DRAFT WILLAMETTE RIVER GREENWAY DESIGN PLAN <br />Map 2.1 Field Investigation Map <br />9 <br />Test Site: <br />W1 Hatton <br />- i - I <br />i <br />1 - <br />,J <br />a <br />Willamette River Greenway Base Map <br /> - WILLAMETTE RIVER GREENWAY CODE AMENDMENTS - <br />Legend <br />O UGB <br />TOB <br />100ft Setback <br />WRG Boundary <br />City Limits <br />Bikeways <br />AG <br />C-1 <br />C-2 <br />C-3 <br />E-1 <br />E-2 <br />GO <br />1-2 <br />1-3 <br />NR <br />PL <br />PRO <br />R-1 <br />R-1.5 <br />R-2 <br />R-3 <br />R-4 <br />S-H <br />SAZ <br />N <br />A 0 75 150 300 Ft <br />45 <br />