Zone Change Completeness Review Form <br />Public Works <br />Application File Name (#): Z22-11 4J School District Date: 7/17/2022 <br />Current Zoning: R1 Proposed PL <br />Zoning: <br />Victoria Doyle Phone: 541-682-5714 <br />General After acquiring the subject property, the 4J Public School district request changing of the current zoning for Public <br />Comments:Lands use. <br />Written Statement <br /> <br />SubmittedMissing Incomplete N/A <br /> <br />1.Provided a written statement demonstrating how the requested change <br />satisfies the criteria in Eugene Code Section 9.8865(3): “The uses and <br /> density that will be allowed by the proposed zoning in the location of the <br />proposed change can be served through the orderly extension of key urban <br />facilities and services.” <br /> <br />2.Submit a written statement describing how this request is consistent with <br />the Transportation Planning Rule (TPR)set forth in Oregon Administrative <br /> <br />Rule (OAR) 660-012-0060subsection (9) <br />Comments: <br /> <br />Regarding item #1 above: <br /> <br />Wastewater – the address is currently connected to public Facilities via an 8” main between <br />o <br />MH8118 and MH11475 per sewer connection record 23606. This criterion is met. <br /> <br />Public Storm – Public Storm Facilities terminate just to the east of the subject property and can <br />o <br />be extended at future development. This criterion is met. <br /> <br />Streets- W Hilliard Lane is a local street and the subject property has frontage. <br />o <br /> <br />Regarding item #2 above, <br />TPR analysis is insufficient and will require a more thorough review. The lack of a future plan does not <br />determine the “worst case scenario.” Please refer to planning comments. <br />Supporting Information – Transportation Planning Rule Analysis (TPRA) Scoping Checklist and Report <br /> <br />SubmittedMissing Incomplete N/A <br />1.The TPRA Scoping Checklist is only required if the application does not <br />qualify under Subsection 9 of the TPR. Submit a TPRA Scoping checklist <br /> <br />and a report addressing the elements identified in the checklist. <br /> <br />Comments:Please provide a more in depth analysis <br />Map Information <br /> <br />SubmittedMissingIncompleteN/A <br /> <br />1.Provided a map indicating the property involved in the request and <br /> <br />showing adjacent streets, alleys etc. <br /> <br />2. Provided a vicinity map showing the general area of the request and <br /> <br />indicating the specific property involved in the request. <br />Comments <br />Referral Information <br /> <br />Yes No <br /> <br />1.Is a full analysis required to demonstrate TPR compliance? <br /> <br /> <br />2.Does Team Central require a referral for this application? <br /> <br /> <br />3. Does Parks Planning require a referral for this application? <br /> <br /> <br />4. Does Traffic Operations require a referral? <br /> <br /> <br />5.Does Lane County require a referral? <br /> <br /> <br />6.Does ODOT require a referral? <br /> <br /> <br /> <br />