Expedited Land Divisions <br />If your proposal meets the following requirements, you have the option of proceeding under the Expedited Land <br />Division process or the standard city process. Please refer to the information sheet for further details. <br />Does your application qualify as an Expedited Land Division? My application: <br />❑ Includes only land that is zoned for residential uses and is within the urban growth boundary; <br />❑ Is solely for the purpose of residential use; <br />❑ Results in development that either: <br />❑ Creates parcels that allow building residential units at 80% or more of the maximum net density permitted <br />by the underlying zoning; or <br />❑ Will be sold or rented to households with incomes below 120% of the median family income for Lane <br />County <br />Please refer to EC 9.8515(13) or EC 9.8520(9) for a full description of these Requirements. <br />If you checked each box above, select "yes" below. If not, select "no" <br />❑ Yes, my project qualifies as an Expedited Land Division <br />F](' No, I do not qualify <br />If you selected "yes" above, and you may opt to proceed under the requirements of an Expedited Land Division. If you <br />select the Expedited Land Division process, please include all necessary information in your application demonstrating <br />how you qualify, specifically. If you selected "no" above, please select the "standard" process below. <br />Please check one option: <br />5C Standard Process (EC 9.7200-9.7230) <br />❑ Expedited Land Division process (9.7900-9.7925) <br />Neighborhood/Applicant Meeting Requirements <br />Provide the following documentation that a neighborhood/applicant meeting was held per EC 9.7007 (see EC 9.7010): <br />❑ The list of persons to whom notice was mailed pursuant to EC 9.7007(5) and a signed statement that notice was <br />posted and mailed to those on the list; <br />❑ A copy of the notice; <br />❑ A copy of the meeting notes and sign -in sheet described at EC 9.7007(9); and <br />❑ A copy of the site plan presented at the meeting. <br />Filing Fee <br />❑ A filing fee must accompany all applications. The fee varies depending upon the type of application and is adjusted <br />periodically by the City Manager. Check with Planning staff at the Permit and Information Center to determine the <br />required fee or check website at: www.eugeneplanning.org <br />Submittal Requirements <br />Provide 2 paper copies and one digital copy (CD, USB Drive, or Other) of all application materials (i.e. written <br />statement, site plans, etc.). Digital files must be in PDF file format. Please note that it is the applicant's responsibility to <br />make sure that the digital and paper copies are identical. Following completeness review, an updated digital and paper <br />copies may be required. All paper site plans must be folded to a size equal or less than 11" x 17". <br />Written Statement <br />Planning & Development <br />Planning Division <br />99 W. JOT" Avenue, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us <br />www. eugene-or. govZ21anning <br />Updated: December 2023 <br />Page 2 of 6 <br />