A note including the Base Flood Elevation for each lot. <br /> A stamped, dated narrative from the surveyor or engineer explaining the methodology used to determine the <br />Base Flood Elevation. <br /> <br /> The applicant is responsible for submitting a copy of the plat signed by an Oregon licensed land surveyor to the Lane <br />County Surveyor’s office along with necessary review fee. <br /> <br /> A current title report issued by a title insurance company licensed by the State of Oregon, verifying ownership by the <br />applicant of the real property. <br /> <br /> Closures for lots, right-of-way, centerline, and irregularly shaped easements. <br /> <br /> Draft Irrevocable Petition for Public Improvements, if required. <br /> <br /> Draft Bargain and Sale Deeds for reserve strips, if required. <br /> <br /> Draft Conditions, Covenants, and Restrictions or Joint Access Easement and Maintenance Agreement, if required. <br /> <br /> Drywell certification signed by a civil engineer, based on field-observed soil types and percolation rates, if required. <br /> <br /> Draft copies of off-site easements and right-of-way, if required. <br /> <br /> Draft storm drainage maintenance agreement, if required. <br /> <br /> Copy of the receipt for the Street Tree Agreement submitted to the City’s Urban Forester, if required. <br /> <br /> Copy of wetland documents, if required. <br /> <br /> Deed restrictions, if required. <br /> <br /> Submit a legal description of property included in the subdivision application. This legal description must be typed on <br />an 8½" x 11" white sheet of paper (no letterhead) so that it is suitable for recording. <br /> <br /> Alternate Methods and Materials (AMM) application, fire separation easement and receipt demonstrating the AMM <br />has been submitted to Building and Permit Services staff for review, if required. <br /> <br />Tier 2 Submittal Requirements <br /> <br /> Final plat mylars <br /> <br /> Concurrences <br /> <br /> Performance Bond, if required for public improvements. <br /> <br /> Documentation of water service availability to each lot in the plat. <br /> <br /> All documents specified as Draft in Tier 1 shall be final. <br /> <br /> Additional documentation or evidence to demonstrate compliance with tentative approval conditions and final plat <br />approval criteria, as required. <br /> <br /> Post-monumentation certificate, identification of corners to be post-monumented, deposit estimate, and check, as <br />required. <br />N/A <br />x <br />x <br />x <br />N/A <br />x <br />x <br />N/A