Future Transportation Map* P <br />1�► t � N� <br />sari( <br />E Enid Rd <br />� 1 <br />1 <br />1 <br />1 Filbert' <br />M ow Park <br />M� <br />�2 Randy Pape <br />Barger Dr <br />`Santa Clara <br />Community <br />OIOOOA, <br />'Wei <br />`I a <br />Z] <br />w <br />Hil--Ila d 1 (�j t — <br />- <br />Delta Ponds Park <br />o--- <br />U <br />�. <br />9P� <br />Park Ahvre. ««� <br />r 9 <br />ar <br />Ras r <br />'.. Park <br />G <br />Royal Ave <br />�Lo <br />Valley River <br />Center <br />Q <br />River Road - Santa Clara <br />- <br />Roosevelt Blvd <br />Future Transportation Projects <br />soy; <br />Projects in the Transportation Transportation Additions <br />Miles N <br />System Plan to Consider <br />Parks and Open Space <br />0 0.25 0.5 A <br />• ! • Accessway Safe Routes to School <br />Eugene Urban Growth Boundary <br />Caution: This map is for <br />'for illustrative purposes <br />s o o Neighborhood Greenway -= Accessway to River <br />River Road - Santa Clara <br />informational purposes only. It <br />is based on imprecise source <br />only <br />Protected Bike Lane <br />Neighborhood Plan Area <br />data and is subject to change. <br />Map created September 2023 <br />0 0 0 Shared Use Path <br />Metro Plan Boundary <br />y <br />by Planning Staff. <br />Sources: <br />Sources: City of Eugene and <br />O <br />2p <br />Rivers and Waterways <br />