My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
ARA
>
2026
>
ARA 26-03
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2026 9:26:56 AM
Creation date
2/5/2026 7:06:30 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
ARA
File Year
26
File Sequence Number
3
Application Name
The Mark at Eugene
Document Type
Application Materials
Document_Date
2/4/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
City of Eugene <br />February 4, 2026 <br />Page 2 of 2 <br /> <br /> <br />Plan Sets – 2 Copies <br />A1_T1.1 Title Sheet <br />A2_AS1.1 Architectural Site Plan <br />A3_A3.1 Exterior Elevations <br />A4_A1.11 Level 1 Enlarged Bike Room Floor Plan <br />L1.00 Landscape Plan - For Reference Only <br />1 OF 1 Existing Conditions Plan - For Reference Only <br />1 OF 2 Land Partition Plat - For Reference Only (Sheet 2 not included) <br /> <br />If you have any questions, please contact TBG Community Planning Group LLC at 541.687.1010. Thank <br />you for your time and consideration of this proposal. <br /> <br />Sincerely, <br /> <br /> <br /> <br /> <br />Zach Galloway, AICP <br />Principal Planner <br /> <br />ZG/KT <br /> <br />cc: Grady Layman, PeaceHealth <br /> Harris Moye, The Mark at Eugene, LLC <br /> Mike Reeder, Law Office of Mike Reeder <br /> Anna Backus, PE KPFF Consulting Engineers <br /> Teresa Forsberg, ESG Architecture & Design <br />Antonio Brister, HPLA Studio <br />Z:\PROJ\202511 The Mark at Eugene\Corresp\Agency\Adj Rev-Ph 2\202511-City-ARA_CvrLtr.docx
The URL can be used to link to this page
Your browser does not support the video tag.