FLOOR 1421' -3"T/STRUCTURE437' -3"T/MECH ENCLSOURE449' -3"T/PARAPET441' -7"MECHANICAL SCREEN BEYOND37'-6" STEP BACK IN BUILDING6" RECESS47' - 0"41' - 0"8'-6" PROTRUSION11' - 9 1/4" 9' - 9"10' - 0"13' - 8"47' - 9 7/8"CANOPY OVER STAFF ENTRY NOT SHOWN FOR CLARITY101' - 8"72' - 5 5/8"OVER 100 FT LENGTH = +/- MIN 3'-0" DEPTH RECESS / PROJECTION REQUIRED6" PROVIDEDFLOOR 1421' -3"T/STRUCTURE437' -3"T/MECH ENCLSOURE449' -3"T/PARAPET441' -7"6" RECESS27' - 0" 27' - 11" 38' - 7 5/8"3'-6" PROTRUSION14' - 8 3/8" 40' - 0 1/8"1'-6" RECESS 16' - 10 3/4" 99' - 1 1/2"1'=0" PROJECTION, TYP (10) BAY WINDOWS3' - 9"16'-6" STEP BACK IN BUILDING8' - 4"START OF PORTE COCHERESTART OF PORTE COCHEREANGLE STARTS IN WALL272' - 7"FLOOR 1421' -3"T/STRUCTURE437' -3"T/PARAPET441' -7"FLOOR 1421' -3"T/STRUCTURE437' -3"T/MECH ENCLSOURE449' -3"T/PARAPET441' -7"69'-4" STEP BACK IN BUILDING1'-6" RECESS6' - 0"1'-6" RECESS6' - 0"MECHANICAL SCREEN BEYOND17'-9" PROTUSION @ EQUIP. YARD69' - 6 1/4"45' - 3 3/8"16' - 11"9' - 6 1/4"81' - 8 1/4"37' - 4 3/4"234' - 11 1/4"FLOOR 1421' -3"T/STRUCTURE437' -3"T/MECH ENCLSOURE449' -3"T/PARAPET441' -7"116'-0" STEP BACK IN BUILDINGMECHANICAL SCREEN BEYOND1'-0" PROJECTION38' - 6"1'-0" PROJECTION38' - 8"12' - 1"11' - 5 1/4"49' - 2 1/2"149' - 11 1/4"OVER 100 FT LENGTH = +/- MIN 4'-6" DEPTH RECESS / PROJECTION REQUIRED1'-0" PROVIDEDNORTH ELEVATION:LENGTH OF WALL: 272'-7"LENGTH REQUIRED (20%): 54' -6"LENGTH PROPOSED (43.6%): 116' - 1" (PASS)DEPTH MIN (3%): 8' -3"DEPTH PROPOSED: VARIES, SEE ELEVATION (PASS)EAST ELEVATION:LENGTH OF WALL: 174'-5"LENGTH REQUIRED (20%): 35' -0"LENGTH PROPOSED: 69' - 4" (PASS)DEPTH MIN (3%): 5'-3"DEPTH PROPOSED: VARIES, SEE ELEVATIONWEST ELEVATION:LENGTH OF WALL: 166'-3"LENGTH REQUIRED (20%): 33' -3"LENGTH PROPOSED: 93' - 5"(PASS)DEPTH MIN (3%): 5'-0"DEPTH PROPOSED AVG: VARIES, SEE ELEVATIONSOUTH ELEVATION:LENGTH OF WALL: 234'-11"LENGTH REQUIRED (20%): 47' -0"LENGTH PROPOSED: 69' - 6" (PASS)DEPTH MIN (3%): 7' -0"DEPTH PROPOSED (7.5%) AVG: 17'-9" (PASS)EXTERIOR WALL ARTICULATION CALCULATIONS PER EC 9.2463(7)(a)GROUND FLOOR FACADE 100 FT OR GREATER IN LENGTH REQUIRES RECESS OR PROJECTIONMINIMUM 20% OF THE LENGTH OF THE FACADEDEPTH MINIMUM 3% OF THE LENGTH OF THE FACADE*PROPOSED ADJUSTMENT TO 9.2463(7)(A): • REMOVE THE MINIMUM 3% PROJECTION / RECESS DEPTH IN SELECT AREAS INDICATED. NORTH ELEVATION:LENGTH OF WALL: 272' - 7"LENGTH REQUIRED (50%): 136' - 2 1/2"LENGTH PROPOSED (58%): 157' - 6" (PASS)AREA OF WALL: 5,175 SF AREA REQUIRED: 1,294 SF AREA PROVIDED (25%) (BTWN 4'-0" AND 9'-0" AFF): 735 SF (14.2%)AREA PROVIDED (BTWN 0'-0" AND L1 CEILING) : 1,914 SF (36.9%)EAST ELEVATION:LENGTH OF WALL: 174' - 5"LENGTH REQUIRED (50%): 87' - 2 1/2"LENGTH PROPOSED (50%): 94' - 0" (PASS)AREA OF WALL: 2,950 SFAREA REQUIRED (25%): 738 SF AREA PROVIDED (BTWN 4'-0" AND 9'-0" AFF): 377 SF (12.8%)AREA PROVIDED (BTWN 0'-0" AND L1 CEILING) : 748 SF (25.4%)WEST ELEVATION:LENGTH OF WALL: 166' - 3"LENGTH REQUIRED (50%): 83' - 1 1/2"LENGTH PROPOSED (33%): 54' - 2"AREA OF WALL: 3,395 SFAREA REQUIRED (25%): 849 SF AREA PROVIDED (BTWN 4'-0" AND 9'-0" AFF): 263 SF (7.8%)AREA PROVIDED (BTWN 0'-0" AND L1 CEILING) : 538 SF (15.8%)SOUTH ELEVATION:LENGTH OF WALL: 272' - 7"LENGTH REQUIRED (50%): 136' - 3 1/2"LENGTH PROPOSED (23%): 61' - 8"AREA OF WALL: 5,280 SFAREA REQUIRED (25%): 1,320 SF AREA PROVIDED (BTWN 4'-0" AND 9'-0" AFF): 182 SF (3.4%)AREA PROVIDED (BTWN 0'-0" AND L1 CEILING) : 371 SF (7.0%)GROUND FLOOR WINDOW CALCULATIONS PER EC 9.2463(7)(b)(1)REQUIRED GROUND FLOOR WINDOWS50% OF THE LENGTH25% OF THE GROUND FLOOR WALL AREA (PORTION OF WALL AREA FROM 4FT TO 9 FT)*PROPOSED ADJUSTMENTS TO 9.2463(7)(b)(1): • UTILIZE 0 FT TO L1 CEILING FOR THE 25% GROUND FLOOR WINDOW AREA.• UTILIZE LOWER REQUIRED LENGTH AND AREA OF GLAZING ON THE SOUTH AND WEST ELEVATIONS. GLAZING ZONE BETWEEN THE HEIGHTS OF 0'-0" AND L1 CEILINGGLAZING ZONE BETWEEN THE HEIGHTS OF 4' AND 9'-0" AFFPROJECTDATEREVISIONSSHEET TITLESHEET NUMBER#THIS LINE IS 1 INCH LONG WHEN PRINTED TO FULL SCALE©BOULDER ASSOCIATESROBERT T. VIZENORREGISTERED ARCHITECTSTATE OF OREGONLIC.# 6660v2105072 NICKERSON STREET, SUITE 200SEATTLE, WASHINGTON 98109206.957.64008/21/2025 12:10:55 PMAutodesk Docs://246893.00 Slocum Ortho ASC R25/246893.00 A-Slocum ASC.rvt246893.00July 24, 2025BUILDING WINDOWZONEG1.12SLOCUMCENTER FORORTHOPEDICS& SPORTSMEDICINE - ASCBID / PERMIT SET1" = 10'-0"G1.123WINDOW ZONE DIAGRAM - EAST ELEVATION1" = 10'-0"G1.121WINDOW ZONE DIAGRAM - NORTH ELEVATION A1" = 10'-0"G1.124WINDOW ZONE DIAGRAM - NORTH SIDE OF VESTIBULE1" = 10'-0"G1.122WINDOW ZONE DIAGRAM - ELEVATION SOUTH1" = 10'-0"G1.125WINDOW ZONE DIAGRAM - WEST ELEVATIONWALL ARTICULATION CALCULATIONSWALL CALCULATIONSLEGEND - WINDOW ZONEDESCRIPTION DATE1 Addendum 1 8/08/20253 Adjustment Review 8/29/25133ROBERT T. VIZENORREGISTERED ARCHITECTSTATE OF OREGONLIC.# 6660Robert T.VizenorSeattle, WaLic # 6660Robert T.VizenorSeattle, WaLic # 6660ADJUSTMENT REVIEWPACKAGE8/29/2025