My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Staff Memorandum
>
OnTrack
>
CA
>
2024
>
CA 24-3
>
Staff Memorandum
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 8:32:43 AM
Creation date
10/16/2024 8:32:28 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
24
File Sequence Number
3
Application Name
Stormwater Code Amendments
Document Type
Staff Report
Document_Date
10/15/2024
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />Ordinance -- Page 8 of 10 <br />feet in elevation will not increase during storms larger than the water quality design storm <br />and smaller than the flood control design storm as a result of the development that is the <br />subject of the application; <br /> <br />(b) For purposes of designing the system as required by the standards in this section, the <br />amount of impervious surface per lot is assumed to be the maximum lot coverage allowed <br />for the use in the zone in which it is located, unless the applicant demonstrates otherwise. <br /> <br />(c) All facilities to control the rate of stormwater runoff shall be sited, designed and <br />constructed according to the flow control provisions and the facility design requirements set <br />forth in the Stormwater Management Manual. Flow control facilities must be designed using <br />one of the methodologies outlined in the Stormwater Management Manual. <br /> <br />(d) The standards in EC 9.6793(3) may be adjusted pursuant to EC 9.8030(24). <br /> <br /> <br />Section 4. Subsections (24)(a) and (24)(b) of Section 9.8030 of the Eugene Code, <br />1971, are amended to provide as follows: <br />9.8030 Adjustment Review – Approval Criteria. <br />The planning director shall approve, conditionally approve, or deny an adjustment review <br />application. Approval or conditional approval shall be based on compliance with the following <br />applicable criteria. <br />* * * <br />(24) Stormwater Quality, Flow Control, Oil Control and Source Control Standards Adjustment. <br />(Adjustments under this subsection are not permitted within the /CL Clear Lake Overlay Zone.) <br />(a) The requirement in EC 9.6792(3)(e)(3)(a) and EC 9.3155(17)(c)4 that selected <br />stormwater quality facilities shall treat all the stormwater runoff that will result from the water <br />quality design storm may be adjusted upon a finding that the stormwater quality facility will <br />treat as much of the runoff as possible; and <br />(b) The requirement in EC 9.6792(3)(f)(3)(a) and EC 9.3155(17)(c)5 that all stormwater <br />quality facilities be selected from and sited, designed, and constructed according to the <br />stormwater quality provisions and the facility design requirements set forth in the Stormwater <br />Management Manual and that stormwater quality facilities must be designed using one of <br />the methodologies outlined in the Stormwater Management Manual may be adjusted upon <br />finding that all of the following requirements are met: <br />1. The proposed alternative design will achieve equal, or superior, results for function <br />(reducing pollution), maintainability and safety, and the proposed siting does not <br />adversely affect structures or other properties. <br />2. The applicant’s written description of the proposed alternative design has been <br />reviewed and approved by the City Engineer. The description of the proposed design
The URL can be used to link to this page
Your browser does not support the video tag.