Willamette River Greenway Code Amendments <br />Attachment C <br />(2) The modification will result in insignificant changes in the physical appearance of the <br />development, the use of the site, and impact on the surrounding properties. <br />If determined to be consistent with the above criteria, the planning director shall approve the request. <br />The applicant retains the ability to submit the requested modification as a new Willamette River <br />Greenway permit application based on the Type III procedural requirements. Nothing in this land use <br />code shall preclude the applicant from initially submitting the requested modification as a new <br />Willamette River Greenway permit application. <br />Draft: December 1, 2022 (Minor Revisions January 20, 2023) <br />Page 25 of 25 <br />Page 43 of 43 <br />