My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Inital Site Plans.pdf
>
OnTrack
>
TIA
>
2025
>
TIA 25-02
>
Inital Site Plans.pdf
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/12/2025 8:38:36 AM
Creation date
6/12/2025 8:37:24 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
TIA
File Year
25
File Sequence Number
2
Application Name
Slocum Surgery center
Document Type
Application Materials
Document_Date
6/11/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4020222140ITEM 15.VARIABLE WIDTHPERMANENT EASEMENTFOR SLOPES, DRAINAGEFACILITIES, ANDWILDLIFE/VEGETATIVEHABITATCONSERVATION PEROREGON CIRCUITCOURT CASE DECISIONRECORDED FEBRUARY26, 2007, RECEPTIONNO. 2007-012926, LANECOUNTY DEEDS ANDRECORDS.ITEM 11.VARIABLE WIDTHFLOODWAY CHANNELMAINTENANCEEASEMENT RECORDEDJANUARY 12, 1990,RECEPTION NO.9001771, LANE COUNTYOFFICIAL RECORDS.41REMOVE OR ABANDON UTILITY LINE INPLACESAWCUT LINEDEMOLITION/WORK LIMITS (SHOWN OFFSETFOR CLARITY)EXISTING GRADE CONTOUR1.CONTRACTOR MAY STAGE WITHIN LIMITS OF DEMOLITION.2.REMOVE ALL SITE COMPONENTS AND RECYCLE COMPONENTS ASREQUIRED IN THE SPECIFICATIONS.3.GENERAL DEMOLITION PERMIT SHALL BE SECURED BY THECONTRACTOR.4.ALL TRADE LICENSES AND PERMITS NECESSARY FOR THEPROCUREMENT AND COMPLETION OF THE WORK SHALL BE SECUREDBY THE CONTRACTOR PRIOR TO COMMENCING DEMOLITION.5.THE CONTRACTOR SHALL PRESERVE AND PROTECT FROM DAMAGEALL EXISTING RIGHT-OF-WAY SURVEY MONUMENTATION DURINGDEMOLITION. THE CONTRACTOR IS RESPONSIBLE FORCOORDINATING AND PAYING FOR THE REPLACEMENT BY A LICENSEDSURVEYOR OF ANY DAMAGED OR REMOVED MONUMENTS.6.PROTECT ALL ITEMS ON ADJACENT PROPERTIES AND IN THE RIGHTOF WAY INCLUDING BUT NOT LIMITED TO SIGNAL EQUIPMENT,PARKING METERS, SIDEWALKS, STREET TREES, STREET LIGHTS,CURBS, PAVEMENT AND SIGNS. CONTRACTOR SHALL BERESPONSIBLE FOR RESTORING ANY DAMAGED ITEMS TO ORIGINALCONDITION.7.PROTECT STRUCTURES, UTILITIES, SIDEWALKS, AND OTHERFACILITIES IMMEDIATELY ADJACENT TO EXCAVATIONS FROMDAMAGES CAUSED BY SETTLEMENT, LATERAL MOVEMENT,UNDERMINING, WASHOUT AND OTHER HAZARDS.8.SAWCUT STRAIGHT LINES IN SIDEWALK, AS NECESSARY.9.CONTRACTOR IS RESPONSIBLE TO CONTROL DUST AND MUD DURINGTHE DEMOLITION PERIOD, AND DURING TRANSPORTATION OFDEMOLITION DEBRIS. ALL STREET SURFACES OUTSIDE THECONSTRUCTION ZONE MUST BE KEPT CLEAN.10.ALL EXPOSED PORTIONS OF UNDERGROUND UTILITIES TO BEABANDONED SHALL BE PLUGGED PER DETAIL X/XX.X.20SAWCUT LINE21REMOVE CONCRETE CURB.22REMOVE ASPHALT PAVEMENTPROPERTY LINE40PROTECT UNDERGROUND UTILITIES.41PROTECT ODOT DRAINAGEWAY.XDEMOLITION KEY NOTESXPROTECTION KEY NOTES/////////SHEET NOTESSHEET LEGENDPROJECTDATEREVISIONSSHEET TITLESHEET NUMBER#THIS LINE IS 1 INCH LONG WHENPRINTED TO FULL SCALE©BOULDER ASSOCIATESv210507 <br />2 NICKERSON STREET, SUITE 200SEATTLE, WASHINGTON 98109206.957.6400246893.00MAY 28 2025SLOCUMCENTER FORORTHOPEDICS& SPORTSMEDICINE - ASCDESIGN DEVELOPMENTDESCRIPTIONDATE3300 CHAD DR, EUGENE, 974086:)LIWK$YH6XLWHˇ3RUWODQG25˝ˆ2˛˘˘˙ˇ)˛˘ˆˇ˙ZZZNSIIFRPC2.00File: N:\c\p\2025\2500023-Slocum-ASC\CAD\PLOT\2500023-C2.00-DEMO.dwg TAB:C2.00Plotted: 5/22/25 at 2:01pm By: AEddy <br />OVERALLDEMOLITIONPLANSCALE401 INCH = 40 FEET40800
The URL can be used to link to this page
Your browser does not support the video tag.