My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials 2026-01-21
>
OnTrack
>
PDF
>
2025
>
PDF 25-01
>
Supplemental Materials 2026-01-21
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/22/2026 9:02:20 AM
Creation date
1/22/2026 9:01:00 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PDF
File Year
25
File Sequence Number
1
Application Name
Braewood Hills 3rd Addition
Document Type
Supplemental Materials
Document_Date
1/21/2026
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
157
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />6 <br /> <br />Braewood Hills | KPFF Consulting Engineers <br />STORMWATER ANALYSIS <br />Precipitation data for the respective storms are City of Eugene design storms are shown in Table 1 below. <br /> <br />TABLE 1: 24-Hour Precipitation for Eugene, OR (NOAA Atlas 2, Volume X) <br />Storm Event Inches <br />WQ 1.56* <br />2-Year 3.23* <br />5-Year 3.6 <br />10-Year 4.46 <br />25-Year 5.18 <br />50-Year 6.0 <br />100-Year 6.48 <br />*Updated to match SLOPES V & DEQ Storm Values, increased from storm events defined in the SWMM <br /> <br />See Appendix 3 for Water Quality Calculations and Appendix 4 for Detention Calculations. <br />Engineering Conclusions <br />Based on the requirements of the Stormwater Management Manual, no errors were found in the stormwater <br />system design. The facilities and conveyance components have enough capacity to handle the required storm <br />events and should be approved as designed. <br /> <br /> <br />2100216-kg <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.