importance, but all the developer says is that the requirement is “acknowledged and agreed”. <br />But the developer should specify exactly what measures will be taken to prevent petroleum <br />products, chemicals, and other deleterious material used in construction from entering the <br />stream or wetland. The developer should also indicate how the natural resources of Videra <br />Park (also adjacent to the development and my house) will be protected from any incursion by <br />machinery, products, or chemicals. <br /> <br />My mailing address is 3034 Hawkins Ln. Eugene OR 97405.