My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
AA
>
2026
>
AA 26-04
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/29/2026 9:50:45 AM
Creation date
1/29/2026 9:50:38 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
AA
File Year
26
File Sequence Number
4
Application Name
90485 Auction Way
Document Type
Application Materials
Document_Date
1/27/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />kimley-horn.com 1100 Town and Country Rd, Suite 700, Orange, CA 92868 714-939-1030 <br /> <br />Letter of Intent <br /> To: Planning and Development Department <br /> City of Eugene <br /> From: Kimberly Coronel, PM <br /> Kimley-Horn and Associates, Inc. <br /> Date: Jan 13, 2026 <br /> Subject: Carvana Eugene, OR – Letter of Intent <br /> <br />PROJECT NARRATIVE: <br /> <br />The purpose of this letter is to summarize the existing conditions and proposed improvements for the <br />projects located on both the north and south sides of the impasse at Auction Way, including the south lot <br />of Awbrey Lane in Eugene, Oregon. The project area, identified by APNs 17040400-00100, 17040400- <br />00101, 17040413-00100, 17040413-00200, and 17040413-00300 is bounded by Awbrey Lane and <br />Auction Way and is surrounded by a combination of vacant land and developed industrial properties. The <br />current land use of the north and south lots is vacant, while the central lot is currently developed as an <br />industrial property. The proposed use of vehicle outdoor display, merchandise, and storage is permitted <br />within the I-2 zoning classification of this site. <br /> <br />The overall project site is approximately 68 acres with three distinct lots—north, center, and south sites— <br />each with its respective scope of improvements. The north lot’s project scope includes clearing the site by <br />removing the existing gravel/dirt/shrubs, construction of new pavement and curbs, three above -ground <br />basins for stormwater management, and an approximately 83,000 square-foot building. The center lot <br />includes resigning and restriping throughout the site, minor improvements to the existing pavemen t, and <br />installation of curbs and new pavement in areas that are currently occupied by dirt, gravel, and <br />vegetation. On the south lot, the scope includes clearing the existing gravel/dirt/shrubs, constructing a <br />new driveway along the north side of the lot, improvements to the existing driveway located southeast of <br />the site, and adding new pavement and curbs. The overall project site will also include landscaping <br />around the perimeter of each site per City of Eugene’s landscape setback requirements. <br /> <br />The project will also consist of creating onsite cross-access over the existing wetland area to connect the <br />north and central lots, allowing the site to expand and increase its capacity for production and storage. <br /> <br />Please contact me at (714) 705-1384 or Kimberly.Coronel@kimley-horn.com should you have any <br />questions. <br /> <br />Sincerely, <br /> <br />KIMLEY-HORN AND ASSOCIATES, INC. <br /> <br />Kimberly Coronel
The URL can be used to link to this page
Your browser does not support the video tag.