<br /> <br /> Middle Housing Land Division, Tentative <br /> Completeness Review <br />Page 2 of 3 <br /> <br /> <br /> <br /> <br />7. Informational: An Irrevocable Petition will be required for public improvements in Potter Street to include <br />street trees and sidewalks. <br />Easement Requirements Shown on Site Plan EC 9.8194 (4)-(5) and Dedication of Public Ways EC 9.8194(3)(c) <br />Submitted Missing Incomplete N/A <br />☐ ☐ ☒ ☐ 1. Easements necessary for locating, accessing, replacing, and <br />servicing all utilities. <br />☐ ☐ ☒ ☐ 2. Easements for pedestrian access from each dwelling unit to a <br />street. <br />☐ ☐ ☐ ☒ 3. Easements necessary for any common areas or shared building <br />elements. <br />☐ ☐ ☒ ☐ 4. Easements necessary for any shared driveways or parking. <br />☒ ☐ ☐ ☐ 5. Separate utilities provided for each dwelling unit. <br />☐ ☐ ☐ ☒ 6. Address Public Ways for ped/bike access (if applicable). <br />Comments: 1,2, and 4 Incomplete: <br />• The site plan identifies a proposed 20-foot wide private shared access and pedestrian easement, <br />while the written statement references a 24-foot wide private utility and pedestrian access easement. <br />Staff requests that the applicant clarify the intended use and proposed width of this easement and <br />correct written statement for 9.8194(4)(d). <br />• The written statement references a 5-foot wide private utility and pedestrian access easement along <br />south property line of Middle Housing Lot (Parcel) 1. It appears that this easement is located along the <br />west property line of Middle Housing Lot (Parcel) 3 and south property line of Middle Housing Lots <br />(Parcels) 2 and 3. Staff requests that the applicant clarify the proposed easement width and location <br />of the easement. <br />• The written statement references a 5-foot wide private utility easement along the west property line of <br />Middle Housing Lot (Parcel) 1. It appears that the easement is 9-feet-wide. Staff requests that the <br />applicant clarify the proposed easement width. <br />Contour Intervals <br />Submitted Missing Incomplete N/A <br />☒ ☐ ☐ ☐ 1. Note on Plat City Benchmark Used (include vertical datum) <br />☐ ☐ ☒ ☐ One-foot contour intervals for ground slopes up to five percent. <br />☐ ☐ ☒ ☐ Two-foot contour intervals for ground slopes between five and ten <br />percent. <br />☐ ☐ ☒ ☐ Five-foot contour intervals for ground slopes exceeding ten percent. <br />Comments: <br />Stormwater Drainage Analysis (if explicitly shown) <br />Submitted Missing Incomplete N/A <br />☐ ☐ ☒ ☐ 1. EC 9.6791 – EC 9.6797 <br />Comments: Incomplete: While the written statement notes that development plans will be required to meet City of <br />Eugene Stormwater Management criteria and will be evaluated by staff for compliance. Staff request that <br />applicant confirm whether you’d prefer the design of the proposed stormwater infrastructure shown on site