1. There was no Certification of Description included in the application – please have the surveyor submit a <br />stamped and signed Certification of Description <br />2. The Annexation Legal Description needs to be revised. The beginning point needs to be tied to a government <br />corner ( section corner, quarter section corner, Donation Land Claim corner), or monument corner in a partition or <br />subdivision plat not a corner described in a Bargain and Sale deed. The surveyor can delete the section entitled “Said <br />PROPOSED ANNEXATION TERRITORY also being described per the Vesting Deed as:”. <br />3. The Annexation Site plan needs to be revised to show a tie to the commencement point of the legal <br />description. <br />I have attached our Annexation Packet document for the surveyor to review. He needs to review pages 20-23 ( I <br />have highlighted the issues that need to be addressed) and revise the legal description and annexation site plan <br />accordingly. <br />Please let me know if you have any questions. <br />Jim Colton, PLS <br />City of Eugene Surveyor, Engineering Division <br />180 West 8th Avenue, Suite 200, Eugene, OR 97401 <br />541.682.2704 – office <br />541.852.1255 - cell <br />James.W.Colton@ci.eugene.or.us <mailto:James.W.Colton@ci.eugene.or.us>