My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Application Adjustment Review U Haul Eugene 4.1.22
>
OnTrack
>
ARA
>
2023
>
ARA 23-8
>
Application Adjustment Review U Haul Eugene 4.1.22
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/26/2023 4:00:35 PM
Creation date
5/25/2023 10:09:53 AM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
ARA
File Year
23
File Sequence Number
8
Application Name
UHAUL
Document Type
Supplemental Materials
Document_Date
4/28/2023
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Filing Fee <br />A filing fee must accompany all applications. The fee varies depending upon the type of application and is adjusted periodically by <br />the City Manager. Check with Planning staff at the Permit and Information Center to determine the required fee or check website at <br />www.eugeneplanning.org <br />Submittal Requirements: <br />Provide 3 paper copies and one CD copy of all application materials (i.e. written statement, site plans, etc.) in pdf format at the time <br />of initial submittal. Please note that it is the applicant's responsibility to make sure that the CD and paper copies are identical. <br />Following completeness review, an updated CD and additional paper copies may be required. All site plans must be folded to a size <br />equal or less than 11" x 17". <br />Written Statement <br />Submit a detailed written statement describing how this request is consistent with all applicable criteria beginning at Eugene Code <br />Section 9.8030. Please note: it is the applicant's responsibility to provide adequate information demonstrating how the project <br />satisfies the applicable approval criteria. Failure to provide such information may result in denial of your application. <br />Submit an Alternative Traffic Safety Study (ATSS) if an adjustment is requested to required internal vehicle stacking at EC <br />9.6703(3)(a). <br />Demonstrate that access to the development site is located in accordance with EC 7.420. <br />Site Plan Requirements <br />❑ Show date, north arrow, and standard engineer's or architect's scale. <br />❑ Show the Assessor's Map and Tax Lot numbers. <br />❑ Show a vicinity map on the plan. (Vicinity map does not need to be drawn to scale.) <br />❑ Show the dimensions of the site plan boundary. <br />❑ Show the location of all existing structures and indicate whether they will remain or be removed. <br />❑ Show any site features necessary to illustrate the basis for the proposed adjustment. <br />❑ Show access to the development site. <br />❑ Site Plan must be prepared, stamped and signed by one of the following: Oregon Licensed architect, Oregon licensed civil <br />engineer, Oregon licensed landscape architect, a member of the American Institute of Certified Planners, or an Oregon licensed <br />land surveyor. <br />Planning & Development <br />Planning Division <br />99 W. 1011 Avenue, Eugene, OR 97401 <br />Phone: 541.682.5377 or E-mail: planning@ci.eugene.or.us <br />WWW. eugene-or. goy/planning <br />Updated: March 2014 <br />Page 2 of 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.