Glacier Subdivision (MHT 25-16) Page 3 of 4 <br />Conditions of Approval <br />February 24, 2026 <br /> <br /> <br />Schirmer Consulting, LLC · PO Box 10424, Eugene, OR 97440 · (541) 234-5108 <br />Landscape Architecture + Land Use Planning <br />There is a PUE shown on the plat. This note has been added to the final plat. <br /> <br />· All City liens and assessments must be paid or segregated prior to final plat approval <br />Acknowledged and agreed. <br /> <br />· Taxes for the current year must be paid prior to recording of the final plat. The applicant should <br />contact the Lane County Surveyor’s office to make arrangements. <br />A Tax Work Up sheet has been submitted to Lane County Surveyor’s office. <br /> <br />· “In the event any utilities include shared components (e.g. share wastewater connection or <br />“common sewer”), an easement will be required at that time that includes language that ensures <br />access to and maintenance/repair of utilities, as well as dictating responsibility of the <br />maintenance and repair of said utility.” <br />See attached easement documents. <br /> <br />· EC 7.350 states: Public Utility Easements shall be provided for all city maintained facilities. <br />Private utilities must remain on private property and/or within private utility easements beyond the <br />point of connection. <br />Acknowledged and agreed. <br /> <br />Eugene Building & Permit Services <br />· If at the time of development the Eugene/Springfield Fire Marshal (or their designee) determines <br />that there is inadequate water supply, apparatus access, or both, to the site for the development <br />of one and two family dwellings that will be subject to the Oregon Residential Specialty Code, <br />Eugene Building Official (or the Building Official’s designee) may require compliance with one or <br />more of the fire suppression or fire containment Uniform Alternate Construction Standards set out <br />in OAR 918-480-0125(4) and (5). <br />Acknowledged and agreed. <br /> <br />Electric Comments <br />EWEB has overhead electric facilities on the south side of the property. An electric service extension is <br />required to serve the middle housing development. Extension of electric facilities will be designed to meet <br />the City of Eugene Utility Permitting ordinances, land use ordinances, EWEB standards, and other <br />applicable codes. The cost of facility extension to this parcel will be borne by the requesting customer and <br />executed under EWEB policies and procedures at the time request for electric service is made. After <br />EWEB provides the customer with electric design, typically the electric service conduit and conductors are <br />installed by customer to current codes and EWEB specifications and inspected by EWEB. The applicant <br />or their representative should initiate a design with EWEB electric by contacting Distribution Engineering <br />at 541-685-7521 or DistributionEngineering@EWEB.org. <br /> <br />Electric comments or questions can be directed to: <br /> <br />Brad Rudler <br />Distribution Engineering Technician IV <br />Eugene Water & Electric Board <br />Office/fax 541-685-7334; bred.rudler@eweb.org <br /> <br />Water Comments <br />There is an existing 6” water main on the north side of E 32nd Ave. All parcels will need separate water <br />services. Contact EWEB’s Building & Renovation services at (541) 685-7086 to arrange for new services. <br /> <br />EWEB Water recommends the developer contact the Fire Marshall concerning fire protection <br />requirements for building permits. <br /> <br />EWEB water does not allow installation of any water facilities under proposed “rain gardens” or any open <br />drainage structure within the right-of-way. Provisions within the design must be made to accommodate