<br /> Page 7 of 12 <br />THE FAVREAU GROUP <br />CIVIL ENGINEERING <br /> (9)As far as is practicable, lot side lines shall run at right angles to the street upon which the lots face, <br />except that on curved streets they shall be radial to the curve. <br />RESPONSE: All proposed lot side lines run at right angles as best possible. <br /> (10)The proposed subdivision complies with all of the following: <br /> (d(d(d(d)))) ECECECEC 9.67069.67069.67069.6706 Development in Flood Plains through ECDevelopment in Flood Plains through ECDevelopment in Flood Plains through ECDevelopment in Flood Plains through EC 9.67099.67099.67099.6709 Special Flood Hazard AreasSpecial Flood Hazard AreasSpecial Flood Hazard AreasSpecial Flood Hazard Areas –––– <br />Standards.Standards.Standards.Standards. <br />RESPONSE: The site is located in Zone X according to FEMA. Therefore, this criteria does not apply. <br /> ((((eeee)))) ECECECEC 9.67109.67109.67109.6710(6) (6) (6) (6) Geological and Geotechnical Analysis.Geological and Geotechnical Analysis.Geological and Geotechnical Analysis.Geological and Geotechnical Analysis. <br />RESPONSE: A geotechnical report is provided <br /> ((((ffff)))) ECECECEC 9.67309.67309.67309.6730 Pedestrian Circulation OnPedestrian Circulation OnPedestrian Circulation OnPedestrian Circulation On----Site.Site.Site.Site. <br />RESPONSE: Pedestrian circulation is provided by the proposed street and sidewalk system. <br /> (g(g(g(g)))) ECECECEC 9.67359.67359.67359.6735 Public Access RequiredPublic Access RequiredPublic Access RequiredPublic Access Required <br />RESPONSE: Public access is provided by the proposed public street (Craftsman Place) <br /> ((((hhhh)EC)EC)EC)EC 9.67509.67509.67509.6750 Special Setback StanSpecial Setback StanSpecial Setback StanSpecial Setback Standards.dards.dards.dards. <br />RESPONSE: There are no Special Setback Standards for the subject site. <br /> ((((iiii)))) ECECECEC 9.67759.67759.67759.6775 Underground Utilities.Underground Utilities.Underground Utilities.Underground Utilities. <br />RESPONSE: All proposed utilities shall be placed underground. <br /> ((((jjjj)))) ECECECEC 9.67809.67809.67809.6780 Vision Clearance AreaVision Clearance AreaVision Clearance AreaVision Clearance Area <br />RESPONSE: The vision clearance triangles are shown on the tentative map. <br /> ((((kkkk)EC)EC)EC)EC 9.67919.67919.67919.6791 throughthroughthroughthrough 9.67979.67979.67979.6797 regarding stormwater flood control, quality, flow control for headwaters regarding stormwater flood control, quality, flow control for headwaters regarding stormwater flood control, quality, flow control for headwaters regarding stormwater flood control, quality, flow control for headwaters <br />area, oil control, source control, easements, and operation and maintenancearea, oil control, source control, easements, and operation and maintenancearea, oil control, source control, easements, and operation and maintenancearea, oil control, source control, easements, and operation and maintenance.... <br /> <br />RESPONSE: EC 9.6791 Stormwater Flood Control – Stormwater Flood Control shall be accomplished via a <br />stormwater detention basin on lot A. There is a proposed overflow that connects to an existing <br />drainage swale along the south side of the property. The applicant is proposing to dedicate lot A to <br />the City for maintenance. Attached is a hydrology study. <br /> EC 9.6792 Stormwater Quality – Stormwater quality shall be accomplished via a proposed publicly- <br />owned stormwater detention basin on lot A. <br /> All stormwater quality facilities shall be sited, designed and constructed according to the water <br />quality provisions and the facility design requirements set forth in the Stormwater Management <br />Manual. The detention basin will be reviewed during the building PEPI process. <br /> EC 9.6793 Stormwater Flow Control (Headwaters) – Stormwater Flow Control (Headwaters), do not <br />apply because the elevation of the subject property does not drain directly to a headwaters stream <br />or into a pipe that discharges into a headwater stream. <br /> EC 9.6794 Stormwater Oil Control – Stormwater Oil Control, do not apply because the proposed <br />residential partition does not include any of the specified oil control sources. <br /> EC 9.6795 Stormwater Source Controls – Stormwater Source Control, do not apply because the <br />proposed residential partition does not include any of the pollution sources specified in EC <br />9.6795(2).