My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
ST
>
2026
>
ST 26-04
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/20/2026 11:27:03 AM
Creation date
7/20/2026 10:37:24 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
ST
File Year
26
File Sequence Number
4
Application Name
Graham Place
Document Type
Application Materials
Document_Date
7/17/2026
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
259
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rip-Rap Splash Pad Calculations <br />*Based on Eugene Stormwater Management Manual (2014) Appendix F <br />*For pipes equal to or less than 6", Chapter 2.7 was used for splash pad sizes <br />Discharge Velocity at Design Flow (fps):0 - 5 <br />Type:Rip-Rap <br />Rip-Rap Size:ds = 0.25 x Do x Fo (6" min.) <br />Depth:2 x ds (1' min.) <br />Width:Pipe Dia + 6 ft <br />Length:Lsp = Do (8+17(Log(V/((g x Do)^0.5)))) (2' min.) <br />CB #2 Outlet <br />Inlet Pipe <br />Diameter (ft) <br />Average <br />Velocity (fps) <br />Rip-Rap Size <br />(ft) <br />Size <br />Calculated <br />(in) <br />Size (in)Depth <br />Calculated (ft)Depth (ft) Width (ft) Fo Length (ft) <br />8 0.67 2.33 0.08 1.0 6.0 0.17 1.00 6.7 0.5 2.0
The URL can be used to link to this page
Your browser does not support the video tag.