My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Supplemental Materials
>
OnTrack
>
VEU
>
2022
>
VEU 22-3
>
Supplemental Materials
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/11/2022 1:00:40 PM
Creation date
5/11/2022 12:56:21 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
VEU
File Year
22
File Sequence Number
3
Application Name
CHELDER
Document Type
Supplemental Materials
Document_Date
5/4/2022
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
28
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
only mark to that point, beyond the meter would require hiring a priva <br /> <br />* Because utilities have 2 business days to respond to this request, yo <br />responding at different times <br /> <br />* Underground facilities shall be marked in accordance with the follow <br />OAR 952-001-0070 (7)) <br />- RED - Electric power lines, cables or conduit, and lighting cables <br />- YELLOW - Gas, oil, steam, petroleum, or gaseous materials <br />- ORANGE - Communications, alarm or signal lines, cables or conduit <br />- BLUE - Potable Water <br />- GREEN - Sewers, drainage facilities or other drain lines <br />- WHITE - Pre-marking of the outer limits of the proposed excavation o <br />width of proposed lineal installations of buried facilities <br />- PINK - Temporary Survey Markings <br />- PURPLE - Slurry, irrigation and reclaimed water <br /> <br />* Questions about what happens next? Click the link below to find out <br />digging in Oregon: <br /> Dig Safely Oregon <br />* You can now download the Oregon APP for free through the APP St <br />Android! The Oregon APP also has additional information regarding <br />
The URL can be used to link to this page
Your browser does not support the video tag.