DRAFT WILLAMETTE RIVER GREENWAY DESIGN PLAN A <br />APPENDIX C. 2018 WILLAMETTE RIVERFRONT ACCESS STUDY SYSTEM MAP <br />Figure ES-1. System-wide Concept Plan <br />rIAP, KEY V F~ 14CA,T1O <br />.ems, <br />.,r 1&n! <br />e vii IF _ <br />~ ~ c u7'r~ <br />~.•Me A <br />..l~ATAr'i3G~ <br />k 7 <br />a.frMnir, <br />w <br />•n mm <br />A <br />r Erkcx EQMDM <br />~ <br />0 ' <br />0 <br />" ii0m <br /> <br />• o-.RW <br />- G <br />a <br />1104 <br />CAME RCN <br />SYSTEM .P <br />WILLAMETTE R IVERFRONT ACCESS STUDY <br />rry,~ 0 <br />I Inch = O.S mails <br />0 0.25. 0.5 1 .rni F <br />Willamette Riverfront Access Study <br />DRAFT Final Report. 2018 ES3 <br />WILLAMETTE RIVER GREENWAY CODE AMENDMENTS -Y 0 FUC1L t, 52 <br />