My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
23_10_17 Bacth2 Testimony
>
OnTrack
>
MA
>
2023
>
MA 23-5
>
23_10_17 Bacth2 Testimony
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2023 12:31:17 PM
Creation date
10/17/2023 12:22:35 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
MA
File Year
23
File Sequence Number
5
Application Name
River Road-Santa Clara Neighborhood Plan
Document Type
Public Testimony
Document_Date
10/17/2023
External View
Yes
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
708
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
include landscaping requirements, open space requirements and setback requirements, would provide <br />sufficient landscape, open space and setback buffer for a multi - family development to meet the intent of <br />adopted policies, and of this recommendation. <br />The applicant's written statement addresses several additional RRSC policies. To the extent they are <br />applicable to the proposal staff finds that the proposal is consistent with the RRSC. Based on the above <br />findings, the approval criterion at EC 9.8865(2) is met. <br />EC 9.8865131 The uses and density that will be allowed by the proposed zoning in the location <br />of the proposed change can be served through the orderly extension of key urban facilities and <br />services. <br />The minimum level of key urban facilities and services are defined in the Metro Plan and include <br />wastewater service, stormwater service, transportation, solid waste management, water service, fire and <br />emergency medical services, police protection, City -wide parks and recreation programs, electric service, <br />land use controls, communication facilities, and public schools on a district wide basis ( Metro Plan page V- <br />3). The applicant's findings related to EC 9.8865(3) (pages 1 -2 of the applicant's narrative) describe the <br />availability of wastewater, electricity, telephone, natural gas, and stormwater and are incorporated <br />herein by reference. <br />Referral comments from Public Works staff indicate that transportation facilities and wastewater facilities <br />are currently available and that stormwater facilities can be made available through off -site easements or <br />on -site treatment. All other key urban services are currently available to the subject property, or can be <br />extended in an orderly and efficient manner to the property as needed to serve development. <br />Based on the findings and condition above, staff concludes that key urban facilities and services are <br />currently available, or can be extended in an orderly manner to the subject property as required, <br />consistent with this criterion. <br />EC 9.8865141 The proposed zone change is consistent with the applicable siting requirements <br />set out for the specific zone in: <br />a) EC 9.2150 Commercial Zone Siting Requirements <br />b) EC 9.2430 Industrial Zone Siting Requirements <br />c) EC 9.2510 Natural Resource Zone Siting Requirements <br />d) EC 9.2610 Park. Recreation. and Open Space Siting Requirements <br />e) EC 9.2681 Public Land Zone Siting Requirements <br />f) EC 9.2735 Residential Zone Siting Requirements <br />g) EC 9.3055 S -C Chambers Special Area Zone Siting Requirements <br />h) EC 9.3105 S -CN Chase Node Special Area Zone Siting Requirements <br />i) EC 9.3205 S -DW Downtown Westside Special Area Zone Siting Requirements <br />0) EC 9.3305 S-E Elmira Road Special Area Zone Siting Requirements <br />k) EC 9.3705 S-RP Riverfront Park Special Area Zone Siting Requirements <br />1) EC 9.3805 S -RN Royal Node Special Area Zone Siting Requirements <br />m) EC 9.4205 /EC East Campus Overlay Zone Siting Requirements. <br />n) EC 9.3905 S -W Whiteaker Special Area Zone Siting Requirements. <br />o) EC 9.4715 /WP Waterside Protection Overlay Zone Siting Requirements. <br />Staff Report (Z 10 -3) July 2010 5 <br />HO Agenda -Page5 <br />440
The URL can be used to link to this page
Your browser does not support the video tag.