My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Decision
>
OnTrack
>
SDR
>
2025
>
SDR 25-02
>
Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 8:10:10 AM
Creation date
3/13/2026 8:08:37 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
SDR
File Year
25
File Sequence Number
2
Application Name
Braewood Hills 3rd Hills
Document Type
Decision Document
Document_Date
3/12/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Evaluations <br />This concurrent request includes two applications, a Standards Review and Final Planned Unit <br />Development. Both the Standards Review and Final Planned Unit Development applications are <br />subject to the Type II land use application procedures, which are primarily addressed at EC <br />9.7200-9.7230. <br />Section 1 of this decision addresses the Standards Review application. In accordance with the <br />Standards Review process beginning at EC 9.8460, the Planning Director shall approve, <br />conditionally approve, or deny this application. The Planning Director's decision is based on the <br />following evaluation of the proposal in the context of determining the uses subject to Standards <br />Review at EC 9.4930(3) and compliance with the applicable approval criteria and related <br />standards listed at EC 9.8470 and EC 9.4980 /WR Water Resources Conservation Overlay Zone - <br />Development Standards. <br />Section 2 of this decision addresses the Final Planned Unit Development application. In <br />accordance with the Final Planned Unit Development (PUD) process beginning at EC 9.8350 the <br />Planning Director shall approve, conditionally approve, or deny this application. The Planning <br />Director's decision for Final PUD is based on the evaluation of the proposal and compliance <br />with the applicable approval criteria at EC 9.8365, which include conformance with the <br />approved Tentative PUD and its conditions of approval. <br />In each of the evaluations below, the applicable standards and criteria for the Standards Review <br />and the Final PUD are provided below (in bolded text) in two sections and include findings <br />addressing compliance with each. <br />SECTION 1 STANDARDS REVIEW EVALUATION <br />The areas subject to a Standards Review are those impacted portions of a Conservation Area, <br />when an activity explicitly requires a Standards Review approval in accordance with EC 9.4930. <br />This proposal includes the extension of Randy Lane and associated infrastructure, which <br />includes construction activities within the Conservation Area of a protected riparian resource. <br />The proposed construction of a public street is permitted subject to a Standards Review in <br />accordance EC 9.4930(3)(b). <br />EC 9.4930(3): Uses Subject to Standards Review Within /WR Conservation Areas. Except as <br />prohibited by subsection (4), or as excepted under subsection (5), within /WR conservation <br />areas, the following uses are permitted, subject to the standards review process beginning <br />with EC 9.8460 in which consistency with the specific standards referenced for each use <br />below shall be used as the criteria for approval. <br />(b) Construction of public improvements (including but not limited to streets, bridges, <br />paved bikeways and pedestrian paths, and public utilities) required by this land use <br />March 2026 Findings & Decision of the Planning Director Page 8 of 28 <br />Braewood Hills Third Addition (SDR 25-02 & PDF 25-01) <br />
The URL can be used to link to this page
Your browser does not support the video tag.