My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
ARA
>
2026
>
ARA 26-12
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/12/2026 2:04:31 PM
Creation date
5/12/2026 2:04:20 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
ARA
File Year
26
File Sequence Number
12
Application Name
Bushnell University
Document Type
Appeal Materials
Document_Date
5/11/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Duke Commons: A Bushnell University Project Page 4 of 9 <br />Adjustment Review Application: Written Statement <br />May 11, 2026 <br /> <br /> <br />Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108 <br />Landscape Architecture + Land Use Planning <br />The following is specific proposal information from the Adjustment Review Application Checklist. This information <br />addresses the project on the development site located at Bushnell University. <br /> <br />MAP and TAX LOT and ZONING <br />Assessor’s Map: 17 03 32 24 <br />Tax Lot: 03600 and 03601 <br />Zoning: R-4/SR/TD - R-4 (High Density Residential), SR (Site Review Overlay) and /TD <br />(Transit <br /> Oriented Development Overlay). <br /> <br />CODE SECTIONS PROPOSED FOR ADJUSTMENT REVIEW <br />EC 9.4530(1)(a) Building Setbacks <br />EC 9.6210 (4)(a)(5)1. High Wall Landscape Standards (L-4) <br />EC 9.6210 (4)(a)(5)2. High Wall Landscape Standards (L-4) <br />EC 9.6210 (4)(a)(5)3. High Wall Landscape Standards (L-4) <br />EC 9.6210 (4)(a)(5)4. High Wall Landscape Standards (L-4) <br /> <br />TYPE <br />University <br /> <br />DOES THE ADJUSTMENT REQUEST AFFECT AT LEAST TWO OF THE FOLLOWING? <br />a) Maximum front yard setbacks <br />b) Building orientation <br />c) Building entrances <br />d) On-site pedestrian circulation <br />e) Block requirements or street layout <br />No. <br /> <br />DOES THE ADJUSTMENT INCLUDE STORMWATER FACILITIES? <br />No. <br /> <br />DOES THE ADJUSTMENT INCLUDE AN ADJUSTMENT OF INTERNAL VEHICLE STACKING AT EUGENE <br />CODE SECTION 9.6703(3)(a)? <br />No. <br /> <br />ASSOCIATED PENDING LAND USE APPLICATION OR BUILDING PERMIT NUMBERS? <br />Site Review
The URL can be used to link to this page
Your browser does not support the video tag.