UO Next Generation Housing Development Plan February 10, 2026 <br />Land Use Applications <br />Code Amendments <br /> <br /> <br /> Page 2 <br />(b) Broadcasting studios including commercial and public education. <br />(c) University and college dormitories. <br />(cd) Fraternities and sororities. <br />(de) Hospitals. <br />(ef) Retail use requiring a Transportation Impact Analysis. <br />(fg) Manufacturing and assembly uses. <br />(gh) Arenas. <br />(hi) Heliports and helistops. <br />(ij) Recycling and large collection facilities. <br />(jk) Recycling scrap and dismantling yards. <br />(kl) Race tracks, including drag strips and go-cart tracks. <br />(lm) Sewage treatment plants. <br />(mn) Correctional facilities. <br />(no) Parking lots exceeding 100 spaces. <br />(op) Service stations. <br />(pq) Mineral resource mining. <br />(qr) Blood banks. <br />(rs) Plasma centers. <br />(2) Special Use Limitations. Within the /EC East Campus Overlay Zone, camping is permitted for a <br />maximum of 2 continuous days only when directly tied to a special event permit held for the location of the <br />camping site. A special event permit approving camping is required by the City to ensure minimal impact on <br />the surrounding neighborhood. <br />9.4220 /EC East Campus Overlay Zone Development Standards. <br />(1) Application of Standards. The General Standards for all Development in EC 9.6000 through EC 9.6885, <br />the special standards for specific uses in EC 9.5000 through EC 9.5850, as well as all development