My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Decision
>
OnTrack
>
PDF
>
2025
>
PDF 25-01
>
Decision
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/13/2026 8:08:46 AM
Creation date
3/13/2026 8:06:12 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDF
File Year
25
File Sequence Number
1
Application Name
Braewood Hills 3rd Addition
Document Type
Decision Document
Document_Date
3/12/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
site. As indicated in the July 2024 tentative PUD staff report, Public Works staff confirmed that <br />safe and adequate transportation systems are found in the vicinity and adjoining public streets <br />including Hawkins Lane and Randy Lane are already built to applicable street standards. <br />Therefore, as this proposal is the finalization of the previously approved PUD, this proposal will <br />not general any additional concerns related to this topic that were not previously argued during <br />the Tentative PUD process. <br />• Land is not stable on the hillside. <br />As discussed in the July 2024 tentative PUD staff report the site is exempt from the standards of <br />EC 9.6710 Geological and Geotechnical Analysis due to the status of the subject property being <br />on the City's adopted Goal 5 inventory and exempted from the standards per EC 9.6710(3)(f). <br />However, geotechnical analysis will be required during future permitting processes, including <br />but not limited to the Privately Engineered Public Improvement permit process, site <br />development permits, and building permits to the extent that public improvement standards <br />and building code requirements apply in subsequent stages of development. Therefore, as this <br />proposal is the finalization of the previously approved PUD, this proposal will not general any <br />additional concerns related to this topic that were not previously argued during the Tentative <br />PUD process. <br />• The site should include a park area, also walking trails that connect Melvin Miller Park, <br />Skyview City Park, and Videra Park. <br />The tentative PUD approval was approved under the Housing/Clear and Objective standards of <br />EC 9.8325, which do not require the inclusion of parks or walking trails within the development. <br />This application for final PUD requires substantial conformance with the tentative PUD <br />approval. Therefore, there is no ability to require a park within the site as part of this approval <br />process. <br />• The Final PUD does not conform to the tentative PUD approval concerning the Joint <br />Access Management agreement and the various Joint Access Easements, Conditions 5, <br />6, 15 and 16. The Final PUD does not conform to the tentative PUD Condition 7, Public <br />Utility Easement. The Final PUD does not conform to the tentative PUD Condition 26 — <br />stormwater compliance with EC 9.6796. <br />Section 2 of this decision provides full analysis of how this final PUD application is in <br />conformance with each of the above listed conditions of approval of the tentative PUD. The <br />findings for Condition of Approval 5 include an additional condition for compliance prior to final <br />plat. Condition 26 required the applicant to submit updated application materials that <br />demonstrate compliance with EC 9.6796. The findings for Condition of Approval 6 include an <br />additional condition for compliance prior to final plat. <br />March 2026 Findings & Decision of the Planning Director Page 3 of 28 <br />Braewood Hills Third Addition (SDR 25-02 & PDF 25-01) <br />
The URL can be used to link to this page
Your browser does not support the video tag.