My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Materials
>
OnTrack
>
PF
>
2025
>
PF 25-05
>
Application Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/23/2025 3:32:51 PM
Creation date
6/23/2025 3:32:43 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
PF
File Year
25
File Sequence Number
5
Application Name
Debra Antionette Doveri
Document Type
Application Materials
Document_Date
6/23/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />www.eugene-or.gov/planning <br />Planning & Development Updated: January 2025 <br />Planning Division <br />99 W. 10TH Avenue Suite 290, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: planning@eugene-or.gov Page 2 of 3 <br /> <br /> Plat signed by an Oregon licensed land surveyor. A list of plat requirements subject to City Survey staff review is <br />available at the City of Eugene Public Works offices, at 180 W. 8th Avenue, Suite 200, Eugene, OR 97401. <br /> As required, include the following: <br /> Delineation of the flood plain or floodway boundaries. <br /> The community number, map/panel number and effective date of the relevant FIRM map. <br /> A note including the Base Flood Elevation for each lot. <br /> A stamped, dated narrative from the surveyor or engineer explaining the methodology used to determine <br />the Base Flood Elevation. <br /> <br /> The applicant is responsible for submitting a copy of the plat signed by an Oregon licensed land surveyor to the Lane <br />County Surveyor’s office along with necessary review fee. <br /> Current title report issued by a title insurance company licensed by the State of Oregon, verifying ownership by the <br />applicant of the real property. <br /> Draft Irrevocable Petition for Public Improvements, as required <br /> Draft Bargain and Sale Deeds for reserve strips, as required. <br /> Draft Conditions, Covenants, and Restrictions or Joint Access Easement and Maintenance Agreement, as required <br /> Drywell certification signed by a civil engineer, based on field-observed soil types and percolation rates, as required. <br /> Off-site easements and right-of-way, as required. <br /> Alternate Methods and Materials (AMM) application, fire separation easement and receipt demonstrating the AMM <br />has been submitted to Building and Permit Services staff for review, as required. <br /> Verification of the storm drainage maintenance agreements, as required <br /> Verification that street tree agreement is in progress, as required. <br /> Copy of wetland documents, as required. <br /> Deed restrictions, as required. <br /> Closures for lots, right-of-way, centerline, and irregularly shaped easements. <br /> <br />Stage 2 Application Requirements <br /> Final plat mylars <br /> Concurrences <br /> Performance Bond, if required for public improvements. <br /> All documents specified as Draft in Stage 1 shall be final. <br /> Additional documentation or evidence to demonstrate compliance with tentative approval conditions and final plat <br />approval criteria, as required. <br /> <br /> <br />NOTICE STATEMENT: If the Eugene/Springfield Fire Marshall (or the Fire Marshal’s designee) determine that there is <br />inadequate water supply, apparatus access, or both, to the site for the development of one and two family dwellings <br />that will be subject to the Oregon Residential Specialty Code, the Eugene Building Official (or the Building Official’s <br />designee) may require compliance with one or more of the fire suppression or fire containment Uniform Alternate <br />Construction Standards set out at OAR 918-480-0125(4) and (5).
The URL can be used to link to this page
Your browser does not support the video tag.