My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Testimony Batch 1
>
OnTrack
>
CA
>
2024
>
CA 24-3
>
Testimony Batch 1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/19/2024 4:00:51 PM
Creation date
9/19/2024 4:00:37 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
24
File Sequence Number
3
Application Name
Stormwater Code Amendments
Document Type
Public Testimony
Document_Date
9/19/2024
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ordinance -- Page 6 of 9 <br />unit dwelling and duplex lots or parcels adjoining the public street based on full buildout <br />of those lots or parcels. <br /> <br />2. If using a mechanical facility to treat the stormwater runoff from the public street or <br />if the infiltration or filtration facility is not sized to also treat the stormwater runoff from <br />the adjoining lots or parcels at full buildout, all lots or parcels created by the land <br />division application shall comply with EC 9.6792(3)(d)-(g) at the time of development <br />permit application. <br /> <br />(c) For land use applications proposing construction of a private street or shared driveway, <br />stormwater quality facilities to treat the runoff from the proposed private street or shared <br />driveway shall be selected from the Stormwater Management Manual and shall be based <br />on the following priority order: infiltration, filtration. <br /> <br />1. An infiltration or filtration treatment facility to treat the stormwater runoff from the <br />shared driveway or private street can be sized to treat the stormwater runoff from the <br />proposed single-unit and duplex dwelling lots or parcels that adjoin the shared <br />driveway or private street based on full buildout of those lots or parcels. <br /> <br />2. If the infiltration or filtration facility is not sized to treat the stormwater runoff from <br />the adjoining lots or parcels at full build out, all lots or parcels created by the land <br />division application must comply with EC 9.6792(3)(d)-(g) at the time of development <br />permit application. <br /> <br />(d) For development permit applications, stormwater quality facilities shall be selected <br />from the Stormwater Management Manual and shall be based on the following priority <br />order: infiltration, filtration, off-site stormwater quality management. <br /> <br />1. If selecting a filtration treatment facility, the applicant shall submit a report that <br />demonstrates at least one of the following development site conditions exist: a. <br />Infiltration rates are less than 2 inches per hour; b. Bedrock is less than 5 feet below <br />the ground surface; c. Groundwater elevations are less than 6 feet; or, d. Ground <br />surface slopes are greater than 10%. <br /> <br />2. If selecting off-site stormwater quality management by contributing to the public off- <br />site stormwater quality facilities, through payment of a higher stormwater system <br />development charge adopted as part of the City’s system development charge <br />methodology, the applicant shall submit a report that demonstrates there is insufficient <br />land area to construct an approved infiltration or filtration facility by setting forth the <br />required size of the smallest infiltration or filtration facility needed for the development’s <br />impervious surface area and a site plan demonstrating that an approved infiltration or <br />filtration facility cannot be located on the development site without reducing the size of <br />the proposed development which is otherwise consistent with all other applicable lot <br />and development standards. <br /> <br />(e) The selected stormwater quality facilities shall treat all stormwater runoff from all new <br />or replaced impervious surface areas, or an equivalent on-site area, that will result from <br />the water quality design storm except that the selected the stormwater quality facility does <br />not need to treat the stormwater runoff from new or replaced impervious surface that is
The URL can be used to link to this page
Your browser does not support the video tag.