Photo taken from the <br />West side — behind <br />the second 4-plex <br />under construction. <br />The fill and fence get <br />higher the further N <br />(left) it goes. The <br />bottom 2' — 3' of the <br />new fence still needs <br />to be boarded, <br />followed by more fill <br />up to the back 'patio' <br />of the new buildings. <br />Taken from the NE <br />corner. Due to the <br />elevation change, the <br />top of the foundation <br />for the new 2 -story 4- <br />plex is halfway up the <br />existing residence. <br />More fill, 'patios' and <br />fencing to follow. <br />Taken at the <br />intersection of Lake and <br />Howard. Note repeated <br />parking in/near the <br />stormwater swale. <br />Camera lens was not <br />wide-angle enough to <br />include the three other <br />(construction -related) <br />vehicles parked to the <br />right — in the <br />unimproved Howard <br />ROW - also near/in the <br />swale. <br />35 <br />