City of Eugene <br />Final Plat Partition Application <br />Attachments <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />ATTACHMENT C <br /> <br />Geotechnical Investigation and Seismic Hazard Study <br /> prepared by Foundation Engineering, Inc. <br />January 6, 2026