My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Public Testimony Batch 15 - through 5:00pm on 2026-02-10
>
OnTrack
>
CA
>
2025
>
CA 25-02
>
Public Testimony Batch 15 - through 5:00pm on 2026-02-10
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2026 11:30:09 AM
Creation date
2/12/2026 11:29:19 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
25
File Sequence Number
2
Application Name
East Campus University of Oregon
Document Type
Public Testimony
Document_Date
2/10/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
95
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UO Next Generation Housing Development Plan February 10, 2026 <br />Land Use Applications <br />Code Amendments <br /> <br /> <br /> Page 2 <br />(b) Broadcasting studios including commercial and public education. <br />(c) University and college dormitories. <br />(cd) Fraternities and sororities. <br />(de) Hospitals. <br />(ef) Retail use requiring a Transportation Impact Analysis. <br />(fg) Manufacturing and assembly uses. <br />(gh) Arenas. <br />(hi) Heliports and helistops. <br />(ij) Recycling and large collection facilities. <br />(jk) Recycling scrap and dismantling yards. <br />(kl) Race tracks, including drag strips and go-cart tracks. <br />(lm) Sewage treatment plants. <br />(mn) Correctional facilities. <br />(no) Parking lots exceeding 100 spaces. <br />(op) Service stations. <br />(pq) Mineral resource mining. <br />(qr) Blood banks. <br />(rs) Plasma centers. <br />(2) Special Use Limitations. Within the /EC East Campus Overlay Zone, camping is permitted for a <br />maximum of 2 continuous days only when directly tied to a special event permit held for the location of the <br />camping site. A special event permit approving camping is required by the City to ensure minimal impact on <br />the surrounding neighborhood. <br />9.4220 /EC East Campus Overlay Zone Development Standards. <br />(1) Application of Standards. The General Standards for all Development in EC 9.6000 through EC 9.6885, <br />the special standards for specific uses in EC 9.5000 through EC 9.5850, as well as all development
The URL can be used to link to this page
Your browser does not support the video tag.