My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2.14.2023 Agenda Packet
>
OnTrack
>
CA
>
2022
>
CA 22-1
>
2.14.2023 Agenda Packet
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/12/2023 4:02:13 PM
Creation date
2/10/2023 3:51:09 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
CA
File Year
22
File Sequence Number
1
Application Name
WILLAMETTE GREENWAY CODE AMENDMENTS
Document Type
Staff Report
Document_Date
2/14/2023
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Attachment A.1 <br />• <br />Construct a shared-use path to <br />Between Merry <br />connect to the City's existing West <br />Lane and West <br />R-1/PL/WR/WG <br />WG 12-1 <br />Approved <br />Complete <br />No <br />Bank Path to Merry Lane. <br />Bank Path <br />& PL/WR/WG <br />Public open space (Rasor Park); <br />paved-shared use path (Rasor Park <br />WG 12-2 <br />Approved <br />Complete <br />No <br />Connector) <br />Rasor Park <br />PL/ND/WR <br />Replace EWEB water main across <br />the Willamette River. New pipe <br />attached to existing Beltline Bridge. <br />Old pipe under the riverbed to be <br />PL/WR & <br />WG 12-3 <br />Approved <br />Complete <br />No <br />abandoned. <br />Beltline Bridge <br />AG/WR <br />EWEB Downtown Riverfront. <br />Concurrent Code Amendments, <br />Metro Plan and Refinement Plan <br />Replaced with <br />amendments, Zone Change, and <br />POS/ND & MU <br />New <br />Willamette Greenway Permit for <br />& HDR, MU/ND <br />Application (see <br />implementation of the EWEB <br />Downtown <br />& HI/ND & <br />WG 12-4 <br />Approved <br />WG 19-3) <br />Yes <br />Riverfront Master Plan. <br />Riverfront <br />POS/ND <br />Residential Cohousing <br />development with 29 dwelling <br />Under <br />units (Oakleigh Meadow Planned <br />Southeast terminus <br />WG 13-1 <br />Approved <br />Construction <br />Yes <br />Unit Development) <br />of Oakleigh Lane <br />R-1 <br />Eugene Townplace Suites, a 101- <br />Property East of <br />WG 16-1 <br />Approved <br />Not Developed <br />No <br />room hotel <br />Valley River Inn <br />C-2/WR/SR <br />Market District Townhomes. 20 <br />Under <br />Townhouses on South side of <br />135 Shelton <br />WG 16-2 <br />Approved <br />Construction <br />Yes <br />Skinner Butte. <br />McMurphy Blvd <br />S-W/SR <br />100-unit multi-family apartment <br />building with 5-stories over 1 story <br />WG 17-1 <br />Approved <br />Complete <br />Yes <br />parking garage <br />35 Club Road <br />C-2/SR <br />Lombard Apartments: 94 market <br />R-2/ND & R- <br />WG 17-2 <br />Withdrawn <br />n/a <br />Yes <br />rate multi-family dwelling units <br />n/a <br />2/ND/SR <br />Page 20 of 65 <br />Page 2 of 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.