My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23_10_31_Batch3_Testimony
>
OnTrack
>
MA
>
2023
>
MA 23-5
>
23_10_31_Batch3_Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/2/2023 4:06:15 PM
Creation date
11/1/2023 3:56:02 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MA
File Year
23
File Sequence Number
5
Application Name
River Road-Santa Clara Neighborhood Plan
Document Type
Public Testimony
Document_Date
10/31/2023
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
341
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Meeker Family Testimony <br />MA 23-5/CA 23-3/509-PA23-05532 <br />October 17, 2023 3 <br />a. Envision Eugene Comprehensive Plan policies <br />Policy 3.5 Business retention and expansion, states: <br />Facilitate the retention and growth of existing businesses in the community. <br />The proposed code amendments that make existing businesses nonconforming do the <br />exact opposite of what Policy 3.5 commands. <br />b. Statewide Planning Goals <br />As noted in my October 6th letter, the code amendment proposal is not consistent with <br />state-wide planning goals, in particular, Goal 2 (Land Use Planning) and Goal 9 (Economic <br />Development), and should therefore be rejected. <br />Goal 2: Land Use Planning — <br />The statewide planning goal for "planning," Goal 2, states in relevant part: <br />To establish a land use planning process and policy framework as a basis for all <br />decision[s] and actions related to use of land and to assure an adequate factual <br />base for such decisions and actions...*** <br />All land use plans shall include identification of issues and problems, inventories <br />and other factual information for each applicable statewide planning goal, <br />evaluation of alternative courses of actions and ultimate policy choices., taking <br />into consideration social, economic, energy and environmental needs...*** <br />The plans shall be the basis for specific implementation measures. These <br />measures shall be consistent with and adequate to carry out the plans. Each plan <br />and related implementation measure shall be coordinated with plans of affected <br />governmental units. <br />The proposed code amendments are required to be coordinated with and consistent <br />with the adopted land use plans, including the Metro Plan and the Envision Eugene <br />Comprehensive Plan. <br />However, there is no factual basis for reducing the maximum building height of the C- <br />2 zone or imposing a blanket prohibition of RV/Boat & Watercraft/Motor Vehicle sales and <br />service in the C-2 zone in this area. The impacts to the City's buildable lands inventory have <br />not been addressed. <br />Office phone: (541) 225-8777I 375 W. 4th Ave., Suite 205 <br />mreeder@oregonlanduse.com Eugene, Oregon 97401 229 <br />oregonlanduse.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.