MATCHLINE SHEET LX01MATCHLINE SHEET LX02CHAD DRIVETREE CANOPYAT 15 YEARS,TYP.TREE CANOPYAT 15 YEARS,TYP.LEGENDPROPERTY LINETREE CANOPY AT 15 YEARSPARKING LOT SURFACEAREATREE CANOPYCOVERAGE AT 15 YEARSTREE CANOPYCOVERAGE PERCENTAGEPARKING LOT TREE CANOPYCOVERAGE CALCULATION99,199 SF41,763 SF42.10%CANOPY REQUIREMENTS FOR LARGE PARKINGAREAS PER EC 9.6420(4)(D)(3):PER EC 9.6420(4)(D)(3) CANOPY COVERAGE OF 40% OF SURFACEPARKING IS REQUIRED.SITE CANOPY TREE REQUIREMENTS PER EC9.6420(3)(B):PER EC 9.6420(3)(B) 1 CANOPY TREE IS REQUIRED FOR EVERY 3000 SF OFPAVED VEHICULAR USE AREA.TOTAL PROPOSED PAVING AREA: 93,410 SFREQUIRED TREES:32 TREESPROPOSED CANOPY TREES:157 TREES* DRIVEWAY CANOPY PER EC 9.6420 (E). TREES PROVIDED ALONG ENTRYDRIVE TO PROVIDE CONTINUOUS CANOPY WITHIN 15 YEARS.PLANTING REQUIREMENTS PER EC 9.2461(3)(A):PER EC 9.2461(3)(A) - IN E-1, A MINIMUM OF 20% OF THE DEVELOPMENTSITE SHALL BE LANDSCAPED WITH LIVING PLANT MATERIALTOTAL LOT AREA - 290,500 SQ. FT.MINIMUM LOT AREA REQUIRED (20%) - 58,100 SQ. FT.TOTAL LANDSCAPE AREA PROPOSED - 63,678 SQ. FT.05102040SCALE: 1" = 20'-0"NORTHPROJECTDATEREVISIONSSHEET TITLESHEET NUMBER#THIS LINE IS 1 INCH LONG WHENPRINTED TO FULL SCALE©BOULDER ASSOCIATESv210507 <br />2 NICKERSON STREET, SUITE 200SEATTLE, WASHINGTON 98109206.957.6400246893.00DEC. 01, 2025SLOCUMCENTER FORORTHOPEDICS& SPORTSMEDICINE - ASCIFC / PERMIT SETDESCRIPTIONDATE3300 CHAD DR, EUGENE, 97408111 SW Oak Street, SUITE 200PORTLAND, OR. 97204503-228-3122PLANTINGPLANL4.014ADD0044ADD0044ADD0044ADD0044ADD004108.08.25ADDENDUM 1410.31.25ADDENDUM 4