City of Eugene <br />Concurrent Conditional Use Permit & Major Adjustment Review Applications <br /> <br /> <br />ATTACHMENT CONTENTS <br /> <br />ATTACHMENT A Tax Assessor’s Map <br />ATTACHMENT B Property Deed and Legal Descriptions <br />ATTACHMENT C FIRM Flood Insurance Rate Map, Map Number 41039C1136F <br />ATTACHMENT D Project Consultation Meeting Application Form, Project Consultation <br />Application, and Project Consultation Attendance Sheet (City file no. <br />PC 25-47) <br />ATTACHMENT E Proposed Meeting Dates Letter to Chambers Westside Neighbors <br />chair, Certified Mail Receipt, and Email response from Chambers <br />Westside Neighbors chair <br />ATTACHMENT F Map of Properties within 500 Feet of the Subject Property and <br />Owner and Occupant/Resident Address Mailing Lists <br />ATTACHMENT G Neighborhood/Applicant Meeting Notice Letter, Site Plan, <br />Confirmation Email from EDMS <br />ATTACHMENT H Copy of Neighborhood/Applicant Meeting Posted Sign and Site <br />Photos of Posted Sign <br />ATTACHMENT I Affidavit of Mailing and Affidavit of Posting <br />ATTACHMENT J Neighborhood/Applicant Meeting Attendee Sign-In Sheet, Site Plan, <br />and Summary Neighborhood/Applicant Meeting Notes <br />ATTACHMENT K Alternative Traffic Safety Study, Prepared by Kelly Sandow, PE, <br />Sandow Engineering LLC, dated January 23, 2026. <br />ATTACHMENT L Stormwater Analysis, prepared by Anna Backus, PE, KPFF <br />Consulting Engineers, dated January 12, 2026. <br />