My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Inital Site Plans
>
OnTrack
>
MHF
>
2025
>
MHF 25-14
>
Inital Site Plans
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/23/2025 2:49:10 PM
Creation date
5/23/2025 2:48:54 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MHF
File Year
25
File Sequence Number
14
Application Name
Potter ST
Document Type
Application Materials
Document_Date
5/23/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
N/A ❑ A stamped, dated narrative from the surveyor or engineer explaining the methodology used to determine the <br />Base Flood Elevation. <br />❑■ The applicant is responsible for submitting a copy of the plat signed by an Oregon licensed land surveyor to the Lane <br />County Surveyor's office along with necessary review fee. <br />❑■ A current title report issued by a title insurance company licensed by the State of Oregon, verifying ownership by the <br />applicant of the real property. <br />❑■ Closures for lots, right-of-way, centerline, and irregularly shaped easements. <br />❑■ Draft Irrevocable Petition for Public Improvements, if required. <br />N/A ❑ Draft Bargain and Sale Deeds for reserve strips, if required. <br />❑ Draft Conditions, Covenants, and Restrictions or Joint Access Easement and Maintenance Agreement, if required. <br />❑ Drywell certification signed by a civil engineer, based on field -observed soil types and percolation rates, if required. <br />❑ Draft copies of off -site easements and right-of-way, if required. <br />❑ Draft storm drainage maintenance agreement, if required. <br />❑ Copy of the receipt for the Street Tree Agreement submitted to the City's Urban Forester, if required. <br />❑ Copy of wetland documents, if required. <br />❑■ Deed restrictions, if required. <br />N/A ❑ Submit a legal description of property included in the subdivision application. This legal description must be typed on <br />an 8%" x 11" white sheet of paper (no letterhead) so that it is suitable for recording. <br />❑ Alternate Methods and Materials (AMM) application, fire separation easement and receipt demonstrating the AMM <br />has been submitted to Building and Permit Services staff for review, if required. <br />State 2 Submittal Reauirements after finalizine items in State 1 <br />❑ Final plat mylars <br />❑ Concurrences <br />❑ Performance Bond, if required for public improvements. <br />❑ Documentation of water service availability to each lot in the plat. <br />❑ All documents specified as Draft in Tier 1 shall be final. <br />❑ Additional documentation or evidence to demonstrate compliance with tentative approval conditions and final plat <br />approval criteria, as required. <br />❑ Post-monumentation certificate, identification of corners to be post-monumented, deposit estimate, and check, as <br />required. A field check for all found and set monuments is preformed prior to final plat approval in order to <br />demonstrate compliance with ORS 92.100(2-3). <br />NOTICE STATEMENT: If the Eugene/Springfield Fire Marshall (or the Fire Marshal's designee) determine that there <br />is inadequate water supply, apparatus access, or both, to the site for the development of one and two family <br />dwellings that will be subject to the Oregon Residential Specialty Code, the Eugene Building Official (or the Building <br />Official's designee) may require compliance with one or more of the fire suppression or fire containment Uniform <br />Alternate Construction Standards set out at OAR 918-480-0125(4) and (5). <br />Planning & Development <br />Planning Division <br />99 W. 10T" Avenue Suite 290, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: planning@eugene-or.gov <br />www. eugene-or. gov/planninq <br />Updated: December 2024 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.