My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Open Record Materials #1
>
OnTrack
>
Z
>
2022
>
Z 22-1
>
Open Record Materials #1
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/27/2022 9:15:49 AM
Creation date
4/26/2022 2:28:50 PM
Metadata
Fields
Template:
PDD_Planning_Development
File Type
Z
File Year
22
File Sequence Number
1
Application Name
CORNERSTONE COMMUNITY HOUSING
Document Type
Public Testimony
Document_Date
4/20/2022
External View
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
93
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Rehabilitation Feasibility: The applicant provides a report from Meritus Consulting which is a historic <br />redevelopment firm based in Portland with over 25 years of company experience. The report provides <br />detailed analysis reaching the conclusion that it is not financially feasible to rehabilitate the Chase House. <br />Additionally, it is noted that Cornerstone Housing is willing to sell the building to anyone for $1 to anyone <br />who can move it offsite prior to groundbreaking on new development. <br />Construction Economic Impact: The report from Meili Construction estimates that construction costs for <br />the affordable housing project will be about $25 Million and occur over a 16-month timeframe during <br />which about 450 workers will be employed. The applicant goes on to note that costs included in the <br />budget will include contracts with locally based design professionals and consultants. <br />Community Benefit Statement: The Cornerstone letter explains that the new construction would provide <br />housing for approximately 379 residents which will include seniors, children, and survivors of domestic <br />violence. The letter also notes that the property will remain affordable to households earning less than <br />60% of the Area Median Income for at least 60 years. <br />The Board finds that the information provided by the applicant demonstrates the economic benefit of <br />allowing the demolition of the Harry and Etta Chase House. <br />Factor 7: Design or construction rarity <br />The applicant states that the Chase House does not possess design or construction rarity. In support of <br />their statement they quote the Heritage Consulting report as follows, "the house may be 'of the style' <br />but only marginally representative. During his era, fostered in part by mail-order kits from Sears, <br />Roebuck, and Montgomery Ward, the bungalow was the dominant style across the county. That said, <br />the Harry and Etta Chase House is not a rarity in Eugene as the construction typology is prevalent in the <br />area with other examples being of a less vernacular design." <br />Carter states that while the Chase house may not be a rarity, its significance is not derived from its <br />individual design or history, but rather from its contribution to the overall grouping. <br />The Board finds that the evidence provided by the applicant demonstrates that the Harry and Etta Chase <br />House does not have design or construction rarity which would require its preservation when <br />considering other factors. <br />Factor 8: Consistency with and consideration of other policy objectives <br />in the acknowledged <br />comprehensive plan <br />The Envision Eugene Comprehensive Plan is the adopted and acknowledged comprehensive plan for the <br />City of Eugene. The plan specifically notes that policies in the Metro Plan and/or refinement plans may <br />be applicable as approval criteria for land use applications (page 1-3 of the Envision Eugene <br />Comprehensive Plan). In the context of the above factor, the Metro Plan and the Willakenzie Area Plan <br />are the adopted plans with policy objectives to which consistency must be ensured. <br />The applicant begins by providing a list of seven policies from the Residential Element of the Eugene- <br />Springfield Metropolitan Area General Plan (Metro Plan) (which is a component of the City's <br />Final Order: The Harry and Etta Chase House I HDM 21-1/ HA 21-3/ ARB 21-2
The URL can be used to link to this page
Your browser does not support the video tag.