2680 Onyx Street MHLD (MHT 26-03) Page 4 of 4 <br />Conditions of Approval <br />July 26, 2026 <br /> <br /> <br />Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108 <br />Landscape Architecture + Land Use Planning <br />EWEB Water recommends the developer contact the Fire Marshall concerning fire protection requirements for <br />building permits. <br /> <br />EWEB water does not allow installation of any water facilities under proposed “rain gardens” or any open <br />drainage structure within the right-of-way. Provisions within the design must be made to accommodate the <br />installation of water facilities (services & hydrants) at common lot corners. A minimum 5’ wide “utility corridor” <br />at service crossing and hydrant locations is required. <br /> <br />State Drinking Water regulations (OAR 333-061-0050(10)) require a minimum separation between water and <br />sewer lines of 10’ where they run parallel to each other, unless the sewer line is located with 1.5’ of clearance <br />lower than the water line then the required separation is 5’. EWEB owned water facilities will be located in the <br />right-of-way, or in a minimum 7’ public utility easement (PUE) adjacent to the public right-of-way. <br /> <br />Water comments or questions can be directed to : <br /> <br />Amy Abramson <br />Water Engineering Technician III <br />Eugene Water & Electric Board <br />Office/fax 541-685-7625; amy.abramson@eweb.org <br /> <br />Right-of-Way Comments <br /> <br />EWEB Property has no additional comments at this time. Previous comments still apply (see below). <br /> <br />Easements must be either Public Utility Easements or EWEB Easements if they are to accommodate EWEB <br />facilities. A PUE or EWEB Easement is required for the existing overhead lines crossing the subject property <br />and serving the property to the east, unless those lines are relocated prior to recordation of the final plat. <br /> <br />Because Public Utility Easements are designated on the plat, the plat should include the customary note for <br />PUEs: “No building, structure, trees, shrubbery or other obstruction shall be placed or located on or in a public <br />utility easement.” <br />This note will be added to the Final Plat. <br /> <br />If an EWEB Easement will be designated on the plat, a separate EWEB Easement document will need to be <br />created by EWEB Property Management. This document will be recorded with the Plat. In addition, if an EWEB <br />Easement is designated on the plat, EWEB requests that a Note be added to the plat stating: “EWEB <br />easements shall include EWEB and its joint users with whom it may contract. At no time shall any building, <br />structure, sign or other obstruction shall be erected or placed or located within an EWEB utility easement area <br />without prior written consent of EWEB.” <br /> <br />Right-of-Way comments or questions can be directed to : <br /> <br />Isabell Mathews <br />Right-of-Way Agent <br />Eugene Water & Electric Board <br />Office/fax 541-685-7041; isabelle.mathews@eweb.org <br /> <br />Please call if you have any questions, comments or need any additional information. <br /> <br />Sincerely, <br />Schirmer Consulting, LLC <br /> <br />Carol Schirmer