My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials.pdf
>
OnTrack
>
NV
>
2026
>
NV 26-01
>
Application Materials.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/20/2026 10:16:58 AM
Creation date
2/20/2026 10:16:53 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
NV
File Year
26
File Sequence Number
1
Application Name
LTD Eugene Station
Document Type
Application Materials
Document_Date
2/19/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Project Name: LTD 2026 Eugene Station Pressure Washing & Painting Project <br />Site Address: 1080 Olive St, Eugene, OR 97401 <br />Date Range: June 14, 2026 – August 28.2026 <br />Pressure Washing Time Range: 9pm to 6am <br /> <br />Pressure washing must occur at night once bus service is complete, as the safety of <br />passengers is our highest priority. Eugene Station is an active transit hub during normal <br />business hours, with continuous pedestrian tra1ic, bus movements, and passenger <br />loading and unloading. Performing pressure washing during these hours would introduce <br />slip hazards, obstruct travel paths, and create conflicts with bus operations, increasing the <br />risk of injury or service disruption. Scheduling this work after hours allows the area to be <br />controlled and cleaned safely and e1iciently, minimizing public exposure to wet surfaces, <br />equipment, and hoses while ensuring transit operations and passenger access remain <br />uninterrupted.
The URL can be used to link to this page
Your browser does not support the video tag.