinceantennasare flushmountedtothepoleand N asecondgroupisneededto completethearray. Alternate Site# 1 The coverage obtained from this Alternate location is worse than that from our proposed site as shown inExhibit C – Exhibit D.2 Alternate Candidate New 4G LTE 700 MHz Coverage Map Service Area AFTERAlternate Site #1 at Antenna Tip Height of 39 feet. (2 nd Antenna Array on a Utility Pole with an 18-ft Extension) Coveragelossduetolower antennaheightwhichisbelow thesurroundingtreeheight. Twoantennaarraysare requiredsinceantennasare N flushmountedtothepoleand N asecondgroupisneededto completethearray. Alternate Site# 1 The coverage obtained from this Alternate location is worse than that from our proposed site as shown inExhibit C – Exhibit E.1 Alternate Candidate New 4G LTE 700 MHz Coverage Map Service Area AFTERFrom Alternate Site #2 Antenna Tip Height of 63 feet. (1 st Antenna Array on a Utility Pole with an 18-ft Extension) Coveragelossduetolower antennaheightwhichisbelow thesurroundingtreeheight. Twoantennaarraysare requiredsinceantennasare flushmountedtothepoleand N asecondgroupisneededto completethearray. Alternate Site# 2 The coverage obtained from this Alternate location is worse than that from our proposed site as shown inExhibit C – Exhibit E.2 Alternate Candidate New 4G LTE 700 MHz Coverage Map Service Area AFTERAlternate Site #2 Antenna Tip Height of 54 feet. (2 nd Antenna Array on a Utility Pole with an 18-ft Extension) Coveragelossduetolower antennaheightwhichisbelow thesurroundingtreeheight. Twoantennaarraysare requiredsinceantennasare flushmountedtothepoleand N asecondgroupisneededto completethearray. Alternate Site# 2 The coverage obtained from this Alternate location is worse than that from our proposed site as shown inExhibit C – Exhibit F.1 Alternate Candidate New 4G LTE 700 MHz Coverage Map Service Area AFTERAlternate Site #3 Antenna Tip Height of 48 feet. (1 st Antenna Array on a Utility Pole with an 18-ft Extension) Coveragelossduetolower antennaheightwhichisbelow thesurroundingtreeheight. Twoantennaarraysare requiredsinceantennasare flushmountedtothepoleand N asecondgroupisneededto completethearray. Alternate Site# 3 The coverage obtained from this Alternate location is worse than that from our proposed site as shown inExhibit C – Exhibit F.2 Alternate Candidate New 4G LTE 700 MHz Coverage Map Service Area AFTERAlternate Site #3 Antenna Tip Height of 39 feet. (2 nd Antenna Array on a Utility Pole with an 18-ft Extension) Coveragelossduetolower antennaheightwhichisbelow thesurroundingtreeheight. Twoantennaarraysare requiredsinceantennasare flushmountedtothepoleand N asecondgroupisneededto completethearray. Alternate Site# 3 The coverage obtained from this Alternate location is worse than that from our proposed site as shown inExhibit C