My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ord. 20724 - Chapter 9 changes
>
OnTrack
>
CA
>
2024
>
CA 24-3
>
Ord. 20724 - Chapter 9 changes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/15/2025 1:50:30 PM
Creation date
4/15/2025 1:50:20 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
24
File Sequence Number
3
Application Name
Stormwater
Document Type
Ordinance
Document_Date
3/12/2025
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE NO. 20724 <br />AN ORDINANCE CONCERNING STORMWATER MANAGEMENT; AMENDING <br />SECTIONS 9.6791, 9.6792, 9.6793, AND 9.8030 OF THE EUGENE CODE, 1971; <br />AND PROVIDING AN EFFECTIVE DATE. <br />THE CITY OF EUGENE DOES ORDAIN AS FOLLOWS: <br />Section 1. Section 9.6791 of the Eugene Code, 1971, is amended to provide as follows: <br />9.6791 Stormwater — Flood Control. <br />(1) Purpose. The purpose of EC 9.6791 is to protect life and property from flood and drainage <br />hazards by maintaining the capacity of the city's stormwater conveyance system through the <br />establishment of flood control regulations for stormwater runoff. These standards are also <br />intended to ensure that urban stormwater discharged into Junction City Water Control District's <br />flood control system meets the assigned downstream capacity of the District's system. <br />(2) Applicability and Exemptions. <br />(a) Except as provided in EC 9.6791(2)(b), flood control standards in EC 9.6791(3) apply to <br />all development permit applications and land use applications. <br />(b) The standards in EC 9.6791(3) do not apply to development permit applications where <br />the proposed development will be served by a flood control facility that is a manmade <br />drainage system designed to accommodate stormwater run-off generated by the stormwater <br />basin area. <br />(3) Standards. <br />(a) Stormwater flood control facilities shall be selected, sited, designed, and constructed <br />according to adopted plans and policies, and in accordance with standards in EC Chapters <br />6 and 7, and the Stormwater Management Manual. <br />(b) Stormwater runoff from the development site for the applicable flood control design storm <br />shall be: <br />1. Discharged into existing stormwater flood control facilities that, considering all <br />developments that have received tentative or final plan approval as of the date the <br />applicant submits a complete application, have the capacity to handle the stormwater <br />runoff; or <br />2. Retained or detained onsite; or <br />3. Discharged into a new stormwater flood control facility constructed by the applicant. <br />Ordinance -- Page 1 of 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.